CN211899624U - Temporary support system for post-cast strip of reinforced concrete beam plate - Google Patents

Temporary support system for post-cast strip of reinforced concrete beam plate Download PDF

Info

Publication number
CN211899624U
CN211899624U CN201922391675.4U CN201922391675U CN211899624U CN 211899624 U CN211899624 U CN 211899624U CN 201922391675 U CN201922391675 U CN 201922391675U CN 211899624 U CN211899624 U CN 211899624U
Authority
CN
China
Prior art keywords
cast strip
post
pull rod
horizontal pull
support system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922391675.4U
Other languages
Chinese (zh)
Inventor
谭英辉
闫雁军
谭震川
宋自杰
胡奕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 7 Group Co Ltd
Original Assignee
Shanghai Construction No 7 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 7 Group Co Ltd filed Critical Shanghai Construction No 7 Group Co Ltd
Priority to CN201922391675.4U priority Critical patent/CN211899624U/en
Application granted granted Critical
Publication of CN211899624U publication Critical patent/CN211899624U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a reinforced concrete roof beam board post-cast strip temporary support system, including the post-cast strip with be located the roof beam body of post-cast strip both sides, the below of the roof beam body all supports the lattice column that has the several to be buckled steel pipe support overlap joint and form by socket joint type dish, the lattice column sets up along the even interval of roof beam body length direction. The lattice column comprises socket type plate buckle vertical rods positioned at four corners, a first horizontal pull rod, a second horizontal pull rod and an inclined rod, wherein the first horizontal pull rod, the second horizontal pull rod and the inclined rod are connected with the adjacent socket type plate buckle vertical rods, and a top support and a bottom support are respectively installed at the top end and the bottom end of each socket type plate buckle vertical rod. The utility model discloses utilize socket joint type dish to detain lapped lattice column of steel pipe support as interim support system, the turnover material of usable project use need not to make separately, has reduced construction cost by a wide margin, is worth utilizing widely.

Description

Temporary support system for post-cast strip of reinforced concrete beam plate
Technical Field
The utility model relates to an interim support system among the building engineering especially indicates, reinforced concrete roof beam slab post-cast strip interim support system belongs to engineering building technical field.
Background
The post-cast strip is a temporary construction joint reserved at the corresponding position of a foundation slab, a wall and a beam according to the design or construction specification requirement in order to prevent a possibly generated harmful crack of a cast-in-place reinforced concrete structure due to nonuniform self shrinkage or nonuniform settlement in the building construction. The post-cast strip can cut the original continuous structure, so that part of the beam slab structure becomes a cantilever state, and the stress working condition is greatly changed. In order to ensure the stress of the reinforced concrete beam slab, a temporary support system is usually additionally arranged at the post-cast strip.
The conventional post-cast strip temporary support has the following methods: 1. the support at the post-cast strip position and the support at the rest area form an integral system, and the support frame body at the post-cast strip position is erected according to the template support scheme after all the supports are integrally dismantled. 2. And the post-cast strip support system is separated from the integral support system to form an independent support system, and the post-cast strip support system is reserved during the form removal. 3. And pouring small reinforced concrete columns under the beam beside the post-cast strip to serve as temporary supports. 4. And the corresponding positions of the two sides of the post-cast strip are provided with the section steel lattice columns. The first method can cause a large amount of disordered field materials to be stacked, occupies a field, has large using amount of secondary back-jacking materials and high cost, and easily causes cracking of a main body structure due to secondary back jacking, thereby having great potential safety hazard. The second method requires a large amount of turnover material and labor, results in high cost, and is not favorable for surrounding traffic organization because the support is not removed. The third method not only needs to pour the concrete column, and has more time, materials and labor, but also has more complex dismantling process after the concrete column is used up, and simultaneously generates a large amount of construction waste to cause the waste of construction materials. The fourth method solves the disadvantages of the former methods, but the steel lattice column has high cost and heavy weight, which makes the transportation, installation and dismantling processes complicated.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a reinforced concrete roof beam slab post-cast strip temporary support system is provided, simple structure and easily construction.
In order to solve the above problem, the utility model discloses a technical scheme as follows:
a temporary supporting system for a post-cast strip of a reinforced concrete beam plate comprises a post-cast strip and beam bodies positioned on two sides of the post-cast strip,
and a plurality of lattice columns formed by lapping socket type disc buckle type steel pipe supports are supported below the beam body, and the lattice columns are uniformly arranged at intervals along the length direction of the beam body.
Furthermore, the lattice column comprises socket type plate buckle vertical rods positioned at four corners, a first horizontal pull rod, a second horizontal pull rod and an inclined rod, wherein the first horizontal pull rod, the second horizontal pull rod and the inclined rod are respectively connected with adjacent socket type plate buckle vertical rods in an inclined mode along the length direction and the width direction, and the top end and the bottom end of each socket type plate buckle vertical rod are respectively provided with a top support and a bottom support.
Further, the length of the first horizontal pull rod is 600mm, the width of the second horizontal pull rod is 300mm, and the length of the inclined rod is 1000 mm.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. the utility model discloses utilize socket joint type dish to detain lapped lattice column of steel pipe support as interim support system, the turnover material that usable project used need not to make separately, has saved the transportation link, is convenient for build and demolish, has reduced construction cost by a wide margin.
2. After the concrete on the two sides of the post-cast strip reaches the form removal strength, the whole formwork support system can be removed, a temporary support lattice column system is left, and a large amount of turnover materials and labor force can be saved.
3. The utility model discloses the construction is simple and convenient, utilizes to support and sets up personnel and can accomplish all works.
4. The utility model discloses a can not produce building rubbish, green after interim braced system demolishs.
5. The lattice columns are kept at a certain distance without influencing the traffic of peripheral construction, and a construction activity space is provided.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of the present invention.
Fig. 2 is a top view of fig. 1.
Fig. 3 is a top view of a lattice column according to a preferred embodiment of the present invention.
Fig. 4 is a cross-sectional view taken along line 1-1 of fig. 3.
FIG. 5 is a cross-sectional view taken along line 2-2 of FIG. 3
Detailed Description
The present invention will be described in further detail with reference to the following drawings and specific embodiments. The objects, aspects and advantages of the present invention will become more apparent from the following description. It should be understood that the described embodiments are presently preferred, but not all embodiments of the invention.
Referring to fig. 1 to 3, the temporary support system for the post-cast strip of the reinforced concrete beam plate comprises a post-cast strip 1 and beam bodies 2 located on two sides of the post-cast strip 1, wherein a plurality of lattice columns 3 formed by overlapping socket type disc buckle type steel pipe supports are supported below the beam bodies 2, and the lattice columns 3 are uniformly arranged at intervals along the length direction of the beam bodies.
As shown in fig. 4 and 5, preferably, the lattice column 3 includes socket-type plate buckle vertical rods 31 located at four corners, and a first horizontal pull rod 32a, a second horizontal pull rod 32b and an inclined rod 33 which are respectively connected to the adjacent socket-type plate buckle vertical rods 31 in a length direction and a width direction in an inclined manner, and a top support 34 and a bottom support 35 are respectively installed at the top end and the bottom end of the socket-type plate buckle vertical rod 31. The length of the first horizontal pull rod 32a is 600mm, the width of the second horizontal pull rod 32b is 300mm, and the length of the inclined rod 33 is 1000 mm.
The application method of the temporary support system for the post-cast strip of the reinforced concrete beam plate comprises the following steps:
s1, according to the construction drawing, a plurality of lattice columns 3 formed by lapping socket type disc buckle type steel pipe brackets are evenly supported at intervals along the length direction under the beam bodies 2 at the two sides of the post-cast strip 1,
s2, after the concrete on the two sides of the post-cast strip reaches the form removal strength, the whole formwork support system is removed, the lattice column 3 is left,
and S3, pouring concrete at the post-cast strip 1, and removing the latticed column 3 after the post-cast strip concrete beam 4 reaches the form removal strength.
The utility model discloses utilize socket joint type dish to detain lapped lattice column of steel pipe support as interim support system, it is very convenient to build and demolish, need not other preparation and transportation, has practiced thrift construction cost. After the concrete on the two sides of the post-cast strip reaches the form removal strength, the whole formwork support system can be removed, a temporary support lattice column system is left, and a large amount of turnover materials and labor force can be saved.
The above description is only for the purpose of illustration of the preferred embodiments of the present invention, and it is not intended to limit the scope of the present invention, and it is obvious that any person skilled in the art can easily conceive of alterations and modifications to obtain other embodiments based on the above embodiments, and these should be covered by the scope of the present invention.

Claims (3)

1. The utility model provides a reinforced concrete roof beam slab post-cast strip temporary support system, includes post-cast strip and the roof beam body that is located post-cast strip both sides, its characterized in that:
and a plurality of lattice columns formed by lapping socket type disc buckle type steel pipe supports are supported below the beam body, and the lattice columns are uniformly arranged at intervals along the length direction of the beam body.
2. The reinforced concrete beam slab post-cast strip temporary support system according to claim 1, wherein:
the lattice column comprises socket type plate buckle vertical rods positioned at four corners, a first horizontal pull rod, a second horizontal pull rod and an inclined rod, wherein the first horizontal pull rod, the second horizontal pull rod and the inclined rod are respectively connected with the adjacent socket type plate buckle vertical rods in an inclined mode along the length direction and the width direction, and a top support and a bottom support are respectively installed at the top end and the bottom end of each socket type plate buckle vertical rod.
3. The reinforced concrete beam slab post-cast strip temporary support system according to claim 2, wherein:
the length of first horizontal pull rod is 600mm, the width of second horizontal pull rod is 300mm, the length of down tube is 1000 mm.
CN201922391675.4U 2019-12-25 2019-12-25 Temporary support system for post-cast strip of reinforced concrete beam plate Active CN211899624U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922391675.4U CN211899624U (en) 2019-12-25 2019-12-25 Temporary support system for post-cast strip of reinforced concrete beam plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922391675.4U CN211899624U (en) 2019-12-25 2019-12-25 Temporary support system for post-cast strip of reinforced concrete beam plate

Publications (1)

Publication Number Publication Date
CN211899624U true CN211899624U (en) 2020-11-10

Family

ID=73295761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922391675.4U Active CN211899624U (en) 2019-12-25 2019-12-25 Temporary support system for post-cast strip of reinforced concrete beam plate

Country Status (1)

Country Link
CN (1) CN211899624U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058619A (en) * 2019-12-25 2020-04-24 上海建工七建集团有限公司 Temporary support system for post-cast strip of reinforced concrete beam plate and application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058619A (en) * 2019-12-25 2020-04-24 上海建工七建集团有限公司 Temporary support system for post-cast strip of reinforced concrete beam plate and application method

Similar Documents

Publication Publication Date Title
CN102383628B (en) Construction device and construction method for post-construction decompression cone of silo structure
CN102635128A (en) Foundation slab post-cast strip waterproof steel plate combined structure and bracing method thereof
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN109139049B (en) Construction method for secondary lining buckling arch of underground excavation station of subway
CN104153579B (en) A kind of formwork for placing structure of non-standard layers structure and construction method
CN217652349U (en) Temporary supporting system for post-cast strip template of basement roof
CN111058619A (en) Temporary support system for post-cast strip of reinforced concrete beam plate and application method
CN211899624U (en) Temporary support system for post-cast strip of reinforced concrete beam plate
CN112030995B (en) Construction method for quickly taking out of ground for supporting and disassembling in advance for main building of super high-rise building
CN113482330A (en) Basement back-jacking detachable steel pipe construction method
CN111778990A (en) Permanent-temporary combined assembly type inner support system and construction method
CN106381810A (en) Beam-and-column type bracket and method for casting-in-place cantilever perfusion beam with beam-and-column type bracket
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN115288504A (en) Construction method of concrete floor on top of large-scale bin body structure
CN212506301U (en) Support system in combination assembled forever
CN213806505U (en) Shaping operation platform in elevator shaft
CN105133787A (en) Latticed column for supporting post-pouring belt
CN108104506A (en) It is a kind of to be used for structural demolition and the temporary facility rebuilded and its construction method
CN204676610U (en) A kind of for the template jacking instrument in Bars In Poured Concrete Slab post empiricism
CN212002169U (en) Shear force wall eminence concrete structure formwork platform of encorbelmenting
CN205100433U (en) A lattice column for supporting post -cast strip
CN215369949U (en) Middle plate and frame body reserved door type channel
CN110952765A (en) Formwork supporting platform for shear wall high-altitude concrete cantilever structure and assembling method of formwork supporting platform
CN219753293U (en) Efficient retaining wall skeleton structure free of form removal
CN203654292U (en) Reverse building plate construction structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant