CN211981364U CN202020771202.7U CN202020771202U CN211981364U CN 211981364 U CN211981364 U CN 211981364U CN 202020771202 U CN202020771202 U CN 202020771202U CN 211981364 U CN211981364 U CN 211981364U
Authority
CN
China
Prior art keywords
main equipment
regulating plate
push rod
equipment shell
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020771202.7U
Other languages
Chinese (zh)
Inventor
石正秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Guoji Power Installation Co ltd
Original Assignee
Xinchang Hongbai Electric Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang Hongbai Electric Power Technology Co ltd filed Critical Xinchang Hongbai Electric Power Technology Co ltd
Priority to CN202020771202.7U priority Critical patent/CN211981364U/en
Application granted granted Critical
Publication of CN211981364U publication Critical patent/CN211981364U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a construction of electric power cable wall is laid and is used pre-buried equipment, including main equipment shell, location push rod and driven regulating plate, the lateral surface welding of main equipment shell has the fixed bolster, and the upper and lower both ends symmetry of fixed bolster installs the pulley, location push rod swing joint is in the inside upper and lower both sides of main equipment shell, and the side fixed mounting of location push rod has the fixed plate, driven regulating plate fixed mounting is in the outside of fixed bolster, the equal fixed mounting in inside of initiative regulating plate and driven regulating plate has vacuum negative pressure extraction equipment, the inside welding of main equipment shell has the stopper, the lateral surface fixed mounting of disc has tooth piece and lug. This electric power cable wall construction is laid and is used pre-buried equipment adopts neotype structural design for this device is convenient for be applicable to the wall body not co-altitude and carries out pre-buried construction, and the device is provided with adsorption structure, and the continuity of being convenient for is pre-buried longer cable and pipe fitting.

Description

Pre-buried equipment for construction and laying of power cable wall surface
Technical Field
The utility model relates to an electric power cable technical field specifically is an electric power cable wall construction is laid and is used pre-buried equipment.
Background
The electric power cable is the main material of circuit connection structure, to be through the mutual electric connection of cable structure between the equipment of correlation each other, the mutual correlation control of being convenient for, at the in-process of construction, according to the design requirement of drawing, set up cable connection structure and communicate each other electric power structure in the corresponding position of wall body, general cable is fixed need run through inside the spool when the wall body is inside earlier, fix the spool structure is pre-buried inside the wall body again, process it through some mountings, the spool structure is more, use pre-buried equipment can improve the efficiency of whole construction during workman's construction.
With the continuous construction and use of the embedded equipment, the following problems are found in the use process:
1. the height difference of the pre-buried cable pipe fitting structure in different positions of the wall body, the existing partial pre-buried equipment is inconvenient to use on the wall bodies with different heights, and the application range is small.
2. And cable and pipe fitting structure are generally longer, are not convenient for link up fixedly at pre-buried in-process to it, and the effect of equipment usage receives the influence.
Therefore, the embedded equipment for the construction and the laying of the power cable wall surface needs to be designed aiming at the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power cable wall construction is laid and is used pre-buried equipment to solve the high difference that proposes the pre-buried cable pipe fitting structure of the different positions of wall body in the above-mentioned background art, current partial pre-buried equipment is not convenient for use on the wall body of co-altitude not when using, and application scope is less, and cable and pipe fitting structure are generally longer, is not convenient for link up fixedly it at pre-buried in-process, and the effect that equipment used receives the problem of influence.
In order to achieve the above object, the utility model provides a following technical scheme: a pre-buried equipment for laying power cable wall construction comprises a main equipment shell, a positioning push rod and a driven adjusting plate, wherein a fixing support is welded on the outer side surface of the main equipment shell, pulleys are symmetrically installed at the upper end and the lower end of the fixing support, a built-in round bar is fixedly installed in the main equipment shell, the positioning push rod is movably connected to the upper side and the lower side in the main equipment shell, a fixing plate is fixedly installed on the side surface of the positioning push rod, the inner side of the main equipment shell is connected with a pre-buried push plate through an internal electric telescopic rod, the driven adjusting plate is fixedly installed on the outer side of the fixing support and is connected with a driving adjusting plate through an adjusting rod, a positioning lead screw is rotatably connected to the side surface of the driving adjusting plate, vacuum negative pressure extracting equipment is fixedly installed in, and the lateral surface fixed mounting of vacuum negative pressure extraction equipment has powerful sucking disc, the inside welding of main equipment shell has the stopper, and the inside rotation of main equipment shell is connected with the disc, the lateral surface fixed mounting of disc has tooth piece and lug, and the lug is connected with the one end interconnect of connecting rod to the other end and the location push rod interconnect of connecting rod.
Preferably, the fixed bolster and location lead screw threaded connection, and fixed bolster and driven regulating plate, main equipment shell three fixed connection to driven regulating plate is through adjusting the pole and initiative regulating plate constitution extending structure.
Preferably, the positioning push rod is connected with the limiting block in a sliding mode, the positioning push rod is connected with the built-in round rod in a penetrating mode, the positioning push rod and one end of the connecting rod form a rotating structure, and meanwhile the other end of the connecting rod is connected with the protruding block in a rotating mode.
Preferably, the inside movable mounting of fixed plate has the ball, and the side of fixed plate is circular-arc structure to the fixed plate passes through the location push rod and constitutes extending structure with the main equipment shell.
Preferably, the powerful suction cups are respectively provided with 2 on the side surfaces of the driving adjusting plate and the driven adjusting plate, and the 2 powerful suction cups are arranged up and down correspondingly in a central symmetry mode relative to the shell of the main equipment.
Preferably, the number of the disks is 2, and the 2 disks are symmetrically arranged around the center of the main device shell and are meshed with each other through the tooth blocks.
Compared with the prior art, the beneficial effects of the utility model are that: the embedded equipment for power cable wall construction and laying adopts a novel structural design, so that the equipment can be conveniently adsorbed on a constructed wall body, the equipment is convenient to use at different height positions of the wall body, and meanwhile, an adsorption moving structure is arranged in the equipment, so that the cable and pipe fitting structures can be always fixed in the using process, and the embedded equipment is convenient to use;
1. the vacuum negative pressure extraction equipment and the powerful sucker form a powerful adsorption structure, the device is fixed at the corresponding position of a wall body through the adsorption structure, so that the position of a main equipment shell corresponds to the pre-buried position of a cable and a pipe fitting, the cable is clamped and fixed in the device, the operation motor controls the positioning screw rod to rotate, the main equipment shell is driven by the transmission structure to move on the side surface of a wire slot, the cable and the pipe fitting structure are pre-buried in the wire slot of the wall body, the device can be positioned at different heights of the wall body to operate due to the arrangement of the adsorption structure, and the application range of the device is enlarged;
2. fixed plate that extending structure set up, and the initiative regulating plate that extending structure set up, pre-buried man-hour, adsorb the device on the wall body through the sucker structure of initiative regulating plate side, the location lead screw is rotated in the operation, it carries out pre-buried construction to drive the main equipment shell removal, when the main equipment shell removes to the most lateral position of location lead screw, the adsorption structure who uses driven regulating plate side adsorbs on the wall body, the adsorption structure of not hard up initiative regulating plate side simultaneously, it promotes the outside removal of initiative regulating plate to continue to rotate the location lead screw, the setting of this part structure can make the device continuity pre-buried at the surface removal of wall body, be applicable to the cable and the pipe fitting structure of different length, it is more convenient to.
Drawings
FIG. 1 is a schematic front sectional view of the present invention;
FIG. 2 is a schematic top sectional view of the present invention;
FIG. 3 is a schematic view of a front partial sectional structure of the main device housing of the present invention;
fig. 4 is a schematic front partial sectional view of the fixing plate of the present invention.
In the figure: 1. a main device housing; 2. fixing a bracket; 3. a pulley; 4. a round rod is arranged inside; 5. positioning the push rod; 6. a fixing plate; 7. an internal electric telescopic rod; 8. pre-burying a push plate; 9. a driven adjusting plate; 10. adjusting a rod; 11. an active adjusting plate; 12. positioning a screw rod; 13. vacuum negative pressure extraction equipment; 14. a powerful sucker; 15. a limiting block; 16. a disc; 17. a tooth block; 18. a bump; 19. a connecting rod; 20. and a ball.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a pre-buried device for construction and laying of power cable wall surfaces comprises a main device shell 1, a fixed support 2, pulleys 3, a built-in round rod 4, a positioning push rod 5, a fixed plate 6, an internal electric telescopic rod 7, a pre-buried push plate 8, a driven adjusting plate 9, an adjusting rod 10, a driving adjusting plate 11, a positioning screw rod 12, a vacuum negative pressure extraction device 13, a strong suction cup 14, a limiting block 15, a disc 16, a tooth block 17, a convex block 18, a connecting rod 19 and balls 20, wherein the fixed support 2 is welded on the outer side surface of the main device shell 1, the pulleys 3 are symmetrically arranged at the upper end and the lower end of the fixed support 2, the built-in round rod 4 is fixedly arranged inside the main device shell 1, the positioning push rod 5 is movably connected to the upper side and the lower side of the main device shell 1, the fixed plate 6 is fixedly arranged on the side surface of the positioning push, driven regulating plate 9 fixed mounting is in the outside of fixed bolster 2, and driven regulating plate 9 is through adjusting pole 10 and initiative regulating plate 11 interconnect, and the side of initiative regulating plate 11 is rotated and is connected with positioning screw 12, the equal fixed mounting in inside of initiative regulating plate 11 and driven regulating plate 9 has vacuum negative pressure extraction equipment 13, and vacuum negative pressure extraction equipment 13's lateral surface fixed mounting has powerful suction cup 14, the inside welding of main equipment shell 1 has stopper 15, and main equipment shell 1's inside rotation is connected with disc 16, disc 16's lateral surface fixed mounting has tooth piece 17 and lug 18, and lug 18 and connecting rod 19's one end interconnect, and connecting rod 19's the other end and positioning push rod 5 interconnect.
In the embodiment, the fixed support 2 is in threaded connection with the positioning screw rod 12, the fixed support 2 is fixedly connected with the driven adjusting plate 9 and the main equipment shell 1, the driven adjusting plate 9 and the driving adjusting plate 11 form a telescopic structure through the adjusting rod 10, and the design structure is convenient for continuously driving the device to transversely move on the surface of a wall body and continuously perform pre-embedding processing;
the positioning push rod 5 is connected with the limiting block 15 in a sliding mode, the positioning push rod 5 is connected with the built-in round rod 4 in a penetrating mode, the positioning push rod 5 and one end of the connecting rod 19 form a rotating structure, meanwhile, the other end of the connecting rod 19 is connected with the lug 18 in a rotating mode, the lug 18 drives the two ends of the connecting rod 19 to rotate when rotating, and the connecting rod 19 pushes the positioning push rod 5 to move in a telescopic mode;
the inside of the fixed plate 6 is movably provided with a ball 20, the side surface of the fixed plate 6 is of an arc-shaped structure, the fixed plate 6 and the main equipment shell 1 form a telescopic structure through the positioning push rod 5, and the fixed plate 6 moves up and down along with the telescopic movement of the positioning push rod 5 to fixedly clamp the wire pipe;
2 strong suction cups 14 are arranged on the side surfaces of the driving adjusting plate 11 and the driven adjusting plate 9, the 2 strong suction cups 14 are symmetrically arranged up and down relative to the center of the main equipment shell 1, and the device is adsorbed on the surface of a wall body by using the strong suction cups 14, so that the device can be suitable for pre-embedding processing of the wall body at different heights;
the number of the discs 16 is 2 about the central symmetry of the main equipment shell 1, the 2 discs 16 are meshed with each other through the tooth blocks 17, the motor on the side surface of the operation disc 16 drives the operation disc to rotate, and the meshing transmission structure drives the two discs 16 to rotate reversely at the same time.
The working principle is as follows: when the device is used, firstly, according to the structure shown in figures 1, 2, 3 and 4, the device is adsorbed on the surface of a wall body through a vacuum negative pressure extraction device 13 and a strong suction cup 14 on the side surface of a driving adjusting plate 11 according to the position of a wire slot formed on the surface of the wall body, a running motor controls a positioning screw rod 12 to rotate, the positioning screw rod 12 is in threaded connection with a fixed support 2, the fixed support 2 is fixedly connected with a main device shell 1 and a driven adjusting plate 9, the positioning screw rod 12 drives the part of the fixed structure to move to the side surface when rotating, the fixed support 2 transversely moves on the surface of the wall body through a pulley 3, one ends of a cable and a wire pipe are fixed inside the wire slot through a clamping piece, then one end of the wire pipe is arranged on the inner side of the main device shell 1, the running motor controls a disc 16 to rotate (a driving motor is arranged on the side surface of, the lug 18 fixed on the side of the disc 16 rotates with the disc, drives the two ends of the connecting rod 19 to rotate, meanwhile, the connecting rod 19 pushes the positioning push rod 5 on the side surface to move towards the side surface, the positioning push rod 5 drives the fixing plate 6 on the outer side to move towards the outer side of the spool, the fixing plate 6 clamps and fixes the outer part of the spool, then, the operation motor controls the positioning screw rod 12 to rotate, the positioning screw rod 12 is in threaded connection with the fixing support 2, the main equipment shell 1 and the driven adjusting plate 9 are driven to move towards the outer side, the fixing plate 6 slides outside the spool through the balls 20, other positions of the spool correspond to the outer side positions of the wire chase, the inner electric telescopic rod 7 is extended to push the embedded push plate 8 to move towards the side, the embedded push plate 8 pushes the spool to enter the inner part of the wire chase, embedding is achieved, and the spool is sequentially embedded into the inner part of the wire chase as the main equipment shell 1 moves towards the side;
subsequently, according to the structure shown in fig. 1 and 2, when the fixing bracket 2 moves to the outermost position of the positioning screw rod 12, the powerful suction cup 14 on the side surface of the driven adjusting plate 9 is adsorbed on the outer side of the wall body through the vacuum negative pressure extraction device 13, the powerful suction cup 14 on the side surface of the driving adjusting plate 11 is loosened, the rotating positioning screw rod 12 continues to operate, the fixing bracket 2 and the driven adjusting plate 9 are fixedly connected, the driving adjusting plate 11 moves to the outer side through the adjusting rod 10, when the driving adjusting plate 11 moves to the maximum position, the driving adjusting plate 11 is adsorbed on the wall surface, the adsorption structure on the side surface of the driven adjusting plate 9 is loosened, the operation is repeated, and cables and pipe fittings are embedded continuously.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a construction of power cable wall is laid and is used pre-buried equipment, includes main equipment shell (1), location push rod (5) and driven regulating plate (9), its characterized in that: the outer side welding of main equipment shell (1) has fixed bolster (2), and the upper and lower both ends symmetry of fixed bolster (2) installs pulley (3), and the inside fixed mounting of main equipment shell (1) has built-in pole (4), location push rod (5) swing joint both sides about the inside of main equipment shell (1), and the side fixed mounting of location push rod (5) has fixed plate (6), and the inboard of main equipment shell (1) is through inside electric telescopic handle (7) and pre-buried push pedal (8) interconnect, driven regulating plate (9) fixed mounting is in the outside of fixed bolster (2), and driven regulating plate (9) are through adjusting pole (10) and initiative regulating plate (11) interconnect to the side rotation of initiative regulating plate (11) is connected with location lead screw (12), the equal fixed mounting in the inside of initiative regulating plate (11) and driven regulating plate (9) has vacuum negative pressure extraction equipment (13), and the lateral surface fixed mounting of vacuum negative pressure extraction equipment (13) has powerful suction cup (14), the inside welding of main equipment shell (1) has stopper (15), and the inside rotation of main equipment shell (1) is connected with disc (16), the lateral surface fixed mounting of disc (16) has tooth piece (17) and lug (18), and the one end interconnect of lug (18) and connecting rod (19) to the other end and location push rod (5) interconnect of connecting rod (19).
2. The embedded equipment for power cable wall construction laying according to claim 1 is characterized in that: fixed bolster (2) and positioning screw (12) threaded connection, and fixed bolster (2) and driven regulating plate (9), main equipment shell (1) three fixed connection to driven regulating plate (9) are through adjusting pole (10) and initiative regulating plate (11) constitution extending structure.
3. The embedded equipment for power cable wall construction laying according to claim 1 is characterized in that: the positioning push rod (5) is connected with the limiting block (15) in a sliding mode, the positioning push rod (5) is connected with the built-in round rod (4) in a penetrating mode, a rotating structure is formed by the positioning push rod (5) and one end of the connecting rod (19), and meanwhile the other end of the connecting rod (19) is connected with the protruding block (18) in a rotating mode.
4. The embedded equipment for power cable wall construction laying according to claim 1 is characterized in that: the inside movable mounting of fixed plate (6) has ball (20), and the side of fixed plate (6) is circular-arc structure to fixed plate (6) are through location push rod (5) and main equipment shell (1) constitution extending structure.
5. The embedded equipment for power cable wall construction laying according to claim 1 is characterized in that: the side of the driving adjusting plate (11) and the side of the driven adjusting plate (9) are respectively provided with 2 strong suckers (14), and the 2 strong suckers (14) are arranged up and down correspondingly in a central symmetry mode relative to the main equipment shell (1).
6. The embedded equipment for power cable wall construction laying according to claim 1 is characterized in that: the number of the discs (16) is 2, and the discs (16) are meshed with each other through the toothed blocks (17).
CN202020771202.7U 2020-05-11 2020-05-11 Pre-buried equipment for construction and laying of power cable wall surface Active CN211981364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020771202.7U CN211981364U (en) 2020-05-11 2020-05-11 Pre-buried equipment for construction and laying of power cable wall surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020771202.7U CN211981364U (en) 2020-05-11 2020-05-11 Pre-buried equipment for construction and laying of power cable wall surface

Publications (1)

Publication Number Publication Date
CN211981364U true CN211981364U (en) 2020-11-20

Family

ID=73370487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020771202.7U Active CN211981364U (en) 2020-05-11 2020-05-11 Pre-buried equipment for construction and laying of power cable wall surface

Country Status (1)

Country Link
CN (1) CN211981364U (en)

Similar Documents

Publication Publication Date Title
CN208556443U (en) A kind of ABB robot arm fixture
CN211981364U (en) Pre-buried equipment for construction and laying of power cable wall surface
CN215433726U (en) Lower ingot turning clamp for reducing crystal collision of quartz glass
CN108808413A (en) A kind of harness is fixedly connected with equipment automatically with terminal
CN112548774A (en) Cable insulation polisher
CN209878479U (en) Movable clamp for detecting automobile glass
CN114498450B (en) Flexible pneumatic control cable feeding equipment for laying communication engineering cables
CN215881039U (en) Grinding device for vertical upward bending machining
CN212682860U (en) Automatic welding device for automobile temperature sensor production
CN212399585U (en) Manipulator convenient to different electronic product of centre gripping
CN210351828U (en) Positioning fixture of soft and hard combined plate set
CN112447332A (en) Automatic stranding device with double clamping suitable for cables of various sizes
CN219465940U (en) Base station bottom plate processing jig
CN215791706U (en) High-efficient hydraulic pipe bender with limit function
CN219263089U (en) Electrical pipeline positioning device
CN217317933U (en) Gear box body clamp
CN217741999U (en) Granite base for circuit board
CN220680637U (en) Joint assembling machine
CN215880624U (en) Manipulator for assembling electronic product
LU505315B1 (en) Automatic Robot Gripper
CN215588802U (en) Burnishing device is used in conductor material processing
CN213522208U (en) Switch for information-based construction
CN220128810U (en) Manipulator with stable clamping
CN213236261U (en) Intelligent valve electric actuator with stop gear
CN217545461U (en) Communication pipeline construction clamping device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221129

Address after: 450000 South Complex Building, West Hongda East Road, Zhenghua Road, Jinshui District, Zhengzhou City, Henan Province

Patentee after: Henan Guoji Power Installation Co.,Ltd.

Address before: No. 355, Zhanghua village, Huishan Town, Xinchang County, Shaoxing City, Zhejiang Province