CN211806904U - Automatic production system for prefabricated sleeper - Google Patents

Automatic production system for prefabricated sleeper Download PDF

Info

Publication number
CN211806904U
CN211806904U CN201922144187.3U CN201922144187U CN211806904U CN 211806904 U CN211806904 U CN 211806904U CN 201922144187 U CN201922144187 U CN 201922144187U CN 211806904 U CN211806904 U CN 211806904U
Authority
CN
China
Prior art keywords
section
station
concrete
reinforcing bar
automatic production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922144187.3U
Other languages
Chinese (zh)
Inventor
黄文俊
肖晓林
闫冠先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Silibo Rail Equipment Co ltd
Original Assignee
Wuhan Silibo Rail Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Silibo Rail Equipment Co ltd filed Critical Wuhan Silibo Rail Equipment Co ltd
Priority to CN201922144187.3U priority Critical patent/CN211806904U/en
Application granted granted Critical
Publication of CN211806904U publication Critical patent/CN211806904U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model discloses a prefabricated sleeper automatic production system, including built-in fitting system ann station, concrete tamping station, maintenance shaping station, drawing of patterns pile station, maintenance shaping station is located concrete tamping station with between the drawing of patterns pile station, built-in fitting system ann station is including being in same straight line and all installing the iron set pre-buried section, the pre-buried section of reinforcing bar and the reinforcing bar stretch-draw section of rotation roller set, and concrete tamping station is including being in same straight line and all installing the concrete of rotating the roller set and treating pouring section, concrete pouring section and concrete vibration and leveling section, and drawing of patterns pile station includes finished product temporary section and release agent spraying section, release agent spraying section with the iron set pre-buried section is adjacent to, and release agent spraying section below also install rotate the roller set and with iron set pre-buried section on same straight line. Through the arrangement, the stations are arranged orderly, the production space arrangement is reasonable, complete circulating production flow is formed, the space occupation is reduced, and the production efficiency is improved.

Description

Automatic production system for prefabricated sleeper
Technical Field
The utility model relates to a sleeper production field, in particular to prefabricated sleeper automatic production system.
Background
The sleeper is the essential basic construction in the railway traffic, and the development of the sleeper manufacturing field is driven naturally in recent years through the railway construction and urban light rail traffic, and the quality and the yield are stably improved from the initial wooden sleeper to the concrete cast-in-place sleeper and then to the current common prefabricated prestressed concrete sleeper.
The Chinese patent with the application number of CN201310054478.8 discloses a double-block sleeper production line, which comprises a vibrating table, wherein a material distributor capable of sliding left and right along a sliding rail is arranged on the earth of the vibrating table, a lifting and editing channel is arranged between the left side of the vibrating table and the sliding rail, a second mold chain conveyor vertically connected with the sliding rail is arranged on the side of the lifting and editing channel, a conveying and editing channel is arranged on the right side of the vibrating table, a tipping platform is arranged above the middle of the conveying and editing channel, a second mold chain conveyor is arranged at the tail end of the right side of the conveying and editing channel, an aerial automatic mold overturning elbow is arranged on the second mold chain conveyor, the free ends of the second mold chain conveyor and the second mold chain conveyor are connected through an automatic stacker, and a sleeper output device is arranged on the right side of the conveying and editing channel.
But the production line is not complete, only unidirectional production cannot be carried out in actual production, particularly, the die is required to be turned over inevitably for sleeper production, and therefore the design of the production line needs to be further improved.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a prefabricated sleeper automatic production system, each station is connected in order, the installation is compact, and whole occupation of land space is reasonable, and production efficiency is higher.
The above technical purpose of the present invention can be achieved by the following technical solutions: the utility model provides a prefabricated sleeper automatic production system, includes that built-in fitting system ann station, concrete tamping station, maintenance shaping station, drawing of patterns pile station, maintenance shaping station is located concrete tamping station with between the drawing of patterns pile station, the station is ann to the built-in fitting system including being in same straight line and all installing the iron member pre-buried section, the pre-buried section of reinforcing bar and the reinforcing bar stretch-draw section of rotation roller set, concrete tamping station is including being in same straight line and all installing the concrete of rotation roller set and treating pouring section, concrete pouring section and concrete vibration and smoothing section, drawing of patterns pile station includes finished product temporary section and release agent spraying section, release agent spraying section with iron member pre-buried section adjoins, just release agent spraying section below also install rotate the roller set and with iron member pre-buried section is on same straight line.
By adopting the technical scheme, the stations are arranged orderly, the production space is reasonably arranged, complete circulating production flow is formed, the space occupation is reduced, and the production efficiency is improved.
The utility model discloses a further set up to: the demolding and stacking station further comprises a demolding and cutting section and a mold cleaning section, the demolding and cutting section is parallel to the finished product temporary placing section, the mold cleaning section is located on the same straight line with the finished product temporary placing section and parallel to the demolding agent spraying section, a mold turning machine is installed between the finished product temporary placing section and the demolding and cutting section, and a stacking machine is installed at the end of the demolding and cutting section.
By adopting the technical scheme, the sleeper is conveyed to the finished product temporary placing section after being molded in the mold, and is turned and buckled to the demolding splitting section through the mold turning machine to perform demolding operation, so that the mold and the sleeper product are separated, the product is stacked and transported outwards through the stacking machine, and the mold enters the mold cleaning section to be cleaned and is put into the next production.
The utility model discloses a further set up to: mould clearance section with install the translation frame between the release agent spraying section, the mould of placing on the mould clearance section passes through translation frame translation to the release agent spraying section on, just the rotation roller set of release agent spraying section, the pre-buried section of ironware, the pre-buried section of reinforcing bar and the installation of reinforcing bar stretch-draw section is the multiunit rotation roller set on a straight line for the straight line transportation of sliding of mould.
Through adopting above-mentioned technical scheme, set up the width space that suitable translation frame can make full use of factory building, the rotation roller set of release agent spraying section, the pre-buried section of ironware, the pre-buried section of reinforcing bar and reinforcing bar stretch-draw section installation simultaneously is the multiunit rotation roller set on a straight line for the straight line of mould slides the transportation, so the mould after carrying out the clearance formally drops into in the production of next time promptly after the spraying release agent.
The utility model discloses a further set up to: the concrete pouring device is characterized in that a translation frame is also arranged between the steel bar stretching section and the concrete pouring section, and a mould placed on the steel bar stretching section is translated to the concrete pouring section through the translation frame.
Through adopting above-mentioned technical scheme, at reinforcing bar stretch-draw section with concrete is treated to install the translation frame between the section of pouring, not only can utilize the width space of factory building, also need install simultaneously and shorten the installation length of whole production line for arrange between the station in reasonable within range.
The utility model discloses a further set up to: the embedded part system installation station further comprises a steel bar marshalling relaxation forming sliding groove, the relaxation forming sliding groove is parallel to the steel bar pre-buried section, a steel bar placing frame is arranged between the relaxation forming sliding groove and the steel bar pre-buried section, one end of the relaxation forming sliding groove is connected with an operating platform, the other end of the relaxation forming sliding groove is connected with a winch, and one side of the operating platform is connected with a pier head machine.
Through adopting above-mentioned technical scheme, the reinforcing bar marshalling process is orderly neat, and reinforcing bar marshalling efficiency is higher, reduces the error rate, has also reduced artifical intensity of labour, sets up reasonable position relation and is favorable to promoting the process linking work efficiency between each step, and the reinforcing bar after the unloading carries out the interlude work of end baffle and pier nose board on operation platform, can place the reinforcing bar group in the shaping spout of diastole after accomplishing the pier nose, realizes the diastole extension of reinforcing bar group through the hoist engine.
The utility model discloses a further set up to: the diastole shaping spout upper end opening and slip are pegged graft and are had the fixed plate, the fixed plate including slip peg graft in the diastole shaping spout horizontal sliding plate, fixed connection in horizontal sliding plate goes up at least a pair of butt lug, just the width of butt lug is less than the reinforcing bar interval in a set of reinforcing bar, the high two-thirds that is greater than the end baffle height of a set of reinforcing bar both ends installation of butt lug.
Through adopting above-mentioned technical scheme, horizontal sliding plate can follow the shaping spout of diastole under the drive of hoist engine and carry out reciprocating sliding, and because the setting of butt lug, can organize the end baffle butt of having interlude in the reinforcing bar and drive synchronous slip to organize the shaping of diastole with whole reinforcing bar.
The utility model discloses a further set up to: the pulley is connected in the relaxation forming sliding groove and located on the side wall of one end, far away from the winch, of the relaxation forming sliding groove, a steel wire rope is wound on the winch, one end of the steel wire rope is fixedly connected to one side, close to the winch, of the horizontal sliding plate, and the other end of the steel wire rope penetrates through the relaxation forming sliding groove in a sliding mode and bypasses the pulley and then is fixedly connected to the other side of the horizontal sliding plate.
Through adopting above-mentioned technical scheme, roll-up wire rope when the hoist engine rotates to drive horizontal sliding plate and slide along the spout, equally, when hoist engine antiport, also can reverse roll-up wire rope, thereby drive horizontal sliding plate and carry out the antiport along the spout, reach the effect that resets.
The utility model discloses a further set up to: the diastole forming chute is abutted against one end of the operation platform and is further fixed with at least two vertically arranged positioning convex blocks, and the width of each positioning convex block is smaller than the distance between the steel bars in the corresponding group of steel bars.
Through adopting above-mentioned technical scheme, it can prevent that the hoist engine from pulling excessively to set up the locating convex block, can place last end baffle or pier nose board at the afterbody of reinforcing bar group when placing the reinforcing bar group, the hoist engine starts when pulling horizontal slide, last end baffle or pier nose board are along with the final butt that can of the removal of whole reinforcing bar group on the locating convex block, the exhibition to whole reinforcing bar group has been accomplished this moment, the operation of reinforcing bar marshalling has been accomplished promptly, pull whole group's reinforcing bar diastolic in-process at the hoist engine simultaneously, the locating convex block can be timely comb many reinforcing bars and separate, avoid the crisscross knot of many reinforcing bars.
The utility model discloses a further set up to: the width of the gantry crane is larger than or equal to the distance between the finished product temporary placing section and the concrete vibrating and leveling section.
Through adopting above-mentioned technical scheme, install the portal crane and can carry out the operation that the mould went in and out the steam pit, also can carry out the replacement of part district's section operation temporarily, promoted the flexible degree of operation of whole production.
The utility model discloses a further set up to: and a discharging funnel is arranged above the concrete pouring section and is connected with a concrete mixing plant.
By adopting the technical scheme, the pouring of the concrete needs to be matched with the production rhythm, so that a mixing plant needs to be built, and the concrete can be preferably built outside a factory.
To sum up, the utility model discloses following beneficial effect has: the stations are arranged orderly, the production space arrangement is reasonable, complete circulating production flow is formed, the space occupation is reduced, and the production efficiency is improved.
Drawings
FIG. 1 is a system diagram of the present embodiment;
fig. 2 is a schematic structural diagram of the completed grouping of the reinforcing bars in the embodiment;
fig. 3 is a schematic structural view of the present embodiment with the reinforcement bar set and the heading machine removed;
FIG. 4 is an enlarged view at A of FIG. 3;
fig. 5 is an enlarged view of fig. 3 at B.
Reference numerals: 1. an embedded part manufacturing and installing station; 2. a concrete pouring and tamping station; 3. maintaining a forming station; 4. a relaxation forming chute; 5. a fixing plate; 51. a horizontal sliding plate; 52. abutting the bump; 61. a winch; 62. a wire rope; 63. a pulley; 7. demolding and stacking stations; 10. a heading machine; 11. an operating platform; 12. positioning the bump; 15. and (4) reinforcing steel bar groups.
Detailed Description
An automatic production system for prefabricated sleepers is shown in figure 1 and comprises an embedded part installation station 1, a concrete pouring station 2, a maintenance forming station 3 and a demolding and stacking station 7, wherein the maintenance forming station 3 mainly comprises a steam pool, the steam pool is built and one end of a factory and is positioned between the concrete pouring station 2 and the demolding and stacking station 7, the embedded part installation station 1 and the demolding and stacking station 7 are arranged in a straight line, the concrete pouring station 2 is arranged in another straight line, and the embedded part installation station 1, the demolding and stacking station 7 and the concrete pouring station 2 are all arranged along the length direction of the factory.
The embedded part manufacturing and installing station 1 comprises an iron part embedded section, a steel bar embedded section and a steel bar tensioning section which are positioned on the same straight line and are all provided with a rotating roller set, and further comprises a relaxation forming sliding groove 4 for steel bar marshalling.
The pre-buried section of ironware includes that a set of fixed mounting rotates roller set and a plurality of jacking cylinder subaerial, and the mould is placed back on rotating the roller set, and the upset of mould one side jack-up is with a plurality of jacking cylinders of synchronous start, and the personnel of being convenient for at this moment install the location with pre-buried sleeve pipe from the bottom and the lateral wall of mould, accomplishes back jacking cylinder return, rotates the roller set start-up and drives the mould and slide from the pre-buried section of ironware and get into the pre-buried section of reinforcing bar.
As shown in fig. 2 and 3, the relaxation molding chute 4 is parallel to the embedded section of the steel bar, and a steel bar placing frame 9 is arranged between the relaxation molding chute and the embedded section of the steel bar. One end of the diastole forming chute 4 is connected with an operating platform 11, the other end of the diastole forming chute is connected with a winch 61, one side of the operating platform 11 is connected with a pier nose machine 10, and meanwhile, the operating platform 11 is also connected with a steel bar blanking area. The reinforcing bar after unloading carries out the interlude work of end baffle and pier nose board on operation platform 11, can place reinforcing bar group 15 on diastole shaping spout 4 after accomplishing the pier nose, realizes the diastole extension of reinforcing bar group 15 through hoist engine 61.
As shown in fig. 4 and 5, the upper end of the diastolic forming chute 4 is open and is slidably inserted with a fixing plate 5, the fixing plate 5 includes a horizontal sliding plate 51 slidably inserted in the diastolic forming chute 4, and a pair of abutting protrusions 52 fixedly connected to the horizontal sliding plate 51, the width of the abutting protrusions 52 is smaller than the distance between the two steel bars in the set of steel bars, and the height of the abutting protrusions 52 is greater than two thirds of the height of the end partition installed at the two ends of the set of steel bars. The pulley 63 is connected in the diastole forming chute 4, the pulley 63 is positioned on the side wall of one end of the diastole forming chute 4 far away from the winch 61, the wire rope 62 is wound on the winch 61, one end of the wire rope 62 is fixedly connected to one side of the horizontal sliding plate 51 close to the winch 61, and the other end of the wire rope 62 is slidably arranged in the diastole forming chute 4 in a penetrating manner and fixedly connected to the other side of the horizontal sliding plate 51 after bypassing the pulley 63.
As shown in fig. 4 and 5, the horizontal sliding plate 51 is driven by the winding engine 61 to slide back and forth along the expansion forming chute 4, and due to the arrangement of the abutting convex block 52, the end partition plates inserted into the reinforcing steel bar group 15 are abutted and driven to slide synchronously, so that the whole reinforcing steel bar group 15 is expanded and formed. The wire rope 62 is wound up when the winch 61 rotates so as to drive the horizontal sliding plate 51 to slide along the chute, and similarly, the wire rope 62 can be wound up reversely when the winch 61 rotates reversely so as to drive the horizontal sliding plate 51 to slide reversely along the chute, so that the resetting effect is achieved.
As shown in fig. 4 and 5, at least two positioning protrusions 12 are fixed at one end of the relaxation forming chute 4 abutting against the operation platform 11, and the width of each positioning protrusion 12 is smaller than the distance between the steel bars in the group of steel bars. Set up locating convex block 12 and can prevent that hoist engine 61 from pulling excessively, can place last end baffle or pier nose board at the afterbody of reinforcing bar group 15 when placing reinforcing bar group 15, hoist engine 61 starts when pulling horizontal slide 51 and sliding, last end baffle or pier nose board are along with whole reinforcing bar group 15's removal final meeting butt on locating convex block 12, the exhibition to whole reinforcing bar group 15 has been accomplished this moment, the operation of reinforcing bar marshalling has been accomplished promptly, simultaneously at the in-process of hoist engine 61 traction whole group reinforcing bar diastole, locating convex block 12 can be timely comb many reinforcing bars and separate, avoid the crisscross knot of many reinforcing bars.
After the grouping of a group of steel bars is completed, the group of steel bars can be placed on the steel bar placing frame, after the die is processed in the iron part embedding section, the group of steel bars can be placed in the die placed on the steel bar embedding section, and the rotating roller set is started to drive the die to enter the next steel bar stretching station to stretch and draw the steel bars in a prestress mode.
The concrete pouring station 2 comprises a concrete to-be-poured section, a concrete pouring section and a concrete vibrating and leveling section which are located on the same straight line and are all provided with the rotating roller sets, a discharging hopper is arranged above the concrete pouring section, and the discharging hopper is connected with a concrete mixing plant. And a translation frame is arranged between the steel bar stretching section and the concrete section to be cast, and a mould placed on the steel bar stretching section is translated to the concrete section to be cast through the translation frame. The factory building is also provided with a gantry crane, and the width of the gantry crane is slightly larger than the distance between the finished product temporary placing section and the concrete vibrating and leveling section. After the concrete is fed into the mould and vibrated and leveled, the concrete is hoisted by a gantry crane, for example, in a steam pool for curing and forming.
And after the sleeper is maintained and formed, the sleeper is adjusted out through a gantry crane and enters a demolding and stacking station 7. The demolding and stacking station 7 comprises a finished product temporary placing section, a demolding and cutting section, a demolding agent spraying section and a mold cleaning section, wherein the demolding and cutting section is parallel to the finished product temporary placing section, and the mold cleaning section is in the same straight line with the finished product temporary placing section and is parallel to the demolding agent spraying section.
A mold turning machine is arranged between the finished product temporary placing section and the demolding splitting section, and a stacking machine is arranged at the end part of the demolding splitting section. The sleeper is carried to the section is put temporarily to the finished product after shaping in the mould, turn over the mould machine and buckle to the operation of drawing of patterns on cutting the section through turning over and carry out drawing of patterns to mould and sleeper product separation, the section is put temporarily to the product and the rotation roller set starts to transport empty mould to the mould clearance section, the rotation roller set start on the section is cut to the product sleeper and transports to one end, carry out operations such as cutting of reinforcing bar, end baffle demolish and reference numeral coding again in the transportation, the final product rethread stacking machine realizes the external transportation of pile.
The empty mould of placing on the mould clearance section is cleared up by the workman, will remain concrete clean up, installs the translation frame between mould clearance section and the release agent spraying section, and the mould of placing on the mould clearance section passes through the translation frame and translates to on the release agent spraying section. The mold release agent spraying section is adjacent to the iron part embedded section, the rotating roller sets are also installed below the mold release agent spraying section and are located on the same straight line with the iron part embedded section, and the rotating roller sets installed on the mold release agent spraying section, the iron part embedded section, the steel bar embedded section and the steel bar stretching section are a plurality of groups of rotating roller sets on the same straight line and are used for linear sliding transportation of molds, so that circular production operation is achieved.

Claims (10)

1. The utility model provides a prefabricated sleeper automatic production system, includes that built-in fitting system ann station (1), concrete placement smash station (2), maintenance shaping station (3), drawing of patterns pile station (7), maintenance shaping station (3) are located concrete placement smash station (2) with between drawing of patterns pile station (7), its characterized in that: station (1) is ann to built-in fitting system is including being in same straight line and all installing the pre-buried section of ironware, the pre-buried section of reinforcing bar and the reinforcing bar stretch-draw section that rotate the roller set, concrete tamping station (2) are including being in same straight line and all installing the concrete that rotates the roller set and treating pouring section, concrete pouring section and concrete vibration section of leveling, drawing of patterns pile station (7) are including the section of putting temporarily of finished product and release agent spraying section, release agent spraying section with the pre-buried section of ironware is adjoined, just release agent spraying section below also install rotate the roller set and with the pre-buried section of ironware is on same straight line.
2. An automatic production system of prefabricated sleepers according to claim 1, characterized in that: demoulding pile station (7) still include with finished product put section parallel arrangement temporarily the drawing of patterns segmentation, with finished product put section temporarily in same straight line and with mould clearance section of demoulding agent spraying section parallel arrangement, finished product put section temporarily with install the mould machine that turns over between the section is cut to the drawing of patterns segmentation, the machine of stacking is installed to drawing of patterns segmentation tip.
3. An automatic production system of prefabricated sleepers according to claim 2, characterized in that: mould clearance section with install the translation frame between the release agent spraying section, the mould of placing on the mould clearance section passes through translation frame translation to the release agent spraying section on, just the rotation roller set of release agent spraying section, the pre-buried section of ironware, the pre-buried section of reinforcing bar and the installation of reinforcing bar stretch-draw section is the multiunit rotation roller set on a straight line for the straight line transportation of sliding of mould.
4. An automatic production system of prefabricated sleepers according to claim 3, characterized in that: the concrete pouring device is characterized in that a translation frame is also arranged between the steel bar stretching section and the concrete pouring section, and a mould placed on the steel bar stretching section is translated to the concrete pouring section through the translation frame.
5. An automatic production system of prefabricated sleepers according to claim 1, characterized in that: station (1) is installed in built-in fitting system still includes diastole shaping spout (4) that the reinforcing bar marshalled, diastole shaping spout (4) with reinforcing bar pre-buried section parallel arrangement, and be provided with reinforcing bar rack (9) between the two, the one end of diastole shaping spout (4) is connected with operation platform (11), and the other end is connected with hoist engine (61), one side of operation platform (11) is connected with pier nose machine (10).
6. An automatic production system of prefabricated sleepers according to claim 5, characterized in that: the diastole forming chute (4) upper end opening and slip grafting have fixed plate (5), fixed plate (5) including slip grafting in diastole forming chute (4) horizontal slide plate (51), fixed connection in horizontal slide plate (51) go up at least a pair of butt lug (52), just the width of butt lug (52) is less than the reinforcing bar interval in a set of reinforcing bar, the high two-thirds that is greater than the end baffle height of a set of reinforcing bar both ends installation of butt lug (52).
7. An automatic production system of prefabricated sleepers according to claim 6, characterized in that: the extension forming sliding groove (4) is internally connected with a pulley (63), the pulley (63) is located on the side wall of one end, away from the winch (61), of the extension forming sliding groove (4), a steel wire rope (62) is wound on the winch (61), one end of the steel wire rope (62) is fixedly connected to one side, close to the winch (61), of the horizontal sliding plate (51), the other end of the steel wire rope (62) penetrates through the extension forming sliding groove (4) in a sliding mode and bypasses the pulley (63) to be fixedly connected to the other side of the horizontal sliding plate (51).
8. An automatic production system for prefabricated sleepers according to claim 7, characterized in that: the diastole forming chute (4) is abutted to one end of the operating platform (11) and is further fixed with at least two vertically arranged positioning convex blocks (12), and the width of each positioning convex block (12) is smaller than the distance between the steel bars in the group of steel bars.
9. An automatic production system of prefabricated sleepers according to claim 1, characterized in that: the width of the gantry crane is larger than or equal to the distance between the finished product temporary placing section and the concrete vibrating and leveling section.
10. An automatic production system of prefabricated sleepers according to claim 1, characterized in that: and a discharging funnel is arranged above the concrete pouring section and is connected with a concrete mixing plant.
CN201922144187.3U 2019-12-02 2019-12-02 Automatic production system for prefabricated sleeper Expired - Fee Related CN211806904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922144187.3U CN211806904U (en) 2019-12-02 2019-12-02 Automatic production system for prefabricated sleeper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922144187.3U CN211806904U (en) 2019-12-02 2019-12-02 Automatic production system for prefabricated sleeper

Publications (1)

Publication Number Publication Date
CN211806904U true CN211806904U (en) 2020-10-30

Family

ID=73030815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922144187.3U Expired - Fee Related CN211806904U (en) 2019-12-02 2019-12-02 Automatic production system for prefabricated sleeper

Country Status (1)

Country Link
CN (1) CN211806904U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117428923A (en) * 2023-12-21 2024-01-23 蚌埠市蚌铁轨枕有限责任公司 Prestressed tensioning device for reinforced concrete sleeper

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117428923A (en) * 2023-12-21 2024-01-23 蚌埠市蚌铁轨枕有限责任公司 Prestressed tensioning device for reinforced concrete sleeper
CN117428923B (en) * 2023-12-21 2024-02-20 蚌埠市蚌铁轨枕有限责任公司 Prestressed tensioning device for reinforced concrete sleeper

Similar Documents

Publication Publication Date Title
CN208788805U (en) A kind of concrete precast pile automatic production line
CN103128847B (en) Double-block type sleeper production line and production process thereof
CN102744779B (en) PHC (prestressed concrete pipe pile) pile streamline conveying production line
CN108058266A (en) Prefabricated components integrated production line
CN106217590A (en) Pre-tensioned rail plate flowing water unit method produces tooling device and method
CN210820155U (en) Concrete prefabricated square pile manufacturing system
CN105500518A (en) Prefabricated stair production line and production method
EP0289017B1 (en) Plant to manufacture elongated elements of prestressed reinforced concrete
CN108908680B (en) Gypsum block forming device and operation method thereof
CN208163960U (en) The production system of concrete precast pile automatic production line workshop and prefabricated pile
CN211806904U (en) Automatic production system for prefabricated sleeper
CN105600335A (en) Steel reinforcement cage storage and conveying device used for tubular pile production line
CN110142862A (en) The production system of concrete precast pile automatic production line workshop and prefabricated pile
CN111203972A (en) Automatic production line for pile plate type structural bridge deck
CN206140658U (en) Open track plate current water unit method production construction installation equipment earlier
CN110900813A (en) Automatic production system for prefabricated sleeper
CN113183308A (en) Concrete pipe pile production method convenient for demolding
CN112265134A (en) Beam-making area of beam body precast yard
CN115256633A (en) Tendon placing and binding machine for prestressed building component mould platform production line and tendon placing and binding process thereof
CN209665788U (en) A kind of prefabricated system of processing for high-speed railway bridge surface shield
CN212795365U (en) Prefabricated part pedestal method production line for assembly type bridge deck auxiliary structure of high-speed railway
CN209736164U (en) Automatic assembly line fixed hopper belt cleaning device of section of jurisdiction
CN210820156U (en) Concrete prefabricated part production system
CN210282704U (en) Prefabricated part production line with bench formwork temporary storage unit
CN217072828U (en) Prefabricated railway line protective barrier piece production water line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030