Prior art keywords
plate
mounting
scaffold
fixedly provided
cross rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921995154.3U
Other languages
Chinese (zh)
Inventor
张卫卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Xianghao Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921995154.3U priority Critical patent/CN211736259U/en
Application granted granted Critical
Publication of CN211736259U publication Critical patent/CN211736259U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold puts up structure that building site used, comprising a base plate, the top fixed mounting of bottom plate has first mounting panel and second mounting panel, the top fixed mounting of first mounting panel has two first montants, one side fixed mounting that two first montants are close to each other has same first horizontal pole, the top fixed mounting of second mounting panel has two second montants, one side fixed mounting that two second montants are close to each other has same second horizontal pole, the top of bottom plate is equipped with the footboard that is located between first horizontal pole and the second horizontal pole, the equal fixed mounting in both sides of footboard has the link plate, two link plates are L type structure, two link plates contact in the top of first horizontal pole and second horizontal pole respectively. The utility model relates to a rationally, the practicality is good, is convenient for adjust the high position of footboard, and the simple operation makes things convenient for the staff to stand and carries out work on the footboard, is convenient for dismantle the disintegration to the scaffold moreover, convenient transportation.

Description

Scaffold structure for construction site
Technical Field
The utility model relates to a construction equipment technical field specifically is a scaffold puts up structure that building site used.
Background
The scaffold is a working platform which is set up for ensuring that each construction process is carried out smoothly, in the building industry, the scaffold is a very common tool which is set up for workers to operate and solve vertical and horizontal transportation on a construction site, the common scaffold is composed of a scaffold frame and scaffold pedals fixed on the scaffold frame, and workers stand on the pedals of the scaffold to work.
However, in the prior art, a common scaffold is simple in structure, generally, the common scaffold is formed by welding a plurality of steel pipes and pedals or fixing the steel pipes by using steel wires, when the scaffold is used, the height of the pedals is not convenient to adjust, and inconvenience is brought to the work of workers.
Disclosure of Invention
Technical problem to be solved
Not enough to prior art, the utility model provides a scaffold puts up structure that building site used has solved the high inconvenient regulation that adjusts of footboard on the scaffold, brings inconvenience for work, moreover because the scaffold is bulky, is not convenient for dismantle, leads to transporting inconvenient problem.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a scaffold structure for a construction site comprises a bottom plate, wherein a first mounting plate and a second mounting plate are fixedly mounted at the top of the bottom plate, two first vertical rods are fixedly mounted at the top of the first mounting plate, one side, close to each other, of each first vertical rod is fixedly mounted with a same first cross rod, two second vertical rods are fixedly mounted at the top of the second mounting plate, one side, close to each other, of each second vertical rod is fixedly mounted with a same second cross rod, a pedal positioned between the first cross rods and the second cross rods is arranged above the bottom plate, hanging plates are fixedly mounted at two sides of the pedal, both the two hanging plates are of an L-shaped structure, the two hanging plates are respectively contacted with the tops of the first cross rods and the second cross rods, positioning grooves are respectively formed at the tops of the first cross rods and the tops of the second cross rods, positioning plates are respectively fixedly mounted at the bottoms of, the top of bottom plate is seted up and is located the screw hole between first mounting panel and the second mounting panel, and the lead screw is installed to the screw hole internal thread, and outside the both ends of lead screw all extended to the screw hole, the bottom fixed mounting of lead screw had the clamp plate.
Preferably, four universal wheels are installed at the bottom of the bottom plate, and the four universal wheels are arranged in a pairwise symmetry manner.
Preferably, a non-slip mat is fixedly mounted on the top of the pedal.
Preferably, the number of the first cross bars is five, the number of the second cross bars is five, and the five first cross bars and the five second cross bars are symmetrically arranged in pairs.
Preferably, the top end of the screw rod is fixedly provided with an adjusting handle, and the adjusting handle is provided with anti-skid grains.
Preferably, the bottom of the pressure plate is fixedly provided with a friction pad, and the first mounting plate and the second mounting plate are fixedly mounted on the bottom plate through bolts.
(III) advantageous effects
The utility model provides a scaffold puts up structure that building site used. The method has the following beneficial effects:
(1) this scaffold puts up structure that building site used, through utilizing four universal wheels, be convenient for promote this scaffold frame and remove, save physical power, clockwise rotation adjustment handle, adjustment handle drives the lead screw, clamp plate and friction pad rotate and move down, after the friction pad is contacted closely with ground, utilize the friction pad to increase the frictional resistance when contacting with ground, thereby can fix subaerial to the scaffold frame, make the difficult emergence skew of scaffold frame, the same reason, anticlockwise rotation adjustment handle, the lead screw drives clamp plate and friction pad and rotates and the rebound, relieve the fixed to the scaffold frame promptly, be convenient for remove the scaffold frame, thereby through clockwise or anticlockwise rotation adjustment handle, conveniently fix and remove the scaffold frame.
(2) This scaffold puts up structure that building site used, through upwards lifting up the footboard, the footboard drives two link plate rebound, two link plates drive two locating plates back outside the corresponding constant head tank of roll-off respectively, can dismantle the footboard, then remove the footboard to suitable height as required, make two link plates hang respectively on corresponding first horizontal pole and second horizontal pole, two link plates drive two locating plates and insert respectively in the corresponding constant head tank, utilize the location fit of two locating plates and two constant head tanks, fix the footboard at suitable high position, thereby conveniently adjust the high position of footboard, the staff of being convenient for stands and works on the footboard, utilize the slipmat, can make the staff stand and be difficult for slipping on the footboard.
(3) This scaffold puts up structure that building site used, through upwards lifting up the footboard, dismantles the footboard, then utilizes the bolt on pulling the handle on first mounting panel and the second mounting panel to dismantle, can dismantle first mounting panel, two first montants and five first horizontal poles from the bottom plate, dismantles second mounting panel, two second montants and five second horizontal poles from the bottom plate to disintegrate the scaffold, be convenient for transport the scaffold.
Drawings
FIG. 1 is a schematic sectional view of the main view of the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is a schematic side view of the present invention.
In the figure: 1. a base plate; 2. a first mounting plate; 3. a second mounting plate; 4. a first vertical bar; 5. a first cross bar; 6. a second vertical bar; 7. a second cross bar; 8. a pedal; 9. hanging the plate; 10. positioning a groove; 11. positioning a plate; 12. a threaded hole; 13. a screw rod; 14. pressing a plate; 15. a universal wheel; 16. a non-slip mat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-3, the utility model provides a technical solution: a scaffold structure for a construction site comprises a bottom plate 1, wherein a first mounting plate 2 and a second mounting plate 3 are fixedly mounted at the top of the bottom plate 1, two first vertical rods 4 are fixedly mounted at the top of the first mounting plate 2, one side, close to each other, of each first vertical rod 4 is fixedly mounted with a same first cross rod 5, two second vertical rods 6 are fixedly mounted at the top of the second mounting plate 3, one side, close to each other, of each second vertical rod 6 is fixedly mounted with a same second cross rod 7, a pedal 8 positioned between the first cross rod 5 and the second cross rod 7 is arranged above the bottom plate 1, hanging plates 9 are fixedly mounted at two sides of the pedal 8, the two hanging plates 9 are both of an L-shaped structure, the two hanging plates 9 are respectively contacted with the tops of the first cross rod 5 and the second cross rod 7, positioning grooves 10 are respectively formed at the tops of the first cross rod 5 and the second cross rod 7, positioning plates 11 are respectively fixedly, two locating plates 11 are respectively slidably mounted in corresponding locating grooves 10, a threaded hole 12 between the first mounting plate 2 and the second mounting plate 3 is formed in the top of the bottom plate 1, a screw rod 13 is mounted in the threaded hole 12, two ends of the screw rod 13 extend out of the threaded hole 12, and a pressing plate 14 is fixedly mounted at the bottom end of the screw rod 13.
Four universal wheels 15 are installed to bottom plate 1's bottom, four universal wheels 15 are two bisymmetry settings, the top fixed mounting of footboard 8 has slipmat 16, the quantity of first horizontal pole 5 is five, the quantity of second horizontal pole 7 is five, five first horizontal poles 5 and five second horizontal poles 7 are two bisymmetry and arrange, the top fixed mounting of lead screw 13 has adjustment handle, the last anti-skidding line that is equipped with of adjustment handle, the bottom fixed mounting of clamp plate 14 has the friction pad, first mounting panel 2 and second mounting panel 3 all through bolt fixed mounting on bottom plate 1.
When the scaffold is used, the scaffold is formed by combining the bottom plate 1, the first mounting plate 2, the second mounting plate 3, the two first vertical rods 4, the five first cross rods 5, the two second vertical rods 6, the five second cross rods 7 and the pedal 8, the scaffold is conveniently pushed to move by using the four universal wheels 15, the physical strength is saved, after the scaffold is moved to a proper position, the adjusting handle is clockwise rotated and drives the screw rod 13 to rotate, the screw rod 13 is in threaded connection and matching with the threaded hole 12, so that the screw rod 13 drives the pressing plate 14 and the friction pad to rotate and move downwards, after the friction pad is tightly connected with the ground, the adjusting handle is stopped to be rotated, the friction resistance when the friction pad is contacted with the ground is increased, the scaffold can be fixed, the scaffold is not easy to deviate on the ground, and similarly, the adjusting handle is anticlockwise rotated, the screw rod 13 drives the pressing plate 14 and the friction pad to rotate and move upwards, the friction pad is separated from the ground and is not contacted any more, namely the fixing of the pedal frame is released, the pedal frame is convenient to move, the adjusting handle is rotated clockwise or anticlockwise, the fixing and the moving of the pedal frame are convenient, when the height position of the pedal 8 needs to be adjusted, the pedal 8 is lifted upwards, the pedal 8 drives the two hanging plates 9 to move upwards, the two hanging plates 9 drive the two positioning plates 11 to respectively slide towards the outer sides of the corresponding positioning grooves 10, when the two positioning plates 11 respectively slide out of the corresponding positioning grooves 10, the fixing of the pedal 8 is released, the pedal 8 can be detached, then the pedal 8 is moved to a proper height according to needs, the two hanging plates 9 are respectively hung on the corresponding first cross rod 5 and the second cross rod 7, the two hanging plates 9 drive the two positioning plates 11 to be respectively inserted into the corresponding positioning grooves 10, and the positioning matching of the two positioning plates 11 and the two positioning grooves 10 is utilized, the pedal 8 is fixed at a proper height position, so that the height position of the pedal 8 can be conveniently adjusted, when the scaffold needs to be disassembled, firstly, the pedal 8 is lifted upwards, the pedal 8 is disassembled from the corresponding first cross rod 5 and second cross rod 7, then the bolts on the first mounting plate 2 and the second mounting plate 3 are utilized to disassemble, namely, the first mounting plate 2, the two first vertical rods 4 and the five first cross rods 5 can be disassembled from the bottom plate 1, and the second mounting plate 3, the two second vertical rods 6 and the five second cross rods 7 are disassembled from the bottom plate 1, so that the scaffold is disassembled, the scaffold is convenient to transport, and the contents which are not described in detail in the specification belong to the prior art known by a person skilled in the art.
To sum up, the scaffold structure for the building site utilizes the four universal wheels 15 to facilitate the pushing of the scaffold for moving and saving physical strength, the adjusting handle is rotated clockwise to drive the screw 13, the pressing plate 14 and the friction pad to rotate and move downwards, after the friction pad is tightly contacted with the ground, the friction resistance when the friction pad is contacted with the ground is increased by the friction pad, so that the scaffold can be fixed on the ground, and the scaffold is not easy to deviate, similarly, the adjusting handle is rotated anticlockwise, the screw 13 drives the pressing plate 14 and the friction pad to rotate and move upwards, namely the fixation of the scaffold is released, the scaffold is convenient to move, so that the scaffold is convenient to be fixed and move by rotating the adjusting handle clockwise or anticlockwise, when the height position of the pedal 8 needs to be adjusted, the pedal 8 is lifted upwards, the pedal 8 drives the two hanging plates 9 to move upwards, the two hanging plates 9 drive the two positioning plates 11 to respectively slide out of the corresponding positioning grooves 10, the pedal 8 can be disassembled, then the pedal 8 is moved to a proper height as required, so that the two hanging plates 9 are respectively hung on the corresponding first cross rod 5 and the second cross rod 7, the two hanging plates 9 drive the two positioning plates 11 to respectively insert into the corresponding positioning grooves 10, the pedal 8 is fixed at a proper height position by utilizing the positioning fit of the two positioning plates 11 and the two positioning grooves 10, the height position of the pedal 8 is convenient to adjust, a worker can conveniently stand on the pedal 8 to work, the worker can not easily slide down by utilizing the non-slip mat 16 when standing on the pedal 8, when the scaffold needs to be disassembled and disassembled, the pedal 8 is firstly lifted upwards to disassemble the pedal 8, and then the bolts on the first mounting plate 2 and the second mounting plate 3 are utilized to disassemble, can dismantle first mounting panel 2, two first montants 4 and five first horizontal poles 5 from bottom plate 1 get off, dismantle second mounting panel 3, two second montants 6 and five second horizontal poles 7 from bottom plate 1 get off to disintegrate the scaffold, be convenient for transport the scaffold, the utility model relates to a rationally, the practicality is good, is convenient for adjust the high position of footboard 8, and the simple operation makes things convenient for the staff to stand and carries out work on footboard 8, is convenient for dismantle the scaffold moreover and disintegrates, convenient transportation.

Claims (6)

1. A scaffolding structure for construction sites, comprising a base plate (1), characterized in that: the top of the bottom plate (1) is fixedly provided with a first mounting plate (2) and a second mounting plate (3), the top of the first mounting plate (2) is fixedly provided with two first vertical rods (4), one side, close to each other, of each first vertical rod (4) is fixedly provided with the same first cross rod (5), the top of the second mounting plate (3) is fixedly provided with two second vertical rods (6), one side, close to each other, of each second vertical rod (6) is fixedly provided with the same second cross rod (7), a pedal (8) positioned between the first cross rod (5) and the second cross rod (7) is arranged above the bottom plate (1), two sides of the pedal (8) are both fixedly provided with hanging plates (9), the two hanging plates (9) are of L-shaped structure, the two hanging plates (9) are respectively contacted with the tops of the first cross rod (5) and the second cross rod (7), the tops of the first cross rod (5) and the second cross rod (7) are both provided with positioning grooves, the bottom of two link plates (9) is equal fixed mounting has locating plate (11), two locating plates (11) are respectively slidable mounting in corresponding constant head tank (10), screw hole (12) that are located between first mounting panel (2) and second mounting panel (3) are seted up at the top of bottom plate (1), lead screw (13) are installed to screw hole (12) internal thread, outside the both ends of lead screw (13) all extended to screw hole (12), the bottom fixed mounting of lead screw (13) has clamp plate (14).
2. A scaffolding structure for use in a construction site as claimed in claim 1, wherein: four universal wheels (15) are installed at the bottom of the bottom plate (1), and the four universal wheels (15) are arranged in a pairwise symmetrical mode.
3. A scaffolding structure for use in a construction site as claimed in claim 1, wherein: and the top of the pedal (8) is fixedly provided with an anti-skid pad (16).
4. A scaffolding structure for use in a construction site as claimed in claim 1, wherein: the number of the first cross rods (5) is five, the number of the second cross rods (7) is five, and the five first cross rods (5) and the five second cross rods (7) are symmetrically arranged in pairs.
5. A scaffolding structure for use in a construction site as claimed in claim 1, wherein: the top end of the screw rod (13) is fixedly provided with an adjusting handle, and the adjusting handle is provided with anti-skid lines.
6. A scaffolding structure for use in a construction site as claimed in claim 1, wherein: the bottom fixed mounting of clamp plate (14) has the friction pad, and first mounting panel (2) and second mounting panel (3) are all through bolt fixed mounting on bottom plate (1).
CN201921995154.3U 2019-11-19 2019-11-19 Scaffold structure for construction site Expired - Fee Related CN211736259U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921995154.3U CN211736259U (en) 2019-11-19 2019-11-19 Scaffold structure for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921995154.3U CN211736259U (en) 2019-11-19 2019-11-19 Scaffold structure for construction site

Publications (1)

Publication Number Publication Date
CN211736259U true CN211736259U (en) 2020-10-23

Family

ID=72874472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921995154.3U Expired - Fee Related CN211736259U (en) 2019-11-19 2019-11-19 Scaffold structure for construction site

Country Status (1)

Country Link
CN (1) CN211736259U (en)

Similar Documents

Publication Publication Date Title
CN201263057Y (en) Cable pay-off rack
CN211736259U (en) Scaffold structure for construction site
CN205687497U (en) A kind of simple and easy hoisting device installing transhipment for power equipment
CN202377750U (en) Device for replacing supporting roller in adhesive tape machine
CN111206812A (en) Steel pipe tower operation platform
CN212802437U (en) Scaffold with prevent empting function
CN212224199U (en) Scaffold convenient to adjust for power equipment overhaul
CN110143229B (en) Thermal insulation board carrying device
CN205472419U (en) Buffer tank lifting device
CN211729442U (en) Plastic slab punches a hole and uses loading attachment
CN210212441U (en) Motor hauling device
CN211421778U (en) Scaffold with anti-skidding structure for building
CN208218172U (en) It is a kind of for lifting the hanger structure of blade of wind-driven generator
CN204552051U (en) The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN210165968U (en) Measuring line weighs down for construction
CN210370453U (en) Electrician uses wire pole ladder
CN209740605U (en) Multi-point asynchronous lifting mechanism
CN110965753A (en) Multifunctional high stool
CN112171602A (en) Trench pipe of shallow slot and production device thereof
CN211873761U (en) Multifunctional high stool
CN207052920U (en) The controllable sliding support of ground wire press-connection machine
CN208218296U (en) A kind of wind power generation stepped tower section hanging apparatus
CN210704280U (en) Angle anchor clamps based on little grinding machine processing convenient to spacing
CN206846683U (en) A kind of novel hanging device combiner
CN211102600U (en) Tightening machine device with one-way rotary reaction arm

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201214

Address after: No. 053-1, new agriculture group, hetangpu, Hetang District, Zhuzhou City, Hunan Province 412000

Patentee after: Huang Hongguang

Address before: 602, building 4, Zhubang 2000 business center, Chaoyang District, Beijing 100025

Patentee before: Zhang Weiwei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201228

Address after: 412000 shatangli, yangjiashan, Lukou Town, Lukou District, Zhuzhou City, Hunan Province

Patentee after: Hunan Xianghao Construction Engineering Co.,Ltd.

Address before: No. 053-1, new agriculture group, hetangpu, Hetang District, Zhuzhou City, Hunan Province 412000

Patentee before: Huang Hongguang

CF01 Termination of patent right due to non-payment of annual fee