CN211642206U - Handling device for construction - Google Patents

Handling device for construction Download PDF

Info

Publication number
CN211642206U
CN211642206U CN202020238846.XU CN202020238846U CN211642206U CN 211642206 U CN211642206 U CN 211642206U CN 202020238846 U CN202020238846 U CN 202020238846U CN 211642206 U CN211642206 U CN 211642206U
Authority
CN
China
Prior art keywords
shallow
pushing
building construction
construction
push away
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020238846.XU
Other languages
Chinese (zh)
Inventor
黄月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020238846.XU priority Critical patent/CN211642206U/en
Application granted granted Critical
Publication of CN211642206U publication Critical patent/CN211642206U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a handling device for building construction, including the pushing carriage frame, the integral type pushing hopper is installed to one side of pushing carriage frame, the single wheel has been installed in the bottom rotation of pushing hopper, the integral type pushing handle has been seted up to the opposite side of pushing carriage frame, one side the fixed coiling box that has been installed on the pushing carriage handle, the inboard rotation of coiling box has been installed the winding stem, the flexible piece of book is convoluteed at the both ends of winding stem, it has the baldric to coil on the winding stem; use the device transport to carry the material of building construction place usually, the shallow of device is equipped with the baldric of scalable pull to the facial make-up, when promoting the device to remove, can bear the baldric on the shoulder, reduce the effort on the arm through the baldric, convenient construction transport, push away the fill facial make-up at the device and be equipped with the shallow apron that can manually overturn, when holding construction material in this shallow, can prevent to push away the interior construction material of fighting and jolt when removing and drop, better transport construction material, the practicality of the device is improved.

Description

Handling device for construction
Technical Field
The utility model belongs to the technical field of the building shallow, concretely relates to handling device for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The construction site is called "construction site" or "construction site", also called construction site, where the material is transported to the construction site, usually by a transport device, i.e. a trolley, which is a manually pushed and pulled transport vehicle and is the ancestor of all vehicles. While the technology of cart materials handling continues to advance, carts continue to be used as an indispensable handling tool. The trolley is widely used in production and life because of its low cost, simple maintenance, convenient operation, light weight, ability to work in places where motor vehicles are not convenient to use, and convenience in carrying lighter objects in short distance.
The existing carrying device for building construction generally needs to use a vehicle to carry different building materials in a building site, is pushed by manpower when in use, and is easy to incline and turn over if the trolley is unstable and supported by the manpower when being pushed, so that the stability of the material carrying and conveying process is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a handling device for construction to current handling device for construction who proposes in solving above-mentioned background art need use the vehicle to carry different building materials in building site usually, promotes through the manpower when using, if the manpower supports the shakiness during promotion, the shallow inclines easily to appear and turns on one's side, influences the problem of the stability in the material handling transportation process.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a handling device for construction, includes the pushing carriage frame, the push away fill of integral type is installed to one side of pushing carriage frame, the bottom of pushing away the fill is rotated and is installed the single wheel, the shallow handle of integral type is seted up to the opposite side of pushing carriage frame, one side the fixed coiling box of having installed on the pushing carriage frame, the rolling rod has been installed in the inboard rotation of coiling box, the elastic coil sheet is convoluteed at the both ends of rolling rod, the coiling has the baldric on the rolling rod, the one end seam of baldric is equipped with the eye-splice, and the opposite side the connection has been installed and has been detained the seat.
Preferably, the top of pushing away the fill rotates and has installed the shallow apron, the top edge of pushing away the fill has installed the swivel mount, the shallow apron rotates through the swivel mount and installs at the top of pushing away the fill, the inboard connection of swivel mount has installed the elasticity lug, the one end of shallow apron rotates and has installed the bull stick, the bull stick is last to be seted up the gear.
Preferably, the rotary seat and the rotary rod are engaged and clamped with the gear through an elastic lug.
Preferably, the top of the push hopper is provided with two trolley cover plates which are of a split structure.
Preferably, the bottom of the pushing frame is fixedly welded with the supporting legs.
Preferably, two elastic rolling sheets are symmetrically arranged at two ends of the rolling rod in a rolling mode.
Preferably, one end of the shoulder strap is inserted into and clamped with the buckle seat through the inserting buckle.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) when the device is used, materials in a building construction site are generally conveyed and conveyed by using the device, the telescopic and drawable shoulder straps are arranged on the cart handle of the device, when the device is pushed to move, the shoulder straps can be carried on the shoulder, the acting force on the arms is reduced by the shoulder straps, the construction and the conveyance are convenient, meanwhile, the stability of the cart is improved, the device is prevented from inclining and falling sideways, and the practicability of the device is improved;
(2) the push hopper upper mounting of the device is provided with the push hopper cover plate capable of being manually turned, when construction materials are contained in the push hopper, the push hopper cover plate can be arranged on the push hopper, the construction materials in the push hopper are prevented from being jolted and falling when being moved, the construction materials are better conveyed, and the practicability of the device is improved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic top view of the handle bar of the present invention;
fig. 3 is a schematic top view of the push bucket of the present invention;
FIG. 4 is a schematic view of the internal structure of the swivel base of the present invention;
FIG. 5 is a schematic view of the connection structure of the shoulder strap of the present invention;
in the figure: 1. a cart cover plate; 2. rotating; 3. a push bucket; 4. a cart frame; 5. pushing the handle; 6. a coiling box; 7. a single wheel; 8. an elastic roll sheet; 9. rolling the rod; 10. shoulder straps; 11. inserting and buckling; 12. a buckle seat; 13. an elastic tab; 14. a gear; 15. and (6) sleeving a belt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1, fig. 2, fig. 3 and fig. 4, the present invention provides a technical solution: a carrying device for building construction comprises a trolley frame 4, wherein one side of the trolley frame 4 is provided with an integrated pushing bucket 3, the bottom of the pushing bucket 3 is rotatably provided with a single wheel 7, the other side of the trolley frame 4 is provided with an integrated trolley handle 5, a winding box 6 is fixedly arranged on the trolley handle 5 on one side, the inner side of the winding box 6 is rotatably provided with a winding rod 9, two ends of the winding rod 9 are wound with elastic winding sheets 8, a shoulder belt 10 is wound on the winding rod 9, one end seam of the shoulder belt 10 is provided with an inserting buckle 11, the trolley handle 5 on the other side is connected with a buckle seat 12, when the device is pushed to move, the shoulder belt 10 can be pulled out to be clamped on the back to bear on the shoulder, the acting force on the arm is reduced through the shoulder belt 10, construction and carrying are convenient, meanwhile, the stability of the trolley is improved.
In order to better convey materials, in this embodiment, preferably, a cart cover plate 1 is rotatably installed on the top of the pushing bucket 3, a rotation seat 2 is installed at the edge of the top of the pushing bucket 3, the cart cover plate 1 is rotatably installed on the top of the pushing bucket 3 through the rotation seat 2, an elastic lug 13 is connected and installed on the inner side of the rotation seat 2, a rotation rod is rotatably installed at one end of the cart cover plate 1, a gear 14 is installed on the rotation rod to prevent building materials from spilling from the pushing bucket 3 due to bumping during transportation, in order to better cover the cart cover plate 1, in this embodiment, preferably, the rotation seat 2 and the rotation rod are engaged and clamped with the gear 14 through the elastic lug 13 to prevent the cart cover plate 1 from automatically opening and closing, to improve the stability of the cart cover plate 1, in this embodiment, preferably, two cart cover plates 1 are installed on the top of the pushing bucket 3, and the two cart cover plates 1 are of a split structure, can be more convenient with material transport to push away in the fill 3, for better support the device, in this embodiment, preferably, the fixed welding in bottom of shallow frame 4 has the landing leg, prevent that the device from inclining the side and falling, for better rolling shoulder belt 10, in this embodiment, preferably, the both ends symmetry of winding rod 9 is rolled up and is equipped with two elasticity book pieces 8, for better fixed shoulder belt 10, in this embodiment, preferably, the one end of shoulder belt 10 is inserted through eye-splice 11 and detain seat 12 and is established the block, prevent that shoulder belt 10 from the shallow from 5 landing.
Example 2
Referring to fig. 1, fig. 3, fig. 4 and fig. 5, the present invention provides a technical solution: a carrying device for building construction comprises a trolley frame 4, wherein one side of the trolley frame 4 is provided with an integrated pushing bucket 3, the bottom of the pushing bucket 3 is rotated to be provided with a single wheel 7, the other side of the trolley frame 4 is provided with an integrated trolley handle 5, a winding box 6 is fixedly arranged on the trolley handle 5 on one side, the inner side of the winding box 6 is rotated to be provided with a winding rod 9, two ends of the winding rod 9 are wound with elastic winding sheets 8, a shoulder belt 10 is wound on the winding rod 9, one end of the shoulder belt 10 is provided with a sleeve belt 15 in a sewing mode, when the device is pushed to move, the shoulder belt 10 can be pulled out to clamp the back on the shoulder, the acting force on the arm is reduced through the shoulder belt 10, construction and carrying are facilitated, meanwhile, the stability of the trolley is improved.
In order to better convey materials, in this embodiment, preferably, a cart cover plate 1 is rotatably installed on the top of the pushing bucket 3, a rotation seat 2 is installed at the edge of the top of the pushing bucket 3, the cart cover plate 1 is rotatably installed on the top of the pushing bucket 3 through the rotation seat 2, an elastic lug 13 is connected and installed on the inner side of the rotation seat 2, a rotation rod is rotatably installed at one end of the cart cover plate 1, a gear 14 is installed on the rotation rod to prevent building materials from spilling from the pushing bucket 3 due to bumping during transportation, in order to better cover the cart cover plate 1, in this embodiment, preferably, the rotation seat 2 and the rotation rod are engaged and clamped with the gear 14 through the elastic lug 13 to prevent the cart cover plate 1 from automatically opening and closing, to improve the stability of the cart cover plate 1, in this embodiment, preferably, two cart cover plates 1 are installed on the top of the pushing bucket 3, and the two cart cover plates 1 are of a split structure, can be more convenient with material transport to push away in the fill 3, for better support the device, in this embodiment, it is preferred, the fixed welding in bottom of shallow frame 4 has the landing leg, prevent that the device from inclining the side fall, for better rolling shoulder belt 10, in this embodiment, it is preferred, the both ends symmetry of winding rod 9 are rolled up and are equipped with two elasticity book pieces 8, for better fixed shoulder belt 10, in this embodiment, it is preferred, the one end of shoulder belt 10 overlaps through sleeve belt 15 cover and is established on the shallow of opposite side 5, prevent that shoulder belt 10 from slipping from shallow 5.
The utility model discloses a theory of operation and use flow: the device is generally used for conveying materials at a building construction site, a telescopic pull-out shoulder belt 10 is arranged on a trolley handle 5 of the device, when the device is pushed to move, the shoulder belt 10 can be pulled out, one end of the shoulder belt 10 drives a rolling rod 9 to rotate when the shoulder belt 10 is pulled out, the rolling rod 9 drives an elastic rolling sheet 8 to contract tightly, a plug-in buckle 11 at one end of the pulled-out shoulder belt 10 is plugged and clamped on a buckle seat 12 at the other side, the fixed shoulder belt 10 is carried on the shoulder, the acting force on the arm during pushing is reduced through the shoulder belt 10, construction and conveying are convenient, meanwhile, the stability of the trolley is improved, the device is prevented from inclining and falling sideways, a trolley cover plate 1 which can be turned over manually is arranged on a pushing bucket 3 of the device, when the pushing bucket 3 is filled with construction materials, the trolley cover plate 1 can be rotationally covered on the pushing bucket 3, a gear 14 at one end of the trolley cover plate 1 is meshed and clamped with an elastic lug 13, the stability of shallow apron 1 lid time is improved, prevents that the construction materials in the pushing hopper 3 from jolting and dropping when removing, and better transport construction materials improves the device's practicality.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a handling device for construction, includes shallow frame (4), push away the fill (3) of integral type is installed to one side of shallow frame (4), single wheel (7) have been installed in the bottom rotation of push away fill (3), the shallow of integral type (5), its characterized in that are seted up to the opposite side of shallow frame (4): one side it has been fixed on shallow handlebar (5) to have installed coiling box (6), the inboard rotation of coiling box (6) has been installed rolling rod (9), the both ends of rolling rod (9) are convoluteed elasticity roll sheet (8), it has baldric (10) to coil on rolling rod (9), the one end seam of baldric (10) is equipped with eye-splice (11), the opposite side it has installed and has detained seat (12) to connect on shallow handlebar (5).
2. The carrying device for building construction according to claim 1, characterized in that: the top of push away fill (3) is rotated and has been installed shallow apron (1), swivel mount (2) have been installed to the top edge of push away fill (3), shallow apron (1) is rotated through swivel mount (2) and is installed at the top of push away fill (3), elastic lug (13) have been installed to the inboard connection of swivel mount (2), the bull stick has been installed in the one end rotation of shallow apron (1), gear (14) have been seted up on the bull stick.
3. The carrying device for building construction according to claim 2, characterized in that: the rotary seat (2) and the rotary rod are engaged and clamped with the gear (14) through the elastic lug (13).
4. The carrying device for building construction according to claim 2, characterized in that: two cart cover plates (1) are arranged at the top of the push hopper (3), and the two cart cover plates (1) are of a split structure.
5. The carrying device for building construction according to claim 1, characterized in that: the bottom of the trolley frame (4) is fixedly welded with supporting legs.
6. The carrying device for building construction according to claim 1, characterized in that: two elastic rolling sheets (8) are symmetrically arranged at two ends of the rolling rod (9) in a rolling mode.
7. The carrying device for building construction according to claim 1, characterized in that: one end of the shoulder strap (10) is inserted and clamped with the buckle seat (12) through the inserting buckle (11).
CN202020238846.XU 2020-03-02 2020-03-02 Handling device for construction Expired - Fee Related CN211642206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020238846.XU CN211642206U (en) 2020-03-02 2020-03-02 Handling device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020238846.XU CN211642206U (en) 2020-03-02 2020-03-02 Handling device for construction

Publications (1)

Publication Number Publication Date
CN211642206U true CN211642206U (en) 2020-10-09

Family

ID=72685947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020238846.XU Expired - Fee Related CN211642206U (en) 2020-03-02 2020-03-02 Handling device for construction

Country Status (1)

Country Link
CN (1) CN211642206U (en)

Similar Documents

Publication Publication Date Title
CN207482691U (en) Convey slide
CN210592023U (en) Steel pipe transport shallow for building site
CN204038441U (en) A kind of auto-parts automation production flow line chassis
CN109264433A (en) Automatic loading equipment and loading method
CN211642206U (en) Handling device for construction
CN206187073U (en) Cargo transport cart
CN205616085U (en) Simple and easy garbage bin hoisting frame
CN208499794U (en) A kind of tipping bucket hoisting frame
CN210063066U (en) Multifunctional gas carrying bottle carrying device
CN203047315U (en) Elongation type metalworking tool trolley
CN210592060U (en) Can scramble canned drinking water conveyer of stair
CN2784270Y (en) Bucket trolley
CN218198452U (en) Handcart convenient for material conveying
CN202213605U (en) Portable hand-pushed trailer
CN210634611U (en) Bucket transport vehicle
CN207078639U (en) A kind of transloading equipment of wind electricity blade
CN217260108U (en) Transfer trolley for treating pole coil waste
CN207790774U (en) A kind of luggage push-and-pull vehicle
CN212637580U (en) Film transfer car (buggy)
CN216234482U (en) Dedicated high-efficient conveyer of inorganic composite sheet
CN214648341U (en) Handcart for loading and unloading materials
CN212766380U (en) Steel pipe transport vechicle for municipal building construction
CN215798360U (en) Subway access & exit inclined plane conveyor
CN210192716U (en) Steel coil sleeve feeding device
CN211918742U (en) Handling tool for storing oyster calcium fertilizer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201009

CF01 Termination of patent right due to non-payment of annual fee