CN212226204U - Device convenient for assembling large cement pipe - Google Patents

Device convenient for assembling large cement pipe Download PDF

Info

Publication number
CN212226204U
CN212226204U CN202020691331.5U CN202020691331U CN212226204U CN 212226204 U CN212226204 U CN 212226204U CN 202020691331 U CN202020691331 U CN 202020691331U CN 212226204 U CN212226204 U CN 212226204U
Authority
CN
China
Prior art keywords
cement pipe
plate
screw rod
positioning frame
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020691331.5U
Other languages
Chinese (zh)
Inventor
吴太锋
潘祖兴
胡裕成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhijiang Exi Cement Products Co ltd
Original Assignee
Zhijiang Exi Cement Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhijiang Exi Cement Products Co ltd filed Critical Zhijiang Exi Cement Products Co ltd
Priority to CN202020691331.5U priority Critical patent/CN212226204U/en
Application granted granted Critical
Publication of CN212226204U publication Critical patent/CN212226204U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A device convenient for assembling large cement pipes comprises a positioning frame, wherein the opening distance of the positioning frame is smaller than the diameter of a first cement pipe, side rollers are arranged at two ends of the positioning frame, a top roller is arranged in the middle of the positioning frame, a fixing plate is arranged above the side rollers, an adjusting plate is arranged on one side of the fixing plate and connected with the positioning frame through a pull rod, the fixing plate is in threaded connection with the positioning frame, the pull rod is in threaded connection with the positioning frame, a top guide frame is arranged on one side of the top roller, the fixing plate is fixed on the outer surface of the first cement pipe after installation, the adjusting plate is fixed on the outer surface of a second cement pipe, two water-saving cement pipes are butted through the pull rod, the connecting positions of the first cement pipe and the second cement pipe are quickly positioned and aligned, the pull rod is controlled to pull the second cement pipe to the first cement pipe for butting, manpower is saved, the application is wide.

Description

Device convenient for assembling large cement pipe
Technical Field
The utility model belongs to the technical field of hollow cement pipe construction and specifically relates to a be convenient for assemble large-scale cement pipe device is related to.
Background
In municipal and highway engineering, cement pipes are required to be laid underground for circulating rainwater and sewage. In the existing construction mode, for example, a socket cement pipe is laid, a trench of the cement pipe is dug underground, then the cement pipe is hoisted at two points by a chain block, the position of the cement pipe is adjusted, the cement pipe is slowly placed in the trench, then a tensioning tool is used for axially drawing the two adjacent cement pipes close to each other, and the height of the cement pipes is adjusted to enable sockets of the cement pipes to be in butt joint. By adopting the above mode, when installing large-scale cement pipe, it is more to occupy the manual work, and the installation rate is slow moreover, and the butt joint quality reduces, often has the bad condition of cement pipeline butt joint, leads to sewage from cement pipe seam crossing seepage to soil, and serious polluted environment has the risk that the cement pipe drops simultaneously, causes the result of thing destruction casualties easily.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a be convenient for assemble large-scale cement pipe device, the installation rate of being under construction when solving the large-scale cement pipe of installation is slow, and the butt joint quality reduces, often has the bad problem of cement pipeline butt joint.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is: a device convenient for assembling a large cement pipe comprises a positioning frame, wherein the opening distance of the positioning frame is smaller than the diameter of a first cement pipe, side rollers are arranged at two ends of the positioning frame, a top roller is arranged in the middle of the positioning frame, a fixing plate is arranged above the side rollers, an adjusting plate is arranged on one side of the fixing plate and connected with the positioning frame through a pull rod, the fixing plate is in threaded connection with the positioning frame, the pull rod is in threaded connection with the positioning frame, and a top guide frame is arranged on one side of the top roller;
the fixed plate is fixed on the outer surface of the first cement pipe after installation, the adjusting plate is fixed on the outer surface of the second cement pipe, and the two water-saving cement pipes are butted through the pull rod.
In a preferred scheme, the fixing plate comprises a fixing screw rod, the fixing screw rod is in threaded connection with the positioning frame, a second rotating handle is arranged at the end part of the fixing screw rod, and the fixing screw rod is in rotating connection with the fixing plate.
In the preferred scheme, the fixed plate is laminated with the surface of the cement pipe, and rubber is arranged between the fixed plate and the first cement pipe.
In the preferred scheme, the pull rod tip is equipped with the mounting panel, and the regulating plate includes end plate and first screw rod, first screw rod and mounting panel threaded connection, and first screw rod rotates with the end plate to be connected, first screw rod tip is equipped with first rotation handle.
In the preferred scheme, the other end of the first screw is provided with a rotating disc, the end plate is provided with a rotating seat, and the rotating disc is arranged inside the rotating seat.
Preferably, a sliding ball is arranged between the rotating disc and the rotating seat.
In the preferred scheme, the end plate is laminated with the second cement pipe surface, the end plate terminal surface is equipped with rubber.
In the preferred scheme, the pull rod includes the guide bar, the mounting panel is connected with the guide bar, be equipped with the regulating block on the locating rack, guide bar and regulating block sliding connection.
In the preferred scheme, one side of the guide rod is provided with a second screw rod, the second screw rod is in threaded connection with the adjusting block, one end of the second screw rod is rotatably connected with the mounting plate, and the other end of the second screw rod is provided with a third rotating handle.
In a preferable scheme, the top guide frame comprises a guide wheel and a positioning wheel, and the guide wheel is higher than the positioning wheel in the horizontal position;
handles are arranged on two sides of the positioning frame.
The utility model provides a be convenient for assemble large-scale cement pipe device, adopt the locating rack of surrounding structure, the locating rack is installed on first cement pipe, when installing second cement pipe, it is fixed with the locating rack through the fixed plate earlier, slowly hoist and mount second cement pipe to first cement pipe position, the regulating plate through the locating rack both sides is fixed a position, make first cement pipe and second cement pipe hookup location align, then the control pull rod draws second cement pipe to first cement pipe closely, the butt joint, use manpower sparingly, the butt joint is convenient, and convenient to use, easy operation is efficient, use extensively.
Drawings
The invention will be further explained with reference to the following figures and examples:
FIG. 1 is a construction structure diagram of the present invention;
FIG. 2 is a front view structural diagram of the present invention;
FIG. 3 is a left view structural diagram of the positioning frame of the present invention installed on a cement pipe;
FIG. 4 is a general block diagram of the present invention;
FIG. 5 is a left side view of the structure of the present invention;
FIG. 6 is an enlarged view of the structure of the present invention;
FIG. 7 is a drawing of the structure of the pull rod of the present invention;
FIG. 8 is a structural view of the adjusting plate of the present invention;
in the figure: a first cement pipe 1; a second cement pipe 101; hoisting the lifting appliance 2; a positioning frame 3; a side roller 301; a top roller 302; an adjusting block 303; a top guide frame 4; a guide wheel 401; a positioning wheel 402; an adjusting plate 5; a first rotating handle 501; a first screw 502; an end plate 503; a rotating base 504; a rotating disk 505; a mounting plate 6; a fixed plate 7; a fixed screw 701; a second rotating handle 702; a pull rod 8; a third rotating handle 801; a guide rod 802; a second screw 803; a handle 9; rubber 10.
Detailed Description
As shown in fig. 1-8, a be convenient for assemble large-scale cement pipe device, including locating rack 3, 3 opening distances of locating rack are less than first cement pipe 1 diameter, 3 both ends of locating rack are equipped with side gyro wheel 301, and the middle part is equipped with top gyro wheel 302, side gyro wheel 301 top is equipped with fixed plate 7, and fixed plate 7 one side is equipped with regulating plate 5, and regulating plate 5 passes through pull rod 8 and is connected with locating rack 3, fixed plate 7 and 3 threaded connection of locating rack, pull rod 8 and 3 threaded connection of locating rack, top gyro wheel 302 one side are equipped with top leading truck 4, and fixed plate 7 is fixed at the first cement pipe 1 surface that the installation finishes, and regulating plate 5 is fixed at second cement pipe 101 surface, makes two water conservation mud pipes 1 butt joints through pull rod 8. From this structure, as shown in fig. 1-3, the locating rack 3 is installed on first cement pipe 1, when installing second cement pipe 101, fix locating rack 3 through fixed plate 7 earlier, slowly hoist second cement pipe 101 to first cement pipe 1 position, fix a position through regulating plate 5 of locating rack 3 both sides, make first cement pipe 1 and second cement pipe 101 hookup location align, then control pull rod 8 with second cement pipe 101 draw close to on first cement pipe 1, carry out the butt joint.
As shown in the structure of FIG. 3, the positioning frame 3 adopts a surrounding structure, and the opening distance of the positioning frame 3 is smaller than the diameter of the first cement pipe 1.
In a preferable scheme, the fixing plate 7 includes a fixing screw 701, the fixing screw 701 is in threaded connection with the positioning frame 3, a second rotating handle 702 is arranged at an end of the fixing screw 701, and the fixing screw 701 is rotatably connected with the fixing plate 7. With the structure, the fixing plate 7 is mainly used for fixing the positioning frame 3, and the second rotating handle 702 is rotated to enable the fixing screw 701 to rotate to push the fixing plate 7 to abut against the surface of the first cement pipe 1.
In a preferable scheme, the fixing plate 7 is attached to the surface of the cement pipe 1, and rubber 10 is arranged between the fixing plate 7 and the first cement pipe 1. With this structure, the rubber 10 increases the friction between the fixing plate 7 and the cement pipe 1, and the positioning is more stable.
In a preferable scheme, the end portion of the pull rod 8 is provided with a mounting plate 6, the adjusting plate 5 comprises an end plate 503 and a first screw 502, the first screw 502 is in threaded connection with the mounting plate 6, the first screw 502 is in rotational connection with the end plate 503, and the end portion of the first screw 502 is provided with a first rotating handle 501. From this structure, regulating plate 5 is used for the effect of location and fixed second cement pipe 101, when hoist and mount second cement pipe 101, second cement pipe 101 through hoist and mount hoist 2 when hanging with first cement pipe 1's interface position, in order to prevent that second cement pipe 101 from rocking about, supports regulating plate 5 with locating rack 3 both sides and leans on second cement pipe 101 terminal surface, utilizes pull rod 8 to stimulate, docks.
Preferably, a rotating disc 505 is arranged at the other end of the first screw 502, a rotating base 504 is arranged on the end plate 503, and the rotating disc 505 is arranged inside the rotating base 504. With this structure, the swivel plate 505 and the swivel base 504 are rotatably connected, and the end plate 503 does not rotate when the second cement pipe 101 is clamped.
Preferably, a sliding ball is disposed between the rotating disc 505 and the rotating base 504. With this structure, the sliding ball makes the rotational resistance lower.
In a preferable scheme, the end plate 503 is attached to the surface of the second cement pipe 101, and the end surface of the end plate 503 is provided with rubber 10. With this structure, the rubber 10 increases the frictional force between the end plate 503 and the second cement pipe 101.
In the preferred scheme, pull rod 8 includes guide bar 802, mounting panel 6 is connected with guide bar 802, be equipped with regulating block 303 on the locating rack 3, guide bar 802 and regulating block 303 sliding connection. With this structure, the guide bar 802 functions to guide and support the adjusting plate 5.
In a preferable scheme, one side of the guide rod 802 is provided with a second screw 803, the second screw 803 is in threaded connection with the adjusting block 303, one end of the second screw 803 is rotatably connected with the mounting plate 6, and the other end of the second screw is provided with a third rotating handle 801. With this structure, the second screw 803 functions to control the pull rod 8 to slide left and right, thereby pulling the second cement pipe 101.
In a preferred scheme, the top guide frame 4 comprises a guide wheel 401 and a positioning wheel 402, and the guide wheel 401 is higher than the positioning wheel 402 in a horizontal position. With this structure, when the second cement pipe 101 is hoisted to the first cement pipe 1 by the hoisting hoist 2, the second cement pipe 101 is positioned by first guiding the upper position by the guide wheel 401 at the high position and then positioning the upper direction by the positioning wheel 402.
Handles 9 are arranged on two sides of the positioning frame 3. With this structure, the handle 9 is used to slide the entire positioning frame 3.
The above-mentioned embodiments are merely preferred embodiments of the present invention, and should not be considered as limitations of the present invention, and the protection scope of the present invention should be defined by the technical solutions described in the claims, and includes equivalent alternatives of technical features in the technical solutions described in the claims. Namely, equivalent alterations and modifications within the scope of the invention are also within the scope of the invention.

Claims (10)

1. The utility model provides a be convenient for assemble large-scale cement pipe device, characterized by: the cement pipe positioning device comprises a positioning frame (3), wherein the opening distance of the positioning frame (3) is smaller than the diameter of a first cement pipe (1), side rollers (301) are arranged at two ends of the positioning frame (3), a top roller (302) is arranged in the middle of the positioning frame, a fixing plate (7) is arranged above the side rollers (301), an adjusting plate (5) is arranged on one side of the fixing plate (7), the adjusting plate (5) is connected with the positioning frame (3) through a pull rod (8), the fixing plate (7) is in threaded connection with the positioning frame (3), the pull rod (8) is in threaded connection with the positioning frame (3), and a top guide frame (4) is arranged on one side of the top roller (302;
the fixing plate (7) is fixed on the outer surface of the first cement pipe (1) after installation, the adjusting plate (5) is fixed on the outer surface of the second cement pipe (101), and the two water-saving cement pipes (1) are butted through the pull rod (8).
2. The apparatus for assembling large cement pipe according to claim 1, wherein: the fixing plate (7) comprises a fixing screw rod (701), the fixing screw rod (701) is in threaded connection with the positioning frame (3), a second rotating handle (702) is arranged at the end of the fixing screw rod (701), and the fixing screw rod (701) is rotationally connected with the fixing plate (7).
3. The apparatus for assembling large cement pipe according to claim 2, wherein: the fixed plate (7) is attached to the surface of the cement pipe (1), and rubber (10) is arranged between the fixed plate (7) and the first cement pipe (1).
4. The apparatus for assembling large cement pipe according to claim 1, wherein: pull rod (8) tip is equipped with mounting panel (6), and regulating plate (5) include end plate (503) and first screw rod (502), and first screw rod (502) and mounting panel (6) threaded connection, first screw rod (502) rotate with end plate (503) and are connected, first screw rod (502) tip is equipped with first rotation handle (501).
5. The apparatus for assembling large cement pipe according to claim 4, wherein: the other end of the first screw rod (502) is provided with a rotating disc (505), the end plate (503) is provided with a rotating base (504), and the rotating disc (505) is arranged inside the rotating base (504).
6. The apparatus for assembling large cement pipe according to claim 5, wherein: sliding balls are arranged between the rotating disc (505) and the rotating base (504).
7. The apparatus for assembling large cement pipe as claimed in claim 5, wherein: the end plate (503) is attached to the surface of the second cement pipe (101), and rubber (10) is arranged on the end face of the end plate (503).
8. The apparatus for assembling large cement pipe according to claim 4, wherein: pull rod (8) include guide bar (802), mounting panel (6) are connected with guide bar (802), be equipped with regulating block (303) on locating rack (3), guide bar (802) and regulating block (303) sliding connection.
9. The apparatus for facilitating assembly of large cement pipes according to claim 8, wherein: one side of the guide rod (802) is provided with a second screw rod (803), the second screw rod (803) is in threaded connection with the adjusting block (303), one end of the second screw rod (803) is rotatably connected with the mounting plate (6), and the other end of the second screw rod is provided with a third rotating handle (801).
10. The apparatus for assembling large cement pipe according to claim 1, wherein: the top guide frame (4) comprises a guide wheel (401) and a positioning wheel (402), and the guide wheel (401) is higher than the horizontal position of the positioning wheel (402);
handles (9) are arranged on two sides of the positioning frame (3).
CN202020691331.5U 2020-04-29 2020-04-29 Device convenient for assembling large cement pipe Active CN212226204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020691331.5U CN212226204U (en) 2020-04-29 2020-04-29 Device convenient for assembling large cement pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020691331.5U CN212226204U (en) 2020-04-29 2020-04-29 Device convenient for assembling large cement pipe

Publications (1)

Publication Number Publication Date
CN212226204U true CN212226204U (en) 2020-12-25

Family

ID=73909439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020691331.5U Active CN212226204U (en) 2020-04-29 2020-04-29 Device convenient for assembling large cement pipe

Country Status (1)

Country Link
CN (1) CN212226204U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113063032A (en) * 2021-02-06 2021-07-02 浙江水利水电学院 Pipeline construction method for ecological wetland

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113063032A (en) * 2021-02-06 2021-07-02 浙江水利水电学院 Pipeline construction method for ecological wetland
CN113063032B (en) * 2021-02-06 2022-05-24 浙江水利水电学院 Pipeline construction method for ecological wetland

Similar Documents

Publication Publication Date Title
CN212226204U (en) Device convenient for assembling large cement pipe
CN111733948A (en) Pipeline laying device and construction method thereof
CN213929689U (en) Municipal administration cement pipe installation is with butt joint bracket
CN213290083U (en) Positioning support for pipe joint installation
CN116658679A (en) Buried pipeline construction device and construction method for municipal wastewater treatment
CN212775954U (en) Fire-fighting pipeline fixing device for fire engineering
CN211313484U (en) Pipeline lifting device for building installation
CN113089803A (en) A drainage pipe connection auxiliary device for municipal works road water supply and drainage
CN219293907U (en) Pipeline positioning device for hydraulic engineering
CN212226200U (en) Cement pipe end base butt joint device
CN217736496U (en) Pipeline fixing device is used in municipal administration plumbing construction
CN217653378U (en) Pipeline construction equipment that municipal works were used
CN214090680U (en) Electric stair for evacuation of comprehensive pipe rack
CN112197098A (en) Municipal sewer pipeline repairing equipment and repairing method and preparation method thereof
CN219242800U (en) Pipeline lifting equipment for underground pipe network construction
CN219554436U (en) Device for cable laying at four-way part of bridge
CN217168792U (en) Perforating device of HDPE double-walled bellows
CN217580269U (en) Pipeline earth retaining device that digs for hydraulic engineering
CN211220430U (en) Natural gas pipeline mounting structure
CN211940656U (en) Supporting and moving device for quickly installing pipeline
CN219825182U (en) Foundation reinforcing structure
CN216664406U (en) Pipeline supporting and positioning device for municipal drainage engineering construction
CN216666672U (en) Municipal works auxiliary device
CN221196373U (en) Hydraulic engineering pipeline bracket
CN218813826U (en) Basement bottom plate stagnant water sleeve pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Easy to assemble large cement pipe unit

Effective date of registration: 20221017

Granted publication date: 20201225

Pledgee: Hubei Zhijiang Rural Commercial Bank Co.,Ltd.

Pledgor: ZHIJIANG EXI CEMENT PRODUCTS CO.,LTD.

Registration number: Y2022980018490