CN211773545U - Novel special olive-shaped rammer for roadbed treatment - Google Patents

Novel special olive-shaped rammer for roadbed treatment Download PDF

Info

Publication number
CN211773545U
CN211773545U CN202020332166.4U CN202020332166U CN211773545U CN 211773545 U CN211773545 U CN 211773545U CN 202020332166 U CN202020332166 U CN 202020332166U CN 211773545 U CN211773545 U CN 211773545U
Authority
CN
China
Prior art keywords
rammer
adjusting rod
olive
shaped
anchoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020332166.4U
Other languages
Chinese (zh)
Inventor
陈万里
闫超
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Design & Research Institute Of Jinan Urban Construction Group Co ltd
Jinan Urban Construction Group Co Ltd
Shandong Quanjian Engineering Testing Co Ltd
Jinan Municipal Engineering Construction Group Co Ltd
Shandong Huitong Construction Group Co Ltd
Shandong Huiyou Municipal Garden Group Co Ltd
Original Assignee
Design & Research Institute Of Jinan Urban Construction Group Co ltd
Jinan Urban Construction Group Co Ltd
Shandong Quanjian Engineering Testing Co Ltd
Jinan Municipal Engineering Construction Group Co Ltd
Shandong Huitong Construction Group Co Ltd
Shandong Huiyou Municipal Garden Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Design & Research Institute Of Jinan Urban Construction Group Co ltd, Jinan Urban Construction Group Co Ltd, Shandong Quanjian Engineering Testing Co Ltd, Jinan Municipal Engineering Construction Group Co Ltd, Shandong Huitong Construction Group Co Ltd, Shandong Huiyou Municipal Garden Group Co Ltd filed Critical Design & Research Institute Of Jinan Urban Construction Group Co ltd
Priority to CN202020332166.4U priority Critical patent/CN211773545U/en
Application granted granted Critical
Publication of CN211773545U publication Critical patent/CN211773545U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model relates to the technical field of municipal works construction, in particular to a novel special olive-shaped rammer for roadbed treatment, which comprises a rammer, wherein the rammer is olive-shaped, an adjusting rod is arranged in a hollow part on the upper part of the rammer, the top end of the adjusting rod is connected with a mushroom head structure, a plurality of groups of anchoring holes are arranged on the adjusting rod from top to bottom, anchoring points matched with the anchoring holes are symmetrically arranged on the upper part of the rammer, and a fixing part passes through the anchoring points and the anchoring holes to fix the adjusting rod and the rammer together; the outer surface of the hammer head of the rammer is provided with a plurality of convex wings. The utility model discloses in the road bed processing work progress, it is little to produce the vibration influence, and is low to next-door neighbour's building vibration influence, can directly break reinforced concrete structure, the masonry structure in the edulcoration banket, has improved the efficiency of construction, reduces the raise dust simultaneously, tamps splash, green.

Description

Novel special olive-shaped rammer for roadbed treatment
Technical Field
The utility model relates to a municipal works construction technical field, in particular to novel roadbed treatment is with special olive form rammer.
Background
In recent years, the municipal road engineering construction often meets the working condition of poor subgrade geological conditions, wherein the occurrence frequency of the soft subgrade filled with high-filling miscellaneous earth is the highest. The traditional high fill roadbed processing mode has large vibration and noise, influences the structural safety of the adjacent building, easily generates splashes, raised dust and waste soil, and influences the environmental protection and the pedestrian safety. With the development of urban road construction concept, how to develop a low-influence and low-vibration green construction process to treat a high-fill roadbed is a major problem in the municipal industry.
Disclosure of Invention
The to-be-solved problem of the utility model is to overcome the not enough of background art, provide a novel roadbed is handled and is used special olive form rammer.
The utility model discloses a realize through following technical scheme:
a novel special olive-shaped rammer for roadbed treatment comprises a rammer, wherein the rammer is olive-shaped, a hollow part is arranged at the upper part of the rammer, an adjusting rod is arranged in the hollow part, the diameter of the adjusting rod is equal to that of the hollow part, the top end of the adjusting rod is integrally and upwards connected with a mushroom head structure, a plurality of groups of anchoring holes are symmetrically arranged on the adjusting rod from top to bottom, anchoring points matched with the anchoring holes are symmetrically arranged at the upper part of the rammer, and a fixing piece penetrates through the anchoring points and the anchoring holes to fix the adjusting rod and the rammer; the outer surface of the hammer head of the rammer is provided with a plurality of convex wings.
Two groups of anchoring holes are symmetrically arranged on the adjusting rod from top to bottom.
The distance between the two groups of anchoring holes is 2-4 m.
The fixing piece is a pin or a bolt.
The convex wing is a flat convex wing type.
The six convex wings are uniformly distributed on the surface of the hammer head.
The utility model has the advantages that: the splash is effectively reduced during construction, the generated vibration is small, the noise is small, and the influence of urban operation on residents is low; dust is not easy to generate, and the pollution to the atmosphere is reduced; the length of the hammer body can be freely adjusted, and the hammer body can be adjusted according to different required treatment depths; the convex wings of the hammer improve the effect of extruding soil in the hole, the pile-forming material is obtained in situ, the increase of the transportation cost is avoided, the rammer impacts the hole-forming and backfilling at one time, the reinforced concrete structure and the large-block-diameter masonry in the miscellaneous filling soil can be directly crushed, the limit of the filling material in the hole to the particle size is small, and the waste slag and the waste soil in the site can be directly utilized.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure, 1 rammer, 2 hollow part, 3 adjusting rod, 4 mushroom head structure, 5 anchoring hole, 6 anchoring point, 7 hammer head and 8 convex wing.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The overall shape of rammer 1 designed by the present invention is olive-shaped, as shown in figure 1. A hollow part 2 is arranged in the middle of the upper part of the rammer 1, and the rest part is solid. An adjusting rod 3 is placed in the hollow part 2, and the diameter of the adjusting rod 3 is equal to that of the hollow part 2. Adjust 3 integrative upwards connection mushroom head structure 4 in pole top, mushroom head structure 4 is the current structure of ram 1 for claw hangs the mechanism and snatchs, and it is no longer repeated here.
A plurality of groups of anchoring holes 5 are symmetrically arranged on the adjusting rod 3 from top to bottom, preferably two groups of anchoring holes 5 are arranged in the embodiment, as shown in the attached drawing 1, and the distance between the two groups of anchoring holes 5 is 2-4m, so that the adjustable hammer body length is 2-4m, and the adjustment can be carried out according to different treatment depths. And anchoring points 6 matched with the anchoring holes 5 are symmetrically arranged at the upper part of the rammer 1, so that the fixing piece penetrates through the anchoring points 6 and the anchoring holes 5 to fix the adjusting rod 3 and the rammer 1 together. The fixing part can be various, and in the embodiment, the adjusting rod 3 and the rammer 1 are fixed together by a pin. In the present embodiment, there are two anchoring holes 5 per set, with a small height difference, so that the corresponding anchoring point 6 on the rammer 1 is also provided with two corresponding anchoring points 6.
A plurality of convex wings 8 are further integrally arranged on the outer surface of the hammer head 7 of the rammer 1, the convex wings 8 are of a convex wing type structure vertical to the surface of the hammer head 7, and the convex wings 8 can be of a flat convex wing type and the like. In this embodiment, six protruding wings 8 are uniformly distributed on the surface of the hammer 7.
The rammer 1 disclosed by the invention reduces the influence on surrounding buildings when a high-fill roadbed is treated, can cope with more complicated roadbed geological conditions, and effectively reduces splashes, raised dust and the like in the construction process. The novel roadbed treatment uses the special olive-shaped rammer to carry out dynamic compaction on the filler in the hole, the filler in the hole has smaller limitation on the particle size, the site large-block-diameter waste residue and the waste soil can be directly utilized, the site miscellaneous filling is fully utilized, the waste residue soil is reduced, and the novel roadbed treatment is green and environment-friendly.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; those of ordinary skill in the art will understand that: the technical solutions described in the above embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (6)

1. The utility model provides a novel road bed is handled with special olive form rammer, includes rammer (1), its characterized in that: the rammer (1) is olive-shaped, a hollow part (2) is arranged at the upper part of the rammer (1), an adjusting rod (3) is arranged in the hollow part (2), the diameter of the adjusting rod (3) is equal to that of the hollow part (2), the top end of the adjusting rod (3) is integrally and upwards connected with a mushroom head structure (4), a plurality of groups of anchoring holes (5) are symmetrically arranged on the adjusting rod (3) from top to bottom, anchoring points (6) matched with the anchoring holes (5) are symmetrically arranged at the upper part of the rammer (1), and the adjusting rod (3) and the rammer (1) are fixed together by a fixing piece penetrating through the anchoring points (6) and the anchoring holes (5; the outer surface of the hammer head (7) of the rammer (1) is provided with a plurality of convex wings (8).
2. The novel special olive-shaped rammer for roadbed treatment according to claim 1, characterized in that: two groups of anchoring holes (5) are symmetrically arranged on the adjusting rod (3) from top to bottom.
3. The novel special olive-shaped rammer for roadbed treatment according to claim 2, characterized in that: the distance between the two groups of anchoring holes (5) is 2-4 m.
4. The novel special olive-shaped rammer for roadbed treatment according to claim 1, characterized in that: the fixing piece is a pin or a bolt.
5. The novel special olive-shaped rammer for roadbed treatment according to claim 1, characterized in that: the convex wing (8) is a flat convex wing type.
6. The novel special olive-shaped rammer for roadbed treatment according to claim 1, characterized in that: the six convex wings (8) are uniformly distributed on the surface of the hammer head (7).
CN202020332166.4U 2020-03-17 2020-03-17 Novel special olive-shaped rammer for roadbed treatment Active CN211773545U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020332166.4U CN211773545U (en) 2020-03-17 2020-03-17 Novel special olive-shaped rammer for roadbed treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020332166.4U CN211773545U (en) 2020-03-17 2020-03-17 Novel special olive-shaped rammer for roadbed treatment

Publications (1)

Publication Number Publication Date
CN211773545U true CN211773545U (en) 2020-10-27

Family

ID=72930741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020332166.4U Active CN211773545U (en) 2020-03-17 2020-03-17 Novel special olive-shaped rammer for roadbed treatment

Country Status (1)

Country Link
CN (1) CN211773545U (en)

Similar Documents

Publication Publication Date Title
CN102733377B (en) Method for constructing concrete pile
CN105350525A (en) Construction method for piles
CN104912076A (en) Complete machine of hole-expansion and pile-planting static pile presser
CN101570971A (en) Rock mass pile foundation pore-forming preboring construction method
CN110055948A (en) A kind of big Treatment Methods of Karst Foundation of depth and device
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN101718098B (en) Micro-pile combined dug composite foundation and construction method thereof
CN206829148U (en) A kind of combined type shaped steel, concrete square pile bearing diagonal foundation pit enclosure structure
CN211773545U (en) Novel special olive-shaped rammer for roadbed treatment
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN107476319A (en) Mountain area steep slope region Road Bridge Pile Foundation construction method
CN112240022A (en) Construction method and construction equipment for static pressure immersed tube pile
CN101187207A (en) Concrete pedestal pile construction equipment and its construction method
CN207047834U (en) A kind of construction system of hollow preformed pile
CN105970917A (en) Method for controlling excessively-poured concrete on pile top of cast-in-situ bored pile
CN109898531A (en) Gravity type assembles concrete retaining wall
CN1013044B (en) Cinder pile and its special construction apparatus
CN109083134A (en) A kind of annular bore Pile method and apparatus
CN212656235U (en) Double-row steel pipe pile supporting structure for foundation pit supporting
CN204531575U (en) Cement pole Reinforcement Reinforced Concrete Structure
CN106149480B (en) Straight rib line stake machine and construction method suitable for no hydraulic thick sand bed geology
CN112049104A (en) Extensible soft soil area pile foundation structure and construction method thereof
CN105926421B (en) A kind of bumping at bridge-head reparation and prevention method based on load decrement
CN201162217Y (en) Construction equipment for concrete pedestal pile
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant