CN211948464U - Underground continuous wall and foundation slab's pre-buried steel sheet connection structure - Google Patents

Underground continuous wall and foundation slab's pre-buried steel sheet connection structure Download PDF

Info

Publication number
CN211948464U
CN211948464U CN202020369607.8U CN202020369607U CN211948464U CN 211948464 U CN211948464 U CN 211948464U CN 202020369607 U CN202020369607 U CN 202020369607U CN 211948464 U CN211948464 U CN 211948464U
Authority
CN
China
Prior art keywords
continuous wall
underground continuous
steel plate
foundation
foundation slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020369607.8U
Other languages
Chinese (zh)
Inventor
王卫东
徐中华
翁其平
宗露丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Architectural Design and Research Institute Co Ltd
Original Assignee
East China Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Architectural Design and Research Institute Co Ltd filed Critical East China Architectural Design and Research Institute Co Ltd
Priority to CN202020369607.8U priority Critical patent/CN211948464U/en
Application granted granted Critical
Publication of CN211948464U publication Critical patent/CN211948464U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model belongs to the connection structure of the underground continuous wall and the embedded steel plate of the foundation slab in the field of foundation pit support and foundation engineering, and adopts the technical scheme that the vertical early embedded steel plate is embedded in the outer side of a reinforcement cage in the underground continuous wall; the center elevation of the early-stage pre-buried steel plate is the same as the elevation of the main ribs of the foundation slab, and the post-welding steel plate constructed after the foundation pit is excavated to the bottom of the pit is vertically welded with the early-stage pre-buried steel plate and is welded and fixed with the main ribs of the foundation slab after being transversely lapped. The structure solves the technical problems that the position precision of the reserved steel bar connector in the conventional connection method adopted by the underground continuous wall is difficult to ensure and reliable connection is difficult to provide, and simultaneously meets the stress requirement of the connection of the underground continuous wall and the foundation slab.

Description

Underground continuous wall and foundation slab's pre-buried steel sheet connection structure
Technical Field
The utility model belongs to excavation supporting field and foundation engineering field especially relate to underground continuous wall and foundation slab's joint construction, but wide application is in the underground continuous wall foundation engineering as retaining structure.
Background
A large number of deep foundation pit projects are generated in the development of underground spaces in China, and the deep foundation pits usually need to be supported so as to guarantee the safety of the foundation pits and the safety of environments such as adjacent buildings, roads, pipelines and the like. The underground continuous wall used as a building enclosure of the foundation pit has the advantages of high rigidity, good water stopping performance, high safety and the like, and is widely applied to foundation pit engineering with large excavation depth. When the underground continuous wall is used as a support structure of a foundation pit, most of the underground continuous wall adopts a form of combining two walls into one, namely the underground continuous wall is used as the support wall of the foundation pit in the excavation stage of the foundation pit and is used as the outer wall of a basement structure in the permanent use stage. The underground continuous wall used as the integration of two walls must be reliably connected with the bottom plate of the basement structure so as to meet the stress requirement.
The conventional connection method of the underground continuous wall and the foundation slab is that a steel bar connector is pre-embedded in the underground continuous wall, and after a foundation pit is excavated to a base, the steel bars of the foundation slab are directly connected with the steel bar connector pre-embedded in the underground continuous wall. The connection mode has extremely strict requirements on the positioning accuracy of the embedded steel bar connector. Because underground continuous wall construction is concealed engineering, the construction is influenced by multiple complex factors, and underground continuous wall still can take place lateral deformation and vertical displacement after the foundation ditch excavation in addition, consequently the precision of pre-buried connector position in the underground continuous wall often is difficult to obtain guaranteeing, and this makes underground continuous wall and foundation slab's being connected become weak link, can produce the condition that the connector can't use even when the positional deviation of connector is great. Therefore, the node which can meet the reliable connection between the underground diaphragm wall and the foundation slab has important engineering significance.
SUMMERY OF THE UTILITY MODEL
For solving the technical problem, the utility model provides a underground continuous wall and foundation plate's pre-buried steel sheet joint construction, this structure has solved the reservation reinforcing bar connector position precision that underground continuous wall adopted among the conventional connection method and has plugged into and is difficult to obtain the assurance, and then is difficult to provide the technical problem of reliable connection, has satisfied the atress requirement that underground continuous wall and foundation plate are connected simultaneously.
The technical scheme of the utility model is that: the outer side of a reinforcement cage in the underground continuous wall is embedded with a vertical early-embedded steel plate; the center elevation of the early-stage pre-buried steel plate is the same as the elevation of the main ribs of the foundation slab, and the post-welding steel plate constructed after the foundation pit is excavated to the bottom of the pit is vertically welded with the early-stage pre-buried steel plate and is welded and fixed with the main ribs of the foundation slab after being transversely lapped.
Based on the technical characteristics, the main ribs of the foundation slab comprise main ribs of the slab surface and main ribs of the slab bottom.
Based on the technical characteristics, the pre-buried steel plate is connected with the underground continuous wall through welding with the anchor bars.
When the underground continuous wall is constructed, an upper pre-embedded steel plate and a lower pre-embedded steel plate are pre-embedded in the underground continuous wall, the center elevations of the upper pre-embedded steel plate and the lower pre-embedded steel plate are respectively the same as the elevation of a main plate surface rib and the elevation of a main plate bottom rib of a foundation bottom plate, and the pre-embedded steel plates can be connected with the underground continuous wall through welding with anchor bars or can be pre-embedded in the underground continuous wall through other prior art. After foundation ditch excavation to the bottom of the pit, will back welding steel sheet vertical welding on the pre-buried steel sheet in underground continuous wall, even there is the error in the pre-buried steel sheet elevation of elder generation with the elevation of actual requirement, because pre-buried steel sheet of elder generation has certain width, back welded steel sheet just can reciprocate the certain distance according to actual conditions and make the vertical position of back welding steel sheet can satisfy the accurate elevation requirement of soleplate owner muscle, and with soleplate's main muscle lap welding on back welding steel sheet, just so can eliminate the elevation error of pre-buried steel sheet, make soleplate's main muscle can link together with underground continuous wall reliably, satisfy the atress requirement.
Among the above-mentioned scheme, the length of pre-buried anchor bar in the underground continuous wall needs to satisfy the anchor length requirement of stipulating among the prior art standard, and anchor length belongs to prior art, does not belong to the utility model discloses in the protection range. In addition, the welding of pre-buried steel sheet in earlier stage and the anchor bar, the welding of back welding steel sheet and pre-buried steel sheet in earlier stage, the welding of foundation slab owner muscle and back welding steel sheet all need satisfy the welding requirement of stipulating among the prior art standard, and these welding requirements belong to prior art, do not belong to the utility model discloses in the protection range.
The utility model discloses a vertical position of welding steel sheet after removing can compensate the error of the pre-buried steel sheet center elevation of elder generation, and the vertical position of welding steel sheet after guaranteeing can satisfy the accurate elevation requirement of soleplate owner muscle to weld soleplate's main muscle overlap joint on the welding steel sheet after, have higher construction error compatibility, make soleplate's main muscle high with the connection precision of underground continuous wall, and convenient operation, be favorable to the nimble construction at scene.
Drawings
Fig. 1 is a schematic view of pre-burying a steel plate and an anchor bar in an underground continuous wall.
FIG. 2 is a schematic diagram of the foundation pit excavated to the bottom of the pit, and the pre-buried steel plate and the post-welded steel plate in the underground continuous wall are vertically connected and then connected with the foundation slab main rib.
The reference numerals in the figures are meant to be: an underground diaphragm wall 1; a reinforcement cage main reinforcement 2; a plastic collecting plate 3; pre-embedding a steel plate 4 in advance; anchor bars 5; a foundation sole 6; welding a steel plate 7; and a foundation slab main rib 8.
Detailed Description
The following describes the present invention in further detail with reference to the accompanying drawings. These embodiments are provided only for illustrating the present invention and are not intended to limit the present invention.
The structure of the utility model is as shown in figure 2, the outer side of the reinforcement cage in the underground continuous wall 1 is pre-embedded with a vertical early pre-embedded steel plate 4; the center elevation of the early pre-buried steel plate 4 is the same as the elevation of a foundation slab main rib 8 constructed after the foundation pit is excavated to the bottom of the pit, and the later welding steel plate 7 is vertically welded to the early pre-buried steel plate 4 and is welded and fixed with the foundation slab main rib 8 after being transversely lapped. The foundation slab main reinforcement 8 includes a slab surface main reinforcement and a slab bottom main reinforcement.
The specific construction method comprises the following steps:
as shown in fig. 1, an upper pre-embedded steel plate 4 and a lower pre-embedded steel plate 4 are pre-embedded in an underground continuous wall 1, the central elevation of each pre-embedded steel plate 4 is the same as the elevation of a main plate surface rib and a main plate bottom rib of a foundation slab respectively, each pre-embedded steel plate 4 is connected with the underground continuous wall 1 through an anchor rib 5, the pre-embedded steel plates 4 are connected with the anchor ribs 5 in a welding mode, and welding requirements specified in the prior art specifications are met. The plastic plate 3 needs to be filled outside the pre-buried steel plate 4 in the early stage, the plastic plate 3 needs to be bound and fixed on the reinforcement cage main reinforcement 2 of the underground continuous wall 1, and effective measures are taken during construction to prevent the plastic plate 3 from shifting in the reinforcement cage sinking and concrete pouring processes of the underground continuous wall.
As shown in fig. 2, after the foundation pit is excavated to the pit bottom elevation, the plastic collecting plate 3 is removed, the early-stage embedded steel plate 4 is exposed, the surface of the early-stage embedded steel plate is cleaned, the later-stage welded steel plate 7 is vertically welded to the early-stage embedded steel plate 4, the requirement that the vertical position of the later-stage welded steel plate can meet the accurate elevation requirement of the main rib of the foundation slab can be pointed out by moving up and down for a certain distance, and the welding requirement specified in the prior art specification can be met. And then the foundation slab main reinforcement 8 is welded on the rear welding steel plate 7 in an overlapping way, and the welding also meets the welding requirement specified in the prior technical specification. Therefore, the foundation slab main reinforcement 8 and the pre-embedded steel plate 4 of the underground continuous wall can be accurately connected together, and then the concrete poured on the foundation slab 6 can connect the underground continuous wall 1 and the foundation slab 6 into a whole, so that the stress requirement is met.
The above detailed description of the embodiments of the present invention provides a general person skilled in the art with changes in the detailed implementation and application range according to the idea of the embodiments of the present invention. In summary, the content of the present specification should not be understood as a limitation of the present invention, and any changes made according to the design concept of the present invention are all within the protection scope of the present invention.

Claims (3)

1. The utility model provides an underground continuous wall and foundation slab's pre-buried steel sheet joint construction which characterized in that: the outer side of a reinforcement cage in the underground continuous wall (1) is embedded with a vertical early-embedded steel plate (4); the center elevation of earlier pre-buried steel sheet (4) is the same with foundation slab owner muscle (8) elevation, and the back welding steel sheet (7) vertical welding of construction after the foundation ditch excavation reaches the bottom of the pit earlier pre-buried steel sheet (4), and with welded fastening behind the horizontal overlap joint of foundation slab owner muscle (8).
2. The connection structure of the underground continuous wall and the embedded steel plate of the foundation slab as claimed in claim 1, wherein: the foundation slab main ribs (8) comprise slab surface main ribs and slab bottom main ribs.
3. The connection structure of the underground continuous wall and the embedded steel plate of the foundation slab as claimed in claim 1 or 2, wherein: the early-stage embedded steel plate (4) is connected with the underground continuous wall (1) through welding with the anchor bars (5).
CN202020369607.8U 2020-03-23 2020-03-23 Underground continuous wall and foundation slab's pre-buried steel sheet connection structure Active CN211948464U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020369607.8U CN211948464U (en) 2020-03-23 2020-03-23 Underground continuous wall and foundation slab's pre-buried steel sheet connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020369607.8U CN211948464U (en) 2020-03-23 2020-03-23 Underground continuous wall and foundation slab's pre-buried steel sheet connection structure

Publications (1)

Publication Number Publication Date
CN211948464U true CN211948464U (en) 2020-11-17

Family

ID=73184793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020369607.8U Active CN211948464U (en) 2020-03-23 2020-03-23 Underground continuous wall and foundation slab's pre-buried steel sheet connection structure

Country Status (1)

Country Link
CN (1) CN211948464U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942366A (en) * 2021-02-02 2021-06-11 中国建筑第八工程局有限公司 Node structure with steel support serving as steel support and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942366A (en) * 2021-02-02 2021-06-11 中国建筑第八工程局有限公司 Node structure with steel support serving as steel support and construction method

Similar Documents

Publication Publication Date Title
CN103233459B (en) A kind of construction method of two-in-one double steel plate Combined concrete diaphragm wall
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN102535519A (en) I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN112144509A (en) Construction method of underground continuous wall, joint and connection structure thereof
CN111155535A (en) Underground continuous wall and foundation slab's pre-buried steel sheet connection structure
CN113513025A (en) Foundation pit support form LHCW construction method
CN112832257A (en) Foundation pit enclosure type LHW construction method
CN211948464U (en) Underground continuous wall and foundation slab's pre-buried steel sheet connection structure
CN106436721B (en) The construction method of diaphram wall built-in type steel purlin plug system
CN212104111U (en) Foundation pit support next to super deep foundation pit of super high-rise subway
CN203475439U (en) Special precast underground wall in precast underground wall based foundation pit support structure construction method
CN112832228A (en) Positioning and water stopping device for reinforcement cage of underground continuous wall and construction method
CN110093945B (en) Pit with elevator steel structure
CN112030947A (en) Construction method of T-shaped load-bearing underground continuous wall
CN111395352A (en) Foundation pit support next to super-deep foundation pit of super high-rise subway and construction method of foundation pit support
CN216108526U (en) Underground continuous wall structure for foundation pit support
CN211948447U (en) Foundation pit supporting device
CN115977105A (en) A stake wall unification structure that lets pressure strut structure under be used for corrosive environment
CN205894061U (en) Underground structure interior lining wall and underground continuous wall coincide face structure
CN108468339B (en) Skeleton type foundation pit supporting and basement exterior wall assembly structure and construction method thereof
CN212452765U (en) Two-in-one underground pipe gallery structure
CN210658411U (en) Waterproof leaking stoppage structure used in cooperation with SMW construction method pile enclosure wall
CN105780938A (en) Vertical construction seam construction method of core tube bottom board for super high-rise
CN105951844A (en) Roof node structure adopting cover-excavation method and construction method of roof node structure
CN206015720U (en) A kind of prefabricated ground-connecting-wall with limiting card groove plate joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant