CN211421877U - Concrete pouring thickness control frame - Google Patents

Concrete pouring thickness control frame Download PDF

Info

Publication number
CN211421877U
CN211421877U CN201921457798.7U CN201921457798U CN211421877U CN 211421877 U CN211421877 U CN 211421877U CN 201921457798 U CN201921457798 U CN 201921457798U CN 211421877 U CN211421877 U CN 211421877U
Authority
CN
China
Prior art keywords
ring
installation
control frame
thickness control
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921457798.7U
Other languages
Chinese (zh)
Inventor
张磊磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Tengfei Construction Engineering Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921457798.7U priority Critical patent/CN211421877U/en
Application granted granted Critical
Publication of CN211421877U publication Critical patent/CN211421877U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete placement thickness control frame, which comprises a height upright post, an adjusting bolt, an installation ring, a supporting connecting rod, an installation disc, a vertical rod and a ring handle, wherein the height upright post is uniformly arranged on the installation ring body by the adjusting bolt in 120 degrees, the supporting connecting rod is uniformly welded on the installation ring body, the top end of the supporting connecting rod is welded at the bottom of the installation disc body, the vertical rod is arranged at the circle center of the installation disc by screw threads, the ring handle is welded at the top end of the vertical rod body, the concrete placement thickness control frame is manufactured according to the thickness of a structural floor slab, the height upright post is the thickness of the floor slab, the blanking speed and the blanking square quantity can be controlled by using the device, the concrete placement thickness control frame is placed on the surface of the floor slab which is not poured when in use, the vibration of a vibrating bar is matched and used when in, before the concrete is finally set, the strip line light collection is carried out, the elevation of the floor surface is controlled, and the appearance and the flatness of the concrete surface are ensured.

Description

Concrete pouring thickness control frame
Technical Field
The utility model relates to a building field, especially a concrete placement thickness control frame.
Background
The concrete pouring refers to a process of pouring concrete into a mold until the concrete is plasticized, in the civil engineering and building engineering, materials such as concrete are put into the mold to form a preset shape, the free height of the concrete is not more than 2m when the concrete is poured, and corresponding measures are taken when the free height of the concrete exceeds 3 m. In the pouring construction process, strict detection needs to be performed on the pouring thickness.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a concrete placement thickness control frame. In order to realize the purpose, the utility model adopts the following technical scheme:
the utility model provides a concrete placement thickness control frame, includes high stand, adjusting bolt, installation ring, supporting connecting rod, mounting disc, pole setting, ring handle, and high stand uses adjusting bolt to be 120 equipartitions and installs on the installation ring body, and the equipartition welding has a supporting connecting rod on the installation ring body, and supporting connecting rod top welded mounting is in mounting disc disk body bottom position, and the pole setting is installed to mounting disc centre of a circle position screw thread, and the welding of pole setting body of rod top position has the ring handle.
Preferably, the height upright post is installed on the installation ring body through an adjusting bolt, the height upright post can be adjusted by the adjusting bolt, and the bottom of the height upright post is welded with the conical upright post.
Preferably, the bottom of the upright rod is welded with an adjusting threaded rod, and the adjusting threaded rod is fastened and installed on the installation disc body by using an installation nut.
Preferably, the inner diameter of the circular ring grip is provided with an inner rubber circular ring in a glued joint mode.
Compared with the prior art, the utility model has the advantages of it is following: the utility model provides a concrete placement thickness control frame, according to structure floor thickness preparation concrete placement control frame, high stand height is floor thickness, utilizes the speed that this device can control the unloading and the square measure of unloading, places during the use on the floor face of not pouring, and the cooperation simultaneously uses the vibrting spear vibration during the unloading, has improved the unloading speed of concrete greatly, carries out the band wire before the concrete final set and receives light, control floor face elevation, guarantees concrete surface impression and level.
Drawings
Fig. 1 is the utility model discloses concrete placement thickness control frame's structural schematic.
Fig. 2 is a schematic view of the installation structure of the conical column of the present invention.
Fig. 3 is a schematic structural view of the vertical rod of the present invention.
In the figure: 1. height column, 2, adjusting bolt, 3, mounting ring, 4, support connecting rod, 5, mounting disc, 6, upright rod, 7, ring handle, 8, conical column, 9, inner rubber ring, 10, whole threaded rod, 11 and mounting nut.
Detailed Description
The invention is explained in further detail below with reference to the figures and the embodiments.
As shown in fig. 1, fig. 2 and fig. 3, a concrete placement thickness control frame, including high stand 1, adjusting bolt 2, installation ring 3, supporting connecting rod 4, mounting disc 5, pole setting 6, ring handle 7, high stand 1 uses adjusting bolt 2 to be 120 equipartition and installs on 3 rings of installation ring, the equipartition welding has supporting connecting rod 4 on 3 rings of installation ring, the welding of 4 tops of supporting connecting rod is in 5 disk body bottom positions of mounting disc, pole setting 6 is installed to 5 centre of a circle positions screw threads of mounting disc, the welding of 6 body of rod top positions of pole setting has ring handle 7.
The height upright post 1 is installed on the ring body of the installation ring 3 through the adjusting bolt 2, the height upright post 1 can be adjusted by the adjusting bolt 2, and the conical upright post 8 is welded at the bottom of the height upright post 1.
The bottom of the upright rod 6 is welded with an adjusting threaded rod 10, and the adjusting threaded rod 10 is fastened and installed on the disc body of the installation disc 5 by using an installation nut 11.
The inner diameter of the ring grip 7 is provided with an inner rubber ring 9 in a glued joint way.
The utility model discloses the theory of operation: the utility model provides a concrete placement thickness control frame, according to structure floor thickness preparation concrete placement control frame, high stand height is floor thickness, utilizes the speed that this device can control the unloading and the square measure of unloading, places during the use on the floor face of not pouring, and the cooperation simultaneously uses the vibrting spear vibration during the unloading, has improved the unloading speed of concrete greatly, carries out the band wire before the concrete final set and receives light, control floor face elevation, guarantees concrete surface impression and level.
The foregoing is a preferred embodiment of the present invention, and for those skilled in the art to understand the teaching of the present invention, the changes, modifications, replacements and variations to the embodiments will still fall within the protection scope of the present invention without departing from the principle and spirit of the present invention.

Claims (4)

1. The utility model provides a concrete placement thickness control frame, a serial communication port, including high stand (1), adjusting bolt (2), installation ring (3), supporting link (4), mounting disc (5), pole setting (6), ring handle (7), high stand (1) uses adjusting bolt (2) to be 120 equipartitions and installs on installation ring (3) ring body, the equipartition welding has supporting link (4) on installation ring (3) ring body, supporting link (4) top welded mounting is in mounting disc (5) disk body bottom position, pole setting (6) are installed to mounting disc (5) centre of a circle position screw thread, pole setting (6) body of rod top position welding has ring handle (7).
2. The concrete pouring thickness control frame according to the claim 1, characterized in that the height upright posts (1) are installed on the ring body of the installation ring (3) through adjusting bolts (2), the height adjustment of the height upright posts (1) can be realized through the height upright posts (1) through the adjusting bolts (2), and conical upright posts (8) are welded at the bottoms of the height upright posts (1).
3. The concrete pouring thickness control frame according to claim 1, wherein an adjusting threaded rod (10) is welded at the bottom of the upright (6), and the adjusting threaded rod (10) is fixedly installed on the plate body of the installation plate (5) by using an installation nut (11).
4. A concrete casting thickness control frame according to claim 1, characterized in that the inner diameter of the ring grip (7) is provided with an inner rubber ring (9) by gluing.
CN201921457798.7U 2019-09-04 2019-09-04 Concrete pouring thickness control frame Active CN211421877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921457798.7U CN211421877U (en) 2019-09-04 2019-09-04 Concrete pouring thickness control frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921457798.7U CN211421877U (en) 2019-09-04 2019-09-04 Concrete pouring thickness control frame

Publications (1)

Publication Number Publication Date
CN211421877U true CN211421877U (en) 2020-09-04

Family

ID=72246395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921457798.7U Active CN211421877U (en) 2019-09-04 2019-09-04 Concrete pouring thickness control frame

Country Status (1)

Country Link
CN (1) CN211421877U (en)

Similar Documents

Publication Publication Date Title
CN107803918A (en) One kind experiment pours mould with adjustable beams of concrete
CN110802725B (en) Auxiliary form removal device and method for bottom form of stand column
CN101951191A (en) Adjustable-height bracket base for photovoltaic array bracket
CN211421877U (en) Concrete pouring thickness control frame
CN205189422U (en) Concrete casting apparatus
CN204343319U (en) Cableway pipe patten pre-embedded anchoring bolts jig
CN101838986A (en) Disassembling tool type lattice column and construction method thereof
CN212158562U (en) Concrete placement detection device
CN106351400B (en) A kind of precast concrete octagonal column assembly device and its installation method
CN215727254U (en) Concrete strength detection device for concrete pavement construction
CN211419517U (en) Water supply and drainage well cover lifting device
CN210393407U (en) Elevation positioning control device for hoisting large embedded part
CN104005564A (en) Installation technology of large steel tube inclined uprights
CN107461029B (en) Lower hanging beam pouring forming device based on hydraulic climbing formwork system setting
CN210918277U (en) Reinforcing bar net piece fixed bolster
CN112554555A (en) Adjustable top support under quick detach braced system is detained to dish
CN209288681U (en) A kind of installation equipment of headset group and head tube
CN213806622U (en) Device for secondary concrete construction of conical bottom plate
CN215104536U (en) Road surface patching device for highway engineering
CN210507073U (en) Auxiliary assembly is repaired on municipal administration road surface
CN201605822U (en) Structure for installing pre-cast iron parts
CN219826115U (en) Early-dismantling fulcrum structure for aluminum frame plywood formwork system
CN210086768U (en) Movable bench formwork
CN203175062U (en) Manual control frame body elevation fine adjusting device
CN221249262U (en) Anti-floating structure of prefabricated box girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200831

Address after: Room 113, floor 1, management committee, Jindai industrial cluster, No. 12, Dingrui street, Guancheng District, Zhengzhou City, Henan Province

Patentee after: Zhengzhou Tengfei Construction Engineering Group Co.,Ltd.

Address before: Room 1003, unit 2, building 6, Donghu Jingjing, Longcheng Road, Shizhong District, Zaozhuang City, Shandong Province

Patentee before: Zhang Leilei