CN211873737U - Steel construction operation frame - Google Patents

Steel construction operation frame Download PDF

Info

Publication number
CN211873737U
CN211873737U CN201922082509.6U CN201922082509U CN211873737U CN 211873737 U CN211873737 U CN 211873737U CN 201922082509 U CN201922082509 U CN 201922082509U CN 211873737 U CN211873737 U CN 211873737U
Authority
CN
China
Prior art keywords
fixedly connected
steel construction
rod
fixed
operation frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922082509.6U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingzhou Hengchuang Heavy Industry Technology Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922082509.6U priority Critical patent/CN211873737U/en
Application granted granted Critical
Publication of CN211873737U publication Critical patent/CN211873737U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to an operation frame technical field just discloses a steel construction operation frame, including first dead lever, the one end of first dead lever is provided with the external screw thread, the one end threaded connection of first dead lever has the connecting piece, the fixed pipe of one side fixedly connected with of connecting piece, the inner wall swing joint of fixed pipe has the connecting rod, one side fixedly connected with fixed block of connecting rod, the spacing groove has been seted up at the top of fixed block, the inner wall swing joint of spacing groove has the connecting block, one side fixedly connected with plywood of connecting block, the bottom fixedly connected with base of first dead lever. This steel construction operation frame can reach the purpose that this steel construction operation frame makes things convenient for the dismouting to solved the inconvenient problem of general steel construction operation frame dismouting, thereby made things convenient for staff's dismouting work, thereby further improved staff dismouting work's work efficiency, thereby finally brought conveniently for people's work and life.

Description

Steel construction operation frame
Technical Field
The utility model relates to an operation frame technical field specifically is a steel construction operation frame.
Background
The working frame refers to various supports erected on a construction site for workers to operate and solve vertical and horizontal transportation. In architecture, the method is mainly applied to places where external walls, interior decoration or high floor heights cannot be directly constructed on construction sites. Mainly for constructors to live up and down or maintain peripheral safety nets and install components at high altitude, it is said that the scaffold is the scaffold, and the scaffold manufacturing materials are bamboo, wood, steel pipes or synthetic materials and the like. Some projects also use scaffolds as templates, and in addition, the scaffold is widely used in advertising, municipal administration, traffic roads and bridges, mines and other departments.
Most operation frame structures are fixed in the existing market, disassembly and assembly which cannot be convenient and fast are time-consuming and labor-consuming, so that great trouble is brought to disassembly and assembly work of workers, certain loss is brought to economy of people, the work efficiency of the disassembly and assembly work of the workers is further reduced, and the work and life of the people are finally influenced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The not enough to prior art, the utility model provides a steel construction operation frame possesses advantages such as easy dismounting, has solved the inconvenient problem of general steel construction operation frame dismouting.
(II) technical scheme
For realizing the convenient purpose of above-mentioned steel construction operation frame dismouting, the utility model provides a following technical scheme: a steel structure operation frame comprises a first fixed rod, wherein an external thread is arranged at one end of the first fixed rod, a connecting piece is in threaded connection with one end of the first fixed rod, a fixed pipe is fixedly connected to one side of the connecting piece, a connecting rod is movably connected to the inner wall of the fixed pipe, a fixed block is fixedly connected to one side of the connecting rod, a limiting groove is formed in the top of the fixed block, a connecting block is movably connected to the inner wall of the limiting groove, a laminated plate is fixedly connected to one side of the connecting block, a base is fixedly connected to the bottom of the first fixed rod, a reinforcing rib is fixedly connected to the top of the base, a second fixed rod is movably connected to the first fixed rod through the connecting piece, a movable pipe is movably connected to the outer wall of the second fixed rod, a limiting rod is fixedly, one end of the second fixing rod is movably connected with a connecting block, the bottom of the connecting block is movably connected with a bolt, one end of the bolt is in threaded connection with a top cover, the bottom of the connecting rod is fixedly connected with a positioning rod, and the outer wall of the positioning rod is fixedly connected with a connecting rod.
Preferably, the inner diameter of the connecting piece is matched with the outer diameter of the first fixing rod, and the inner wall of the connecting piece is provided with an inner thread matched with the outer thread.
Preferably, the number of the fixed pipes is two, and the two fixed pipes are symmetrically arranged by taking the perpendicular bisector of the connecting piece as the symmetry axis.
Preferably, the number of the connecting rods is two, and the outer diameters of the two connecting rods are matched with the inner diameter of the fixed pipe.
Preferably, the bottom of the connecting block is provided with a groove which is matched with the second fixing rod in shape and size, and the inner wall of the groove is provided with internal threads.
Preferably, one end of the bolt penetrates through the bottom of the connecting block and extends to the inside of the top cover, and the connecting block is movably connected with the top cover through the bolt.
Preferably, the number of the positioning rods is two, and the outer walls of the two positioning rods are fixedly connected with the connecting rod.
(III) advantageous effects
Compared with the prior art, the utility model provides a steel construction operation frame possesses following beneficial effect:
1. this steel construction operation frame uses through mutually supporting of first dead lever, connecting piece, fixed pipe, connecting rod, plywood, second dead lever, locating lever and linking rod, can reach the purpose that this steel construction operation frame makes things convenient for the dismouting to the inconvenient problem of general steel construction operation frame dismouting has been solved, thereby made things convenient for staff's dismouting work, thereby further improved staff dismouting work's work efficiency, thereby finally brought conveniently for people's work and life.
2. This steel construction operation frame uses through mutually supporting of first dead lever, connecting piece, second dead lever, activity pipe, gag lever post and bracing piece, can reach the high purpose of this steel construction operation frame factor of safety to solved the problem that general steel construction operation frame factor of safety is low, thereby further ensured the staff at the personal safety of during operation, thereby finally brought the facility with the life for people's work.
3. This steel construction operation frame, through the second dead lever, link up the piece, the use of mutually supporting of bolt and top cap, can reach this steel construction operation frame and effectively prevent the purpose of rainwater erosion, thereby solved general steel construction operation frame and can not effectually prevent the problem of rainwater erosion, thereby stopped and led to the appearance of steel construction operation frame damage circumstances because of rainwater erosion, thereby prolonged the life of steel construction operation frame, thereby further ensured staff's personal safety, thereby finally made things convenient for people's work and life.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the present invention;
fig. 3 is a schematic view of the connection relationship between the middle layer plate and the connecting rod of the present invention.
In the figure: 1. a first fixing lever; 2. an external thread; 3. a connecting member; 4. a fixed tube; 5. a connecting rod; 6. a fixed block; 7. a limiting groove; 8. connecting blocks; 9. laminating the board; 10. a base; 11. a second fixing bar; 12. a movable tube; 13. a limiting rod; 14. a support bar; 15. a joining block; 16. a bolt; 17. a top cover; 18. reinforcing ribs; 19. positioning a rod; 20. a connecting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a steel structure working frame comprises a first fixing rod 1, wherein an external thread 2 is arranged at one end of the first fixing rod 1, a connecting member 3 is in threaded connection with one end of the first fixing rod 1, the inner diameter of the connecting member 3 is matched with the outer diameter of the first fixing rod 1, an internal thread matched with the external thread 2 is arranged on the inner wall of the connecting member 3, one side of the connecting member 3 is fixedly connected with two fixing tubes 4, the two fixing tubes 4 are symmetrically arranged by taking the perpendicular bisector of the connecting member 3 as a symmetry axis, the inner wall of each fixing tube 4 is movably connected with two connecting rods 5, the outer diameters of the two connecting rods 5 are matched with the inner diameter of each fixing tube 4, one side of each connecting rod 5 is fixedly connected with a fixing block 6, the top of each fixing block 6 is provided with a limiting groove 7, and the inner wall of each limiting groove 7 is movably connected with a, one side of the connecting block 8 is fixedly connected with a laminated board 9, the bottom of the first fixed rod 1 is fixedly connected with a base 10, the top of the base 10 is fixedly connected with a reinforcing rib 18, the first fixed rod 1 is movably connected with a second fixed rod 11 through a connecting piece 3, the outer wall of the second fixed rod 11 is movably connected with a movable tube 12, one side of the movable tube 12 is fixedly connected with a limiting rod 13, the bottom of the limiting rod 13 is fixedly connected with a supporting rod 14, the purpose of high safety factor of the steel structure operation frame can be achieved through the mutual matching use of the first fixed rod 1, the connecting piece 3, the second fixed rod 11, the movable tube 12, the limiting rod 13 and the supporting rod 14, the problem of low safety factor of the common steel structure operation frame is solved, the personal safety of workers in work is further ensured, the convenience is finally brought to the work and life of people, one end of the, the bottom of the connecting block 15 is provided with a groove which is matched with the second fixing rod 11 in shape and size, the inner wall of the groove is provided with internal threads, the bottom of the connecting block 15 is movably connected with a bolt 16, one end of the bolt 16 is connected with a top cover 17 in a threaded manner, one end of the bolt 16 penetrates through the bottom of the connecting block 15 and extends into the top cover 17, the connecting block 15 is movably connected with the top cover 17 through the bolt 16, and the purpose of effectively preventing rainwater erosion of the steel structure operation frame can be achieved through the mutual matching use of the second fixing rod 11, the connecting block 15, the bolt 16 and the top cover 17, so that the problem that the common steel structure operation frame cannot effectively prevent rainwater erosion is solved, the occurrence of the damage condition of the steel structure operation frame caused by rainwater erosion is avoided, the service life of the steel structure operation frame is prolonged, and the personal safety of workers is further ensured, thereby finally made things convenient for people's work and life, the bottom fixedly connected with locating lever 19 of connecting rod 5, the outer wall fixedly connected with of locating lever 19 links up pole 20, the quantity of locating lever 19 is two, and the outer wall of two locating levers 19 all with link up pole 20 fixed connection, through first dead lever 1, connecting piece 3, fixed pipe 4, connecting rod 5, plywood 9, second dead lever 11, locating lever 19 and the use of mutually supporting of linking pole 20, can reach the purpose that this steel construction operation frame makes things convenient for the dismouting, thereby the inconvenient problem of general steel construction operation frame dismouting has been solved, thereby staff's dismouting work has been made things convenient for, thereby the work efficiency of staff dismouting work has further been improved, thereby finally, work and life for people have brought conveniently.
When the connecting plate is used, the bolt 16 is rotated, the top cover 17 is separated from the top of the connecting block 15, the movable pipe 12 is moved, the movable pipe 12 is separated from the outer wall of the second fixed rod 11, the second fixed rod 11 is rotated, the second fixed rod 11 is separated from the inner wall of the connecting piece 3, the connecting block 8 is moved, the layer plate 9 is separated from the fixed block 6, the connecting rod 5 is rotated, the connecting rod 5 is separated from the connecting piece 3, the connecting rod is separated from the first fixed rod 1 by rotating the connecting piece 3, and therefore the disassembling work of the steel structure operation frame is completed.
To sum up, this steel construction operation frame can reach the purpose that this steel construction operation frame makes things convenient for the dismouting to solved the inconvenient problem of general steel construction operation frame dismouting, thereby made things convenient for staff's dismouting work, thereby further improved the work efficiency of staff dismouting work, thereby finally brought conveniently for people's work and life.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a steel construction operation frame, includes first dead lever (1), its characterized in that: an external thread (2) is arranged at one end of the first fixed rod (1), a connecting piece (3) is in threaded connection with one end of the first fixed rod (1), a fixed pipe (4) is fixedly connected to one side of the connecting piece (3), a connecting rod (5) is movably connected to the inner wall of the fixed pipe (4), a fixed block (6) is fixedly connected to one side of the connecting rod (5), a limiting groove (7) is formed in the top of the fixed block (6), a connecting block (8) is movably connected to the inner wall of the limiting groove (7), a layer plate (9) is fixedly connected to one side of the connecting block (8), a base (10) is fixedly connected to the bottom of the first fixed rod (1), a reinforcing rib (18) is fixedly connected to the top of the base (10), and a second fixed rod (11) is movably connected to the first fixed rod (, the outer wall swing joint of second dead lever (11) has movable tube (12), one side fixedly connected with gag lever post (13) of movable tube (12), the bottom fixedly connected with bracing piece (14) of gag lever post (13), the one end threaded connection of second dead lever (11) has linking block (15), the bottom swing joint of linking block (15) has bolt (16), the one end threaded connection of bolt (16) has top cap (17), the bottom fixedly connected with locating lever (19) of connecting rod (5), the outer wall fixedly connected with linking pole (20) of locating lever (19).
2. A steel construction work frame as claimed in claim 1, wherein: the inner diameter of the connecting piece (3) is matched with the outer diameter of the first fixing rod (1), and the inner wall of the connecting piece (3) is provided with inner threads matched with the outer threads (2).
3. A steel construction work frame as claimed in claim 1, wherein: the number of the fixed pipes (4) is two, and the two fixed pipes (4) are symmetrically arranged by taking the perpendicular bisector of the connecting piece (3) as the symmetry axis.
4. A steel construction work frame as claimed in claim 1, wherein: the number of connecting rods (5) is two, and the outer diameters of the two connecting rods (5) are matched with the inner diameter of the fixed pipe (4).
5. A steel construction work frame as claimed in claim 1, wherein: the bottom of the connecting block (15) is provided with a groove which is matched with the second fixing rod (11) in shape and size, and the inner wall of the groove is provided with internal threads.
6. A steel construction work frame as claimed in claim 1, wherein: one end of the bolt (16) penetrates through the bottom of the connecting block (15) and extends to the inside of the top cover (17), and the connecting block (15) is movably connected with the top cover (17) through the bolt (16).
7. A steel construction work frame as claimed in claim 1, wherein: the number of the positioning rods (19) is two, and the outer walls of the two positioning rods (19) are fixedly connected with the connecting rods (20).
CN201922082509.6U 2019-11-27 2019-11-27 Steel construction operation frame Active CN211873737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922082509.6U CN211873737U (en) 2019-11-27 2019-11-27 Steel construction operation frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922082509.6U CN211873737U (en) 2019-11-27 2019-11-27 Steel construction operation frame

Publications (1)

Publication Number Publication Date
CN211873737U true CN211873737U (en) 2020-11-06

Family

ID=73243862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922082509.6U Active CN211873737U (en) 2019-11-27 2019-11-27 Steel construction operation frame

Country Status (1)

Country Link
CN (1) CN211873737U (en)

Similar Documents

Publication Publication Date Title
CN204386134U (en) The attached mould scaffold of a kind of concrete cylindrical hoop
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN206693592U (en) A kind of new mortise and tenon type intelligent and portable scaffold
CN211873737U (en) Steel construction operation frame
CN107605148A (en) A kind of building intellectualization combines mounting bracket
CN207420009U (en) A kind of building intellectualization combines mounting bracket
CN209457352U (en) Portable stable type scaffold
CN201125568Y (en) Assembled type sectional material guard rail
CN207003968U (en) A kind of dismountable scaffold of architectural engineering
CN206053269U (en) Bamboo ferrum mixing frame for building
CN201952899U (en) Beam column connecting node of detachable board house
CN212613727U (en) Be applied to mould shell of close rib structure superstructure building
CN214785753U (en) Scaffold convenient to dismantle installation
CN212453934U (en) Can have enough to meet need assembled fender that encloses
CN204603635U (en) For the moulding bed of Node In Large-span Pipe Truss modularization making
CN206346479U (en) A kind of assembled architecture scaffold chassis
CN104328900A (en) Gantry type scaffold
CN206693066U (en) One kind, which builds a bridge, safeguards scaffold
CN207538481U (en) A kind of floor height changeable type input and output material platform
CN205531250U (en) Scaffold frame of easily dismantling
CN220521907U (en) Scaffold for building construction
CN104234189A (en) Four-pipe truss structure of prefabricated house
CN208702121U (en) Scaffold suitable for curved-surface building inner wall construction
CN218779931U (en) Quick assembly disassembly scaffold frame is used in construction in room
CN214364085U (en) Steel construction pipe truss constructional device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230120

Address after: 434000 No. 9, Jiangjin East Road, Jingzhou Development Zone, Jingzhou City, Hubei Province

Patentee after: Jingzhou Hengchuang Heavy Industry Technology Co.,Ltd.

Address before: 251700 No. 30, Gongye Road, Huimin County, Binzhou City, Shandong Province

Patentee before: Guo Yanlin