CN211338613U - Crane auxiliary arm mounting equipment - Google Patents

Crane auxiliary arm mounting equipment Download PDF

Info

Publication number
CN211338613U
CN211338613U CN201922022340.5U CN201922022340U CN211338613U CN 211338613 U CN211338613 U CN 211338613U CN 201922022340 U CN201922022340 U CN 201922022340U CN 211338613 U CN211338613 U CN 211338613U
Authority
CN
China
Prior art keywords
main arm
fly jib
bolt
arm
auxiliary arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922022340.5U
Other languages
Chinese (zh)
Inventor
赵洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN UNIVERSITY OF TECHNOLOGY (XUZHOU) ENGINEERING MACHINERY RESEARCH CENTER
Original Assignee
DALIAN UNIVERSITY OF TECHNOLOGY (XUZHOU) ENGINEERING MACHINERY RESEARCH CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN UNIVERSITY OF TECHNOLOGY (XUZHOU) ENGINEERING MACHINERY RESEARCH CENTER filed Critical DALIAN UNIVERSITY OF TECHNOLOGY (XUZHOU) ENGINEERING MACHINERY RESEARCH CENTER
Priority to CN201922022340.5U priority Critical patent/CN211338613U/en
Application granted granted Critical
Publication of CN211338613U publication Critical patent/CN211338613U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a hoist auxiliary installation equipment, including main arm, fly jib and ball pivot support, main arm one side is provided with the fly jib, there is the fixed plate main arm top through bolted connection, all have through bolted connection on the wall of fly jib both sides ball pivot support, the inside ball pivot of ball pivot support is connected with the pull rod, there is lock nut through threaded connection on the pull rod. Has the advantages that: the utility model discloses when playing to rise the fly jib, can be in the same place pull rod and fixed plate are fixed through lock nut, make the fly jib, form a triangle-shaped structure between fixed plate and the pull rod, play to rise the process for the fly jib and provide the outrigger, prevent that the fly jib from rotating to both sides, improve the security that the fly jib plays to rise the process, through setting up slide and pivot, can realize adjusting pin joint seat two wantonly on the horizontal direction, make its and a butt joint of pin joint seat, through inserting the pin inside the pinhole, accomplish the quick butt joint connection to main arm and fly jib.

Description

Crane auxiliary arm mounting equipment
Technical Field
The utility model relates to a hoist technical field, concretely relates to hoist auxiliary installation of arm equipment.
Background
The automobile crane is widely applied in the technical field of engineering machinery, and the crane lifts a heavy object by a suspension arm and a steel wire rope wound around a main pulley of the suspension arm. The boom of a crane usually has a main boom and an auxiliary boom, depending on the hoisting requirements. When the load is large and the lifting height is low, the main arm is usually used for lifting; when the load is small and the lifting height is high, the auxiliary arm is used for lifting, when the tail part of the auxiliary arm is connected with the arm head of the main arm, the whole length of the crane boom is the sum of the lengths of the main arm and the auxiliary arm, so that the lifting height can be improved, and the crane boom is suitable for lifting with small load due to the fact that the length is lengthened and the strength is low.
But current hoist auxiliary arm erection equipment is when playing to rise the auxiliary arm, does not set up stable protection architecture in the both sides of auxiliary arm and main arm, can lead to the balance of playing to rise the process relatively poor to the small rotation of both sides when the auxiliary arm rises, has certain potential safety hazard, simultaneously, when the bolt nail, because the position control of the plug socket on the auxiliary arm is inconvenient for the grafting process of pin is comparatively time-consuming.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome the prior art not enough, now provide a hoist fly jib erection equipment, solved current hoist fly jib erection equipment when playing to rise the fly jib, do not set up stable protection architecture in the both sides of fly jib and main arm, can rotate to the both sides is small when the fly jib rises, it is relatively poor to lead to the equilibrium of playing to rise the process, there is certain potential safety hazard, and when the bolt nail, because the position control of the plug socket on the fly jib is inconvenient, make the grafting process of pin problem that takes time comparatively.
(II) technical scheme
The utility model discloses a following technical scheme realizes: the utility model provides a hoist auxiliary installation equipment, including main arm, fly jib and ball pivot support, main arm one side is provided with the fly jib, there is the fixed plate main arm top through bolted connection, all have through bolted connection on the fly jib both sides wall the ball pivot support, the inside ball pivot of ball pivot support is connected with the pull rod, there is lock nut through threaded connection on the pull rod.
By adopting the technical scheme, after the main arm and the auxiliary arm are connected, the pull rod and the fixed plate are fixed together through the locking nut, so that a triangular structure can be formed among the auxiliary arm, the fixed plate and the pull rod, stable support is provided for the lifting process of the auxiliary arm, the auxiliary arm can be prevented from rotating towards two sides, and the safety of the lifting process of the auxiliary arm is improved.
Furthermore, a baffle plate is connected to the lower portion of the auxiliary arm through a bolt, and a hook is connected to one side of the baffle plate through a bolt.
By adopting the technical scheme, the baffle plate can facilitate the connection of the hook and the rotating shaft.
Furthermore, a second pin joint seat is connected to the side wall of the first auxiliary arm through a bolt, a first pin joint seat is connected to the side wall of the first main arm through a bolt, and pin holes are formed in the first pin joint seat and the second pin joint seat.
Through adopting above-mentioned technical scheme, can will through the pin joint seat two with the quick connection of pin joint seat is fixed, convenient and practical.
Furthermore, a T-shaped sliding rail is connected to the lower portion of the main arm through a screw, a sliding seat is arranged below the T-shaped sliding rail, and a T-shaped sliding groove is formed in the joint of the sliding seat and the T-shaped sliding rail.
Furthermore, the T-shaped slide rail is connected with the T-shaped slide groove in a sliding manner.
By adopting the technical scheme, the T-shaped sliding rail is matched with the T-shaped sliding block, so that the sliding seat can be guided to move.
Furthermore, one side of the sliding seat is connected with a hydraulic ejector rod through a screw, one side of the hydraulic ejector rod is connected with a supporting block through a bolt, and the supporting block is connected with the main arm through a bolt.
By adopting the technical scheme, the sliding seat can be pushed to slide along the T-shaped sliding rail through the action of the hydraulic ejector rod, the hook is hung with the rotating shaft, the positions of the auxiliary arm and the main arm can be conveniently adjusted, and further the installation of the pin is facilitated.
Furthermore, the inside pivot that is provided with of slide one side, the pivot with the slide is rotated and is connected.
Through adopting above-mentioned technical scheme, the pivot with the couple cooperation can be along the pivot slides the couple makes the fly jib along the pivot removes, the installation of the pin of being convenient for.
(III) advantageous effects
Compared with the prior art, the utility model, following beneficial effect has:
1. when the auxiliary arm of the existing crane is lifted, the auxiliary arm and the main arm are not provided with stable protection structures at two sides, and the auxiliary arm can rotate slightly towards two sides when lifted, so that the balance of the lifting process is poor, and certain potential safety hazards exist;
2. for solving current hoist auxiliary installation of arms equipment when the bolt nail, because the position control of the plug socket on the auxiliary is inconvenient for the problem that the grafting process of pin is comparatively time-consuming, the utility model discloses a set up slide and pivot, can realize adjusting pin joint seat two wantonly on the horizontal direction, make its and pin joint seat one dock, through inserting the pin inside the pinhole, accomplish the quick butt joint connection to main arm and auxiliary.
Drawings
FIG. 1 is a structural diagram of a crane jib mounting apparatus according to the present invention;
fig. 2 is a front view of the crane jib mounting device after the ball pivot support, the pull rod and the fixing plate are removed;
fig. 3 is a schematic diagram of the connection relationship between the main arm, the T-shaped slide rail, the T-shaped chute and the slide seat in the crane auxiliary arm installation device.
The reference numerals are explained below:
1. an auxiliary arm; 2. a main arm; 3. a slide base; 4. a rotating shaft; 5. a spherical hinge support; 6. a pull rod; 7. locking the nut; 8. a fixing plate; 9. a baffle plate; 10. hooking; 11. a support block; 12. a hydraulic ejector rod; 13. a first pin joint seat; 14. a pin hole; 15. a second pin joint seat; 16. a T-shaped slide rail; 17. t-shaped sliding chutes.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1-3, the crane jib mounting device in this embodiment includes a main jib 2, a jib 1, and a ball hinge support 5, the jib 1 is disposed on one side of the main jib 2, a fixing plate 8 is connected to the upper side of the main jib 2 through a bolt, the ball hinge support 5 is connected to both side walls of the jib 1 through bolts, a pull rod 6 is connected to the ball hinge inside the ball hinge support 5, and a lock nut 7 is connected to the pull rod 6 through a thread, so that after the main jib 2 and the jib 1 are connected, the pull rod 6 and the fixing plate 8 are fixed together through the lock nut 7, a triangular structure can be formed between the jib 1, the fixing plate 8, and the pull rod 6, thereby providing stable support for the lifting process of the jib 1, preventing the jib 1 from rotating to both sides, and improving the safety of the lifting process of the jib 1.
A baffle plate 9 is connected to the lower portion of the auxiliary arm 1 through a bolt, a hook 10 is connected to one side of the baffle plate 9 through a bolt, and the baffle plate 9 can facilitate connection of the hook 10 and the rotating shaft 4.
A side wall of the auxiliary arm 1 is connected with a second pin joint seat 15 through a bolt, a side wall of the main arm 2 is connected with a first pin joint seat 13 through a bolt, pin holes 14 are formed in the first pin joint seat 13 and the second pin joint seat 15, the second pin joint seat 15 and the first pin joint seat 13 can be connected and fixed quickly through pins, and the novel connecting structure is convenient and practical.
The lower part of the main arm 2 is connected with a T-shaped slide rail 16 through a screw, a slide seat 3 is arranged below the T-shaped slide rail 16, a T-shaped slide groove 17 is formed in the joint part of the slide seat 3 and the T-shaped slide rail 16, the T-shaped slide rail 16 is connected with the T-shaped slide groove 17 in a sliding mode, and the T-shaped slide rail 16 can be matched with a T-shaped slide block to provide guidance for the movement of the slide seat 3.
There is hydraulic ram 12 slide 3 one side through the screw connection, and there is supporting shoe 11 hydraulic ram 12 one side through bolted connection, and supporting shoe 11 passes through bolted connection with main arm 2, can promote slide 3 and slide along T type slide rail 16 through the action of hydraulic ram 12, and couple 10 hangs together with pivot 4, can conveniently adjust the position of auxiliary jib 1 and main arm 2, and then makes things convenient for the installation of pin.
The inside pivot 4 that is provided with in slide 3 one side, pivot 4 rotates with slide 3 to be connected, and pivot 4 and couple 10 cooperation can slide couple 10 along pivot 4, make the fly jib 1 remove along pivot 4, the installation of the pin of being convenient for.
The specific implementation process of this embodiment is as follows: in the process of installing the auxiliary arm 1, firstly fixing the baffle plate 9 on the main arm 2, fixing the spherical hinge support 5 and the pull rod 6 on the auxiliary arm 1, then moving the auxiliary arm 1 to enable the hook 10 to be hung on the rotating shaft 4, driving the sliding seat 3 to move along the T-shaped sliding rail 16 through the action of the conveying hydraulic ejector rod 12, adjusting the distance between the main arm 2 and the auxiliary arm 1, simultaneously adjusting the position of the auxiliary arm 1 along the rotating shaft 4 to realize the random adjustment of the pin joint seat II 15 in the horizontal direction, enabling the pin joint seat II to be in butt joint with the pin joint seat I13, completing the quick butt joint connection of the main arm 2 and the auxiliary arm 1 by inserting a pin into the pin hole 14, then fixing the pull rod 6 and the fixing plate 8 together through the locking nut 7 before lifting the auxiliary arm 1, forming a triangular structure among the auxiliary arm 1, the fixing plate 8 and the pull rod 6, and providing stable support for the lifting process of the auxiliary arm 1, the fly jib 1 can be prevented from rotating towards two sides, and the safety of the fly jib 1 in the lifting process is improved.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and are not intended to limit the spirit and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by the technical solution of the present invention by those skilled in the art should fall into the protection scope of the present invention, and the technical contents claimed by the present invention have been fully recorded in the claims.

Claims (7)

1. A crane jib erection equipment which characterized in that: the spherical hinge device is characterized by comprising a main arm (2), an auxiliary arm (1) and a spherical hinge support (5), wherein the auxiliary arm (1) is arranged on one side of the main arm (2), a fixing plate (8) is connected to the upper portion of the main arm (2) through a bolt, the spherical hinge support (5) is connected to the two side walls of the auxiliary arm (1) through bolts, a pull rod (6) is connected to the inner spherical hinge of the spherical hinge support (5), and a locking nut (7) is connected to the pull rod (6) through threads.
2. A crane jib mounting apparatus as claimed in claim 1, wherein: a baffle (9) is connected below the auxiliary arm (1) through a bolt, and a hook (10) is connected to one side of the baffle (9) through a bolt.
3. A crane jib mounting apparatus as claimed in claim 1, wherein: the auxiliary arm is characterized in that a second pin joint seat (15) is connected to one side wall of the auxiliary arm (1) through a bolt, a first pin joint seat (13) is connected to one side wall of the main arm (2) through a bolt, and pin holes (14) are formed in the first pin joint seat (13) and the second pin joint seat (15).
4. A crane jib mounting apparatus as claimed in claim 1, wherein: the lower part of the main arm (2) is connected with a T-shaped sliding rail (16) through a screw, a sliding seat (3) is arranged below the T-shaped sliding rail (16), and a T-shaped sliding groove (17) is formed in the joint of the sliding seat (3) and the T-shaped sliding rail (16).
5. A crane jib mounting apparatus as claimed in claim 4, wherein: the T-shaped slide rail (16) is connected with the T-shaped slide groove (17) in a sliding manner.
6. A crane jib mounting apparatus as claimed in claim 5, wherein: one side of the sliding seat (3) is connected with a hydraulic ejector rod (12) through a screw, one side of the hydraulic ejector rod (12) is connected with a supporting block (11) through a bolt, and the supporting block (11) is connected with the main arm (2) through a bolt.
7. A crane jib mounting apparatus as claimed in claim 4, wherein: the novel sliding seat is characterized in that a rotating shaft (4) is arranged inside one side of the sliding seat (3), and the rotating shaft (4) is rotatably connected with the sliding seat (3).
CN201922022340.5U 2019-11-21 2019-11-21 Crane auxiliary arm mounting equipment Expired - Fee Related CN211338613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922022340.5U CN211338613U (en) 2019-11-21 2019-11-21 Crane auxiliary arm mounting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922022340.5U CN211338613U (en) 2019-11-21 2019-11-21 Crane auxiliary arm mounting equipment

Publications (1)

Publication Number Publication Date
CN211338613U true CN211338613U (en) 2020-08-25

Family

ID=72107581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922022340.5U Expired - Fee Related CN211338613U (en) 2019-11-21 2019-11-21 Crane auxiliary arm mounting equipment

Country Status (1)

Country Link
CN (1) CN211338613U (en)

Similar Documents

Publication Publication Date Title
CN105060125B (en) High tower structure of cable crane and its method for dismounting
CN211338613U (en) Crane auxiliary arm mounting equipment
CN110844806A (en) Crane auxiliary arm mounting equipment
CN210908618U (en) Turnover device for assembling H-shaped steel
CN208776230U (en) A kind of large-tonnage mast hoist
CN117246905A (en) Luffing trolley and control method thereof
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN109132837B (en) Steel wire rope winding system capable of automatically adjusting balance of lifting appliance
CN109626249B (en) Simple three-dimensional positioning installation and load bearing device and using method
CN207759922U (en) Large span suspender
CN204873628U (en) Caterpillar crane cantilever crane is quick -release formula landing leg for system
CN210393401U (en) Hoisting and positioning device for stand column
CN109095388B (en) A lift by crane equipment for building engineering
CN203188197U (en) Automatic hooking device and dynamic compactor
CN206580444U (en) A kind of urban construction building prefabricated components hanging apparatus
CN207312978U (en) A kind of Super High boom-type tower crane hand-held C-type beam and climb band device
CN213171189U (en) Mechanical height adjusting device for gantry crane
CN206088818U (en) Arm equipment is torn open in extra -large -size tower machine high altitude
CN219098492U (en) Hoisting device for height-limiting space structural part
CN219603110U (en) Large-span portal crane
CN221216824U (en) Anti-swing outdoor portal crane
CN210915035U (en) Simple hoisting equipment for overhauling compound fertilizer production line equipment
CN220078419U (en) Movable support hinge herringbone mast hoisting device
CN218320372U (en) Auxiliary hanger frame for road and bridge construction
CN219929367U (en) Translational sliding lifting tool for shaft bushing of combustion engine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825

CF01 Termination of patent right due to non-payment of annual fee