CN211340272U - New old road surface banding side subsides of hole and banding structure - Google Patents

New old road surface banding side subsides of hole and banding structure Download PDF

Info

Publication number
CN211340272U
CN211340272U CN201921487772.7U CN201921487772U CN211340272U CN 211340272 U CN211340272 U CN 211340272U CN 201921487772 U CN201921487772 U CN 201921487772U CN 211340272 U CN211340272 U CN 211340272U
Authority
CN
China
Prior art keywords
new
old
sticker
road surface
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921487772.7U
Other languages
Chinese (zh)
Inventor
吕文明
韦靖峰
杜侃
葛立明
朱海南
周伟武
陈晴
王奔宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Taizhou Yong-Tai-Wen Expressway Co.,Ltd.
Original Assignee
Zhejiang Ningbo Yongtaiwen Expressway Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ningbo Yongtaiwen Expressway Co ltd filed Critical Zhejiang Ningbo Yongtaiwen Expressway Co ltd
Priority to CN201921487772.7U priority Critical patent/CN211340272U/en
Application granted granted Critical
Publication of CN211340272U publication Critical patent/CN211340272U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model belongs to the technical field of pavement engineering, in particular to a new and old pavement edge sealing side paste and edge sealing structure of a pit; the side surface sticker of the new and old pavement sealing side of the pot hole comprises a sticker, wherein two surfaces of the sticker have cohesiveness, one surface of the sticker is used for being stuck to a vertical wall of the old pavement milled and planed by the pot hole, and the other surface of the sticker is used for being stuck with a mixture to be paved; the adhesive tape is a composite waterproof adhesive, and when the temperature rises to a preset temperature, the adhesive tape is changed from a solid to a colloid; protective films are respectively attached to the two surfaces of the adhesive strip. The utility model discloses a new and old road surface sealing side face of pot hole pastes, is applied to the seam crossing on the new and old road surface of pot hole, can effectively solve new and old bituminous paving's bonding, makes it form regional wholeness, effectively plays water-proof effects.

Description

New old road surface banding side subsides of hole and banding structure
Technical Field
The utility model belongs to the technical field of the road surface engineering, concretely relates to new and old road surface banding side subsides of hole and banding structure.
Background
The pavement pot holes are one of common road diseases, and if the pavement pot holes cannot be timely treated, the pavement pot holes can bear the infiltration of pavement water and the impact action of passing vehicle loads, so that the service life and the driving comfort of a pavement structure are seriously influenced. In the traditional pouring and sealing edge construction of a road surface pot hole, the disease paving and rolling are finished, the disease boundary line is poured into the disease and the original asphalt road surface edge by hot asphalt (hot pouring) or finished pouring glue (cold pouring), the water isolation effect is achieved, and the following defects are overcome:
firstly, the water seepage performance is general, and after the traditional disease treatment, the water seepage test is carried out at a side line, and the water seepage performance is poorer than that of a new road surface and an old road surface at the side line;
the surface crack pouring agent at the edge sealing position of the traditional crack pouring is easy to scatter and soften under the action of wheel load and high-temperature weather, and is easy to fall off under the action of external force such as pushing of wheels and the like, so that the generation of early diseases at the side line is easy to cause;
thirdly, the flatness is influenced, the crack pouring and edge sealing agent forms separation between bulges and the asphalt surface in a low-temperature solid state, the flatness of the pavement is influenced, and the travelling comfort is further influenced;
and fourthly, the visual perception is influenced, after the edge sealing is finished, the surfaces of the new and old pavements are separated by the pouring sealant to form a disease frame, and after 2-3 months, the color difference between the surface of the new asphalt pavement and the surface of the old pavement is smaller, but the new asphalt pavement and the old pavement are still separated by the disease frame.
Therefore, a new sealing scheme for the old and new road surfaces of the pot holes is urgently needed in the field.
SUMMERY OF THE UTILITY MODEL
Based on the above-mentioned not enough that exists among the prior art, the utility model provides a new and old road surface banding side subsides of hole and banding structure.
In order to achieve the purpose of the utility model, the utility model adopts the following technical scheme:
the side surface sticker for the new and old road surfaces of the pit comprises a sticker, wherein two surfaces of the sticker have cohesiveness, one surface of the sticker is used for being stuck to a vertical wall of the old road surface milled and planed in the pit, and the other surface of the sticker is used for being stuck with a mixture to be paved; the adhesive tape is a composite waterproof adhesive, and when the temperature rises to a preset temperature, the adhesive tape is changed from a solid to a colloid; protective films are respectively attached to the two surfaces of the adhesive strip.
Preferably, the softening point of the welt is 75-110 ℃.
Preferably, the width of the sticker is 3-10 cm.
Preferably, the width of the strip is 4cm or 10 cm.
The utility model also provides a new and old road surface banding structure of hole, including as above arbitrary scheme the new and old road surface banding side of hole paste, a surface paste of its welt mills the vertical upright wall on the old road surface after the plane in hole, another surface paste in the mixture of paving.
Preferably, the pavement patching device further comprises a fixing piece for fixing the patching strip on the vertical wall of the old pavement milled by the pot hole.
Preferably, the fixing piece is an iron nail.
Preferably, the mixture is an asphalt mixture.
Compared with the prior art, the utility model, beneficial effect is:
the utility model discloses a new and old road surface sealing side face of pot hole pastes, is applied to the seam crossing on the new and old road surface of pot hole, can effectively solve new and old bituminous paving's bonding, makes it form regional wholeness, effectively plays water-proof effects.
The edge banding structure for the old and new road surfaces of the pit hole can be used for sticking the welt strips stuck to the edge banding side surfaces of the old and new road surfaces of the pit hole on the vertical wall of the old road surface milled and milled in the pit hole before the mixture is spread, and rolling is carried out after the mixture is spread; the joint between the new and old road surfaces has excellent waterproof performance, and the connecting effect of the new and old road surface blocks is enhanced.
Drawings
Fig. 1 is a schematic sectional view of a pavement structure according to an embodiment of the present invention;
FIG. 2 is a schematic structural diagram of a conventional edge sealing structure for new and old road surfaces of a pit;
fig. 3 is a schematic cross-sectional structure view of a side sticker according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a new and old road surface edge sealing structure of a pit hole in an embodiment of the present invention;
fig. 5 is a contrast diagram of the water seepage test of the new and old road surface edge banding structure of pot hole and the new and old road surface edge banding structure of traditional pot hole.
Detailed Description
The technical solution of the present invention will be further explained by the following specific examples.
The embodiment of the utility model provides an illustrate with actual engineering overview, wherein, as shown in FIG. 1, the road surface structure includes subbase 1, thread basic unit 2, lower surface course 3, well surface course 4 and top surface course 5, subbase 1 adopts 34cm (17cm +17cm) cement stabilized macadam, thread basic unit 2 adopts 20cm cement stabilized macadam, lower surface course 3 is 8cm coarse grain formula asphalt concrete AC-25(I) type, well surface course 4 is 6cm medium grain formula asphalt concrete AC-20(I) type, top surface course 5 is 4cm SBS modified asphalt AC-13(A) skid resistant top layer.
When a pothole appears on the road surface, the traditional construction process is to adopt a seam pressing belt or an anti-cracking paste. The joint strip is illustrated by an example, one surface of the joint strip is made of an anti-wrinkle heavy-load-resistant polypropylene material (without adhesiveness) with the thickness of 0.3mm, the other surface of the joint strip is made of a polymer waterproof film (with adhesiveness) with the thickness of 2mm, the joint strip is subjected to a new road surface and an old road surface edge sealing process, as shown in fig. 2, after disease paving and rolling are finished, a disease edge line is firstly poured into the edges of the disease and the original asphalt road surface by hot asphalt (hot pouring) 6 or finished pouring glue (cold pouring), and then the joint strip is attached to the edge of the new road surface and the old road surface, so that due to the material characteristics, the water seepage index and the adhesiveness at the joint of the new road surface and the old road surface are poor.
Based on this, as shown in fig. 3, the utility model discloses new and old road surface banding side face subsides of pothole, including the welt 10, both surfaces of welt all have the cohesiveness, and one surface is used for pasting the vertical upright wall in the old road surface after the pothole mills, and another surface is used for gluing with the mixture that waits to pave. The strip 10 is a composite waterproof adhesive (such as an asphalt cementing material), is solid at normal temperature and is colloidal when meeting high temperature; when the temperature rises to the preset temperature, the welt is changed from solid to colloid, namely, the welt can be directly changed from solid to colloid in the process of paving the mixture, so that the joints between the new and old pavements are fully filled with the compound waterproof glue during rolling, and the new and old pavement slabs can be well connected. In addition, protective films 11 are attached to both surfaces of the seal tape 10, respectively, to protect the seal tape. The mixture is preferably a common asphalt material, the softening point of the welt is 75-110 ℃, and the welt is matched with the paving temperature of the mixture of 130-160 ℃, so that the welt is converted into a colloid state from a solid state in the paving process of the mixture. In order to match with actual construction, the width of the sticking strip is designed to be 3-10 cm; the width of the strip is 4cm or 10 cm. To the utility model discloses the new old road surface sealing side of pot hole pastes and carries out the performance detection, as shown in table 1:
TABLE 1 Performance test Table for new and old pavement edge-sealing side surface stickers of potholes
Figure DEST_PATH_GDA0002518690270000041
Through detection, all performance indexes of the side surface stickers on the new and old pavement sealing surfaces of the pot holes of the embodiment of the utility model all reach the technical standard; the softening point, the low-temperature flexibility at-10 ℃ and the low-temperature stretching amount data of the detection result can be used for judging, and the side surface paste can enable the new and old pavement slab blocks to play a good connecting role.
The edge sealing side of the new and old pavement of the pit hole of the embodiment of the utility model is pasted with a roll of adhesive tape, which is very convenient for carrying; the cutting can be carried out according to the sizes of different pits; finally, the problem of bonding of the old asphalt pavement and the new asphalt pavement can be effectively solved, so that the asphalt pavement and the old asphalt pavement form regional integrity, and the waterproof effect is effectively achieved.
Based on the utility model discloses new and old road surface banding side subsides of pot hole, the embodiment of the utility model provides a still provide new and old road surface banding structure of pot hole, its concrete construction method, including following step:
firstly, milling a pothole, and selecting a side surface patch matched with the pothole according to the depth of the pothole; specifically, the damaged layer corresponding to the pit hole is milled, and air blowing and cleaning can be performed after milling is completed, so that the connection performance of new and old pavement plates can be improved; as shown in fig. 4, the middle layer and the upper layer corresponding to the pothole may be milled and then spread, and only the side surface sticker needs to be arranged on the upper layer, or of course, the side surface sticker may also be arranged on the middle layer, and the description will be given by way of example by arranging the side surface sticker on the upper layer.
And step two, after the milling of the damaged layer is finished, fixing the adhesive tape of the asphalt cementing material at the joint of the new road surface and the old road surface in a solid state, specifically, tearing off the protective films on the two surfaces of the adhesive tape, and adhering the right surface of the adhesive tape to the vertical wall of the old road surface milled by the pot hole and leveling the right surface of the adhesive tape with the vertical wall. In addition, in order to prevent the side surface strips from falling off, the attachment strips can be fixed on the vertical wall of the old pavement milled by the pits through fixing pieces (such as iron nails, steel nails and the like), and the condition that the side surface strips are easy to be pushed by asphalt mixture in the subsequent paving process and cannot generate the corresponding effect, so that early diseases at the seams of the old pavement and the new pavement are generated can be prevented.
Paving the mixture, wherein the mixture covers the other surface of the adhesive strip to obtain the edge sealing structure of the new and old pavement of the pit hole; and rolling after paving. Specifically, the mixture is preferably asphalt, the asphalt is paved through a paver, the paving temperature of the mixture is 130-160 ℃, and after paving is completed, the asphalt mixture covers the left surface of the sticking strip; after the preparation of each procedure is finished, normally spreading and rolling, and changing the cementing material into colloid by using the characteristic that the asphalt cementing material is solid at normal temperature and is colloid at high temperature so as to replace the traditional crack pouring adhesive.
As shown in fig. 5, the water seepage test is performed on the edge sealing construction method for the new and old road surfaces of the pot hole and the traditional construction process, so that the traditional edge sealing process cannot meet the standard requirement at the side line during the water seepage test, and the numerical value difference is large (such as the upper curve in fig. 5); and adopt the utility model discloses the banding technology of embodiment can satisfy standard requirement basically in sideline department during the infiltration test, and the infiltration has great promotion (like the lower curve in fig. 5) than traditional technology. Therefore, the utility model discloses old and new road surface sealing side face subsides of pot hole are applied to the seam crossing on old and new road surface of pot hole, can effectively solve old and new bituminous paving's bonding, make its formation regional wholeness, effectively play water-proof effects.
The foregoing has been a detailed description of the preferred embodiments and principles of the present invention, and it will be apparent to those skilled in the art that variations may be made in the specific embodiments based on the concepts of the present invention, and such variations are considered as within the scope of the present invention.

Claims (8)

1. The side surface sticker for the new road surface and the old road surface of the pit is characterized by comprising a sticker, wherein two surfaces of the sticker have cohesiveness, one surface of the sticker is used for being stuck to a vertical wall of the old road surface milled and planed in the pit, and the other surface of the sticker is used for being stuck with a mixture to be paved; the adhesive tape is a composite waterproof adhesive, and when the temperature rises to a preset temperature, the adhesive tape is changed from a solid to a colloid; protective films are respectively attached to the two surfaces of the adhesive strip.
2. The edge-sealing side sticker for the new and old pavement of a pit as claimed in claim 1, wherein the softening point of the sticker is 75-110 ℃.
3. The edge sealing side sticker for the new and old pavement of a pit as claimed in claim 1, wherein the width of the sticker is 3-10 cm.
4. The edge sealing side sticker for the new and old pavement of a pit as claimed in claim 3, wherein the width of the sticker is 4cm or 10 cm.
5. An edge sealing structure for new and old underground road surfaces, which is characterized in that the edge sealing structure comprises the edge sealing side sticker for the new and old underground road surfaces as claimed in any one of claims 1-4, wherein one surface of the sticker is stuck on the vertical wall of the old underground road surface milled by the underground tunnel, and the other surface is stuck on the paved mixture.
6. A pit new and old road surface edge sealing structure according to claim 5, characterized by further comprising fixing members for fixing the welt on the vertical wall of the old road surface milled by the pit.
7. The edge sealing structure for new and old pavement of pit as claimed in claim 6, wherein said fixing member is iron nail.
8. The new and old pavement edge sealing structure of the pit as claimed in claim 5, wherein the mixture is asphalt mixture.
CN201921487772.7U 2019-09-09 2019-09-09 New old road surface banding side subsides of hole and banding structure Active CN211340272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921487772.7U CN211340272U (en) 2019-09-09 2019-09-09 New old road surface banding side subsides of hole and banding structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921487772.7U CN211340272U (en) 2019-09-09 2019-09-09 New old road surface banding side subsides of hole and banding structure

Publications (1)

Publication Number Publication Date
CN211340272U true CN211340272U (en) 2020-08-25

Family

ID=72091991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921487772.7U Active CN211340272U (en) 2019-09-09 2019-09-09 New old road surface banding side subsides of hole and banding structure

Country Status (1)

Country Link
CN (1) CN211340272U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565472A (en) * 2019-09-09 2019-12-13 浙江宁波甬台温高速公路有限公司 Side surface sticker for new and old road surface sealing of pit and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565472A (en) * 2019-09-09 2019-12-13 浙江宁波甬台温高速公路有限公司 Side surface sticker for new and old road surface sealing of pit and construction method

Similar Documents

Publication Publication Date Title
CN100999893A (en) Anti-splitting paster and preparation method thereof
CN102704366A (en) High-performance rubberized asphalt composite seal coat and construction method thereof
CN103692719B (en) Composite pre-laid waterproof coiled material
US4324504A (en) Method of sealing bridge deck joints
CN211340272U (en) New old road surface banding side subsides of hole and banding structure
CN112982069A (en) Asphalt concrete surface layer construction joint treatment method
GB2249102A (en) Structural material and drain
CN108316084B (en) Asphalt pavement pit repairing process
CN113249054A (en) Net-cracking plaster for highway and preparation method thereof
CN110565472A (en) Side surface sticker for new and old road surface sealing of pit and construction method
CN111286305A (en) Seam-sticking material made of seam-sticking belt and net crack sticker for road crack repair
JPS6360307A (en) Method for repairing crack part in asphalt pavement
CN202509361U (en) High-performance rubber asphalt composite seal coat
CN106120510B (en) A kind of construction method slowing down hot-mixed bitumen pavement crack
CN201620354U (en) Multilayer composite self-adhesive waterproof coiled material
CN213328506U (en) Self-adhesive polyester glass fiber cloth composite pavement repair structure and crack-resistant pavement structure
CN208280000U (en) Attachment device for bridges and culverts and roadbed
CN207775651U (en) Cement pavement cracking structure based on anti-splitting paster
JP4773111B2 (en) Color crack sealant for paving
CN111705581A (en) Construction method for repairing asphalt pavement cracks by using joint tape
CN208055793U (en) A kind of structure using plain concrete and reinforced concrete repairing road
CN206545149U (en) A kind of road surface pressing belt
CN208250853U (en) A kind of road gap filling repairing structure
CN219410394U (en) Pitch road hole repair structure
CN207143630U (en) A kind of permeable, anti-settling pavement bricks

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201015

Address after: 317000 No. 599 Baiye West Road, Linhai City, Taizhou City, Zhejiang Province

Patentee after: Zhejiang Taizhou Yong-Tai-Wen Expressway Co.,Ltd.

Address before: 315899 room 736, business building, Ningbo Free Trade Zone, Zhejiang

Patentee before: ZHEJIANG NINGBO YONGTAIWEN EXPRESSWAY Co.,Ltd.