CN211850025U - Building materials mosaic structure - Google Patents

Building materials mosaic structure Download PDF

Info

Publication number
CN211850025U
CN211850025U CN202020069606.1U CN202020069606U CN211850025U CN 211850025 U CN211850025 U CN 211850025U CN 202020069606 U CN202020069606 U CN 202020069606U CN 211850025 U CN211850025 U CN 211850025U
Authority
CN
China
Prior art keywords
anchor bolt
nut
combining
bolt
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020069606.1U
Other languages
Chinese (zh)
Inventor
韩松
李海涛
谭成
戴邵雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Horse Construction Co ltd
Original Assignee
Shanghai Horse Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Horse Construction Co ltd filed Critical Shanghai Horse Construction Co ltd
Priority to CN202020069606.1U priority Critical patent/CN211850025U/en
Application granted granted Critical
Publication of CN211850025U publication Critical patent/CN211850025U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a building material splicing structure, which comprises a first combining piece, a second combining piece, a first anchor bolt, a second anchor bolt and a nut; holes are respectively formed in the opposite surfaces of the first combining part and the second combining part, the first anchor bolt and the second anchor bolt are respectively embedded in the holes through anchoring glue, the end parts of the first anchor bolt and the second anchor bolt are respectively provided with a left-handed thread and a right-handed thread, and the two ends of the nut are respectively screwed to the first anchor bolt and the second anchor bolt; the first combining piece is further provided with a placing groove for placing the nut and an abdicating groove which is connected with the placing groove and is used for screwing the nut. Adopt above-mentioned technical scheme, it is fixed to carry out the spiro union through pre-buried first crab-bolt, second crab-bolt, waters through the anchor glue between the gap and fill, therefore mosaic structure is comparatively firm, and the influence is less to the surface appearance of structural component simultaneously, does not hinder processing to the surface yet, and the effect is very ideal.

Description

Building materials mosaic structure
Technical Field
The utility model relates to a building materials mosaic structure especially relates to a structure of splicing is carried out bamboo timber structure.
Background
The bamboo structural members are often used in the fields of construction, decoration or household articles, but the bamboo structural members are limited by material sources and cannot be manufactured, so that the bamboo structural members have large volume or area, and the bamboo structural members need to be spliced or combined and fixed under the condition of large volume or area requirements. The fixed mode of bamboo wood structure concatenation commonly used includes that directly use nail or glue to carry out the joint on the contact surface, also has to use auxiliary connection spare to lay on the gap edge of contact surface, and the rethread nail or glue carry out the joint. The existing structure mode always has the defect of poor stability, the joint structure is obvious and not attractive, the joint surface is not suitable for processing due to the existence of the joint structural part, and the structural parts are scattered and disintegrated once the joint structural part is damaged in processing.
SUMMERY OF THE UTILITY MODEL
Therefore, an object of the utility model is to provide a better building materials mosaic structure of steadiness ability.
In order to achieve the above object, the utility model discloses a building material splicing structure, including first conjunction, second conjunction, first crab-bolt, second crab-bolt and nut; holes are respectively formed in the opposite surfaces of the first combining part and the second combining part, the first anchor bolt and the second anchor bolt are respectively embedded in the holes through anchoring glue, the end parts of the first anchor bolt and the second anchor bolt are respectively provided with a left-handed thread and a right-handed thread, and the two ends of the nut are respectively screwed to the first anchor bolt and the second anchor bolt; still offer on the first combination piece and be used for placing the standing groove of nut, and connect in the standing groove be used for twisting the operation of revolving the groove of stepping down of nut, the groove of stepping down is perpendicular to the nut axial is seted up and is extended to the lateral wall of first combination piece.
And an anchoring adhesive is poured into the abdicating groove.
And an anchoring adhesive is arranged between the opposite surfaces of the first combining piece and the second combining piece.
The anchoring adhesive is epoxy adhesive.
The first combining piece and/or the second combining piece are bamboo and wood structural pieces.
Adopt above-mentioned technical scheme, the utility model discloses a building materials mosaic structure carries out the spiro union through pre-buried first crab-bolt, second crab-bolt and fixes, waters through the anchor glue between the gap and fills, and consequently mosaic structure is comparatively firm, and is less to the surface appearance influence of structural component simultaneously, does not hinder processing to the surface yet, and the effect is very ideal.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a sectional view taken along line a-a in fig. 1.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
As shown in the figures, the utility model discloses a building materials mosaic structure, including first conjunction 1, second conjunction 2, first crab-bolt 3, second crab-bolt 4 and nut 5. The first combining part 1 and the second combining part 2 can be bamboo-wood structural parts, and can also be structural parts made of other materials, such as resin materials, metal materials and the like.
Holes are respectively formed in the opposite surfaces of the first combining part 1 and the second combining part 2, the first anchor bolt 3 and the second anchor bolt 4 are respectively embedded in the holes through anchor glue 10, the end parts of the first anchor bolt 3 and the second anchor bolt 4 are respectively provided with left-handed threads and right-handed threads, and the two ends of the nut 5 are respectively in threaded connection with the first anchor bolt 3 and the second anchor bolt 4; still offer on the first combination piece 1 and be used for placing the standing groove 6 of nut 5, and connect in standing groove 6 is used for twisting the operation the groove 7 of stepping down of nut 5, the groove 7 of stepping down is perpendicular to nut 5 axial is seted up and is extended to the lateral wall of first combination piece 1.
Before splicing, first anchor bolt 3 and second anchor bolt 4 are pre-embedded on first combining part 1 and second combining part 2, first anchor bolt 3 and second anchor bolt 4 are respectively placed into the holes, and then anchor glue 10 is injected into the holes, wherein in the embodiment, anchor glue 10 can be epoxy glue. After the epoxy glue is solidified, the first combining part 1 and the second combining part 2 are mutually combined, the end parts of the first anchor bolt 3 and the second anchor bolt 4 are respectively aligned to the nut 5, then a screwing tool is inserted into the abdicating groove 7 for screwing operation, and the first anchor bolt 3 and the second anchor bolt 4 are mutually close to each other along with the rotation of the nut 5 until the opposite surfaces of the first combining part 1 and the second combining part 2 are mutually attached. An epoxy adhesive (anchor adhesive 10) can also be arranged between the opposite surfaces of the first combining piece 1 and the second combining piece 2, and the two can be bonded by the epoxy adhesive after being mutually attached.
And then, epoxy glue (anchoring glue 10) can be filled into the abdicating groove 7, so that the epoxy glue is filled in the gap of the placing groove 6 and the abdicating groove 7, and after the epoxy glue is solidified, the splicing operation is completed.
Adopt above-mentioned technical scheme, the utility model discloses a building materials mosaic structure carries out the spiro union through pre-buried first crab-bolt 3, second crab-bolt 4 and fixes, waters through anchor glue 10 between the gap and fills, and consequently mosaic structure is comparatively firm, and it is less to the surface appearance influence of structural component simultaneously, does not hinder processing to the surface yet, and the effect is very ideal.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications can be made without departing from the scope of the invention.

Claims (5)

1. The utility model provides a building materials mosaic structure which characterized in that: comprises a first combining piece, a second combining piece, a first anchor bolt, a second anchor bolt and a nut; holes are respectively formed in the opposite surfaces of the first combining part and the second combining part, the first anchor bolt and the second anchor bolt are respectively embedded in the holes through anchoring glue, the end parts of the first anchor bolt and the second anchor bolt are respectively provided with a left-handed thread and a right-handed thread, and the two ends of the nut are respectively screwed to the first anchor bolt and the second anchor bolt; still offer on the first combination piece and be used for placing the standing groove of nut, and connect in the standing groove be used for twisting the operation of revolving the groove of stepping down of nut, the groove of stepping down is perpendicular to the nut axial is seted up and is extended to the lateral wall of first combination piece.
2. A building material mosaic structure of claim 1, wherein: and an anchoring adhesive is poured into the abdicating groove.
3. A building material mosaic structure of claim 2, wherein: and an anchoring adhesive is arranged between the opposite surfaces of the first combining piece and the second combining piece.
4. A building material mosaic structure of any one of claims 1-3, wherein: the anchoring adhesive is epoxy adhesive.
5. A building material mosaic structure of any one of claims 1-3, wherein: the first combining piece and/or the second combining piece are bamboo and wood structural pieces.
CN202020069606.1U 2020-01-13 2020-01-13 Building materials mosaic structure Active CN211850025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020069606.1U CN211850025U (en) 2020-01-13 2020-01-13 Building materials mosaic structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020069606.1U CN211850025U (en) 2020-01-13 2020-01-13 Building materials mosaic structure

Publications (1)

Publication Number Publication Date
CN211850025U true CN211850025U (en) 2020-11-03

Family

ID=73212161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020069606.1U Active CN211850025U (en) 2020-01-13 2020-01-13 Building materials mosaic structure

Country Status (1)

Country Link
CN (1) CN211850025U (en)

Similar Documents

Publication Publication Date Title
CN102256766B (en) Method of anchoring a connector, and connector
CN214061974U (en) Assembled PC building structure
CN112523386A (en) Assembly type PC building structure and construction method thereof
US20140246639A1 (en) Baluster structure of handrail
JP3272839B2 (en) Jig for joining
CN211850025U (en) Building materials mosaic structure
CN201525060U (en) Bamboo splicing plate
CN103386700B (en) A kind of production method of artificial project log
US20090110488A1 (en) Method of splicing a pair of foundation piles
CN204458778U (en) A kind of combination lock washer
CN111472571A (en) Soil relic reinforcing anchor rod and using method thereof
CN108397454B (en) Seamless splice type wood board
CN105952182A (en) Method for compound reinforcement of wooden beam
CN204356913U (en) Dot-matrix cross-grain enhanced wood structure mortise and tenon joint
CN207160423U (en) Full grout sleeve system and its sleeve holder
CN205421039U (en) A anchor structure for reinforcing T roof beam FRP
CN113601626A (en) High-strength oriented strand board with good moisture resistance
JP2013044345A (en) Method of screwing lag screw to wooden structural member
CN207177177U (en) Wood veneer cladding system
CN220814686U (en) Wall leveling system
CN204983498U (en) It indicates fishplate bar to splice firm bilayer
CN207231987U (en) Suitable for FRP tendons and a kind of grip device of bonding wood slip property experiment
CN206011856U (en) A kind of composite plate pre-buried structure
CN210423306U (en) Furniture connecting piece
CN216476497U (en) Composite reinforced wood beam structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant