CN211569911U - Plate hoisting system for curtain wall installation - Google Patents

Plate hoisting system for curtain wall installation Download PDF

Info

Publication number
CN211569911U
CN211569911U CN201922215109.8U CN201922215109U CN211569911U CN 211569911 U CN211569911 U CN 211569911U CN 201922215109 U CN201922215109 U CN 201922215109U CN 211569911 U CN211569911 U CN 211569911U
Authority
CN
China
Prior art keywords
slide rail
curtain wall
cantilever beam
cantilever
wall mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922215109.8U
Other languages
Chinese (zh)
Inventor
王宝峰
孙亮
刘瑜亮
刘志超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No 3 Construction Engineering Co Ltd
Original Assignee
Beijing No 3 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No 3 Construction Engineering Co Ltd filed Critical Beijing No 3 Construction Engineering Co Ltd
Priority to CN201922215109.8U priority Critical patent/CN211569911U/en
Application granted granted Critical
Publication of CN211569911U publication Critical patent/CN211569911U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a cable hoisting system discloses a panel hoist and mount system for curtain installation, include along the cantilever beam of floor border interval setting, the bottom surface of the section of encorbelmenting of cantilever beam is improved level and is provided with two mutual parallel slide rails of encorbelmenting, and the slide rail of encorbelmenting leads to long setting along floor border direction, slides respectively under two slide rails of encorbelmenting and is provided with the slide rail calabash, and two slide rail calabash all are connected with same signal controller electricity; be provided with between two slide rail calabashes and pull the slide rail, pull the slide rail and perpendicular with the slide rail of encorbelmenting, and respectively with two slide rail calabash fixed connection pulls the slide rail and slides down to hang and be equipped with and lift by crane the position calabash. The utility model discloses on current curtain board hoist and mount system's basis, can directly send curtain board to the curtain installation face on, make the workman needn't take risk to pull the curtain board with the rope, obviously promoted the efficiency of installation curtain board when reducing the construction risk, and the curtain board atress is even, is difficult for taking place the collision that deflects.

Description

Plate hoisting system for curtain wall installation
Technical Field
The utility model relates to a cable hoisting system especially relates to a panel hoist and mount system for curtain installation.
Background
At present, the common cranes in building construction are a winch, a bridge crane and a cantilever crane, the winch only has a degree of freedom under one rectangular coordinate system, the bridge crane has two degrees of freedom under two rectangular coordinate systems, and the cantilever crane has two degrees of freedom under two polar coordinate systems.
The existing hoisting system for installing the curtain wall of the building is a bridge crane, a guide rail of the bridge crane is arranged below a cantilever beam and is parallel to a curtain wall installation surface, and an electric hoist is arranged on the guide rail and can slide along the guide rail to hoist the curtain wall plate and move parallel to the building. But for preventing hoist and mount in-process plate and floor structure collision each other, the curtain board separates the distance that is equivalent to half a major cantilever beam with the mounted position, needs the workman to pull the curtain board to the mounted position with the rope, and the workman pulls the in-process and often will to the building outer half body of visiting, and very dangerous, and lean on the manpower to pull, and the curtain board atress is uneven, takes place easily and deflects the collision.
SUMMERY OF THE UTILITY MODEL
The utility model provides a panel hoist and mount system for curtain installation.
The technical problem to be solved is that: the hoist and mount system that present building curtain installation was used can not remove the mounted position with the curtain board, and the curtain board need be drawn the mounted position by the manpower, draws the process and has dangerous and the curtain board collision that deflects easily.
In order to solve the technical problem, the utility model adopts the following technical scheme:
a panel hoisting system for curtain wall installation comprises cantilever beams arranged at intervals along the edge of a floor slab, wherein two parallel cantilever slide rails are horizontally arranged on the bottom surface of the cantilever section of each cantilever beam and are arranged along the direction of the edge of the floor slab in a through manner, slide rail hoists are respectively arranged below the two cantilever slide rails in a sliding manner, and the two slide rail hoists are electrically connected with the same signal controller;
two be provided with between the slide rail calabash and pull the slide rail, it is perpendicular with the slide rail of encorbelmenting to pull the slide rail, and respectively with two slide rail calabash fixed connection, it is equipped with to lift by crane the calabash of going into position to pull slide rail gliding hoist down.
Further, the distance between one end of the traction sliding rail adjacent to the curtain wall mounting surface and the curtain wall mounting surface is not more than 20cm, and the length of the traction sliding rail is not less than the length of the long edge of the cross section of the curtain wall plate in a hoisting state.
Furthermore, two ends of the traction sliding rail are provided with limiting devices.
Further, the slide rail of encorbelmenting is formed by many I-steel end to end, and adjacent I-steel contact sets up, and passes through slide rail bolt fixed connection with the joint steel sheet of riding the seam setting respectively, the joint steel sheet sets up the web both sides at the I-steel of constituteing the slide rail of encorbelmenting, the slide rail bolt is higher than the setting of slide rail calabash.
Further, the cantilever beam is I-steel, the cantilever beam and the flange plate of the cantilever slide rail are horizontally arranged, the lower flange plate of the cantilever beam is in contact with the upper flange plate of the cantilever slide rail, and the cantilever beam is fixedly connected with the upper flange plate through a bolt.
Further, the traction sliding rail is made of I-shaped steel.
Further, draw the flange board level setting of slide rail, the top both ends of drawing the slide rail set up two ears board respectively, the slide rail calabash passes through the ears board and draws slide rail fixed connection.
Further, the stop device that pulls the slide rail both ends is the end capping steel sheet of rectangle, the face of end capping steel sheet sets up and welded connection with the tip contact of pulling the slide rail, the upper and lower border of end capping steel sheet and the upper and lower border parallel and level of pulling the slide rail, both sides border and the both sides border parallel and level of pulling the slide rail.
Furthermore, the cantilever beam is arranged on a floor higher than the installation surface of the curtain wall and is fixedly connected with the building through a pre-embedded bolt of the floor, an expansion bolt arranged at the edge of the surface of the floor and a stay cable arranged at the bottom of the floor on the previous floor; the embedded bolts are symmetrically arranged on two sides of a web plate of the cantilever beam and are fixedly connected through bolt pressing plates, and the top ends of the embedded bolts penetrate through two layers of flange plates of the cantilever beam and the bolt pressing plates upwards and are locked through nuts;
one end of the stay cable is connected with the bottom surface of the floor slab of the previous floor through a pre-embedded lug plate arranged at the bottom of the floor slab of the previous floor, and the other end of the stay cable is connected with the cantilever end of the cantilever beam.
Furthermore, the included angle between the stay cable and the cantilever beam is 45-80 degrees.
The utility model relates to a panel hoist and mount system for curtain installation compares with prior art, has following beneficial effect:
the utility model discloses on current curtain board hoist and mount system's basis, the quantity that will surround the slide rail of encorbelmenting of building increases to two, and set up between two slide rails of encorbelmenting and encorbelment slide rail vertically pull the slide rail, pull the portable electric block of slide rail accessible and remove on the slide rail of encorbelmenting, the portable electric block setting of usefulness of lifting by crane is on pulling the slide rail, when accomplishing to lift by crane, can also slide along pulling the slide rail, directly send curtain board to the curtain installation face on, make the workman needn't be in danger with the rope pull curtain board, obviously promoted the efficiency of installation curtain board when reducing the construction risk, and the curtain board atress is even, the difficult collision that deflects that takes place.
Drawings
Fig. 1 is a schematic structural view of a plate hoisting system for curtain wall installation according to the present invention;
FIG. 2 is a schematic view of the attachment of the cantilever slide;
FIG. 3 is a schematic view of the attachment of the trailing slide;
FIG. 4 is a schematic structural view of a connecting steel plate;
the hoisting method comprises the following steps of 11-cantilever beam, 12-embedded bolt, 121-bolt pressing plate, 13-expansion bolt, 14-stay cable, 141-embedded lug plate, 21-cantilever slide rail, 211-connecting steel plate, 212-slide rail bolt, 22-slide rail hoist, 31-traction slide rail, 311-limiting device and 32-hoisting into position hoist.
Detailed Description
As shown in fig. 1-3, the utility model relates to a panel hoist and mount system for curtain installation, include along the cantilever beam 11 of floor border interval setting, the bottom surface upper level of the section of encorbelmenting of cantilever beam 11 is provided with two slide rail 21 that encorbelment that are parallel to each other, slide rail 21 that encorbelments leads to long setting along floor border direction, slide rail 21 that two encorbelments and slide respectively down and be provided with slide rail block 22, slide rail block 22 is portable electric block, moving direction sets up along pulling slide rail 31 length direction, two slide rail block blocks 22 all are connected with same signal controller electricity, receive same control signal control, in order to carry out synchronous slip. Note that the lifting member of the rail block 22 can be removed, leaving only the moving member.
Be provided with between two slide rail calabashes 22 and pull slide rail 31, pull slide rail 31 and the slide rail 21 that encorbelments perpendicularly, and respectively with two slide rail calabashes 22 fixed connection, pull slide rail 31 down the sliding crane be equipped with lift by crane into position calabash 32, lift by crane into position calabash 32 and be portable electric block, the direction of movement sets up along pulling slide rail 31 length direction.
The interval of the one end that draws slide rail 31 and curtain installation face adjacent and curtain installation face is no longer than 20cm to send the curtain board to the mounted position, the length of drawing slide rail 31 is not less than the long limit length of the curtain board cross section under the hoist and mount state, with the building of avoiding lifting by crane in-process curtain board and colliding with.
As shown in fig. 4, the overhanging slide rail 21 is formed by connecting a plurality of i-beams end to end, the adjacent i-beams are in contact arrangement and are respectively fixedly connected with the connecting steel plate 211 arranged at the riding joint through the slide rail bolt 212, and the connecting steel plate 211 is arranged at two sides of the web plate of the i-beams forming the overhanging slide rail 21, so that the problem of insufficient length of a single i-beam can be solved by the connection, and the disassembly is convenient. Note that the connecting steel plate 211 and the slide rail bolt 212 are arranged so that the slide rail block 22 is not clamped at the joint and cannot slide, the slide rail bolt 212 may be disposed at a position higher than the slide rail block 22, or a shorter bolt may be used.
The cantilever beam 11 is I-steel, the cantilever beam 11 and the flange plate of the cantilever slide rail 21 are arranged horizontally, and the lower flange plate of the cantilever beam 11 is in contact with the upper flange plate of the cantilever slide rail 21 and is fixedly connected with the upper flange plate through a bolt.
The traction sliding rail 31 is made of I-shaped steel, the flange plate of the traction sliding rail 31 is horizontally arranged, two double-lug plates are respectively arranged at two ends of the top of the traction sliding rail 31, and the sliding rail hoist 22 is fixedly connected with the traction sliding rail 31 through the double-lug plates. Limiting devices 311 are arranged at two ends of the traction sliding rail 31 to prevent the hoisting hoist 32 from falling off. Stop device 311 is the end capping steel sheet of rectangle, and the face of end capping steel sheet sets up and welded connection with the tip contact of drawing slide rail 31, and the upper and lower border of end capping steel sheet is along the parallel and level with the upper and lower border of drawing slide rail 31, and both sides border is along the parallel and level with the both sides border of drawing slide rail 31.
The cantilever beam 11 is arranged on a floor slab higher than the mounting surface of the curtain wall and is fixedly connected with a building through a pre-embedded bolt 12 of the floor slab, an expansion bolt 13 arranged at the edge position of the surface of the floor slab and a stay cable 14 arranged at the bottom of the floor slab of the previous floor; the embedded bolts 12 are symmetrically arranged on two sides of a web plate of the cantilever beam 11 and are fixedly connected through bolt pressing plates 121, the bolt pressing plates 121 are angle steel, and the top ends of the embedded bolts 12 penetrate through two layers of flange plates of the cantilever beam 11 and the bolt pressing plates 121 upwards and are locked through nuts; one end of the stay cable 14 is connected with the floor bottom surface of the previous floor through an embedded lug plate 141 arranged at the floor bottom of the previous floor, and the other end is connected with the cantilever end of the cantilever beam 11. The inclined angle between the inclined stay cable 14 and the cantilever beam 11 is 45-80 degrees. Note that the cantilever beam 11 should be placed on the floor as high as possible above any floor where a curtain wall plate needs to be installed, as the cable length of the electric hoist allows. The cantilever beam 11 is usually placed on the floor of the attic floor to avoid the situation where the curtain wall mounting surface is higher than the cantilever beam 11, thereby requiring the cantilever beam 11 to be reinstalled.
In order to avoid that during the installation of the curtain wall,
the utility model relates to a panel hoist and mount system for curtain installation, its use includes following step:
step 1, moving a hoisting in-place hoist 32 to one end of a traction slide rail 31 far away from a building;
step 2, hoisting the curtain wall board to the height of the installation position;
step 3, moving the sliding rail hoist 22 to enable the curtain wall board to be close to the position of a worker for installing the curtain wall board;
step 4, moving the hoisting in-place hoist 32 to one end of the traction slide rail 31 close to the building;
the above-mentioned embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the design spirit of the present invention should fall into the protection scope defined by the claims of the present invention.

Claims (10)

1. The utility model provides a panel hoist and mount system for curtain installation, includes cantilever beam (11) along floor border interval setting, its characterized in that: two parallel cantilever slide rails (21) are horizontally arranged on the bottom surface of the cantilever section of the cantilever beam (11), the cantilever slide rails (21) are arranged along the direction of the edge of the floor slab in a through length mode, slide rail hoists (22) are respectively arranged below the two cantilever slide rails (21) in a sliding mode, and the two slide rail hoists (22) are electrically connected with the same signal controller;
two be provided with between slide rail calabash (22) and pull slide rail (31), it is perpendicular with slide rail (21) of encorbelmenting to pull slide rail (31), and respectively with two slide rail calabash (22) fixed connection, it is equipped with to lift by crane into position calabash (32) to pull slide rail (31) down the sliding crane.
2. A panel hoist system for curtain wall mounting as claimed in claim 1, wherein: the distance between one end of the traction sliding rail (31) adjacent to the curtain wall mounting surface and the curtain wall mounting surface is not more than 20cm, and the length of the traction sliding rail (31) is not less than the length of the long edge of the cross section of the curtain wall plate in a hoisting state.
3. A panel hoist system for curtain wall mounting as claimed in claim 2, wherein: and limiting devices (311) are arranged at two ends of the traction sliding rail (31).
4. A panel hoist system for curtain wall mounting as claimed in claim 3, wherein: cantilever slide rail (21) are formed by many I-steel end to end, and adjacent I-steel contact sets up, and pass through slide rail bolt (212) fixed connection with connecting steel plate (211) of riding the seam setting respectively, connecting steel plate (211) set up the web both sides at the I-steel of constituteing cantilever slide rail (21), slide rail bolt (212) are higher than slide rail calabash (22) setting.
5. A panel hoist system for curtain wall mounting according to claim 4, characterized in that: cantilever beam (11) are the I-steel, cantilever beam (11) and the equal level setting of flange board of slide rail (21) encorbelment, and the lower flange board of cantilever beam (11) and the contact setting of the upper limb flange board of slide rail (21) encorbelment, and pass through bolt fixed connection.
6. A panel hoist system for curtain wall mounting according to claim 5, characterized in that: the traction sliding rail (31) is made of I-shaped steel.
7. A panel hoist system for curtain wall mounting according to claim 6, characterized in that: the flange plate level of drawing slide rail (31) sets up, the top both ends of drawing slide rail (31) set up two ears board respectively, slide rail calabash (22) through two ears board with draw slide rail (31) fixed connection.
8. A panel hoist system for curtain wall mounting according to claim 7, characterized in that: draw stop device (311) at slide rail (31) both ends to be the end capping steel sheet of rectangle, the face of end capping steel sheet sets up and welded connection with the tip contact of drawing slide rail (31), the upper and lower border of end capping steel sheet and the upper and lower border parallel and level of drawing slide rail (31), both sides border and the both sides border parallel and level of drawing slide rail (31).
9. A panel hoist system for curtain wall mounting according to any one of claims 5-8, characterized in that: the cantilever beam (11) is arranged on a floor slab higher than a curtain wall mounting surface and is fixedly connected with a building through a pre-embedded bolt (12) of the floor slab, an expansion bolt (13) arranged at the edge position of the floor slab surface and a stay cable (14) arranged at the bottom of the floor slab of the previous floor; the embedded bolts (12) are symmetrically arranged on two sides of a web plate of the cantilever beam (11) and are fixedly connected through bolt pressing plates (121), and the top ends of the embedded bolts (12) penetrate through two layers of flange plates of the cantilever beam (11) upwards and are locked through nuts after penetrating through the bolt pressing plates (121);
one end of the stay cable (14) is connected with the bottom surface of the floor slab of the previous floor through an embedded lug plate (141) arranged at the bottom of the floor slab of the previous floor, and the other end of the stay cable is connected with the cantilever end of the cantilever beam (11).
10. A panel hoist system for curtain wall mounting as claimed in claim 9, wherein: the included angle between the stay cable (14) and the cantilever beam (11) is 45-80 degrees.
CN201922215109.8U 2019-12-12 2019-12-12 Plate hoisting system for curtain wall installation Active CN211569911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922215109.8U CN211569911U (en) 2019-12-12 2019-12-12 Plate hoisting system for curtain wall installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922215109.8U CN211569911U (en) 2019-12-12 2019-12-12 Plate hoisting system for curtain wall installation

Publications (1)

Publication Number Publication Date
CN211569911U true CN211569911U (en) 2020-09-25

Family

ID=72535484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922215109.8U Active CN211569911U (en) 2019-12-12 2019-12-12 Plate hoisting system for curtain wall installation

Country Status (1)

Country Link
CN (1) CN211569911U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814396A (en) * 2020-12-31 2021-05-18 中建八局第二建设有限公司 Curtain wall mounting tool and method for roof steel structure overhanging
CN113845026A (en) * 2021-09-14 2021-12-28 中国人民解放军63653部队 A device and monospar hang that is used for monospar to hang spacing and dismantlement of hand dolly
CN113931430A (en) * 2021-12-01 2022-01-14 中国十七冶集团有限公司 High-altitude overhanging structure curtain wall installation and construction method
CN114057101A (en) * 2021-12-01 2022-02-18 中国十七冶集团有限公司 Horizontal transportation device and horizontal transportation method for curtain wall unit elements
CN117328590A (en) * 2023-11-08 2024-01-02 北京城建六建设集团有限公司 Unit body assembled curtain wall construction system and method for super high-rise building reconstruction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814396A (en) * 2020-12-31 2021-05-18 中建八局第二建设有限公司 Curtain wall mounting tool and method for roof steel structure overhanging
CN113845026A (en) * 2021-09-14 2021-12-28 中国人民解放军63653部队 A device and monospar hang that is used for monospar to hang spacing and dismantlement of hand dolly
CN113845026B (en) * 2021-09-14 2023-09-05 中国人民解放军63653部队 Device for limiting and dismounting hand trolley on single-beam crane and single-beam crane
CN113931430A (en) * 2021-12-01 2022-01-14 中国十七冶集团有限公司 High-altitude overhanging structure curtain wall installation and construction method
CN114057101A (en) * 2021-12-01 2022-02-18 中国十七冶集团有限公司 Horizontal transportation device and horizontal transportation method for curtain wall unit elements
CN117328590A (en) * 2023-11-08 2024-01-02 北京城建六建设集团有限公司 Unit body assembled curtain wall construction system and method for super high-rise building reconstruction

Similar Documents

Publication Publication Date Title
CN211569911U (en) Plate hoisting system for curtain wall installation
CN104895337B (en) The installation method of large-size horizontal equipment in concrete frame
CN103967284B (en) The steel column installation method of reserved stigma docking
CN105019664A (en) High-altitude sliding installation method for box room type electric room
CN107447973A (en) A kind of unilateral suspension type aerial movement steel platform
CN108675170A (en) Roofing monorail crane and its construction method
CN201507112U (en) Sliding template system
CN208732486U (en) Roofing monorail crane
CN214834922U (en) Super-long-distance transportation device for roof color steel plates
CN215755931U (en) Large transformer hoisting equipment in factory building
CN206289544U (en) A kind of simple electric nacelle device
CN212154622U (en) Outer wall plate mounting ladder stand for steel structure factory building
CN215364455U (en) Unit curtain wall hoisting construction device
CN109698482B (en) Device and method for laying side optical cable of suspended monorail traffic box girder
CN102500997B (en) Method for installing lower cross beam of fast forging machine
CN206256382U (en) It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed
CN218114849U (en) Curtain wall material hoisting device
CN214570218U (en) Intelligent double-beam crane
CN217949717U (en) Retractable double-row annular track
CN219314425U (en) Cantilever type lifting device system at parapet
CN203558810U (en) Rail-mounted hydraulic lifting device
CN221216935U (en) Assembled curtain wall unit body lifting device for super high-rise building reconstruction
CN219690747U (en) Sliding protective shed
CN210594914U (en) Modularization drilling platform panel hoist
CN215164727U (en) Lifting device for installing steel box girder cantilever

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant