CN212145691U - Production line of composite PE pipe of plastic steel winding pipe - Google Patents

Production line of composite PE pipe of plastic steel winding pipe Download PDF

Info

Publication number
CN212145691U
CN212145691U CN202020765273.6U CN202020765273U CN212145691U CN 212145691 U CN212145691 U CN 212145691U CN 202020765273 U CN202020765273 U CN 202020765273U CN 212145691 U CN212145691 U CN 212145691U
Authority
CN
China
Prior art keywords
pipe
production line
sets
sides
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020765273.6U
Other languages
Chinese (zh)
Inventor
寇刚伟
李鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Pingxing Pipe Products Co ltd
Original Assignee
Henan Pingxing Pipe Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Pingxing Pipe Products Co ltd filed Critical Henan Pingxing Pipe Products Co ltd
Priority to CN202020765273.6U priority Critical patent/CN212145691U/en
Application granted granted Critical
Publication of CN212145691U publication Critical patent/CN212145691U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)

Abstract

The utility model discloses a production line of a composite PE pipe of a plastic-steel winding pipe, which comprises a polishing platform, a supporting plate, two groups of protective covers and two groups of bearing frames which are parallel to each other, wherein the bottom surfaces of the supporting plate, the protective covers and the bearing frames are welded and fixed with the top wall of the polishing platform, a motor, a transmission shaft, a mounting plate and a grinding disc are arranged on the supporting plate, and two opposite sides of the two groups of protective covers are provided with slopes; and two sides of each group of the protective covers, which are positioned on one side of the slope, are provided with accommodating grooves, stretching rods and protective plates are accommodated in the accommodating grooves, and the top wall of each group of the bearing frame is provided with two groups of moving grooves which are symmetrically distributed on the two sides of the bearing frame. This production line of compound PE pipe of steel winding pipe through having set up slot, linking piece, screw and bolt, lift two sets of bolts on the mounting panel, can make mounting panel and mill separation to be convenient for change the mill, make this mechanism be convenient for polish different PE pipes, increased its application scope.

Description

Production line of composite PE pipe of plastic steel winding pipe
Technical Field
The utility model belongs to the technical field of the PE pipe, concretely relates to production line of compound PE pipe of plastic steel winding pipe.
Background
In the municipal pipe market in China, the plastic-steel winding pipe composite PE pipe is rapidly developing, the PE pipe, the PP-R pipe and the UPVC pipe all occupy the place, and the strong development of the PE pipe is compelling attention. The PE pipe has a wide range of fields of use, of which water supply pipes and gas pipes are the two largest application markets.
In a production line of a PE pipe of a plastic-steel winding pipe, one important mechanism is a mechanism for polishing the PE pipe, and the polishing mechanism polishes the end part of the PE pipe and smoothes the end part of the PE pipe. However, most of the polishing mechanisms on the production line can only polish one PE pipe, so that the application range is small.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a production line of compound PE pipe of plastic steel winding pipe to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a production line of a composite PE pipe of a plastic steel winding pipe comprises a polishing table, a supporting plate, two groups of protective covers and two groups of bearing frames which are parallel to each other, wherein the bottom surfaces of the supporting plate, the protective covers and the bearing frames are welded and fixed with the top wall of the polishing table;
every group the both sides that the protection casing is located slope place one side all opened and have accomodate the groove, and accomodate the inslot and hold tensile pole and guard plate, every group all opened two sets of symmetric distribution on the roof of accepting the frame at the shifting chute on its both sides, every group the shifting chute has all held telescopic link and slider, and is equipped with two sets of grip blocks that set up in opposite directions on accepting the frame, the inside wall of grip block is fixed to bond has the silica gel pad.
Preferably, the motor is welded and fixed with the side face of the supporting plate, the transmission shaft penetrates through the supporting plate and is in transmission connection with the motor, and one end, far away from the motor, of the transmission shaft is welded and fixed with the center of the side face of the mounting plate.
Preferably, the mounting panel is laminated with the mill mutually, the slot has all been opened on the both sides that the mounting panel is close to mill one side, and the mill is close to the both sides homogeneous integration of mounting panel one side and is connected with the piece that links up, link up all opened screw on piece and the slot, it is two sets of link up the piece and fix with the both sides installation of mounting panel respectively through two sets of bolts.
Preferably, two ends of the horizontally arranged stretching rod are respectively welded and fixed with the side surface of the protection plate and the inner side wall of the containing groove, and two opposite sides of the two groups of slopes are inclined downwards.
Preferably, two ends of the telescopic rod are respectively bonded and fixed with the inner side surface of the moving groove and the side surface of the sliding block, and a positioning angle integrally welded with the side part of the clamping plate is installed on the top wall of the sliding block.
Preferably, it has the row's material tank that runs through its roof and be located between two sets of protection covers to polish bench, mounting panel and mill are all established directly over row material tank.
The utility model discloses a technological effect and advantage: according to the production line of the steel winding pipe composite PE pipe, the mounting plate can be separated from the grinding disc by arranging the slots, the connecting blocks, the screw holes and the bolts and dismounting two groups of bolts on the mounting plate, so that the grinding disc is convenient to replace, different PE pipes can be conveniently ground by the mechanism, and the application range of the mechanism is enlarged; the PE pipe fixing mechanism is provided with the carrying frame, the moving groove, the telescopic rods, the sliding blocks and the clamping plates, so that the two groups of telescopic rods extend and drive the two groups of clamping plates to approach each other to fix the PE pipe; through having set up the protection casing, having accomodate the groove, tensile pole and guard plate, make two sets of tensile poles extensions on the protection casing and drive two sets of guard plates and remove to suitable position, can utilize two sets of protection casings and guard plate to play the effect of arresting clastic, make the piece can hardly splash outside the production line and influence the environment on every side.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the mounting plate and the grinding disc of the present invention;
FIG. 3 is a schematic structural view of the receiving frame of the present invention;
fig. 4 is a schematic structural view of the protective cover of the present invention.
In the figure: the device comprises a grinding table 1, a supporting plate 2, a protective cover 3, a bearing frame 4, a material discharging groove 5, a motor 6, a transmission shaft 7, an installation plate 8, a grinding disc 9, a slot 10, a connecting block 11, a screw hole 12, a bolt 13, a moving groove 14, a telescopic rod 15, a sliding block 16, a positioning angle 17, a clamping plate 18, a slope 19, a storage groove 20, a stretching rod 21 and a protection plate 22.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a production line of compound PE pipe of plastic steel winding pipe as shown in fig. 1-4, including polishing platform 1, backup pad 2, two sets of protection casing 3 and two sets of receiving frame 4 that are parallel to each other, the bottom surface of backup pad 2, protection casing 3 and receiving frame 4 all with polishing platform 1's roof welded fastening, install motor 6, transmission shaft 7, mounting panel 8 and mill 9 on backup pad 2, two sets of both sides that the protection casing 3 is opposite are all opened slope 19, set up slope 19 and help making the piece better lead to the blow-off groove 5 in, make the piece hardly remain in slope 19, the contained angle of slope 19 and water flat line is 60 degrees;
every group both sides that the protection casing 3 lies in slope 19 place one side all opened and have accomodate groove 20, and accomodate and hold tensile pole 21 and guard plate 22 in the groove 20, every group accept and all opened two sets of symmetric distribution on the roof of frame 4 and at the shifting chute 14 on its both sides, every group all held telescopic link 15 and slider 16 in the shifting chute 14, and accept and be equipped with two sets of grip blocks 18 that set up in opposite directions on the frame 4, and grip block 18 is "C" font, the fixed silica gel pad that bonds of grip block 18's inside wall, tensile pole 21 and telescopic link 15 are by electric drive.
Specifically, motor 6 and the side welded fastening of backup pad 2, transmission shaft 7 passes backup pad 2 and is connected with motor 6 transmission, and transmission shaft 7 keeps away from motor 6's one end and the central welded fastening of mounting panel 8 side.
Specifically, mounting panel 8 laminates with mill 9 mutually, slot 10 has all been opened on the both sides that mounting panel 8 is close to mill 9 one side, and mill 9 is close to the both sides homogeneous integration of mounting panel 8 one side and is connected with and links up piece 11, and two sets of pieces 11 that link up are pegged graft the installation with two sets of slots 10 respectively, and link up the side of piece 11 and closely laminate with the medial surface of slot 10, link up and all open screw 12 on piece 11 and the slot 10, two sets of link up piece 11 and pass through two sets of bolts 13 respectively with mounting panel 8's both sides installation fixed, bolt 13 pass and link up in the screw 12 of slot 10 (on) again behind the screw 12 of piece 11 (to the messenger links up piece 11 and mounting panel 8 and fix together.
Specifically, two ends of a horizontally arranged stretching rod 21 are respectively welded and fixed with the side surface of a protection plate 22 and the inner side wall of the accommodating groove 20, two opposite sides of two groups of slopes 19 are inclined downwards, and four side surfaces of the protection plate 22 are respectively attached to four sides of the inner cavity of the accommodating groove 20; when the stretching rod 21 is contracted to the minimum, it brings the shielding plate 22 completely into the receiving groove 20.
Specifically, two ends of the telescopic rod 15 are respectively bonded and fixed with the inner side surface of the moving groove 14 and the side surface of the sliding block 16, a positioning angle 17 integrally welded with the side part of the clamping plate 18 is installed on the top wall of the sliding block 16, the vertical section of the sliding block 16 is in a T shape, and the side surface of the sliding block 16 is attached to the inner side surface of the moving groove 14, so that the sliding block 16 can stably slide in the moving groove 14.
Specifically, it has run through its roof and is located the row's of discharge tank 5 between two sets of protection casings 3 to grind 1 last division of platform, mounting panel 8 and mill 9 are all established directly over row's of discharge tank 5, and row's of discharge tank 5 runs through the both sides of grinding 1 to the piece that drops on making the PE pipe can be followed row's of discharge tank 5 and discharged.
The using method comprises the following steps: when the production line of the composite PE pipe of the plastic-steel winding pipe is used, firstly, the PE pipe penetrates through two groups of bearing frames 4 along the horizontal direction, the PE pipe is placed between clamping plates 18 on two sides of the bearing frames 4, one side of the PE pipe needing to be polished is contacted with a grinding disc 9, then two groups of telescopic rods 15 on the (two groups of) bearing frames 4 are driven to simultaneously extend and drive the two groups of clamping plates 18 to mutually approach, rubber pads in the two groups of clamping plates 18 are respectively attached to two sides of the PE pipe, so that the PE pipe is fixed, then two groups of stretching rods 21 in the (two groups of) protective covers 3 are driven to extend and drive two groups of protective plates 22 to extend to the outer sides of the protective covers 3, the two groups of protective plates 22 on the protective covers 3 are utilized to play a role of shielding chippings, the protective plates 22 should approach the PE pipe but are not contacted with the PE pipe, then a motor 6 is operated to drive a transmission, during polishing, a part of scraps falling from the PE pipe can be thrown into the two groups of slopes 19, then slide down from the two groups of slopes 19 and fall into the discharge groove 5, and a part of scraps directly falls into the discharge groove 5, so that the four groups of protection plates 22 on the two groups of protection covers 3 have good scrap shielding effect, and the scraps can hardly splash to the external environment; when the grinding disc 9 is damaged for a long time (or the specification of the grinding disc 9 does not meet the requirement), the grinding disc 9 can be separated from the mounting plate 8 after the two groups of bolts 13 are removed, and then the grinding disc 9 is replaced (two groups of connecting blocks 11 inserted and mounted with the two groups of slots 10 are also arranged on the replaced grinding disc 9).
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (6)

1. The utility model provides a production line of compound PE pipe of plastic steel winding pipe, includes platform (1), backup pad (2), two sets of protection casing (3) and two sets of accepting frame (4) that are parallel to each other, its characterized in that: the bottom surfaces of the supporting plate (2), the protective covers (3) and the bearing frame (4) are welded and fixed with the top wall of the polishing table (1), the supporting plate (2) is provided with a motor (6), a transmission shaft (7), a mounting plate (8) and a grinding disc (9), and two opposite sides of the two groups of protective covers (3) are provided with slopes (19);
every group protection casing (3) are located both sides of slope (19) place one side and all open and have received groove (20), and have held tensile pole (21) and guard plate (22) in receiving groove (20), every group accept and all open on the roof of frame (4) and have two sets of symmetric distribution at shifting chute (14) on its both sides, every group all hold telescopic link (15) and slider (16) in shifting chute (14), and accept and be equipped with two sets of grip blocks (18) that set up in opposite directions on frame (4), the inside wall of grip block (18) is fixed to be bonded and has the silica gel pad.
2. The production line of the composite PE pipe of the plastic-steel winding pipe as claimed in claim 1, wherein: the motor (6) is welded and fixed with the side face of the supporting plate (2), the transmission shaft (7) penetrates through the supporting plate (2) and is in transmission connection with the motor (6), and one end, far away from the motor (6), of the transmission shaft (7) is welded and fixed with the center of the side face of the mounting plate (8).
3. The production line of the composite PE pipe of the plastic-steel winding pipe as claimed in claim 1, wherein: mounting panel (8) laminate mutually with mill (9), slot (10) have all been opened on both sides that mounting panel (8) are close to mill (9) one side, and mill (9) are close to both sides homogeneous ization of mounting panel (8) one side and are connected with and link up piece (11), it has screw (12) all to open on block (11) and slot (10) to link up, and is two sets of link up piece (11) and the both sides installation of mounting panel (8) is fixed respectively through two sets of bolts (13).
4. The production line of the composite PE pipe of the plastic-steel winding pipe as claimed in claim 1, wherein: two ends of a horizontally arranged stretching rod (21) are respectively welded and fixed with the side surface of the protection plate (22) and the inner side wall of the containing groove (20), and two opposite sides of the two groups of slopes (19) are inclined downwards.
5. The production line of the composite PE pipe of the plastic-steel winding pipe as claimed in claim 1, wherein: the two ends of the telescopic rod (15) are respectively bonded and fixed with the inner side surface of the moving groove (14) and the side surface of the sliding block (16), and a positioning angle (17) integrally welded with the side part of the clamping plate (18) is installed on the top wall of the sliding block (16).
6. The production line of the composite PE pipe of the plastic-steel winding pipe as claimed in claim 1, wherein: it runs through row material tank (5) between its roof and being located two sets of protection casing (3) to open on platform (1) of polishing, mounting panel (8) and mill (9) are all established directly over row material tank (5).
CN202020765273.6U 2020-05-11 2020-05-11 Production line of composite PE pipe of plastic steel winding pipe Active CN212145691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020765273.6U CN212145691U (en) 2020-05-11 2020-05-11 Production line of composite PE pipe of plastic steel winding pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020765273.6U CN212145691U (en) 2020-05-11 2020-05-11 Production line of composite PE pipe of plastic steel winding pipe

Publications (1)

Publication Number Publication Date
CN212145691U true CN212145691U (en) 2020-12-15

Family

ID=73710054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020765273.6U Active CN212145691U (en) 2020-05-11 2020-05-11 Production line of composite PE pipe of plastic steel winding pipe

Country Status (1)

Country Link
CN (1) CN212145691U (en)

Similar Documents

Publication Publication Date Title
CN212145691U (en) Production line of composite PE pipe of plastic steel winding pipe
CN211264836U (en) Safe display screen equipment
CN213561621U (en) Edge polishing device for processing high polymer plastic plates
CN210616440U (en) Clamp device for wood processing
CN210060796U (en) Part machining clamping equipment
CN114824539A (en) Lithium battery recycling equipment
CN113997150A (en) Steel material grinding device for building engineering
CN210878916U (en) Inner wall grinding device is used in automobile parts processing
CN108973699B (en) Energy-saving driving equipment of new energy automobile
CN208139124U (en) A kind of solar street light easy to clean
CN112339811A (en) Intelligent part storage and transfer device and method
CN218692476U (en) Battery recycling installation mechanism
CN217239661U (en) High-safety outdoor lithium battery
CN216056883U (en) Fixing device for welding photovoltaic module
CN205342359U (en) Special extracting tool of solar cell panel frame
CN220229658U (en) High-efficient cooling device is used in electronic product processing
CN212850400U (en) Photovoltaic frame aluminum profile convenient to disassemble
CN212553251U (en) Copper bar polishing device
CN219767840U (en) Dustproof polishing equipment
CN211975029U (en) Mining dust remover for environmental protection engineering convenient to carry
CN212131791U (en) Information display device for investment management consultation
CN213960606U (en) Clamping and fixing device for radiator
CN216847625U (en) Anti-interference rail ultrasonic transducer
CN209793854U (en) Lithium iron phosphate laminate polymer battery that can filter cuts unloader
CN220094029U (en) Old outer wall old paint layer grinding device for old community

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant