CN211589359U - Elevator part preparation facilities - Google Patents

Elevator part preparation facilities Download PDF

Info

Publication number
CN211589359U
CN211589359U CN201922306612.4U CN201922306612U CN211589359U CN 211589359 U CN211589359 U CN 211589359U CN 201922306612 U CN201922306612 U CN 201922306612U CN 211589359 U CN211589359 U CN 211589359U
Authority
CN
China
Prior art keywords
processing
lead screw
end wall
water
sliding seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922306612.4U
Other languages
Chinese (zh)
Inventor
单飞
钱志军
彭红梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Ruiqin Electromechanical Equipment Co ltd
Original Assignee
Jiangsu Ruiqin Electromechanical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Ruiqin Electromechanical Equipment Co ltd filed Critical Jiangsu Ruiqin Electromechanical Equipment Co ltd
Priority to CN201922306612.4U priority Critical patent/CN211589359U/en
Application granted granted Critical
Publication of CN211589359U publication Critical patent/CN211589359U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cage And Drive Apparatuses For Elevators (AREA)

Abstract

The utility model discloses an elevator part preparation facilities relates to elevator part preparation field, including the processing platform, the side is equipped with the fixed processing box that is equipped with of processing subassembly, lower extreme middle side in the processing bench end, the processing subassembly includes vertical mount, horizontal support frame, telescopic cylinder, processing part, lead screw, the dust absorption cover body, sprinkler bead, convulsions organism, driving motor and water storage box, processing platform position below is equipped with the header box body. The device can realize the built-in processing of elevator part, avoids the part to add man-hour produced dust particle to spatter for the part machining environment obtains the protection, and workman's health is ensured, realizes the nimble regulation and control of dust cage, sprinkler bead position, makes the dust removal wash more abundant, even, realizes the high-efficient heat dissipation of processing part, improves the life of processing part.

Description

Elevator part preparation facilities
Technical Field
The utility model relates to an elevator part preparation field, concretely relates to elevator part preparation facilities.
Background
Elevator part is external processing usually, can produce a large amount of dust particles during processing, and dust particles's splash all around not only can make the parts machining environment bad, seriously influences operation workman's healthy, still can make the collection in dust particle later stage handle very inconvenient for artifical burden increases. The elevator parts are usually required to be subjected to dust removal treatment and water spraying cleaning treatment when being processed, the positions of the dust collection cover and the water spraying head are usually positioned, and the dust collection cover and the water spraying head are probably insufficiently and unevenly cleaned due to the positioning arrangement. In the process of machining elevator parts, a large amount of heat is generated when the machining parts run at high speed, and the machining parts can be damaged when the heat is discharged out in time. Therefore, there is a need for an elevator component preparation apparatus.
Disclosure of Invention
In order to solve the problem, the utility model discloses an elevator part preparation facilities, the device can realize the built-in processing of elevator part, avoids the part to add man-hour produced dust particle to spatter for the part processing environment obtains the protection, and workman's health obtains the guarantee, realizes the nimble regulation and control of dust cage, sprinkler bead position, makes to remove dust and washs more abundant, even, realizes the high-efficient heat dissipation of processing part, improves the life of processing part.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides an elevator part preparation facilities, includes the processing platform, the fixed processing box that is equipped with of side in processing bench end middle side is equipped with processing subassembly, the lower extreme, the processing subassembly includes first horizontal support frame and the second horizontal support frame that is equipped with between a set of vertical mount, the telescopic cylinder that the vertical fixed telescopic cylinder that is equipped with of side in the first horizontal support frame lower extreme, the processing part that telescopic cylinder vertical decurrent tailpiece portion was equipped with, equally divide first lead screw, the second horizontal support frame length direction both sides upper end that do not are equipped with on the corresponding end wall of vertical mount equally divide the second lead screw that does not be equipped with, the dust absorption cover body that the second lead screw outside was equipped with and the convulsions organism, driving motor and the water storage box that are equipped with in sprinkler bead and the first horizontal support frame upper end. The driving motor, the adjusting motor and the rotating motor are rotating motors, an observation window is arranged on the outer end wall of the processing box body, positioning cylinders can be respectively arranged at the upper ends of two sides of the length direction of the second horizontal support frame, and the positioning cylinders can be used for fastening the positions of elevator parts.
As an improvement of the utility model, the edge of the lower end of the processing table is uniformly and vertically fixedly provided with supporting legs, the upper end of the processing box body is open and has no end plate design, the upper end port of the processing box body is fixedly connected with the lower end wall of the processing table, the processing table corresponds to the position of the processing box body and is provided with a through hole, the vertical fixing frames are arranged in parallel at intervals along the length direction of the processing table, the vertical fixing frames are arranged at the middle side of the upper end of the width direction of the processing table and respectively correspond to the position of the inner end wall of the processing box body, the end walls of the corresponding ends of the vertical fixing frames are respectively provided with a vertical groove, the vertical grooves are respectively internally provided with a first lead screw, the vertical grooves are respectively provided with a first guide rod and are positioned beside the position of the first lead screw, the first lead screw and the first guide rod are both arranged along, non-open design in vertical recess top, bottom opening design, the processing platform corresponds vertical groove position is opened there is the notch, first lead screw, first guide arm bottom are equallyd divide and are do not stretched into in the processing box, be equipped with first sliding seat in the vertical recess, first lead screw is equallyd divide do not the activity and run through first sliding seat sets up, just first lead screw outside with it does not is equipped with first lead screw drive assembly to divide equally between the inner end wall of first sliding seat run-through department, it does not open to have a first location to lead to the groove to divide on the first sliding seat, first guide arm activity runs through first location leads to the groove to set up, first sliding seat quantity in the vertical recess is two, first horizontal support frame, second horizontal support frame length direction both sides end equally divide do not with the outer end wall fixed connection of first sliding seat, first lead screw top is equally divide do not the activity to run through top end wall stretches out and stretches out the end portion and do not even pass through the shaft coupling even Is connected with a regulating motor. The first horizontal support frame and the second horizontal support frame can penetrate through the openings and extend into the processing box body, the first guide rod achieves directional movement of the first sliding seat in the vertical direction, the first lead screw transmission assembly and the second lead screw transmission assembly are identical in structure and are designed according to the existing lead screw transmission principle technology, the first lead screw transmission assembly and the second lead screw transmission assembly respectively comprise a lead screw nut sleeved outside a lead screw and a bearing sleeved outside the lead screw nut, and the first sliding seat can movably penetrate through the notch to move.
As an improvement of the utility model, the top end part of the second screw rod is respectively and movably penetrated through the first horizontal support frame and extends upwards, the side of the position of the second screw rod is respectively and parallelly provided with a second guide rod at intervals, the second screw rod is respectively and movably penetrated and provided with a second sliding seat, a second screw rod transmission component is respectively and movably arranged between the inner end wall of the penetrating part of the second sliding seat and the outer part of the second screw rod, the second sliding seat is respectively and separately provided with a second positioning through groove, the second guide rod movably penetrates through the second positioning through groove, a cylindrical transmission frame is movably arranged at the upper end of the first horizontal support frame and corresponding to the position of the second screw rod at one side, the cylindrical transmission frame comprises a first cylindrical transmission frame movably arranged at the upper end of the first horizontal support frame and a second cylindrical transmission frame movably arranged at the upper end of the first cylindrical transmission frame, a driving motor is arranged right above the cylindrical transmission frame, an output shaft of the driving motor extends into the cylindrical transmission frame, first key grooves are uniformly formed in the inner end wall of the first cylindrical transmission frame in an equal radian manner, second key grooves are uniformly formed in the inner end wall of the second cylindrical transmission frame in an equal radian manner, the first key groove and the second key groove are opposite in opening direction, driving rods are respectively hinged outside the output shaft of the driving motor at positions corresponding to the first key groove and the second key groove, the hinging directions of the driving rods are opposite, the top of the second screw rod positioned at one side extends into the first cylindrical transmission frame and is fixedly connected with the inner end wall of the first cylindrical transmission frame through a connecting rod, the top of the second screw rod positioned at the other side is sleeved with a belt wheel, an annular transmission groove is formed in the outer end wall of the second cylindrical transmission frame, and a belt is sleeved between the belt wheel and the annular transmission groove. The second guide rod realizes the directional motion of the vertical direction of the second sliding seat, the cylindrical transmission frame is movably designed and can rotate circumferentially, a spring is arranged between the position of the driving rod close to the hinged position of the driving rod and the outside of the output shaft of the driving motor, and a transmission key groove matched with the belt wheel for transmission is formed in the inner end wall of the annular transmission groove.
As an improvement of the utility model, the processing component comprises an outer shell, an inner shell arranged at the bottom in the outer shell, a rotating motor arranged in the inner shell and a processing head sleeved outside a rotating motor output shaft, the outer shell is fixedly connected with the end part of a piston rod of the telescopic cylinder, a heat dissipation cavity is formed between the outer shell and the inner shell, the rotating motor output shaft movably penetrates through the inner bottom end wall of the inner shell and the inner bottom end wall of the outer shell, the processing head is sleeved at the end part of the extending end, the processing head is a polishing wheel, a dust collection cover body is arranged on the outer end wall of a second sliding seat positioned at one side, a water spray head is arranged on the outer end wall of the second sliding seat positioned at the other side, a dust collection shell is arranged on the outer end wall of the second sliding seat and positioned right above the position of the dust collection cover body, the heat absorption water guide pipe is a spiral pipe, the air inlet end of the air extractor body is communicated with the heat dissipation cavity through a first air guide hose, the air outlet end of the dust collection cover body is communicated with the inner cavity at the bottom of the dust collection shell through a second air guide hose, the inner cavity at the top of the dust removal shell is communicated with the heat dissipation cavity through a third air guide hose, the inner cavity at the upper end of the water collection box body is provided with a water filter screen, the inner cavity at the bottom of the processing tank body is communicated with the inner cavity at the top of the water collecting tank body through a first water guide hose, the inner cavity at the bottom of the water collecting tank body is communicated with the inner cavity at the top of the water storage tank body through a second water guide hose, the inner cavity at the bottom of the water storage tank body is communicated with the water inlet end of the heat absorption water guide pipe through a third water guide hose, the water outlet end of the heat absorption water guide pipe is communicated with the water inlet end of the water spraying head through a fourth water guide hose, and the water inlet end of the water guide hose can be provided with a micro water supply pump body.
Compared with the prior art, the utility model has the advantages of as follows: the device can realize the built-in processing of elevator parts through lead screw transmission principle technology, avoids the produced dust granule of part man-hour to spatter for the part processing environment obtains the protection, and workman's health obtains the guarantee. The flexible regulation and control of the positions of the dust collecting cover and the sprinkler head can be realized through a screw rod transmission principle technology and a ratchet wheel transmission principle technology, so that the dust removal cleaning is more sufficient and uniform. The efficient heat dissipation of the processing part is realized while air suction and dust removal and cleaning water filtration and recycling are realized, and the service life of the processing part is prolonged.
Drawings
Fig. 1 is a schematic view of the whole structure of an elevator part preparation device of the present invention;
FIG. 2 is a schematic view of the driving structure of the driving motor;
FIG. 3 is a schematic view of the first cylindrical transmission frame;
FIG. 4 is a schematic view of the second barrel transmission;
FIG. 5 is a schematic view of the processing component;
list of reference numerals: 1. a processing table; 2. processing the assembly; 3. processing the box body; 4. a vertical fixing frame; 5. a first horizontal support frame; 6. a second horizontal support frame; 7. a telescopic cylinder; 8. processing the component; 9. a first lead screw; 10. a second lead screw; 11. a dust collection cover body; 12. a sprinkler head; 13. an air draft machine body; 14. a drive motor; 15. a water storage tank body; 16. a water collection tank body; 17. a first sliding seat; 18. adjusting the motor; 19. a second sliding seat; 20. a first cylindrical transmission frame; 21. a second cylindrical transmission frame; 22. a first keyway; 23. a second keyway; 24. a drive rod; 25. a pulley; 26. a belt; 27. an outer housing; 28. an inner housing; 29. rotating the motor; 30. a machining head; 31. a heat dissipation cavity; 32. a dust removal housing.
Detailed Description
Example 1: referring to fig. 1, 2, 3, 4, 5, it is right now that the utility model provides an elevator part preparation facilities explain, including processing platform 1, processing platform 1 upper end medial side is equipped with processing subassembly 2, the fixed processing box 3 that is equipped with of lower extreme medial side, processing subassembly 2 includes a set of vertical mount 4, first horizontal support frame 5 and second horizontal support frame 6 that are equipped with between the vertical mount 4, the telescopic cylinder 7 that is equipped with is vertically fixed to the medial side in first horizontal support frame 5 lower extreme, the processing part 8 that telescopic cylinder 7 vertical decurrent piston rod tip was equipped with, equally divide first lead screw 9 that do not equipped with on the corresponding end wall of vertical mount 4, second horizontal support frame 6 length direction both sides upper end equally divide second lead screw 10 that do not vertically equipped with, the dust absorption cover body 11 and the sprinkler bead 12 that the second lead screw 10 outside was equipped with and the convulsions organism 13 that first horizontal support frame 5 upper end was equipped with, A driving motor 14 and a water storage tank body 15, and a water collection tank body 16 is arranged below the processing table 1.
Example 2: referring to fig. 1, a device for preparing elevator parts provided by the present invention is described, wherein the lower edge of the processing table 1 is vertically and fixedly provided with supporting legs, the upper end of the processing box 3 is open and has no end plate design, the upper end port of the processing box 3 is fixedly connected with the lower end wall of the processing table 1, the processing table 1 is provided with through holes corresponding to the position of the processing box 3, the vertical fixing frames 4 are arranged in parallel at intervals along the length direction of the processing table 1, the vertical fixing frames 4 are arranged at the middle side of the upper end of the processing table 1 in the width direction and are respectively arranged corresponding to the position of the inner end wall of the processing box 3, the end walls of the corresponding ends of the vertical fixing frames 4 are respectively provided with vertical grooves, the vertical grooves are respectively provided with first lead screws 9, the vertical grooves are respectively provided with first guide rods at the sides of the first lead screws 9, first lead screw 9, first guide arm are all followed 4 length direction of vertical mount sets up and are parallel each other at the interval, non-open design in vertical recess top, bottom opening design, processing platform 1 corresponds vertical groove position is opened flutedly, first lead screw 9, first guide arm bottom are equallyd divide and are do not stretched into in the processing box 3, be equipped with first sliding seat 17 in the vertical recess, first lead screw 9 is equallyd divide respectively the activity to run through first sliding seat 17 sets up, just first lead screw 9 outside with it is equipped with first lead screw drive assembly to divide equally between the inner end wall to run through a first sliding seat 17, it has first location to lead to divide equally to divide on the first sliding seat 17 respectively, first guide arm activity runs through first location leads to the groove setting, first sliding seat 17 quantity in the vertical recess is two, first horizontal support frame 5, 6 length direction both sides ends of second horizontal support frame are equallyd divide respectively with first sliding seat 17 outer end wall fixed connection, the activity is equallyd divide respectively at first lead screw 9 top and is run through respectively the top end wall stretches out and stretch out the end tip and equally divide and do not have adjusting motor 18 through the coupling joint in the vertical recess.
Example 3: referring to fig. 1, 2, 3, 4, it is right now that the utility model provides a pair of elevator part preparation facilities explain, the tip of second lead screw 10 top is equallyd divide do not the activity and is run through first horizontal support frame 5 is upwards stretched out, the other parallel second guide arm that is equipped with of interval is equallyd divide to second lead screw 10 position side, it is equipped with second sliding seat 19 to equally divide do not the activity to run through on the second lead screw 10, second sliding seat 19 run through in the department end wall with it is equipped with second lead screw drive assembly respectively to equally divide between the second lead screw 10 outside, it has the second location to lead to cut through groove to equally divide on the second sliding seat 19, the activity of second guide arm is run through the second location leads to the groove setting, the activity of second lead screw 10 position that first horizontal support frame 5 upper end and corresponding position in one side is equipped with the cylindric transmission frame, the cylindric transmission frame is located including the activity first cylindric transmission frame 20 and the activity of first cylindric transmission frame 20 upper end of first horizontal support frame The second cylindrical transmission frame 21, be equipped with driving motor 14 directly over the cylindrical transmission frame position, driving motor 14 output shaft stretches into in the cylindrical transmission frame, equal radian is evenly opened on the inner end wall of first cylindrical transmission frame 20 has first keyway 22, equal radian is evenly opened on the inner end wall of second cylindrical transmission frame 21 has second keyway 23, first keyway 22 with second keyway 23 sets up opposite direction each other in the position, driving motor 14 output shaft outside and corresponding first keyway 22, second keyway 23 position are equallyd divide and are articulated respectively have actuating lever 24, actuating lever 24 position is articulated opposite direction each other, the second lead screw 10 top that is located one side stretches into in the first cylindrical transmission frame 20 and through connecting rod and first cylindrical transmission frame 20 inner end wall fixed connection, the second lead screw 10 top cover that is located the opposite side has band pulley 25, an annular transmission groove is formed in the outer end wall of the second cylindrical transmission frame 21, and a belt 26 is sleeved between the belt wheel 25 and the annular transmission groove.
Example 4: referring to fig. 1 and 5, the elevator component manufacturing apparatus provided by the present invention is now described, wherein the processing component 8 includes an outer housing 27, an inner housing 28 provided at the bottom inside the outer housing 27, a rotating motor 29 provided in the inner housing 28, and a processing head 30 sleeved outside an output shaft of the rotating motor 29, the outer housing 27 is fixedly connected to the piston rod end of the telescopic cylinder 7, a heat dissipation chamber 31 is formed between the outer housing 27 and the inner housing 28, the output shaft of the rotating motor 29 movably penetrates through the inner bottom wall of the inner housing 28 and the inner bottom wall of the outer housing 27 to extend out, and the end portion of the output shaft is sleeved with the processing head 30, the processing head 30 is a polishing wheel, a dust collection cover 11 is provided on the outer end wall of the second sliding seat 19 on one side, a water spray head 12 is provided on the outer end wall of the second sliding seat 19 on the other side, and a dust collection housing 32 is provided right above the, a filter screen is arranged at the middle side of the inner end of the dust removing shell 32, a heat absorption water guide pipe is arranged in the heat dissipation cavity 31, the heat absorption water guide pipe is a spiral pipe, the air inlet end of the air draft machine body 13 is communicated with the heat dissipation cavity 31 through a first air guide hose, the air outlet end of the dust suction cover body 11 is communicated with the inner cavity at the bottom of the dust removing shell 32 through a second air guide hose, the inner cavity at the top of the dust removing shell 32 is communicated with the heat dissipation cavity 31 through a third air guide hose, a water filter screen is arranged at the inner cavity at the upper end of the water collecting box body 16, the inner cavity at the bottom of the processing box body 3 is communicated with the inner cavity at the top of the water collecting box body 16 through a first air guide hose, the inner cavity at the bottom of the water collecting box body 16 is communicated with the inner cavity at, the water outlet end of the heat absorption water guide pipe is communicated with the water inlet end of the sprinkler head 12 through a fourth water guide hose.
The utility model discloses can also form new implementation mode with embodiment 1 with at least one in embodiment 2, 3, 4 the technical characterstic.
The working principle is as follows: the elevator part to be processed is placed at the upper end of the second horizontal support frame, the position is fastened through the positioning cylinder, the telescopic cylinder moves to drive the processing part to move downwards, and the processing part can realize part processing. The adjusting motor moves to drive the first lead screw to rotate, the first lead screw rotates to drive the first sliding seat to reciprocate in the vertical direction through the first lead screw transmission assembly, and the movement of the first sliding seat can drive the second horizontal support frame and the first horizontal support frame to be arranged in the processing box body, so that the built-in processing of parts is realized. Driving motor corotation or reversal, it rotates or drives second cylindric drive frame through the actuating lever to drive first cylindric drive frame, the rotation of first cylindric drive frame drives the second lead screw that is located one side through the connecting rod and rotates, the rotation of second cylindric drive frame passes through the annular transmission groove, the belt, the band pulley drives the second lead screw that is located the opposite side and rotates, the rotation of second lead screw drives the vertical direction back and forth movement of second sliding seat through second lead screw drive assembly, the dust absorption cover body can be realized to the motion of second sliding seat, the regulation and control of sprinkler bead position. The dust absorption cover body is breathed in and is removed dust, rethread second air guide hose is with the leading-in dust removal casing of dirt gas in, the filter screen that is equipped with realizes filtering and removes dust, the leading-in heat dissipation intracavity of filterable gaseous rethread third air guide hose, convulsions are realized through first air guide hose in the motion of convulsions organism to when the realization is breathed in and is removed dust, can also drive the motion of the inside air current of heat dissipation chamber, the removal of the produced heat when supplementary rotation motor motion. The sprinkler bead carries out the water spray washing, the cooling after part processing or processing, wash water and lead to the water-collecting tank body through first water guide hose, and the filter screen that is equipped with realizes wasing the filtration of water, and the water after the filtration can lead to the retaining tank body through the second water guide hose, and the water rethread third water guide hose in the retaining tank body is leading to in the heat absorption water pipe, and the inside water rethread fourth water guide hose of heat absorption water pipe is leading to in the sprinkler bead, realizes wasing the filtration cycle recycle of water. The heat absorption water guide pipe absorbs heat to assist in removing heat generated by the rotating motor during movement.
The technical means disclosed by the scheme of the present invention is not limited to the technical means disclosed by the above embodiments, but also includes the technical scheme formed by the arbitrary combination of the above technical features. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, several improvements and modifications can be made, and these improvements and modifications are also considered as the protection scope of the present invention.

Claims (4)

1. The utility model provides an elevator part preparation facilities, includes processing platform (1), its characterized in that, the side is equipped with processing subassembly (2), the fixed processing box (3) that is equipped with of side in processing platform (1) upper end, processing subassembly (2) are including in a set of vertical mount (4), vertical mount (4) between first horizontal support frame (5) and second horizontal support frame (6) that are equipped with, telescopic cylinder (7) that the vertical fixed telescopic cylinder (7) that are equipped with of side, telescopic cylinder (7) vertical decurrent tailpiece of the piston rod portion were equipped with, equally divide first lead screw (9) that do not be equipped with on the corresponding end wall of vertical mount (4), second horizontal support frame (6) length direction both sides upper end equally divide second lead screw (10) that do not vertically be equipped with, dust absorption cover body (11) and sprinkler bead (12) that second lead screw (10) outside was equipped with and organism that first horizontal support frame (5) upper end was equipped with (13) The water collecting tank body (16) is arranged below the position of the processing table (1).
2. An elevator component preparation apparatus according to claim 1, wherein: the processing table (1) is evenly and vertically fixedly provided with supporting legs at the lower end edge, the processing box body (3) is provided with an upper end opening and is designed without end plates, an upper port of the processing box body (3) is fixedly connected with the lower end wall of the processing table (1), the processing table (1) is provided with a through hole corresponding to the position of the processing box body (3), the vertical fixing frame (4) is arranged in parallel at intervals along the length direction of the processing table (1), the vertical fixing frame (4) is arranged at the middle side of the upper end of the processing table (1) in the width direction and is respectively arranged corresponding to the position of the inner end wall of the processing box body (3), the end wall of the corresponding end of the vertical fixing frame (4) is respectively provided with a vertical groove, a first lead screw (9) is respectively arranged in the vertical groove, a first guide rod is respectively arranged beside the position of the first lead screw (9), the first lead screw (9) and the first guide rod are arranged along the length direction of the vertical fixing frame (4) and are parallel to each other at intervals, the processing table (1) is provided with notches corresponding to the vertical groove positions, the bottoms of the first lead screw (9) and the first guide rod are respectively extended into the processing box body (3), a first sliding seat (17) is arranged in the vertical groove, the first lead screw (9) is respectively movably penetrated through the first sliding seat (17) and is arranged, a first lead screw transmission assembly is respectively arranged between the outer part of the first lead screw (9) and the inner end wall of the penetrating part of the first sliding seat (17), a first positioning through groove is respectively arranged on the first sliding seat (17), the first guide rod is movably penetrated through the first positioning through groove, the number of the first sliding seats (17) in the vertical groove is two, first horizontal support frame (5), second horizontal support frame (6) length direction both sides end equally divide respectively with first sliding seat (17) outer end wall fixed connection, first lead screw (9) top is equally divide respectively the activity to run through top end wall stretches out and stretch out the end tip and equally divide and do not have adjusting motor (18) through the coupling joint in the vertical recess.
3. An elevator component preparation apparatus according to claim 1, wherein: the end part of the top end of the second screw rod (10) is equally divided into two parts which respectively movably penetrate through the first horizontal support frame (5) and upwards extend out, the other side of the position of the second screw rod (10) is equally divided into two parts which are parallelly provided with second guide rods at intervals, the second screw rod (10) is equally divided into two parts which respectively movably penetrate through a second sliding seat (19), a second screw rod transmission assembly is equally arranged between the inner end wall of the penetrating part of the second sliding seat (19) and the outside of the second screw rod (10), a second positioning through groove is equally divided on the second sliding seat (19), the second guide rod movably penetrates through the second positioning through groove, a cylindrical transmission frame is movably arranged at the upper end of the first horizontal support frame (5) and correspondingly at the position of the second screw rod (10) positioned at one side, the cylindrical transmission frame comprises a second cylindrical transmission frame (21) movably arranged at the upper end of the first cylindrical transmission frame (20) and the first cylindrical transmission frame (5), be equipped with driving motor (14) directly over the cylindric driving frame position, driving motor (14) output shaft stretches into in the cylindric driving frame, equal radian is evenly opened on the wall in first cylindric driving frame (20) inner has first keyway (22), equal radian is evenly opened on the wall in second cylindric driving frame (21) inner has second keyway (23), first keyway (22) with second keyway (23) position each other is seted up opposite direction, driving motor (14) output shaft outside just corresponds first keyway (22), second keyway (23) position are equallyd divide and are do not articulated to have actuating lever (24), actuating lever (24) position each other hinges opposite direction, and second lead screw (10) top that is located one side stretches into in first cylindric driving frame (20) and through connecting rod and first cylindric driving frame (20) inner end wall fixed connection, the top of the second screw rod (10) positioned at the other side is sleeved with a belt wheel (25), the outer end wall of the second cylindrical transmission frame (21) is provided with an annular transmission groove, and a belt (26) is sleeved between the belt wheel (25) and the annular transmission groove.
4. An elevator component preparation apparatus as defined in claim 3, wherein: processing part (8) including shell body (27), shell body (27) interior bottom be equipped with interior casing (28), rotation motor (29) that are equipped with in interior casing (28) and rotation motor (29) output shaft outside cover have processing head (30), shell body (27) with telescopic cylinder (7) piston rod end fixed connection, shell body (27) with form heat dissipation chamber (31) between interior casing (28), rotation motor (29) output shaft activity runs through interior bottom end wall of interior casing (28), interior bottom end wall of shell body (27) stretch out, and stretch out end portion cover have processing head (30), processing head (30) are the grinding wheel, are equipped with dust absorption cover body (11) on second sliding seat (19) outer end wall that is located one side, are equipped with sprinkler bead (12) on second sliding seat (19) outer end wall that is located the opposite side, just be located on second sliding seat (19) outer end wall be equipped with dust removal casing (32) directly over dust absorption cover body (11) position, dust removal casing (32) inner medial side is equipped with the filter screen, be equipped with the endotherm aqueduct in heat dissipation chamber (31), the endotherm aqueduct is the spiral pipe, convulsions organism (13) air inlet end through first air guide hose with heat dissipation chamber (31) are linked together, dust absorption cover body (11) air-out end through second air guide hose with dust removal casing (32) bottom inner chamber is linked together, dust removal casing (32) top inner chamber through third air guide hose with heat dissipation chamber (31) are linked together, water collection box (16) upper end inner chamber is equipped with the water strainer, processing box (3) bottom inner chamber through first air guide hose with water collection box (16) top inner chamber is linked together, water collection box (16) bottom inner chamber through second air guide hose with water storage box (15) top inner chamber links to each other Through the water storage tank body (15), the inner cavity at the bottom of the water storage tank body is communicated with the water inlet end of the heat absorption water guide pipe through a third water guide hose, and the water outlet end of the heat absorption water guide pipe is communicated with the water inlet end of the water spraying head (12) through a fourth water guide hose.
CN201922306612.4U 2019-12-20 2019-12-20 Elevator part preparation facilities Expired - Fee Related CN211589359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922306612.4U CN211589359U (en) 2019-12-20 2019-12-20 Elevator part preparation facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922306612.4U CN211589359U (en) 2019-12-20 2019-12-20 Elevator part preparation facilities

Publications (1)

Publication Number Publication Date
CN211589359U true CN211589359U (en) 2020-09-29

Family

ID=72594013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922306612.4U Expired - Fee Related CN211589359U (en) 2019-12-20 2019-12-20 Elevator part preparation facilities

Country Status (1)

Country Link
CN (1) CN211589359U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112427381A (en) * 2020-12-17 2021-03-02 常州信息职业技术学院 Cleaning equipment for mechanical parts
CN113275633A (en) * 2021-06-16 2021-08-20 江西乔扬数控设备有限公司 High-efficient heat conduction type longmen high-speed high-precision mold vertical machining center

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112427381A (en) * 2020-12-17 2021-03-02 常州信息职业技术学院 Cleaning equipment for mechanical parts
CN113275633A (en) * 2021-06-16 2021-08-20 江西乔扬数控设备有限公司 High-efficient heat conduction type longmen high-speed high-precision mold vertical machining center

Similar Documents

Publication Publication Date Title
CN211589359U (en) Elevator part preparation facilities
CN111002172A (en) Machining equipment for pump
CN112427381A (en) Cleaning equipment for mechanical parts
CN220279293U (en) Honing and polishing device for inner wall of pump barrel of oil pump
CN220561143U (en) Gold and silver ball processingequipment
CN210304784U (en) Post-processing equipment for turning and milling composite parts
CN217774976U (en) Belt cleaning device is used in case processing
CN217188455U (en) Dust device is used to chemical industry safety
CN114871937B (en) But quick assembly disassembly's tin phosphorus bronze board production is with burnishing device
CN211383455U (en) Urethral catheter valve preparation device
CN210730819U (en) Processing equipment for electric wires and cables
CN210208739U (en) Processing equipment for metal tube float flowmeter
CN212442219U (en) Belt cleaning device is used in air conditioner spare part production
CN213795734U (en) Novel stability buddha's warrior attendant abrasive machine
CN213132356U (en) Drawer type dust remover with automatic cleaning filter cylinder
CN213164677U (en) Brake block is with processing equipment of polishing
CN214418561U (en) Grinding device for grinding diamond abrasive disc
CN212761231U (en) Production and processing equipment for neon lamp
CN213860054U (en) Diamond hole bores device convenient to dismantle
CN113510545A (en) Hub machining and polishing equipment
CN211841073U (en) Equipment is used in tuber pipe processing
CN217143263U (en) Part washing device for numerical control machining center
CN112355822B (en) Processing equipment for brake block
CN220092338U (en) Cleaning device for automobile part production
CN211804800U (en) Preparation device for electronic product

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200929

Termination date: 20211220