CN212200756U CN202020642218.8U CN202020642218U CN212200756U CN 212200756 U CN212200756 U CN 212200756U CN 202020642218 U CN202020642218 U CN 202020642218U CN 212200756 U CN212200756 U CN 212200756U
Authority
CN
China
Prior art keywords
precast beam
precast
column
square
fixed mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020642218.8U
Other languages
Chinese (zh)
Inventor
屈志明
盛伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Fenglin Weiye Construction Engineering Co ltd
Original Assignee
Jiangsu Saishunqi Green Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Saishunqi Green Building Technology Co ltd filed Critical Jiangsu Saishunqi Green Building Technology Co ltd
Priority to CN202020642218.8U priority Critical patent/CN212200756U/en
Application granted granted Critical
Publication of CN212200756U publication Critical patent/CN212200756U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses an assembled antidetonation precast beam convenient to construction, including precast column one, the right side fixed mounting of precast column one has precast beam one, the right-hand member fixed mounting of precast beam one has precast beam two, the right side fixed mounting of precast beam two has precast column two, the lower extreme fixed mounting of precast beam one and precast beam two has the fixed column, the top fixedly connected with set-square one of precast beam one and precast beam two, the below of precast beam one and precast beam two is provided with set-square two, just the outside fixed mounting of set-square one and set-square two has stiffening rib, and set-square one and set-square two pass through fixed block one and install on precast column one and precast column two. This assembled antidetonation precast beam convenient to construction, stability can be good, and the installation is dismantled conveniently, can play shock-resistant effect, has guaranteed construction environment's security to prevent that personnel are injured, do not influence the construction progress.

Description

Assembled antidetonation precast beam convenient to construction
Technical Field
The utility model relates to a construction technical field specifically is an assembled antidetonation precast beam convenient to construction.
Background
The prefabricated beam is prefabricated in a factory and then is transported to a construction site to be installed and fixed according to the design requirement, wherein the prefabricated beam comprises an assembly type prefabricated beam, and the assembly type prefabricated beam is an important object in the history of buildings, so that the building industrialization technology integration level is improved.
However, most of prefabricated beams are complicated in construction, construction is not convenient, the anti-seismic performance is not good, the stability is poor, collapse is easy to occur in the construction process, and accordingly constructors are injured and the construction progress is further influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled antidetonation precast beam convenient to construction to propose in solving above-mentioned background art all relatively more loaded down with trivial details in the construction, be not convenient for very much construct, anti-seismic performance is not fine moreover, and stability can be relatively poor, takes place to collapse easily at the in-process of construction, thereby leads to constructor injured, further influences the problem of construction progress.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an assembled antidetonation precast beam convenient to construction, includes precast column one, the right side fixed mounting of precast column one has precast beam one, the right-hand member fixed mounting of precast beam one has precast beam two, the right side fixed mounting of precast beam two has precast column two, the lower extreme fixed mounting of precast beam one and precast beam two has the fixed column, the top fixedly connected with set-square one of precast beam one and precast beam two, the below of precast beam one and precast beam two is provided with set-square two, just the outside fixed mounting of set-square one and set-square two has stiffening rib, and set-square one and set-square two pass through fixed block one and install on precast column one and precast column two.
Preferably, the upper end of the second triangular plate is provided with a groove, the bottom of the groove is provided with a rubber pad, the outer side of the groove is provided with a spring, and the spring is fixedly installed at the upper end of the second triangular plate.
Preferably, the connecting ribs are arranged inside the first precast beam, the connecting grooves are formed inside the second precast beam, the first connecting holes are formed in the upper side and the lower side of the first precast beam and the upper side and the lower side of the second precast beam, and the anti-cracking plates are arranged at the upper ends of the first precast beam and the second precast beam.
Preferably, a second connecting hole is formed in the surface of the anti-cracking plate, a second fixing block is arranged inside the second connecting hole, and the fixing block extends downwards into the first connecting hole.
Preferably, the fixing column is arranged on the inner side of the groove, and the diameter of the fixing column is equal to the inner diameter of the groove.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the fabricated anti-seismic precast beam convenient for construction is provided with the precast beam I and the precast beam II, and meanwhile, the precast beam I and the precast beam II are connected with each other through the anti-cracking plate and the connecting rib and are fixed through the fixing block II, so that the fabricated anti-seismic precast beam is better in stability and convenient to install and disassemble;
2. according to the fabricated anti-seismic precast beam convenient for construction, the upper end and the lower end of the precast beam I and the upper end and the lower end of the precast beam II are fixed on the precast column I and the precast column II through the triangular plate I and the triangular plate II, and the outer sides of the triangular plate I and the triangular plate II are provided with the stiffening ribs, so that the positions of the precast beam I and the precast beam II can be more stable;
3. this assembled antidetonation precast beam convenient to construction has set up the recess in the upper end of set-square two, can firmly fix precast beam one and precast beam two on set-square two, still is provided with the spring in the upper end of set-square two simultaneously, has set up the rubber pad in the inside of recess, can play shock-resistant effect, has guaranteed construction environment's security to prevent that personnel are injured, do not influence the construction progress.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
FIG. 3 is a schematic perspective view of a precast beam according to the present invention;
FIG. 4 is a schematic view of a second cross-sectional structure of the precast beam of the present invention;
fig. 5 is a schematic diagram of the structure of the anti-cracking plate of the present invention;
fig. 6 is a schematic view of a second structure of the set square of the present invention.
In the figure: 1. prefabricating a first column; 2. prefabricating a first beam; 3. prefabricating a second beam; 4. prefabricating a second column; 5. fixing a column; 6. a first set square; 7. a second set square; 8. a stiffening rib; 9. a first fixed block; 10. a groove; 11. a rubber pad; 12. a spring; 13. connecting ribs; 14. connecting grooves; 15. a first connecting hole; 16. an anti-cracking plate; 17. a second connecting hole; 18. and a second fixing block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: an assembled anti-seismic precast beam convenient for construction comprises a precast column I1, a precast beam I2, a precast beam II 3, a precast column II 4, a fixed column 5, a triangular plate I6, a triangular plate II 7, a stiffening rib 8, a fixed block I9, a groove 10, a rubber pad 11, a spring 12, a connecting rib 13, a connecting groove 14, a connecting hole I15, an anti-cracking plate 16, a connecting hole II 17 and a fixed block II 18, wherein the precast beam I2 is fixedly installed on the right side of the precast column I1, the precast beam II 3 is fixedly installed at the right end of the precast beam I2, the precast column II 4 is fixedly installed on the right side of the precast beam II 3, the fixed column 5 is fixedly installed at the lower ends of the precast beam I2 and the precast beam II 3, the triangular plate I6 is fixedly connected above the precast beam I2 and the precast beam II 3, the triangular plate II 7 is arranged below the precast beam I2 and the precast beam II 3, and the stiffening rib 8 is fixedly installed on the outer, and the first set square 6 and the second set square 7 are installed on the first prefabricated column 1 and the second prefabricated column 4 through the first fixing block 9.
Furthermore, the upper end of the second triangular plate 7 is provided with a groove 10, the bottom of the groove 10 is provided with a rubber pad 11, the outer side of the groove 10 is provided with a spring 12, and the spring 12 is fixedly installed at the upper end of the second triangular plate 7, so that an anti-seismic effect can be achieved, the second triangular plate cannot collapse due to vibration in the construction process, and the safety of the construction environment is guaranteed.
Furthermore, the connecting ribs 13 are arranged inside the first precast beam 2, the connecting grooves 14 are formed inside the second precast beam 3, the connecting holes 15 are formed in the upper side and the lower side of the first precast beam 2 and the upper side and the lower side of the second precast beam 3, and the anti-cracking plates 16 are arranged at the upper ends of the first precast beam 2 and the second precast beam 3, so that the first precast beam 2 and the second precast beam 3 can be connected together more firmly and cannot fall off during construction.
Furthermore, a second connecting hole 17 is formed in the surface of the anti-cracking plate 16, a second fixing block 18 is arranged inside the second connecting hole 17, the second fixing block 18 extends downwards into the first connecting hole 15, the first precast beam 2 and the second precast beam 3 are further fixed, and stability of the precast beam is guaranteed.
Further, the fixing column 5 is arranged on the inner side of the groove 10, the diameter of the fixing column 5 is equal to the inner diameter of the groove 10, and the first precast beam 2 and the second precast beam 3 are well fixed on the second set square 7.
The working principle is as follows: firstly, a first precast beam 2 is fixedly installed on the right side of a first precast column 1, a second precast beam 3 is fixedly installed on the right end of the first precast beam 2, a second precast column 4 is fixedly installed on the right side of the second precast beam 3, a fixing column 5 is fixedly installed at the lower ends of the first precast beam 2 and the second precast beam 3, a first triangular plate 6 is fixedly connected above the first precast beam 2 and the second precast beam 3, a second triangular plate 7 is arranged below the first precast beam 2 and the second precast beam 3, stiffening ribs 8 are fixedly installed on the outer sides of the first triangular plate 6 and the second triangular plate 7, the first triangular plate 6 and the second triangular plate 7 are installed on the first precast column 1 and the second precast column 4 through a first fixing block 9, the first precast beam 2 and the second precast beam 3 are connected with each other through an anti-cracking plate 16 and a connecting rib 13 and are fixed through a second fixing block 18, so that the first precast beam 2 and the second precast beam 3 have better stability and are convenient to install and disassemble, the stiffening ribs, the position that can stabilize precast beam one 2 and precast beam two 3 more has set up recess 10 in the upper end of set square two 7, can firmly fix precast beam one 2 and precast beam two 3 on set square two 7, still is provided with spring 12 in the upper end of set square two 7 simultaneously, has set up rubber pad 11 in the inside of recess 10, can play shock-resistant effect, has guaranteed construction environment's security to prevent that personnel from being injured, do not influence the construction progress.
It should be finally noted that the above only serves to illustrate the technical solution of the present invention, and not to limit the scope of the present invention, and that simple modifications or equivalent replacements performed by those skilled in the art to the technical solution of the present invention do not depart from the spirit and scope of the technical solution of the present invention.

Claims (5)

1. The utility model provides an assembled antidetonation precast beam convenient to construction, includes prefabricated post one, its characterized in that: the right side fixed mounting of precast column one has precast beam one, the right-hand member fixed mounting of precast beam one has precast beam two, the right side fixed mounting of precast beam two has precast column two, the lower extreme fixed mounting of precast beam one and precast beam two has the fixed column, the top fixedly connected with set-square one of precast beam one and precast beam two, the below of precast beam one and precast beam two is provided with set-square two, just the outside fixed mounting of set-square one and set-square two has stiffening rib, and set-square one and set-square two pass through fixed block one and install on precast column one and precast column two.
2. The fabricated earthquake-resistant precast beam convenient to construct according to claim 1, wherein: the upper end of the second triangular plate is provided with a groove, the bottom of the groove is provided with a rubber pad, the outer side of the groove is provided with a spring, and the spring is fixedly installed at the upper end of the second triangular plate.
3. The fabricated earthquake-resistant precast beam convenient to construct according to claim 1, wherein: the prefabricated beam I is provided with connecting ribs inside, the prefabricated beam II is provided with connecting grooves inside, the upper side and the lower side of the prefabricated beam I and the prefabricated beam II are provided with connecting holes I, and the upper ends of the prefabricated beam I and the prefabricated beam II are provided with anti-cracking plates.
4. The fabricated earthquake-resistant precast beam convenient to construct according to claim 3, wherein: and a second connecting hole is formed in the surface of the anti-cracking plate, a second fixing block is arranged inside the second connecting hole, and the fixing block extends downwards into the first connecting hole.
5. The fabricated earthquake-resistant precast beam convenient to construct according to claim 1, wherein: the fixed column sets up the inboard at the recess, and the diameter of fixed column equals the internal diameter of recess.
CN202020642218.8U 2020-04-25 2020-04-25 Assembled antidetonation precast beam convenient to construction Active CN212200756U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020642218.8U CN212200756U (en) 2020-04-25 2020-04-25 Assembled antidetonation precast beam convenient to construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020642218.8U CN212200756U (en) 2020-04-25 2020-04-25 Assembled antidetonation precast beam convenient to construction

Publications (1)

Publication Number Publication Date
CN212200756U true CN212200756U (en) 2020-12-22

Family

ID=73827425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020642218.8U Active CN212200756U (en) 2020-04-25 2020-04-25 Assembled antidetonation precast beam convenient to construction

Country Status (1)

Country Link
CN (1) CN212200756U (en)

Similar Documents

Publication Publication Date Title
CN210887574U (en) Novel dry-type connected node of assembled concrete beam column
CN212200756U (en) Assembled antidetonation precast beam convenient to construction
CN208650258U (en) A kind of outer hoop assembled connecting node for the light steel increasing layer mixed structure of RC-
CN210976071U (en) Connection node of assembled concrete beam column
CN210369418U (en) Assembled damping assembly wall for building
CN216196889U (en) Assembled steel structure frame and assembled steel structure house
CN206090822U (en) Concrete supporting frame and assembled concrete wall
CN214784945U (en) Prefabricated reinforced concrete column foundation swinging energy dissipation node with fan-shaped damping device
CN211850044U (en) Adjustable supporting device for splicing building assembly type beam column nodes
CN213114993U (en) Stable supporting structure for coal shed
CN214246607U (en) Building aluminum alloy balcony template convenient to assemble
CN210049632U (en) Shear force wall reinforced structure
CN110616851A (en) Floor system device with beam and provided with flat support column cap and construction method of floor system device
CN219973482U (en) Steel construction node assembled structure
CN215802771U (en) Assembled building stair with shock-absorbing function
CN211257281U (en) Main structure of assembly building with light steel corner nodes
CN215330758U (en) Spliced curtain wall for building
CN217711637U (en) Supporting structure of attached intelligent climbing frame
CN213868549U (en) Multifunctional assembled component
CN221168259U (en) Wall corner structure of assembled steel-concrete house
CN205242997U (en) Concrete superstructure polyphenyl template mounting structure
CN217232227U (en) Wind-resistant and earthquake-resistant light steel keel building house
CN211714314U (en) Supporting mechanism for prefabricated concrete slab
CN214364065U (en) Assembled steel construction building turning beam column connecting piece
CN215520103U (en) Plate column-shear wall structure building based on prefabricated reinforced concrete hollow template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230417

Address after: Room A-8455, Building 3, No. 20 Yong'an Road, Shilong Economic Development Zone, Mentougou District, Beijing, 102300 (cluster registration)

Patentee after: Beijing Fenglin Weiye Construction Engineering Co.,Ltd.

Address before: 215000 Yushan Town Xinhong village, Changshu City, Suzhou City, Jiangsu Province

Patentee before: Jiangsu saishunqi Green Building Technology Co.,Ltd.

TR01 Transfer of patent right