CN212002134U - Electric power construction work platform - Google Patents

Electric power construction work platform Download PDF

Info

Publication number
CN212002134U
CN212002134U CN201922041216.3U CN201922041216U CN212002134U CN 212002134 U CN212002134 U CN 212002134U CN 201922041216 U CN201922041216 U CN 201922041216U CN 212002134 U CN212002134 U CN 212002134U
Authority
CN
China
Prior art keywords
base
electric power
power construction
sides
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922041216.3U
Other languages
Chinese (zh)
Inventor
丁坚
吴丽文
李伊斯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luzhou Tianyi Development Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922041216.3U priority Critical patent/CN212002134U/en
Application granted granted Critical
Publication of CN212002134U publication Critical patent/CN212002134U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an electric power construction work platform, the on-line screen storage device comprises a base, the both sides at base top all are provided with locking device, the both sides at the base back and positive both sides all are provided with slider, the vertical fixedly connected with baffle of inner chamber of base, the equal fixedly connected with rubber pad in both sides of baffle, the outside of rubber pad is provided with the loading board, the locking hole has been seted up at the top of loading board, the bottom of loading board is provided with stabilising arrangement, slider includes first spout, the inner chamber sliding connection of first spout has the gyro wheel, there is the support column the inboard of gyro wheel through loose axle swing joint, the inboard front and the back fixed connection with the loading board inboard of support column. Has the advantages that: the area of the electric power construction operation platform can be enlarged, the use requirements of people can be met, the working efficiency of constructors is not affected, and therefore the practicability of the electric power construction operation platform is improved.

Description

Electric power construction work platform
Technical Field
The utility model relates to an electric power construction field, concretely relates to electric power construction work platform.
Background
Electric power construction, i.e., a project related to the production, transmission, and distribution of electric energy, broadly includes a project in which electricity is used as power and energy in various fields, and is also understood as a transmission and transformation business expansion project.
Need use electric power construction work platform in the electric power work progress to in the air of rising some higher with constructor and carry out the construction operation, present electric power construction work platform can't adjust usable floor area, when needing many people to use electric power construction work platform in the electric power work progress, can't enlarge electric power construction work platform area, can't satisfy people's user demand, has influenced constructor's work efficiency, thereby the practicality of electric power construction work platform has been reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an electric power construction work platform just in order to solve above-mentioned problem to solve among the prior art electric power construction work platform, can't adjust area's problem. The utility model provides an among a great deal of technical scheme preferred technical scheme have: when needing many people to use electric power construction work platform among the electric power construction process, can enlarge electric power construction work platform area, can satisfy people's user demand, do not influence constructor's work efficiency to electric power construction work platform's practicality has been improved, see the following explanation in detail.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model provides an electric power construction work platform, which comprises a base, wherein locking devices are arranged on two sides of the top of the base, sliding devices are arranged on two sides of the back of the base and two sides of the front of the base, a partition plate is fixedly connected to the vertical direction of an inner cavity of the base, rubber pads are fixedly connected to two sides of the partition plate, a bearing plate is arranged on the outer side of each rubber pad, a locking hole is formed in the top of the bearing plate, and a stabilizing device is arranged at the bottom of the bearing plate;
the sliding device comprises a first sliding groove, an inner cavity of the first sliding groove is connected with a roller in a sliding mode, the inner side of the roller is connected with a supporting column through a movable shaft in a movable mode, and the inner side of the supporting column is fixedly connected with the front side and the back side of the inner side of the bearing plate.
Adopt above-mentioned electric power construction operation platform, during the regulation, people upwards stimulate the arm-tie at first, the arm-tie passes through the spring and leads to the groove will move the capital portion and remove outside locking hole, then people stimulate the loading board to both sides, the loading board elongates flexible guardrail bar through the baffle, the loading board passes through the second spout simultaneously and slides on the slider, synchronous loading board drives the support column and begins to remove to both sides, the support column drives the gyro wheel through the loose axle and slides in first spout, after the loading board removes to people's assigned position, loosen the arm-tie, the spring drives through the arm-tie and removes the post and begins to reset, it is downthehole to make the locking of movable capital portion card income, make its stability that increases the loading board, thereby reached the advantage that can adjust.
Preferably, the stabilizing device comprises a second sliding groove, an inner cavity of the second sliding groove is connected with a sliding block in a sliding mode, and the bottom of the sliding block is fixedly connected with the outer side of the bottom of the inner cavity of the base.
Preferably, the outside of loading board runs through to the both sides of base, the top fixedly connected with baffle of loading board, the inboard front side of baffle and the equal fixedly connected with flexible guardrail bar of rear side.
Preferably, the locking device comprises a through groove, a movable column is arranged in the inner cavity of the through groove, a pull plate is fixedly connected to the top of the movable column, and the bottom of the movable column penetrates through the inner cavity of the locking hole.
Preferably, the top of the surface of the moving column is sleeved with a spring, the top of the spring is fixedly connected with the bottom of the pulling plate, and the bottom of the spring is fixedly connected with the top of the base.
Has the advantages that: the utility model discloses can enlarge electric power construction work platform area, can satisfy people's user demand, do not influence constructor's work efficiency to electric power construction work platform's practicality has been improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of the present invention;
FIG. 2 is a top sectional view of the base structure of the present invention;
fig. 3 is a sectional view of the base structure of the present invention.
The reference numerals are explained below:
1. a base; 2. a locking device; 21. a through groove; 22. moving the column; 23. pulling a plate; 3. a sliding device; 31. a first chute; 32. a roller; 33. a support pillar; 4. a partition plate; 5. a rubber pad; 6. a carrier plate; 7. a locking hole; 8. a stabilizing device; 81. a second chute; 82. a slider; 9. a baffle plate; 10. a telescopic guard rail; 11. a spring.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be described in detail below. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model provides an electric power construction work platform, which comprises a base 1, wherein locking devices 2 are arranged on both sides of the top of the base 1, sliding devices 3 are arranged on both sides of the back and both sides of the front of the base 1, a partition plate 4 is vertically and fixedly connected with an inner cavity of the base 1, rubber pads 5 are fixedly connected with both sides of the partition plate 4, a bearing plate 6 is arranged outside the rubber pads 5, a locking hole 7 is arranged on the top of the bearing plate 6, and a stabilizing device 8 is arranged on the bottom of the bearing plate 6;
the sliding device 3 comprises a first sliding groove 31, an inner cavity of the first sliding groove 31 is connected with a roller 32 in a sliding manner, the inner side of the roller 32 is connected with a supporting column 33 through a movable shaft in a movable manner, and the inner side of the supporting column 33 is fixedly connected with the inner side of the bearing plate 6 in the front and back.
Preferably, the stabilizing device 8 comprises a second sliding groove 81, a sliding block 82 is slidably connected to an inner cavity of the second sliding groove 81, and the bottom of the sliding block 82 is fixedly connected with the outer side of the bottom of the inner cavity of the base 1, so that the purpose of stably moving the bearing plate 6 during working and use is achieved.
As preferred, the outside of loading board 6 runs through to the both sides of base 1, the top fixedly connected with baffle 9 of loading board 6, the inboard front side of baffle 9 and the equal fixedly connected with flexible guardrail bar 10 of rear side, so set up, reached and played the effect that increases stable strength to loading board 6 when the work is used.
Preferably, the locking device 2 comprises a through groove 21, a movable column 22 is arranged in an inner cavity of the through groove 21, a pull plate 23 is fixedly connected to the top of the movable column 22, the bottom of the movable column 22 penetrates through the inner cavity of the locking hole 7, and the effect of facilitating fixing of the bearing plate 6 during working and use is achieved.
Preferably, the top cover on the surface of the movable column 22 is provided with a spring 11, the top of the spring 11 is fixedly connected with the bottom of the pulling plate 23, the bottom of the spring 11 is fixedly connected with the top of the base 1, and the movable column 22 is conveniently reset when being used.
Adopt above-mentioned structure, during the adjustment, people upwards stimulate arm-tie 23 at first, arm-tie 23 will move the post 22 bottom through spring 11 and logical groove 21 and move outside locking hole 7, then people stimulate loading board 6 to both sides, loading board 6 will stretch out flexible guardrail bar 10 through baffle 9, loading board 6 slides on slider 82 through second spout 81 simultaneously, synchronous loading board 6 drives support column 33 and begins to move to both sides, support column 33 drives gyro wheel 32 through the loose axle and slides in first spout 31, after loading board 6 moved to people's finger position, loosen arm-tie 23, spring 11 drives through arm-tie 23 and removes post 22 and begins to reset, make it increase the stability of loading board 6 in the locking hole 7 of card bottom of removal post 22, thereby reached the advantage that can adjust usable floor area.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (5)

1. The utility model provides an electric power construction work platform which characterized in that: the locking device comprises a base (1), wherein locking devices (2) are arranged on two sides of the top of the base (1), sliding devices (3) are arranged on two sides of the back surface and two sides of the front surface of the base (1), a partition plate (4) is vertically and fixedly connected with an inner cavity of the base (1), rubber pads (5) are fixedly connected with two sides of the partition plate (4), a bearing plate (6) is arranged on the outer side of each rubber pad (5), a locking hole (7) is formed in the top of the bearing plate (6), and a stabilizing device (8) is arranged at the bottom of the bearing plate (6);
slider (3) include first spout (31), the inner chamber sliding connection of first spout (31) has gyro wheel (32), there are support column (33) inboard through loose axle swing joint of gyro wheel (32), the inboard front and the back fixed connection with loading board (6) inboard of support column (33).
2. The electric power construction work platform of claim 1, wherein: stabilising arrangement (8) include second spout (81), the inner chamber sliding connection of second spout (81) has slider (82), the outside fixed connection of the bottom and base (1) inner chamber bottom of slider (82).
3. An electric power construction work platform according to claim 2, characterized in that: the outside of loading board (6) runs through to the both sides of base (1), the top fixedly connected with baffle (9) of loading board (6), the equal fixedly connected with of front side and the rear side of baffle (9) inboard protects railing (10) telescopically.
4. The electric power construction work platform of claim 1, wherein: locking device (2) are including leading to groove (21), the inner chamber that leads to groove (21) is provided with removes post (22), the top fixedly connected with arm-tie (23) of removing post (22), the inner chamber to locking hole (7) is run through to the bottom of removing post (22).
5. An electric power construction work platform according to claim 4, characterized in that: the top cover on removal post (22) surface is equipped with spring (11), the top of spring (11) and the bottom fixed connection of arm-tie (23), the bottom of spring (11) and the top fixed connection of base (1).
CN201922041216.3U 2019-11-24 2019-11-24 Electric power construction work platform Active CN212002134U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922041216.3U CN212002134U (en) 2019-11-24 2019-11-24 Electric power construction work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922041216.3U CN212002134U (en) 2019-11-24 2019-11-24 Electric power construction work platform

Publications (1)

Publication Number Publication Date
CN212002134U true CN212002134U (en) 2020-11-24

Family

ID=73412770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922041216.3U Active CN212002134U (en) 2019-11-24 2019-11-24 Electric power construction work platform

Country Status (1)

Country Link
CN (1) CN212002134U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554637A (en) * 2020-12-11 2021-03-26 青岛联合智造科技有限公司 Electric power iron tower installation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554637A (en) * 2020-12-11 2021-03-26 青岛联合智造科技有限公司 Electric power iron tower installation device

Similar Documents

Publication Publication Date Title
CN206554481U (en) A kind of portable scaffold
CN212002134U (en) Electric power construction work platform
CN106958732A (en) A kind of Portable field notebook computer bracket
CN206761080U (en) A kind of portable knapsack
CN207785854U (en) A kind of self-powered remote control type sports equipment folding and unfolding vehicle
CN214074959U (en) Basketball stand for primary school sports
CN108483165A (en) A kind of elevator reparing platform
CN210635629U (en) Hoisting equipment for electric power equipment maintenance
CN209277625U (en) A kind of stage of easy of rise
CN209048977U (en) A kind of easy-to-mount Suresh Kumar dumbbell storage rack
CN205815077U (en) A kind of slide plate
CN206704276U (en) A kind of level land ice face convertible car
CN207803786U (en) A kind of two dimension artistic working platform
CN217828789U (en) A shank strength training device for dance exercise
CN207274674U (en) A kind of unmanned truck rack
CN205802861U (en) A kind of books in libraries tapping equipment
CN217615538U (en) New forms of energy trolley-bus casing apparatus for producing
CN207510289U (en) A kind of solar energy vendors' cart
CN216377383U (en) Construction safety lift
CN208215307U (en) A kind of vehicle maintenance support frame
CN215577569U (en) Information allocation display board for human resources
CN202590304U (en) Detachable jumping-helping roller skating wheel sliding structure
CN217386359U (en) Multi-window multi-user identity card reader
CN215636304U (en) Face identification temperature measuring device convenient to carry
CN211038490U (en) Climbing frame for electric power construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221101

Address after: No. 4308, Floor 43, Building 1, No. 41, Dongmen Road, Jiangyang District, Luzhou, Sichuan 646000

Patentee after: Luzhou Tianyi Development Co.,Ltd.

Address before: Floor 7, Block 4A, Jingrong Hui, No. 200, Tianfu Fifth Street, Wuhou District, Chengdu, Sichuan 610000

Patentee before: Ding Jian

TR01 Transfer of patent right