CN212052771U - Clear up precast tubular pile stake core fast and fill out native device - Google Patents

Clear up precast tubular pile stake core fast and fill out native device Download PDF

Info

Publication number
CN212052771U
CN212052771U CN202020440568.6U CN202020440568U CN212052771U CN 212052771 U CN212052771 U CN 212052771U CN 202020440568 U CN202020440568 U CN 202020440568U CN 212052771 U CN212052771 U CN 212052771U
Authority
CN
China
Prior art keywords
air inlet
hose
inlet pipe
intake pipe
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020440568.6U
Other languages
Chinese (zh)
Inventor
徐庆
吴哲元
胡凯翔
吴翔
董殷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jianhao Engineering Consultancy Co ltd
Original Assignee
Shanghai Jianhao Engineering Consultancy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jianhao Engineering Consultancy Co ltd filed Critical Shanghai Jianhao Engineering Consultancy Co ltd
Priority to CN202020440568.6U priority Critical patent/CN212052771U/en
Application granted granted Critical
Publication of CN212052771U publication Critical patent/CN212052771U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a clear up precast tubular pile stake core device of filling out fast, including air compressor, coupling hose and be used for inserting the intake pipe in the stake core soil body, coupling hose one end is connected with air compressor, the other end and intake pipe sealing connection, and the head of intake pipe has the gas outlet. Has the advantages that: the utility model discloses a large amount of engineering practices, and the scene is adopted the utility model discloses the clear hole of equipment back, efficiency improves greatly, is two times more than original artifical clear hole. The average time of each tubular pile for manual hole cleaning is 40-60min, and the hole cleaning only needs 15-20min by adopting the utility model, so that the time can be shortened and the efficiency can be increased after the operation of workers is skilled. The original manual hole cleaning needs 2-3 people, and the utility model can be completed by one person, thereby greatly reducing the labor cost.

Description

Clear up precast tubular pile stake core fast and fill out native device
Technical Field
The utility model relates to a building engineering construction technical field, in particular to clear up precast tubular pile stake core device that bankets fast.
Background
It is known that pile foundation engineering plays a very important role in the construction of urban high-rise buildings. Particularly for soft soil foundations in coastal regions, soil layers have the characteristics of large pore ratio, high compressibility, high sensitivity, low shear strength, low permeability coefficient, large deformation after re-solidification and the like, high-rise buildings continuously emerge along with the development of urban construction, and most buildings with more than multiple layers adopt a pile foundation form at present due to the national requirements on building settlement control. The prestressed concrete pipe pile has the advantages of being produced in a factory, stable in pile body quality, good in anti-seismic performance, high in single-pile bearing capacity, convenient and fast to construct, economical, applicable and the like, can be widely applied to the modern decades as a product combining the modern prestressing technology and the centrifugal pipe making technology, and is particularly popularized in ports and coastal areas in a large quantity.
The prestressed pipe pile is a prestressed concrete pile with a circular ring-shaped cross section formed by adopting a centrifugal and prestressed process, the pile head part of the pipe pile can be silted with a large amount of silty soil in the process of sinking the pipe pile into the soil (rock) and the process of excavating a foundation pit, when the pipe pile is connected with a building foundation anchor, a concrete core needs to be poured into a pile hole in a certain depth below the pile head of the pipe pile, and before concrete pouring, the silty soil in the pile head and the following area needing to be poured with concrete needs to be cleaned up in order to ensure that the poured concrete is reliably connected with the inner wall of the pipe pile.
According to the third specification of the technical standard of prestressed concrete pipe piles (JGJ406-2017)5.3.10, the inner wall of a pipe pile should be cleaned from floating slurry, and the core filling concrete should be fully poured and vibrated to be compact, so that the lower sealing layer cannot leak slurry. Therefore, the cleaning of the core pouring part before the core pouring of the prestressed concrete pipe pile is very critical. Under the general condition, the prestressed pipe pile hole cleaning market also has mature pipe pile soil digging machine equipment, and the prestressed pipe pile soil digging machine equipment has the advantages of high soil digging speed and high mechanization degree; however, the method also has the defects that the dangerousness of the mechanically exposed drill bit screw is high, the possibility of hurting people exists, particularly, once a hard object is thrown out of the soil body, an injury accident is more easily caused, the self weight is high, at least 2 people are required to complete the operation simultaneously, the requirement on cooperation of operators is high, the mechanical structure power cannot accurately control the force, the overexcavation is easy, the damage to the pipe wall is easy, the mechanical purchasing and maintenance cost is high, the professional requirement on replacing the drill bit is high, and the like. In addition, a Luoyang shovel is also adopted to clean soil in the pipe pile hole and then pour the core, and the process has the advantage of low tool cost; however, the labor cost is too high, and the requirement on physical strength of operators is high especially for aging of labor force; the time cost is high, three persons operate in turn, the hole digging efficiency is only 1/6 of mechanical hole digging, and the influence on the construction period is large; the depth is not enough, because instrument and operating personnel's restriction, it can't satisfy the requirement to dig the depth less, can dig how deep and depend on operating personnel's strength size and physical power condition completely. General commodity district construction period is tighter, adopts current tradition manual hole digging mode can not satisfy the progress requirement and the cost of labor is great, and traditional hole digging instrument efficiency is lower in addition.
SUMMERY OF THE UTILITY MODEL
The utility model provides a solve above-mentioned technical problem, provide an easy operation, convenient and fast, make full use of air compressor recycles compressed air repeatedly, reaches the certain degree and forms airtight high pressure in the tubular pile stake core of prestressing force when air pressure, extrudes the stake core position soil body to reach the device that the precast tubular pile stake core of quick clearance banked up.
Technical scheme as follows, a clear up precast tubular pile stake core fast and fill out native device, its characterized in that includes air compressor, coupling hose and is used for inserting the internal intake pipe of tubular pile stake core soil, coupling hose one end is connected with air compressor, the other end with intake pipe sealing connection, the head of intake pipe has the gas outlet. Compressed air is conveyed to the pile core part of the tubular pile through an air compressor, so that silt soil at the pile core part is well discharged, and the aim of quickly cleaning the pile core soil is fulfilled.
As a further improvement, the head of the air inlet pipe is a closed conical tip, the air outlet is provided with a plurality of air outlets which are uniformly arranged on the side wall of the closed conical tip, and the closed conical tip is beneficial to reducing the soil-entering friction and enabling the soil to enter the soil quickly. The gas outlets are arranged on the side wall, and the purpose is to increase the gas outlet quantity and accelerate the gas inlet speed. The head of the air inlet pipe is not easy to be blocked by soil, and can be effectively suitable for various soil qualities.
As a further improvement, the head of the air inlet pipe is a beveled head, and the air outlet is a beveled notch. Simple manufacture and obvious effect. The inclined plane incision increases the air inlet section, and air is admitted more quickly for form inside cavity, and more conveniently insert the soil body.
As a further improvement, the connecting hose and the air inlet pipe are hermetically connected in a heating welding mode. Ensure the gas transmission is airtight.
As a further improvement, the connecting hose and the air inlet pipe are hermetically connected through a multi-split joint.
As a further improvement, the one-drag-multiple joint is provided with a hose connecting part connected with the inverted teeth of the connecting hose, the lower end of the hose connecting part is provided with a connecting arm communicated with the hose connecting part, and the connecting arm is provided with at least two air inlet pipe interfaces for connecting the air inlet pipe. Meanwhile, the air is fed through the plurality of air inlet pipes, so that a cavity can be formed at an accelerated speed, and the working efficiency is accelerated.
As a further improvement, the air inlet pipe is in threaded connection with the air inlet pipe connector. Convenient connection and good sealing effect.
As a further improvement, the air inlet pipe is connected with an air inlet pipe connector in a pawl manner. Convenient connection and good sealing effect.
Advantageous effects
The beneficial effects are that: the utility model discloses a large amount of engineering practices, and the scene is adopted the utility model discloses the clear hole of equipment back, efficiency improves greatly, is two times more than original artifical clear hole. The average time of each tubular pile for manual hole cleaning is 40-60min, and the hole cleaning only needs 15-20min by adopting the utility model, so that the time can be shortened and the efficiency can be increased after the operation of workers is skilled. The original manual hole cleaning needs 2-3 people, and the utility model can be completed by one person, thereby greatly reducing the labor cost.
Drawings
The present invention will be further described with reference to the accompanying drawings and embodiments.
FIG. 1: is a schematic diagram of the utility model when used in a construction site;
FIG. 2: is a schematic structural view of the closed conical pointed end of the utility model;
FIG. 3: is a schematic structural view of the oblique tangent plane head of the utility model;
FIG. 4: is a structural schematic diagram of the one-to-many joint of the utility model;
FIG. 5: is a structural schematic diagram of the air inlet pipe which is connected with the multi-split connector through the screw thread;
FIG. 6: do the utility model discloses a with the structure schematic diagram of the intake pipe that one drags many joint pawl to be connected.
Reference numbers in the figures:
1. air compressor 2, connecting hose 3, intake pipe
3a, a closed conical tip 3b, a chamfer head 4 and an air outlet
5. One-to-many joint 51, hose connecting part 52 and connecting arm
53. Air inlet pipe connector 6, tubular pile 7 and floor
Detailed Description
In order to further understand and appreciate the structural features and advantages of the present invention, preferred embodiments and the accompanying drawings are described in detail as follows:
as shown in fig. 1-6, a device for quickly cleaning soil filled in a precast tubular pile core comprises an air compressor 1, a connecting hose 2 and an air inlet pipe 3 inserted into the soil of the tubular pile core, wherein one end of the connecting hose 2 is connected with the air compressor 1, the other end of the connecting hose is hermetically connected with the air inlet pipe 3, and the head of the air inlet pipe 3 is provided with an air outlet 4. Compressed air is conveyed to the pile core part of the tubular pile through an air compressor, so that silt soil at the pile core part is well discharged, and the aim of quickly cleaning the pile core soil is fulfilled.
Specifically, the head of the air inlet pipe 3 is a closed conical tip 3a, the air outlet 4 is provided with a plurality of air outlets which are uniformly arranged on the side wall of the closed conical tip, and the closed conical tip is beneficial to reducing the soil-entering friction and enabling the soil to enter the soil quickly. The gas outlets are arranged on the side wall, and the purpose is to increase the gas outlet quantity and accelerate the gas inlet speed. The head of the air inlet pipe is not easy to be blocked by soil, and can be effectively suitable for various soil qualities.
The head of the air inlet pipe 3 can also be an inclined plane head 3b, and the air outlet 4 is an inclined plane notch. Simple manufacture and obvious effect. The inclined plane incision increases the air inlet section, and air is admitted more quickly for form inside cavity, and more conveniently insert the soil body.
The connecting hose 2 and the air inlet pipe 3 can be directly connected in a sealing mode through heating welding. Ensure the gas transmission is airtight.
If the soil body is hard or the pressure of the air compressor is insufficient, the connecting hose 2 is hermetically connected with the air inlet pipe 3 through the multi-split joint 5, and hole cleaning operation is performed in sections. The multi-joint 5 is provided with a hose connecting part 51 connected with the inverted tooth of the connecting hose 2, the lower end of the hose connecting part 51 is provided with a connecting arm 52 communicated with the hose connecting part, and at least two air inlet pipe connectors 53 used for connecting the air inlet pipe 3 are arranged on the connecting arm 52. Meanwhile, the air is fed through the plurality of air inlet pipes, so that a cavity can be formed at an accelerated speed, and the working efficiency is accelerated. The intake pipe 3 and the intake pipe connection 53 may be screwed. The air inlet pipe 3 is in inverted tooth connection with the air inlet pipe connector 53. Convenient connection and good sealing effect.
The connecting hose 2 is a leather hose which is easy to obtain materials, the air inlet pipe 3 is a steel pipe or a galvanized steel pipe which can be obtained locally at present in construction, the diameter is generally 20mm, the wall thickness is 1.5mm, the strength is required to meet certain pressure intensity, the steel pipe or the galvanized steel pipe is not deformed and is inserted into a soil body.
As shown in fig. 1, the specific implementation steps are as follows:
1. an air compressor 1 is arranged on the terrace 7 on site, so that air circulation is ensured as much as possible, and light is sufficient;
2. a phi 20mm steel pipe is self-made as an air inlet pipe 3 as required, and the head of the steel pipe is made into a closed conical tip 3a and is provided with an air outlet hole;
3. the steel pipe has a certain wall thickness of 1.5mm, the strength must meet certain pressure intensity without deformation, and the inserted soil body is not distorted;
4. inserting the self-made steel pipe into the depth required by the hole cleaning tubular pile 6;
5. connecting the self-made steel pipe with an air compressor through a connecting hose 2 made of a leather hose;
6. starting an air compressor device, and withdrawing an operator to a safe distance position;
7. after a certain pressure is formed in the tubular pile, soil body is sprayed out from the pipe orifice;
8. after a large amount of soil is extruded out, manually and simply cleaning a small amount of soil on the pipe wall;
9. and (5) carrying out concrete core pouring construction on the prestressed pipe pile.
In summary, the present invention is only a preferred embodiment, and is not intended to limit the scope of the present invention, and all equivalent changes and modifications of the shapes, structures, features and spirit described in the claims of the present invention should be included in the scope of the present invention.

Claims (8)

1. The utility model provides a device that bankets of prefabricated tubular pile stake core of clearance fast, its characterized in that, include air compressor, coupling hose and be used for inserting the internal intake pipe of tubular pile stake core soil, coupling hose one end is connected with air compressor, the other end with intake pipe sealing connection, the head of intake pipe has the gas outlet.
2. The device of claim 1, wherein the head of the air inlet pipe is a closed conical tip, and the air outlet has a plurality of holes uniformly arranged on the side wall of the closed conical tip.
3. The device of claim 1, wherein the head of the air inlet pipe is a beveled head and the air outlet is a beveled cut.
4. The device of claim 1, characterized in that the connecting hose with the intake pipe is hermetically connected through a heat welding manner.
5. The device of claim 1, wherein the connecting hose is connected to the air inlet pipe via a multi-split joint.
6. The device of claim 5, wherein the one-drag-many joint has a hose connecting portion connected with the inverted teeth of the connecting hose, the lower end of the hose connecting portion has a connecting arm communicated with the hose connecting portion, and the connecting arm is provided with at least two air inlet pipe interfaces for connecting the air inlet pipe.
7. The device of claim 6, wherein the air inlet pipe is in threaded connection with the air inlet pipe interface.
8. The device of claim 6, characterized in that intake pipe and intake pipe interface pawl are connected.
CN202020440568.6U 2020-03-31 2020-03-31 Clear up precast tubular pile stake core fast and fill out native device Expired - Fee Related CN212052771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020440568.6U CN212052771U (en) 2020-03-31 2020-03-31 Clear up precast tubular pile stake core fast and fill out native device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020440568.6U CN212052771U (en) 2020-03-31 2020-03-31 Clear up precast tubular pile stake core fast and fill out native device

Publications (1)

Publication Number Publication Date
CN212052771U true CN212052771U (en) 2020-12-01

Family

ID=73540466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020440568.6U Expired - Fee Related CN212052771U (en) 2020-03-31 2020-03-31 Clear up precast tubular pile stake core fast and fill out native device

Country Status (1)

Country Link
CN (1) CN212052771U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114059541A (en) * 2021-11-26 2022-02-18 上海宝冶集团有限公司 High-pressure drilling pile core drawing instrument

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114059541A (en) * 2021-11-26 2022-02-18 上海宝冶集团有限公司 High-pressure drilling pile core drawing instrument

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN100570122C (en) Bidirectional helix extruding-enlarging pile construction method and bidirectional helix closed extruding-enlarging aiguille
WO2021109144A1 (en) Modular intelligent dado cast-in-place pile and construction process therefor
CN112323823B (en) Filling device and method for waste air-raid shelter of pile foundation construction site
CN107165160A (en) Electric drill bores construction filling pile construction engineering method with rotary digging relay
CN201024899Y (en) Two-directional spiral sealing extrusion and expansion aiguille
CN109505297A (en) A kind of resistance to compression resistance to plucking variable diameters steel reinforcement cage club-footed pile
CN107724383A (en) Rotary digging cast-in-place pile construction method
CN105421445A (en) Construction method for non-prestressed centrifugal high-strength concrete pile planted pile
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN212052771U (en) Clear up precast tubular pile stake core fast and fill out native device
CN208136918U (en) A kind of tubular type Soil-Nailing Wall Structure
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN107100164A (en) A kind of long auger guncreting pile construction method
CN213014295U (en) A slip casting fills device for handling abandonment air-raid shelter
CN108677959A (en) A kind of grouting tube and grouting construction method suitable for mortar depositing construction under the conditions of limited space
CN113338362A (en) Construction method of cage core bag bottom-expanding grouting anchor rod static pressure steel pipe pile
CN201554047U (en) Grouting pipe used for repairing defects of underground building curtain by grouting method
CN2370066Y (en) Channel slip casting steel bar concrete hollow prefabricated pile
CN110144918A (en) Hypogee dewatering well antiseepage plugging construction method
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN110528532A (en) A kind of precast splice type steel concrete combined support stake and its construction method
CN210598826U (en) Mechanical pile forming device for bottom-expanding cast-in-place foundation pile
CN110939161B (en) Construction method of large-diameter socketed anti-floating anchor rod and drilling tool used in method
CN111636419A (en) Construction equipment and construction method for grouting thin-wall tubular pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201