CN211690719U - Cable work well with intelligent drainage function - Google Patents

Cable work well with intelligent drainage function Download PDF

Info

Publication number
CN211690719U
CN211690719U CN201922396205.7U CN201922396205U CN211690719U CN 211690719 U CN211690719 U CN 211690719U CN 201922396205 U CN201922396205 U CN 201922396205U CN 211690719 U CN211690719 U CN 211690719U
Authority
CN
China
Prior art keywords
well
drainage
control switch
worker
water pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922396205.7U
Other languages
Chinese (zh)
Inventor
王勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Intelligence Power Engineering Co Ltd
Original Assignee
Shanghai Intelligence Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Intelligence Power Engineering Co Ltd filed Critical Shanghai Intelligence Power Engineering Co Ltd
Priority to CN201922396205.7U priority Critical patent/CN211690719U/en
Application granted granted Critical
Publication of CN211690719U publication Critical patent/CN211690719U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a cable worker well with intelligent drainage function, including electrical power generating system and drainage structure worker well, electrical power generating system includes photovoltaic board, dc-to-ac converter, control switch and bracing piece at least, drainage structure worker well includes at least filtration baffle, sump pit, water pump and drainage pipe, the upper portion of bracing piece is installed the photovoltaic board, the lower part of bracing piece is installed the dc-to-ac converter with control switch, control switch carries the power on the water pump through insulated wire; the utility model discloses because above-mentioned structural design has electrical power generating system, worker's well leads to pipe and bilge well and is linked for ponding in the city power worker's well obtains getting rid of, has guaranteed the safe and reliable operation of cable, has made things convenient for the maintenance of electric power, and structure intelligence, the practicality is strong.

Description

Cable work well with intelligent drainage function
Technical Field
The utility model relates to an electric power engineering technical field especially relates to a cable worker well with intelligence drainage function.
Background
The demand of urban development on electric energy is increasing day by day, how to safely and smoothly send the electric energy to each corner of the city under the condition of not influencing urban landscape and space utilization, a cable is the most direct and best method, so that electric power working wells in the city are increased day by day, however, accumulated water often appears in the working wells, most of the existing working wells adopt waterproof coatings, but the problem of the accumulated water cannot be completely solved, after water enters the cable well, if the cable cracks due to construction or product quality, when water enters water vapor, the insulation of the cable is damaged, the cable is caused to enter the water, the cable is cracked, and the safety risk of a line is increased. In addition, the cable working well is difficult to drain water, and cable patrol personnel cannot go into the well for normal patrol, so that water in the well needs to be pumped out in advance, and the overhauling efficiency is seriously influenced.
The person skilled in the art is dedicated to solving the above technical drawbacks.
SUMMERY OF THE UTILITY MODEL
In view of the above-mentioned drawbacks of the prior art, the technical purpose of the present invention is to solve the problems mentioned in the background art.
In order to realize the technical purpose, the utility model provides a cable worker well with intelligence drainage function, including electrical power generating system and drainage structure worker well, electrical power generating system includes photovoltaic board, dc-to-ac converter, control switch and bracing piece at least, drainage structure worker well is at least including filtering baffle, sump pit, water pump and drainage pipe, the upper portion installation of bracing piece the photovoltaic board, the lower part installation of bracing piece the dc-to-ac converter with control switch, control switch carries the power through insulated wire on the water pump.
Preferably, the bottom of drainage structure worker well sets up the sump, the anticorrosion that has the filtration net is laid on the upper portion of sump filter the baffle, install in the sump the water pump, lay at the bottom of the pit drainage pipe, the delivery port of water pump with drainage pipe's one end sealing connection, drainage pipe's the other end and the upper portion of town road built bilge well link up even.
Preferably, the control switch has functions of timing switch and remote control.
The utility model has the advantages that:
the utility model discloses because above-mentioned structural design has electrical power generating system, worker's well leads to pipe and bilge well and is linked for ponding in the city power worker's well obtains getting rid of, has guaranteed the safe and reliable operation of cable, has made things convenient for the maintenance of electric power, and structure intelligence, the practicality is strong.
Drawings
Fig. 1 is a schematic plan view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a schematic side view of the present invention;
fig. 4 is a schematic three-dimensional structure of the present invention;
fig. 5 is a wiring schematic diagram of the present invention.
In the figure: the photovoltaic panel is characterized by comprising a photovoltaic panel 1, an inverter 2, a control switch 3, a support rod 4, an insulated wire 5, a filtering partition plate 6, a water collecting pit 7, a water pump 8 and a drainage pipeline 9.
Detailed Description
The conception, the specific structure and the technical effects of the present invention will be further described with reference to the accompanying drawings, so as to fully understand the objects, the features and the effects of the present invention.
Example (b):
as shown in fig. 1-5, a cable working well with intelligent drainage function comprises a power supply system and a drainage structure working well, wherein the power supply system at least comprises a photovoltaic panel 1, an inverter 2, a control switch 3 and a support rod 4, the drainage structure working well at least comprises a filtering partition plate 6, a water collecting pit 7, a water pump 8 and a drainage pipeline 9, the photovoltaic panel 1 is installed on the upper portion of the support rod 4, the inverter 2 and the control switch 3 are installed on the lower portion of the support rod 4, and the control switch 3 transmits power to the water pump 8 through an insulated wire 5.
Specifically, a sump 7 with the thickness of 0.8m multiplied by 0.5m is arranged at the bottom of the drainage structure work well, an anti-corrosion filtering partition plate 6 with a filtering grid is laid on the upper portion of the sump 7, a water pump 8 is installed in the sump 7, a drainage pipeline 9 is laid on the bottom of the sump 7, a water outlet of the water pump 8 is hermetically connected with one end of the drainage pipeline 9, and the other end of the drainage pipeline 9 is communicated with the upper portion of the constructed sewage well of the municipal road.
Specifically, the control switch 3 has functions of a time switch and remote control.
The foregoing has described in detail preferred embodiments of the present invention. It should be understood that numerous modifications and variations can be devised by those skilled in the art in light of the teachings of the present invention without undue experimentation. Therefore, the technical solutions that can be obtained by a person skilled in the art through logic analysis, reasoning or limited experiments based on the prior art according to the concepts of the present invention should be within the scope of protection defined by the claims.

Claims (3)

1. The utility model provides a cable worker well with intelligence drainage function, includes electrical power generating system and drainage structure worker well, its characterized in that: power supply system includes photovoltaic board (1), dc-to-ac converter (2), control switch (3) and bracing piece (4) at least, drainage structure worker well is including filtering baffle (6), sump pit (7), water pump (8) and drainage pipe (9) at least, bracing piece (4) upper portion installation photovoltaic board (1) inverter (2) with control switch (3), control switch (3) are carried the power through insulated wire (5) on water pump (8).
2. The cable work well with intelligent drainage function of claim 1, wherein: the bottom of drainage structure worker well sets up sump (7), lay on the upper portion of sump (7) filter baffle (6), install in sump (7) water pump (8), lay at the bottom of the pit of sump (7) drainage pipe (9), the delivery port of water pump (8) and the one end sealing connection of drainage pipe (9), the other end of drainage pipe (9) has been built the upper portion of bilge well with the town road and has been link up even.
3. The cable work well with intelligent drainage function of claim 1, wherein: the control switch (3) has the functions of timing switch and remote control.
CN201922396205.7U 2019-12-27 2019-12-27 Cable work well with intelligent drainage function Active CN211690719U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922396205.7U CN211690719U (en) 2019-12-27 2019-12-27 Cable work well with intelligent drainage function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922396205.7U CN211690719U (en) 2019-12-27 2019-12-27 Cable work well with intelligent drainage function

Publications (1)

Publication Number Publication Date
CN211690719U true CN211690719U (en) 2020-10-16

Family

ID=72795355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922396205.7U Active CN211690719U (en) 2019-12-27 2019-12-27 Cable work well with intelligent drainage function

Country Status (1)

Country Link
CN (1) CN211690719U (en)

Similar Documents

Publication Publication Date Title
CN202298885U (en) Automatic draining device for cable trench of transformer station
CN204126320U (en) Apportion modular offshore boosting station
CN111490485A (en) Prefabricated offshore booster station upper module and construction method thereof
CN110984355A (en) Cable work well with intelligent drainage function
CN211690719U (en) Cable work well with intelligent drainage function
CN212412593U (en) Prefabricated offshore booster station upper module
CN203669074U (en) Drainage system of cable duct of transformer substation
CN201391337Y (en) Automatic drainage system of cable tunnel
CN208423490U (en) A kind of buried distribution cabinet
CN203722538U (en) Building photovoltaic power station of pumped storage type
CN208471733U (en) A kind of energy saving and environment friendly purification of waste water device
CN202068113U (en) Fixed offshore booster station for offshore wind farm
CN209670037U (en) Cable hand wellhole self-draining arrangement
CN205171634U (en) Power cable ditch automatic water discharging device
CN208949850U (en) A kind of draining of pipe well combination wind-light-electricity complementary changes salt system
CN210066880U (en) Green water system of job site
CN110173019B (en) Superposed group water inlet lifting pump room
CN209509155U (en) A kind of drainage system improving piping lane space utilization
CN204125968U (en) The anti-water collecting device of a kind of cable shaft
CN209114574U (en) A kind of drainage arrangement in sponge city
CN109235392A (en) A kind of draining of pipe well combination wind-light-electricity complementary changes salt system and its application method
CN202306343U (en) Automatic draining controller for cable trench
CN201593187U (en) Automatic control system for large-scale multi-well-point dewatering
CN214090662U (en) Energy-saving building drainage structure
CN213038432U (en) Communication engineering construction inspection device

Legal Events

Date Code Title Description
GR01 Patent grant