CN212107193U - Pipeline fixing device for water conservancy construction - Google Patents

Pipeline fixing device for water conservancy construction Download PDF

Info

Publication number
CN212107193U
CN212107193U CN202020513063.8U CN202020513063U CN212107193U CN 212107193 U CN212107193 U CN 212107193U CN 202020513063 U CN202020513063 U CN 202020513063U CN 212107193 U CN212107193 U CN 212107193U
Authority
CN
China
Prior art keywords
fixedly connected
lifting
water conservancy
mounting block
conservancy construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020513063.8U
Other languages
Chinese (zh)
Inventor
胡兴耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yuze Construction Engineering Co ltd
Original Assignee
Ma'anshan Yuze Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ma'anshan Yuze Construction Engineering Co ltd filed Critical Ma'anshan Yuze Construction Engineering Co ltd
Priority to CN202020513063.8U priority Critical patent/CN212107193U/en
Application granted granted Critical
Publication of CN212107193U publication Critical patent/CN212107193U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline fixing device for water conservancy construction relates to water conservancy construction technical field, and its technical scheme main points include the bottom plate, the top fixedly connected with quantity of bottom plate is two lifting unit, two the equal fixedly connected with installation piece in lifting unit's top, the mounting groove has been seted up to the inside of installation piece, the left side of installation piece is provided with the lead screw, and the lead screw runs through the installation piece and rotates with the inner wall right side of mounting groove and be connected. The utility model discloses a set up lifting unit, can highly adjust the pipeline installation, it is more convenient when the installation, reduce the degree of difficulty of installation, improve the suitability of device, and the second spring has certain shock attenuation effect, avoid the lifter the condition that warp to appear, through setting up lead screw and thread bush, can adjust the interval of locking board, avoid leading to the fixed unstable condition appearance because of the too big or undersize of pipeline, improve the application scope of device.

Description

Pipeline fixing device for water conservancy construction
Technical Field
The utility model relates to a water conservancy construction technical field, the more specifically pipeline fixing device for water conservancy construction that says so.
Background
Hydraulic engineering is the surface water and the groundwater that are used for controlling and allotment nature, reach the earth's surface water and the groundwater of harmfully having the benefit purpose and the engineering of building, and water is the essential valuable resource of mankind production and life, but its state that exists naturally does not accord with the human needs completely, only builds hydraulic engineering, just can control rivers, prevents flood disasters to adjust and distribute the water yield, in order to satisfy people's life and production to the needs of water resource, when hydraulic engineering construction, often need lay the pipeline.
Often need lay the pipeline, in order to prevent that the pipeline from shifting, set up the clamping ring on the pipeline usually, this kind of clamping ring shifts on hydraulic engineering's the construction face very easily, influences the effect of laying of pipeline, and current pipeline fixing device is mostly can not adjust simultaneously, and the suitability is relatively poor, consequently, technical personnel in the field provide a pipeline fixing device for water conservancy construction to solve the problem that proposes in the above-mentioned background art.
SUMMERY OF THE UTILITY MODEL
For solving the problem that provides among the above-mentioned background art, the utility model aims to provide a pipeline fixing device for water conservancy construction, its advantage lies in can adjusting width and height, and accommodation is wide.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline fixing device for water conservancy construction, includes the bottom plate, the top fixedly connected with quantity of bottom plate is two lifting unit, two lifting unit's the equal fixedly connected with installation piece in top, the mounting groove has been seted up to the inside of installation piece, the left side of installation piece is provided with the lead screw, and the lead screw runs through the installation piece and rotates with the inner wall right side of mounting groove to be connected, the surperficial threaded connection of lead screw has the thread bush that quantity is two, two the inside screw thread opposite direction of thread bush, two the equal fixedly connected with connecting rod in upper surface of thread bush, and the connecting rod runs through the installation piece and extend to the outside of installation piece, two the equal fixedly connected with locking plate in top of connecting rod, the first spring of top fixedly connected with of installation piece, first spring is located two between the connecting rod.
As a further aspect of the present invention: and protective pads are arranged on the opposite sides of the two locking plates and are rubber material members.
As a further aspect of the present invention: the top of installation piece has seted up the bar mouth, the connecting rod is located the inner wall of bar mouth.
As a further aspect of the present invention: the inner wall right side embedding of mounting groove is installed and is rotated the seat, it rotates with the lead screw and connects to rotate the seat.
As a further aspect of the present invention: and the top of the bottom plate is provided with fixing bolts which are uniformly distributed.
As a further aspect of the present invention: the lifting assembly comprises a lifting base, the lifting base is fixedly connected with the bottom plate, a lifting rod is inserted into the top of the lifting base and fixedly connected with an installation block, a second spring is fixedly connected to the top of the lifting base, the top of the second spring is fixedly connected with the installation block, the lifting rod is located inside the second spring, limiting holes are formed in the side faces of the lifting base and the side faces of the lifting rod, and limiting bolts are arranged on the inner walls of the limiting holes.
Compared with the prior art, the beneficial effects of the utility model are that:
1. according to the pipeline fixing device for water conservancy construction, the height of pipeline installation can be adjusted by arranging the lifting assembly, the installation is more convenient, the installation difficulty is reduced, the applicability of the device is improved, the second spring has a certain damping effect, the deformation of the lifting rod is avoided, the distance between the locking plates can be adjusted by arranging the lead screw and the threaded sleeve, the unstable fixation caused by overlarge or undersize pipelines is avoided, the application range of the device is improved, the bottom of the pipeline is damped by arranging the first spring, and the damage to a pipeline body caused by untimely force unloading is avoided;
2. according to the pipeline fixing device for water conservancy construction, the surface of a pipeline is protected by arranging the protection pad, so that the surface of the pipeline is prevented from being damaged in the locking process, the connecting rod is limited by arranging the strip-shaped opening, the situation that the connecting rod deviates in the locking process is avoided, and the normal operation of the device is guaranteed;
3. this pipeline fixing device for water conservancy construction rotates the seat through setting up, and the normal rotation of guarantee lead screw reduces the degree of difficulty of installation, practices thrift installation time through setting up fixing bolt.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged view of a portion a in fig. 1 according to the present invention.
In the figure: 1. a base plate; 101. fixing the bolt; 2. a lifting assembly; 201. a lifting base; 202. a lifting rod; 203. a second spring; 204. a limiting hole; 205. a limit bolt; 3. mounting blocks; 301. a strip-shaped opening; 4. mounting grooves; 401. a rotating seat; 5. a threaded sleeve; 6. a screw rod; 7. a first spring; 8. a connecting rod; 9. a locking plate; 901. a protective pad.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings
Referring to fig. 1-2, in the embodiment of the present invention, a pipeline fixing device for water conservancy construction comprises a bottom plate 1, two lifting assemblies 2 are fixedly connected to the top of the bottom plate 1, two mounting blocks 3 are fixedly connected to the tops of the two lifting assemblies 2, a mounting groove 4 is formed in the mounting block 3, a screw rod 6 is disposed on the left side of the mounting block 3, the screw rod 6 penetrates through the mounting block 3 and is rotatably connected to the right side of the inner wall of the mounting groove 4, two thread sleeves 5 are connected to the surface of the screw rod 6 in a threaded manner, the internal threads of the two thread sleeves 5 are in opposite directions, connecting rods 8 are fixedly connected to the upper surfaces of the two thread sleeves 5, the connecting rods 8 penetrate through the mounting block 3 and extend to the outside of the mounting block 3, locking plates 9 are fixedly connected to the tops of the two connecting rods 8, and first springs 7 are fixedly connected to the, the first spring 7 is located between two connecting rods 8.
In fig. 1, protection pads 901 are arranged on opposite sides of two locking plates 9, the protection pads 901 are rubber material members, and by arranging the protection pads 901, the surface of the pipeline is protected, so that the surface of the pipeline is prevented from being damaged in the locking process;
the top of the mounting block 3 is provided with a strip-shaped opening 301, the connecting rod 8 is positioned on the inner wall of the strip-shaped opening 301, and the connecting rod 8 is limited by the arrangement of the strip-shaped opening 301, so that the situation that the connecting rod 8 deviates in the locking process is avoided, and the normal operation of the device is guaranteed;
a rotating seat 401 is embedded and mounted on the right side of the inner wall of the mounting groove 4, the rotating seat 401 is rotatably connected with the screw rod 6, and the normal rotation of the screw rod 6 is guaranteed by the arrangement of the rotating seat 401;
the top of bottom plate 1 is provided with evenly distributed's fixing bolt 101, through setting up fixing bolt 101, reduces the degree of difficulty of installation, practices thrift installation time.
In fig. 2, the lifting assembly 2 includes a lifting base 201, the lifting base 201 and a bottom plate 1 are fixedly connected, a lifting rod 202 is inserted into the top of the lifting base 201, the lifting rod 202 and an installation block 3 are fixedly connected, a second spring 203 is fixedly connected to the top of the lifting base 201, the top of the second spring 203 and the installation block 3 are fixedly connected, the lifting rod 202 is located inside the second spring 203, a limit hole 204 is formed in the side surfaces of the lifting base 201 and the lifting rod 202, a limit bolt 205 is arranged on the inner wall of the limit hole 204, the lifting assembly 2 is arranged, the height of the pipeline installation can be adjusted, the installation is more convenient, the installation difficulty is reduced, the applicability of the device is improved, the second spring 203 has a certain damping effect, and the phenomenon that the lifting rod 202 deforms is avoided.
The utility model discloses a theory of operation is: the device is fixedly installed on the ground through the fixing bolt 101, the installation difficulty is reduced and the installation time is saved by arranging the fixing bolt 101, the overall height of the lifting component 2 is adjusted according to the installation height, the lifting rod 202 is pressed downwards, the second spring 203 is stressed and bent, the height of the lifting component 2 is fixed by utilizing the limiting bolt 205 and the limiting hole 204, the pipeline installation height can be adjusted by arranging the lifting component 2, the installation is more convenient, the installation difficulty is reduced, the applicability of the device is improved, the second spring 203 has a certain damping effect, the phenomenon that the lifting rod 202 is deformed is avoided, the pipeline is placed above the installation block 3, the pipeline is directly contacted with the first spring 7, the bottom of the pipeline is damped by arranging the first spring 7, and the phenomenon that the pipeline body is damaged when the unloading force is not in time is avoided, the screw rod 6 is rotated in the rotating seat 401, the normal rotation of the screw rod 6 is ensured by arranging the rotating seat 401, the two thread sleeves 5 are driven to simultaneously move inwards and outwards, the connecting rod 8 moves in the strip-shaped opening 301, and by arranging the strip-shaped opening 301, the connecting rod 8 is limited, the situation that the connecting rod 8 deviates in the locking process is avoided, the normal operation of the device is ensured, the locking plate 9 locks the surface of the pipeline, through the arrangement of the screw rod 6 and the thread bush 5, the distance between the locking plates 9 can be adjusted, the situation that the pipeline is too large or too small to cause unstable fixation is avoided, the application range of the device is improved, the protective pad 901 is directly contacted with the surface of the pipeline, by arranging the protective pad 901, the pipeline surface is protected, the pipeline surface is prevented from being damaged in the locking process, and the pipeline is fixed.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a pipeline fixing device for water conservancy construction, includes bottom plate (1), its characterized in that: the lifting device is characterized in that the two lifting components (2) are fixedly connected to the top of the bottom plate (1), the two lifting components (2) are fixedly connected to the top of the mounting block (3), a mounting groove (4) is formed in the mounting block (3), a lead screw (6) is arranged on the left side of the mounting block (3), the lead screw (6) penetrates through the mounting block (3) and is rotatably connected with the right side of the inner wall of the mounting groove (4), the two thread sleeves (5) are in threaded connection with the surface of the lead screw (6), the internal threads of the two thread sleeves (5) are opposite in direction, the connecting rods (8) are fixedly connected to the upper surfaces of the two thread sleeves (5), the connecting rods (8) penetrate through the mounting block (3) and extend to the outer portion of the mounting block (3), and the locking plates (9) are fixedly connected to the tops of the two connecting rods (8), the top of the mounting block (3) is fixedly connected with a first spring (7), and the first spring (7) is positioned between the two connecting rods (8).
2. The pipeline fixing device for water conservancy construction according to claim 1, wherein protection pads (901) are arranged on opposite sides of the two locking plates (9), and the protection pads (901) are rubber material members.
3. The pipeline fixing device for water conservancy construction according to claim 1, characterized in that a strip-shaped opening (301) is opened at the top of the mounting block (3), and the connecting rod (8) is located on the inner wall of the strip-shaped opening (301).
4. The pipeline fixing device for water conservancy construction according to claim 1, characterized in that a rotation seat (401) is embedded in the right side of the inner wall of the installation groove (4), and the rotation seat (401) is rotatably connected with the screw rod (6).
5. The pipeline fixing device for water conservancy construction according to claim 1, characterized in that the top of the bottom plate (1) is provided with evenly distributed fixing bolts (101).
6. The pipeline fixing device for water conservancy construction according to claim 1, wherein the lifting assembly (2) comprises a lifting base (201), the lifting base (201) is fixedly connected with the bottom plate (1), a lifting rod (202) is inserted into the top of the lifting base (201), the lifting rod (202) is fixedly connected with the mounting block (3), a second spring (203) is fixedly connected to the top of the lifting base (201), the top of the second spring (203) is fixedly connected with the mounting block (3), the lifting rod (202) is located inside the second spring (203), limiting holes (204) are formed in the side surfaces of the lifting base (201) and the lifting rod (202), and limiting bolts (205) are arranged on the inner wall of the limiting holes (204).
CN202020513063.8U 2020-04-10 2020-04-10 Pipeline fixing device for water conservancy construction Expired - Fee Related CN212107193U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020513063.8U CN212107193U (en) 2020-04-10 2020-04-10 Pipeline fixing device for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020513063.8U CN212107193U (en) 2020-04-10 2020-04-10 Pipeline fixing device for water conservancy construction

Publications (1)

Publication Number Publication Date
CN212107193U true CN212107193U (en) 2020-12-08

Family

ID=73630000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020513063.8U Expired - Fee Related CN212107193U (en) 2020-04-10 2020-04-10 Pipeline fixing device for water conservancy construction

Country Status (1)

Country Link
CN (1) CN212107193U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113883354A (en) * 2021-10-18 2022-01-04 江苏圣大中远电力科技有限公司 A antidetonation gallows system for large-scale transmission line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113883354A (en) * 2021-10-18 2022-01-04 江苏圣大中远电力科技有限公司 A antidetonation gallows system for large-scale transmission line

Similar Documents

Publication Publication Date Title
CN107401313B (en) Three-dimensional shock-insulation anti-deformation device and construction method
CN212107193U (en) Pipeline fixing device for water conservancy construction
CN110700432A (en) Shock insulation layer structure
CN212377461U (en) Anti-seismic support and hanger convenient for position adjustment
CN211547300U (en) Three-dimensional gear type self-resetting energy-consumption shock-insulation support
CN206114998U (en) Built on stilts communication cable land used wire clamping plate
CN212986256U (en) Pipeline interface strutting arrangement for hydraulic engineering
CN211472913U (en) Shock insulation layer structure
CN211522927U (en) Bridge construction support frame
CN209636793U (en) A kind of adjustable rise buildings stake
CN211113727U (en) Retaining wall for hydraulic engineering
CN207161609U (en) Para-seismic support connect base
CN114562636B (en) Self-resetting support adaptive to differential settlement
CN210372332U (en) Door type anti-seismic support and hanger
CN219992731U (en) Vertical displacement release type support
CN214329309U (en) Built-in fitting for civil engineering
CN213299050U (en) Pipeline strutting arrangement for hydraulic engineering
CN214301580U (en) Water conservancy project construction stagnant water seepage prevention structure
CN218670122U (en) Major diameter overlap joint rag bolt
CN220816238U (en) Anchor bolt gasket resistant to bending moment and shearing force and anchor bolt comprising anchor bolt gasket
CN208152279U (en) A kind of simple and reliable architectural vibration-insulation seam joint seal structure
CN213145573U (en) Anti-seismic support locking structure
CN216243411U (en) Antidetonation support with adjustment mechanism
CN216740516U (en) Prefabricated external wall connecting piece of assembly type structure
CN211972928U (en) Track adjusting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 243000 south of Xiangcheng River and east of national highway 205, Dangtu Economic Development Zone, Ma'anshan City, Anhui Province

Patentee after: Anhui Yuze Construction Engineering Co.,Ltd.

Address before: 243000 south of Xiangcheng River and east of national highway 205, Dangtu Economic Development Zone, Ma'anshan City, Anhui Province

Patentee before: Ma'anshan Yuze Construction Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201208