CN211572146U - Building heat preservation curtain - Google Patents

Building heat preservation curtain Download PDF

Info

Publication number
CN211572146U
CN211572146U CN201921778421.1U CN201921778421U CN211572146U CN 211572146 U CN211572146 U CN 211572146U CN 201921778421 U CN201921778421 U CN 201921778421U CN 211572146 U CN211572146 U CN 211572146U
Authority
CN
China
Prior art keywords
heat
filling layer
vertical beam
wall
embedded part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921778421.1U
Other languages
Chinese (zh)
Inventor
杨洪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921778421.1U priority Critical patent/CN211572146U/en
Application granted granted Critical
Publication of CN211572146U publication Critical patent/CN211572146U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a building heat preservation curtain, include: the structure wall comprises a structure wall body, a pre-buried component, a vertical beam, a cross beam, a limiting block, an anchor bolt, a first through hole, a clamping table and a second through hole; a filling layer is arranged at the front end of the structural wall body, and the filling layer is poured on the structural wall body; the front end of the filling layer is provided with a heat-insulating wallboard, and the heat-insulating wallboard is connected with the filling layer in a laying mode; an embedded part is arranged inside the filling layer, and the back of the embedded part is connected with the structural wall through a bolt; the front end of the embedded part is provided with a rectangular square tubular vertical beam, and the vertical beam is connected with the embedded part through a bolt. The utility model discloses a structural improvement has structural design rationally, and installation construction is convenient, and is firmly durable, can reduce the potential safety hazard and take place, has improved the stability of efficiency of construction and heat preservation curtain in the use, and the practicality is strong advantage such as to the effectual problem and the not enough that exist in having solved current device.

Description

Building heat preservation curtain
Technical Field
The utility model relates to a building decoration technical field, more specifically the theory especially relates to a building heat preservation curtain.
Background
In order to preserve heat and save energy and provide better comfort, a layer of heat preservation curtain wall is installed on the outer wall body of a modern building, the curtain wall is an outer wall enclosure of the building, is a light wall body with decoration effect commonly used by modern large-scale and high-rise buildings, and consists of a panel and a supporting structure system.
The mounting method of present heat preservation curtain adopts the reinforcing bar to take into frame roughly usually, lay the mould, concrete and other heat preservation materials are pour in proper order, adopt directly to pack heat preservation material in the outer wall dalle back keel frame and the wall body between the crack in, or directly rivet on the wall body, mounting structure steadiness is relatively poor, receive external environment's influence easily, lead to curtain life to reduce greatly, leave the potential safety hazard very easily, the result of use is poor, can't satisfy the user demand of building decoration.
In view of this, research and improvement are carried out to solve the existing problems, and a building thermal insulation curtain wall is provided, aiming at achieving the purposes of solving the problems and improving the practical value through the technology.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building heat preservation curtain to current heat preservation curtain mounting structure steadiness that proposes in solving above-mentioned background art is relatively poor, receives external environment's influence easily, leads to curtain life to reduce greatly, leaves the potential safety hazard very easily, and the result of use is poor, can't satisfy the problem and the not enough of building decoration's user demand.
In order to achieve the above object, the utility model provides a building heat preservation curtain wall is reached by following specific technological means:
a building insulation curtain wall comprising: the structure wall comprises a structure wall body, a filling layer, a heat-insulation wallboard, a pre-embedded part, a vertical beam, a cross beam, a limiting block, an anchor bolt, a first through hole, a clamping table and a second through hole; a filling layer is arranged at the front end of the structural wall body, and the filling layer is poured on the structural wall body; the front end of the filling layer is provided with a heat-insulating wallboard, and the heat-insulating wallboard is connected with the filling layer in a laying mode; an embedded part is arranged inside the filling layer, and the back of the embedded part is connected with the structural wall through a bolt; the front end of the embedded part is provided with a rectangular square tubular vertical beam, and the vertical beam is connected with the embedded part through a bolt; the front end of the vertical beam is vertically provided with a plurality of cross beams, and the cross beams are connected with the vertical beam through bolts; a T-shaped limiting block is arranged at the front end of the lower part of the cross beam and is connected with the cross beam through a bolt; the front end of the heat-insulation wallboard is provided with an anchor bolt, and the anchor bolt is respectively connected with the heat-insulation wallboard and the vertical beam in a penetrating way; a first through hole in clearance fit with the anchor bolt is formed in the vertical beam; the front end and the back of the heat-insulation wallboard are both provided with clamping tables which are sunken inwards; and a second through hole in clearance fit with the anchor bolt is formed in the heat-insulating wall plate.
Preferably, the crossbeam looks sideways at and is the right angle chair form, and blocks the platform and be clearance fit setting with the crossbeam.
Preferably, the limiting blocks are arranged in a linear mode and provided with a plurality of positions, and gaps which are in clearance fit with the limiting blocks are formed in the top ends of the heat-insulation wallboards.
Preferably, the anchor bolt is a heat-preservation anchor bolt with an expansion pipe at the bottom.
Preferably, the second through holes are symmetrically arranged at four positions, and the second through holes and the first through holes are arranged in a front-back corresponding manner.
Preferably, the heat-insulating wall board is a prefabricated wall board integrating external wall decoration and heat insulation.
Because of above-mentioned technical scheme's application, compared with the prior art, the utility model have the following advantage:
1. the utility model discloses a setting of prefabricating at the inside perpendicular roof beam of filling layer and crab-bolt, erect the roof beam and fix the front end at wall structure through being connected fixed prefabricated part with basic wall structure, and pour the front end at wall structure through the filling layer, it is more stable to make the connection between perpendicular roof beam and the wall structure, the bottom of crab-bolt is run through the first through-hole that perpendicular roof beam front end set up, the expansion pipe that makes the crab-bolt bottom is fixed at the inside inflation of erecting the roof beam, heat preservation wallboard mounting structure's fastness has further been improved, reduce the potential safety hazard that causes because of external factor to the influence of curtain structure, the stability of heat preservation curtain in the use has been improved, the life of heat preservation curtain has been prolonged.
2. The utility model discloses a setting of the crossbeam of the right angle chair shape that both sides set up about T stopper and the heat preservation wallboard, the crossbeam can not only play limiting displacement to the heat preservation wallboard with the stopper, makes the connection of heat preservation wallboard and crossbeam more inseparable, and the stopper can also be convenient for the fixed mounting of heat preservation wallboard to the second through-hole that enables to set up on the heat preservation wallboard aligns with the first through-hole of seting up on erecting the roof beam, and the installation of the crab-bolt of being convenient for is fixed, and is rational in infrastructure, and installation fixed convenient has improved staff's installation effectiveness.
3. The utility model discloses a structural improvement has structural design rationally, and installation construction is convenient, and is firmly durable, can reduce the potential safety hazard and take place, has improved the stability of efficiency of construction and heat preservation curtain in the use, and practicality is strong, thereby effectual solution the utility model provides a problem and not enough.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the shaft side unfolding structure of the present invention.
Fig. 3 is a schematic side view of the present invention.
In the figure: the structure wall comprises a structure wall body 1, a filling layer 2, a heat-insulating wall plate 3, a pre-embedded part 4, a vertical beam 5, a cross beam 6, a limiting block 7, an anchor bolt 8, a first through hole 301, a clamping table 302 and a second through hole 501.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
It is to be noted that, in the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 3, the present invention provides a specific technical implementation of a building thermal insulation curtain wall:
a building insulation curtain wall comprising: the structure wall comprises a structure wall body 1, a filling layer 2, a heat-insulating wall plate 3, a pre-embedded part 4, a vertical beam 5, a cross beam 6, a limiting block 7, an anchor bolt 8, a first through hole 301, a clamping table 302 and a second through hole 501; the front end of the structural wall body 1 is provided with a filling layer 2, and the filling layer 2 is poured with the structural wall body 1; the front end of the filling layer 2 is provided with a heat-insulating wall plate 3, and the heat-insulating wall plate 3 is connected with the filling layer 2 in a laying mode; an embedded part 4 is arranged inside the filling layer 2, and the back of the embedded part 4 is connected with the structural wall 1 through a bolt; a rectangular square tubular vertical beam 5 is arranged at the front end of the embedded part 4, and the vertical beam 5 is connected with the embedded part 4 through a bolt; the front end of the vertical beam 5 is vertically provided with a plurality of cross beams 6, and the cross beams 6 are connected with the vertical beam 5 through bolts; a T-shaped limiting block 7 is arranged at the front end of the lower part of the cross beam 6, and the limiting block 7 is connected with the cross beam 6 through a bolt; the front end of the heat-insulating wall plate 3 is provided with an anchor bolt 8, and the anchor bolt 8 is respectively connected with the heat-insulating wall plate 3 and the vertical beam 5 in a penetrating way; a first through hole 301 which is in clearance fit with the anchor bolt 8 is formed in the vertical beam 5; the front end and the back of the heat-insulating wall plate 3 are both provided with an inward-concave clamping table 302; the inside of thermal insulation wallboard 3 is seted up and is clearance fit's second through-hole 501 with crab-bolt 8.
Specifically, crossbeam 6 looks sideways at and is the right angle chair form, and blocks platform 302 and crossbeam 6 and be clearance fit setting, and the installation of the heat preservation wallboard 3 of being convenient for is fixed to can play limiting displacement to heat preservation wallboard 3, make the heat preservation wallboard 3 after the installation simultaneously and crossbeam 6's surface at same horizontal position, improve curtain wall construction's clean and tidy nature, aesthetic property.
Specifically, stopper 7 is linear arrangement and is provided with many places, and the top of thermal insulation wallboard 3 seted up and be clearance fit's breach with stopper 7, can play limiting displacement to thermal insulation wallboard 3, and the fixed mounting of thermal insulation wallboard 3 of not only being convenient for aligns around first through-hole 301 of still being convenient for and second through-hole 501, makes things convenient for the entering of crab-bolt 8.
Specifically, crab-bolt 8 is the heat preservation crab-bolt that the bottom has the expansion pipe, enables the bottom of crab-bolt 8 and in the inside inflation of erecting roof beam 5, reinforcing heat preservation wallboard and basic unit's wall structure 1's fastness.
Specifically, the second through hole 501 is provided with four positions in bilateral symmetry, and the second through hole 501 and the first through hole 301 are arranged in a front-back corresponding manner, so that the expansion pipe at the bottom of the anchor bolt 8 can be conveniently embedded.
Specifically, heat preservation wallboard 3 decorates heat preservation integrative prefabricated wallboard for the outer wall, and the decorative board of the integrative prefabricated wallboard of heat preservation can adopt metal sheet or stone material, the machine-shaping of being convenient for of outer wall decoration.
The method comprises the following specific implementation steps:
when the device is used, the embedded part 4 is fixed on the surface of the basic wall structure 1 by bolts, the vertical beam 5 is arranged in the embedded part 4, then the surface of the wall structure 1 is poured and leveled, so that the front end of the filling layer is flush with the front end of the vertical beam 5, the upper cross beam 6 is fixed at the front end of the vertical beam 5, the heat-insulating wall board 3 is clamped on the T-shaped limiting block 7 below the cross beam 6, the upper cross beam 6 is also arranged at the bottom end of the heat-insulating wall board 3, the T-shaped limiting block 7 and the cross beams at the upper side and the lower side of the heat-insulating wall board 3 can ensure that the heat-insulating wall board 3 can be tightly attached to the filling layer 2 after being installed and fixed, the T-shaped limiting block 7 not only can play a limiting role in installing and fixing the heat-insulating wall board 3, but also is convenient for the front and back alignment of the first through hole 301 and the second through, make heat preservation wallboard 3's mounting structure stable, reduced the emergence of potential safety hazard, prolonged heat preservation curtain wall structure's life, the practicality is strong.
In summary, the following steps: the building thermal insulation curtain wall has the advantages that the vertical beam and the anchor bolt are arranged in the filling layer in a prefabricated mode, the vertical beam is fixed at the front end of the wall structure through the prefabricated part fixedly connected with the basic wall structure, the filling layer is poured at the front end of the wall structure, the connection between the vertical beam and the wall structure is more stable, the bottom end of the anchor bolt penetrates through the first through hole formed in the front end of the vertical beam, the expansion pipe at the bottom of the anchor bolt is expanded and fixed in the vertical beam, the firmness of the thermal insulation wall board mounting structure is further improved, potential safety hazards caused by the influence of external factors on the curtain wall structure are reduced, the stability of the thermal insulation curtain wall in the using process is improved, the service life of the thermal insulation curtain wall is prolonged, and the cross beams in the shape of right-angled chairs are arranged on the upper side and the lower side of the thermal insulation wall board through the T limiting blocks, the cross beams, make being connected of thermal-insulation wall board and crossbeam more inseparable, the stopper still is convenient for the thermal-insulation wall board installation fixed to the second through-hole that enables to set up on the thermal-insulation wall board aligns with the first through-hole of setting up on the perpendicular roof beam, and the installation of the crab-bolt of being convenient for is fixed, and is rational in infrastructure, and the installation is fixed convenient, has improved staff's installation effectiveness, has solved the problem and not enough that exist among the current device.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A building insulation curtain wall comprising: the structure wall comprises a structure wall body (1), a filling layer (2), a heat-insulating wall plate (3), an embedded part (4), a vertical beam (5), a cross beam (6), a limiting block (7), an anchor bolt (8), a first through hole (301), a clamping table (302) and a second through hole (501); the method is characterized in that: the front end of the structural wall body (1) is provided with a filling layer (2), and the filling layer (2) is poured with the structural wall body (1); the front end of the filling layer (2) is provided with a heat-insulating wallboard (3), and the heat-insulating wallboard (3) is connected with the filling layer (2) in a laying mode; an embedded part (4) is arranged inside the filling layer (2), and the back of the embedded part (4) is connected with the structural wall (1) through a bolt; a rectangular square tubular vertical beam (5) is arranged at the front end of the embedded part (4), and the vertical beam (5) is connected with the embedded part (4) through a bolt; the front end of the vertical beam (5) is vertically provided with a plurality of cross beams (6), and the cross beams (6) are connected with the vertical beam (5) through bolts; a T-shaped limiting block (7) is arranged at the front end of the lower part of the cross beam (6), and the limiting block (7) is connected with the cross beam (6) through a bolt; the front end of the heat-insulation wallboard (3) is provided with an anchor bolt (8), and the anchor bolt (8) is respectively connected with the heat-insulation wallboard (3) and the vertical beam (5) in a penetrating way; a first through hole (301) which is in clearance fit with the anchor bolt (8) is formed in the vertical beam (5); the front end and the back of the heat-insulating wall plate (3) are both provided with an inwards-concave clamping table (302); and a second through hole (501) which is in clearance fit with the anchor bolt (8) is formed in the heat-insulating wall plate (3).
2. The building thermal insulation curtain wall as claimed in claim 1, wherein: crossbeam (6) side look is right angle chair form, and blocks platform (302) and crossbeam (6) and be clearance fit setting.
3. The building thermal insulation curtain wall as claimed in claim 1, wherein: the limiting blocks (7) are linearly arranged and provided with a plurality of positions, and gaps which are in clearance fit with the limiting blocks (7) are formed in the top ends of the heat-insulation wallboards (3).
4. The building thermal insulation curtain wall as claimed in claim 1, wherein: the anchor bolt (8) is a heat-preservation anchor bolt with an expansion pipe at the bottom.
5. The building thermal insulation curtain wall as claimed in claim 1, wherein: the second through holes (501) are arranged in four positions in a bilateral symmetry mode, and the second through holes (501) and the first through holes (301) are arranged in a front-back corresponding mode.
6. The building thermal insulation curtain wall as claimed in claim 1, wherein: the heat-insulation wallboard (3) is a prefabricated wallboard integrating external wall decoration and heat insulation.
CN201921778421.1U 2019-10-22 2019-10-22 Building heat preservation curtain Expired - Fee Related CN211572146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921778421.1U CN211572146U (en) 2019-10-22 2019-10-22 Building heat preservation curtain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921778421.1U CN211572146U (en) 2019-10-22 2019-10-22 Building heat preservation curtain

Publications (1)

Publication Number Publication Date
CN211572146U true CN211572146U (en) 2020-09-25

Family

ID=72529726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921778421.1U Expired - Fee Related CN211572146U (en) 2019-10-22 2019-10-22 Building heat preservation curtain

Country Status (1)

Country Link
CN (1) CN211572146U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113818610A (en) * 2021-10-26 2021-12-21 深圳市博大建设集团有限公司 Super high-rise full-special-shaped unit type curtain wall design structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113818610A (en) * 2021-10-26 2021-12-21 深圳市博大建设集团有限公司 Super high-rise full-special-shaped unit type curtain wall design structure and construction method

Similar Documents

Publication Publication Date Title
CN105507539B (en) A kind of lightweight exterior wall point hangs thermal-insulation decorative board combination and is anchored system and its construction method
CN111764542A (en) Assembled indoor partition wall
US20100024323A1 (en) Energy Saving House
CN102947519A (en) Variable fastener for fixing curtain wall
CN102031866A (en) Removal-free thermal insulation decorative template and mounting method thereof
CN204919895U (en) Existing deposit concrete of low heat conduction exterior sheathing decorates integrative composite insulation board
CN212001800U (en) Connecting assembly and connecting structure of external wall panel
CN211572146U (en) Building heat preservation curtain
CN209941906U (en) PC (polycarbonate) external wallboard connecting structure
CN103806597A (en) Assembled steel-skeleton light heat-preserving and energy-saving board
CN205669279U (en) There is the NEW TYPE OF COMPOSITE GRC curtain wall system of prefabricated partition board
CN204001289U (en) There is the light steel keel partition that carries the arm of encorbelmenting
CN216340339U (en) Hollow coincide floor of assembled concrete
CN211818281U (en) Net frame sandwich module passive room
CN210976300U (en) Prefabricated heat preservation wallboard of assembly type structure
CN107268803B (en) Connecting method for external wall board with out-of-plane constraint on wall board only at bottom end
CN214423851U (en) Light external wall board
CN215211673U (en) External enclosure heat insulation and decoration integrated wallboard
CN201347593Y (en) Light partition wall with suspension cable structure
CN221276915U (en) Decorate sound insulation heat preservation intergral template
CN211037653U (en) Environment-friendly energy-saving building outer wall decorative plate
CN215948530U (en) Heat preservation integration infilled wall embeds connecting piece and infilled wall thereof
CN214614821U (en) Stone unit curtain wall
CN211572092U (en) Light steel composite wallboard with heat preservation function
CN209874305U (en) Wallboard for architectural decoration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200925

Termination date: 20211022

CF01 Termination of patent right due to non-payment of annual fee