CN211998554U - Foundation ditch construction device that unearths - Google Patents

Foundation ditch construction device that unearths Download PDF

Info

Publication number
CN211998554U
CN211998554U CN202020620909.8U CN202020620909U CN211998554U CN 211998554 U CN211998554 U CN 211998554U CN 202020620909 U CN202020620909 U CN 202020620909U CN 211998554 U CN211998554 U CN 211998554U
Authority
CN
China
Prior art keywords
plate
foundation pit
end surface
motor
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020620909.8U
Other languages
Chinese (zh)
Inventor
杨凯旋
张荣清
郭军杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Huashui Foundation Engineering Co Ltd
Original Assignee
Henan Huashui Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Huashui Foundation Engineering Co Ltd filed Critical Henan Huashui Foundation Engineering Co Ltd
Priority to CN202020620909.8U priority Critical patent/CN211998554U/en
Application granted granted Critical
Publication of CN211998554U publication Critical patent/CN211998554U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to the technical field of foundation pit construction, in particular to a foundation pit construction unearthing device, which comprises a foundation pit, wherein a first bottom plate is placed on the upper end surface of the foundation pit, a transport box is placed on the right side of the first bottom plate, a first fixed plate is detachably connected on the upper end surface of the first bottom plate, an air cylinder is fixedly connected on the upper end surface of the first fixed plate, a fixed rod is fixedly connected on the upper end surface of the air cylinder, a second wall plate is fixedly connected on the upper end surface of the fixed rod, two winches drive the fixed rod to move up and down through the air cylinder, so as to adjust the unearthing device according to the height of the foundation pit, then a motor is turned on, a rotating plate is driven by the motor to rotate, the rotating plate is rotated through a rotating shaft, the unearthing device is transported to the upper part of the foundation pit through the rotating shaft, a transport box is, the manpower is saved and the space occupying the construction site is reduced during construction.

Description

Foundation ditch construction device that unearths
Technical Field
The utility model relates to a foundation ditch construction technical field, concretely relates to foundation ditch construction unearthing device.
Background
At present, with the gradual improvement of environmental protection consciousness and safety consciousness in recent years, the traditional foundation pit earth excavation methods such as horse-road excavation and step relay excavation in construction have suffered from scaling problems, but a mature special device or method for deep foundation pit earth excavation is not provided; the chain bucket type elevator is used as a vertical material lifting and conveying device which is simple in structure, low in maintenance cost, high in conveying efficiency, high in lifting height, stable in operation and wide in application range, is extremely suitable for vertical lifting of muck, and is not yet applied to foundation pit excavation due to the influences of factors such as long foundation pit length, inconvenient movement after a support frame is arranged, frequent excavation depth change and the like. How to solve the problem of frequent displacement of the chain bucket elevator economically and reasonably is an effective idea for expanding the earthwork excavation mode and accelerating the earthwork excavation efficiency.
But the device that unearths of current foundation ditch construction wastes the manpower and occupies the use place space in the use.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a foundation ditch construction device that unearths has the manpower of saving when the construction, has solved the characteristics that area is big.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a foundation pit construction unearthing device, includes the foundation ditch, first bottom plate has been placed to the up end of foundation ditch, the transport case has been placed on the right side of first bottom plate, the up end of first bottom plate can be dismantled and be connected with first fixed plate, the up end fixedly connected with cylinder of first fixed plate, the up end fixedly connected with dead lever of cylinder, the up end fixedly connected with second wallboard of dead lever, the up end fixedly connected with pivot of second wallboard, the motor is installed to the inside up end of pivot, the output swing joint of motor has the commentaries on classics board, the lower extreme of commentaries on classics board can be dismantled and be connected with two second fixed plates, the lower terminal surface fixedly connected with two hoisters of second fixed plate.
Regard as in the transport case in order to make the inside soil of dress soil box conveniently pour into the transport case the utility model relates to a foundation ditch construction unearthed device is preferred, two the left side of hoist engine all is provided with first motor, the below of commentaries on classics board is provided with dress soil box, the left and right sides of dress soil box all through connection has two steel strand wires, two the both ends and 2 swing joint of hoist engine of steel strand wires.
Speed and strength when carrying the soil in order to practice thrift the workman are regarded as the utility model relates to a foundation ditch construction unearthed device is preferred, the lower terminal surface fixedly connected with shallow of transport case.
For the convenient operation unearthed device, as the utility model relates to a foundation ditch construction unearthed device is preferred, well accuse is installed to the inside lower extreme of first fixed plate, the switch is installed to the preceding terminal surface of first fixed plate, be electric connection between switch and well accuse, cylinder, motor, the first motor.
In order to avoid first fixed plate and first bottom plate to break away from, as the utility model relates to a foundation ditch construction unearthing device is preferred, the up end of first fixed plate can be dismantled and be connected with four second nuts, first fixed plate and first bottom plate can be dismantled the connection through the second nut.
In order to prevent to drop between fixed plate and the commentaries on classics board, as the utility model relates to a foundation ditch construction unearthing device is preferred, two the lower terminal surface of second fixed plate can be dismantled and is connected with a plurality of first nuts, and is a plurality of the up end of first nut runs through the second fixed plate and extends to the below of second fixed plate and changes the board and be connected.
In order to reach the balance of dress soil box, conduct the utility model relates to a foundation ditch construction unearthing device is preferred, steel strand wires are provided with four, and two bisymmetry distributions are in the both sides of dress soil box.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses when using, drive the dead lever through the cylinder and reciprocate, and then reached and highly adjusted fortune native device according to the foundation ditch, open the motor after that, drive the commentaries on classics board by the motor and rotate, utilize the pivot to let the commentaries on classics board rotate, will go out native device and transport the foundation ditch top through the pivot, lay the transport case on the right side of first bottom plate to pour the inside of transport case into the soil in the foundation ditch, reached and practiced thrift the manpower and reduced the space that occupies the construction site when the construction.
Drawings
FIG. 1 is a structural diagram of a foundation pit construction unearthing device of the utility model;
FIG. 2 is a structural diagram of the foundation pit earth-moving structure of the present invention;
FIG. 3 is a view of the structure of the transporting soil of the present invention;
fig. 4 is a structural diagram of a hoist of the present invention;
fig. 5 is a cross-sectional view of the central control system of the present invention;
fig. 6 is a cross-sectional view of the rotating shaft of the present invention.
In the figure: 1. a foundation pit; 101. a first base plate; 102. a first fixing plate; 103. a cylinder; 104. fixing the rod; 105. a second wall panel; 106. a rotating shaft; 1061. a motor; 107. rotating the plate; 1071. a second fixing plate; 108. steel strand wires; 109. loading a soil box; 2. a winch; 201. a first nut; 202. a first motor; 3. a second nut; 4. a switch; 5. a transport case; 501. pushing a cart; 6. and (4) central control.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-6, the utility model provides a technical solution: the utility model provides a foundation pit construction unearthing device, including foundation pit 1, first bottom plate 101 has been placed to the up end of foundation pit 1, transport case 5 has been placed on the right side of first bottom plate 101, the up end of first bottom plate 101 can be dismantled and be connected with first fixed plate 102, the up end fixedly connected with cylinder 103 of first fixed plate 102, the up end fixedly connected with dead lever 104 of cylinder 103, the up end fixedly connected with second wallboard 105 of dead lever 104, the up end fixedly connected with pivot 106 of second wallboard 105, motor 1061 is installed to the inside up end of pivot 106, motor 1061's output swing joint has commentaries on classics board 107, the lower extreme of commentaries on classics board 107 can be dismantled and be connected with two second fixed plates 1071, two hoist engine 2 of the lower terminal surface fixedly connected with of second fixed plate 1071.
In this embodiment: through placing first bottom plate 101 at foundation ditch 1 up end, and then be connected first bottom plate 101 and foundation ditch, it is fixed between first bottom plate 101 and first fixed plate 102 through second nut 3, prevent to break away from between first bottom plate 101 and the first fixed plate 102, through upper end installation cylinder 103 at first fixed plate 102, it reciprocates to drive dead lever 104 by cylinder 103, and then reached the effect of adjusting fortune native device height, through internally mounted motor 1061 at pivot 106, it rotates to drive commentaries on classics board 107 by motor 1061, it transports the device of digging out to foundation ditch 1 top through pivot 106, lay transport case 5 on the right side of first bottom plate 101, thereby pour the soil in foundation ditch 1 into the inside of transport case 5, reached when the construction save the manpower and reduced the effect of occupying the space in construction site.
As a technical optimization scheme of the utility model, two hoist engine 2's left side all is provided with first motor 202, and the below of commentaries on classics board 107 is provided with dress soil box 109, and the left and right sides of dress soil box 109 all through connection has two steel strand wires 108, two steel strand wires 108's both ends and hoist engine 2 swing joint.
In this embodiment: through all run through connection steel strand wires 108 in dress soil box 109's the left and right sides, when starting first motor 202, first motor 202 drives hoist engine 2 and rotates, makes convenient the pulling dress soil box 109 of steel strand wires 108 to make the inside soil of dress soil box 109 conveniently pour into transport case 5.
As a technical optimization scheme of the utility model, the lower terminal surface fixedly connected with shallow 501 of transport case 5.
In this embodiment: the soil in the foundation pit 1 is poured into the transport box 5 in the soil loading box, and the transport box 5 is processed by pushing the cart 501, so that time and labor are saved.
As a technical optimization scheme of the utility model, well accuse 6 is installed to the inside lower extreme of first fixed plate 102, and switch 4 is installed to the preceding terminal surface of first fixed plate 102, is electric connection between switch 4 and well accuse 6, cylinder 103, motor 1061, the first motor 202.
In this embodiment: the switch 4 is used for controlling the central control 6, the air cylinder 103, the motor 1061 and the first motor 202 to start the soil discharging device, so that the soil discharging device is convenient to operate.
As a technical optimization scheme of the utility model, the up end of first fixed plate 102 can be dismantled and be connected with four second nuts 3, and first fixed plate 102 and first bottom plate 101 can be dismantled through second nut 3 and connect.
In this embodiment: the four second nuts 3 are detachably connected to the upper end surface of the first fixing plate 102, so that the first fixing plate 102 and the first base plate 101 are fixed, and the first fixing plate 102 is prevented from being separated from the first base plate 101.
As a technical optimization scheme of the utility model, two second fixed plates 1071's lower terminal surface can be dismantled and be connected with a plurality of first nuts 201, and the up end of a plurality of first nuts 201 runs through second fixed plate 1071 and extends to the below of second fixed plate 1071 and is connected with commentaries on classics board 107.
In this embodiment: the plurality of first nuts 201 are detachably connected to the lower end surfaces of the two second fixing plates 1071, and the second fixing plates 1071 are fixed to the rotating plate 107, thereby preventing the second fixing plates 1071 from being separated from the rotating plate 107.
As a technical optimization scheme of the utility model, steel strand wires 108 are provided with four, and two bisymmetry distributions are in dress soil box 109's both sides.
In this embodiment: the four steel strands 108 are distributed and connected to two sides of the soil loading box 109, so that the balance of the soil loading box 109 is guaranteed.
When using, turn on switch 4, control 6 control rather than electric connection's cylinder 103 in controlling, motor 1061 and first motor 202 carry out work, drive dead lever 104 through cylinder 103 and reciprocate, and then adjust the earth-moving device according to the high flexibility of foundation ditch 1, open two first motors 202 and drive two hoist engines 2, drive steel strand wires 108 through hoist engine 2, will adorn soil box 109 pulling by steel strand wires 108 and transport out foundation ditch 1, open motor 1061 after that, drive the commentaries on classics board 107 by motor 1061 and rotate, utilize pivot 106 to let commentaries on classics board 107 rotate, can rotate out the device that goes out to through pivot 106 and lay the next door of transport case 5 on first bottom plate 101 right side, thereby arrive the inside of transport case 5 through adorning soil box 109 slope, and then do benefit to transporting out the earth with shallow 501 fast, the shared time during the saving construction.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a foundation ditch construction unearthed device, includes foundation ditch (1), its characterized in that: a first bottom plate (101) is arranged on the upper end surface of the foundation pit (1), a transport box (5) is arranged on the right side of the first bottom plate (101), the upper end surface of the first bottom plate (101) is detachably connected with a first fixing plate (102), the upper end surface of the first fixing plate (102) is fixedly connected with an air cylinder (103), the upper end surface of the air cylinder (103) is fixedly connected with a fixing rod (104), the upper end surface of the fixed rod (104) is fixedly connected with a second wall plate (105), the upper end surface of the second wall plate (105) is fixedly connected with a rotating shaft (106), the upper end surface inside the rotating shaft (106) is provided with a motor (1061), the output end of the motor (1061) is movably connected with a rotating plate (107), the lower end of the rotating plate (107) is detachably connected with two second fixed plates (1071), the lower end face of the second fixing plate (1071) is fixedly connected with two winches (2).
2. The foundation pit construction unearthing device of claim 1, characterized in that: the left side of two hoist engine (2) all is provided with first motor (202), the below of commentaries on classics board (107) is provided with dress soil box (109), the left and right sides of dress soil box (109) all through connection has two steel strand wires (108), two the both ends and hoist engine (2) swing joint of steel strand wires (108).
3. The foundation pit construction unearthing device of claim 1, characterized in that: the lower end face of the transport box (5) is fixedly connected with a trolley (501).
4. The foundation pit construction unearthing device of claim 1, characterized in that: well accuse (6) are installed to the inside lower extreme of first fixed plate (102), switch (4) are installed to the preceding terminal surface of first fixed plate (102), be electric connection between switch (4) and well accuse (6), cylinder (103), motor (1061), first motor (202).
5. The foundation pit construction unearthing device of claim 1, characterized in that: the upper end face of the first fixing plate (102) is detachably connected with four second nuts (3), and the first fixing plate (102) is detachably connected with the first base plate (101) through the second nuts (3).
6. The foundation pit construction unearthing device of claim 2, characterized in that: the lower end face of two second fixed plate (1071) can dismantle and be connected with a plurality of first nuts (201), and a plurality of the up end of first nut (201) runs through second fixed plate (1071) and extends to the below of second fixed plate (1071) and is connected with commentaries on classics board (107).
7. The foundation pit construction unearthing device of claim 2, characterized in that: four steel strands (108) are arranged and are symmetrically distributed on two sides of the soil box (109) in pairs.
CN202020620909.8U 2020-04-22 2020-04-22 Foundation ditch construction device that unearths Expired - Fee Related CN211998554U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020620909.8U CN211998554U (en) 2020-04-22 2020-04-22 Foundation ditch construction device that unearths

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020620909.8U CN211998554U (en) 2020-04-22 2020-04-22 Foundation ditch construction device that unearths

Publications (1)

Publication Number Publication Date
CN211998554U true CN211998554U (en) 2020-11-24

Family

ID=73406235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020620909.8U Expired - Fee Related CN211998554U (en) 2020-04-22 2020-04-22 Foundation ditch construction device that unearths

Country Status (1)

Country Link
CN (1) CN211998554U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113682986A (en) * 2021-09-07 2021-11-23 国网江苏省电力有限公司常州供电分公司 Working method of intelligent machine for deep foundation pit operation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113682986A (en) * 2021-09-07 2021-11-23 国网江苏省电力有限公司常州供电分公司 Working method of intelligent machine for deep foundation pit operation
CN113682986B (en) * 2021-09-07 2024-03-19 国网江苏省电力有限公司常州供电分公司 Working method of intelligent deep foundation pit operation machine

Similar Documents

Publication Publication Date Title
CN211998554U (en) Foundation ditch construction device that unearths
CN209797314U (en) adjustable assembled door-shaped frame for assembling and disassembling tower crane
CN210103322U (en) Self-driven urban underground prefabricated comprehensive pipe gallery laying and hoisting machine
CN210855107U (en) Building material conveying device
CN214879791U (en) Electric power tower stone pit is drawn and is dug machine of carrying soil
CN213171212U (en) A hoisting apparatus for building engineering
CN213923950U (en) Civil engineering elevating gear
CN201241729Y (en) Simple automatic slag-discharging apparatus of deep large drilled shaft
CN210214605U (en) Salted broken pepper accuse fortune equipment
CN211370280U (en) Tubular pile stake core clearance instrument
CN210683055U (en) Device convenient to building material transport
CN217025102U (en) Material loading machine for construction
CN203513129U (en) Lifting device for conveying digging pile construction materials
CN212613442U (en) Roofing tile pressure equipment
CN217534084U (en) Construction site garbage pool
CN218667631U (en) Sinking construction device for assembled underground building
CN215924150U (en) Mechanical soil guide device for pilot tunnel manual hole digging pile
CN213085336U (en) Municipal works construction is with portable elevating gear
CN217894978U (en) Movable hoisting device
CN210635150U (en) Garbage collection device for construction site
CN210658268U (en) Tool for disassembling fence plate template
CN217148317U (en) Movable derrick crane used in adit
CN219279397U (en) Hydraulic pull rod for opening concrete prefabricated cable well cover plate
CN215326552U (en) Hoisting accessory that has protect function based on prefabricated building
CN218623379U (en) Concrete pouring device for construction engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201124

Termination date: 20210422