CN211288991U - Pipeline fixing device on construction frame - Google Patents

Pipeline fixing device on construction frame Download PDF

Info

Publication number
CN211288991U
CN211288991U CN201921728400.9U CN201921728400U CN211288991U CN 211288991 U CN211288991 U CN 211288991U CN 201921728400 U CN201921728400 U CN 201921728400U CN 211288991 U CN211288991 U CN 211288991U
Authority
CN
China
Prior art keywords
pipeline
fixedly connected
plate
fixed plate
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921728400.9U
Other languages
Chinese (zh)
Inventor
石秀芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Jieruijia Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921728400.9U priority Critical patent/CN211288991U/en
Application granted granted Critical
Publication of CN211288991U publication Critical patent/CN211288991U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline fixing device on construction frame, including first fixed plate, the first pipeline of first fixed plate upper end middle part fixedly connected with, the surface lower part fixedly connected with U-shaped frame of first pipeline, the front end lower part of U-shaped frame is provided with flexible extrusion device, the surface upper portion fixedly connected with second fixed plate of first pipeline, the left part and the right part of second fixed plate all are provided with a pipeline device, the surface middle part fixedly connected with third fixed plate of first pipeline, the middle part of third fixed plate is connected with chucking fixing device. A pipeline fixing device on construction frame, set up the gyro wheel through the below at first fixed plate to make things convenient for the removal of scaffold, reduce the work load that brings when dismantling the pipeline again, play screw thread limiting displacement with scaffold and ground through setting up the screw thread gag lever post simultaneously, also can keep firm when making not need remove the scaffold.

Description

Pipeline fixing device on construction frame
Technical Field
The utility model relates to a construction technical field specifically is a pipeline fixing device on construction scaffold.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object at a designated place, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein the place of construction operation is called a construction site or a construction site, also called a construction site, and the construction is usually assisted by using a scaffold in the existing building construction process, so the firmness of the scaffold is crucial, however, the pipelines on the existing scaffold are usually fixed by screws, the firmness is not strong, the pipelines are easy to loosen during long-term construction, the potential safety hazard is brought to constructors, the pipelines are easy to damage, and the existing building scaffold can not be moved generally, so the pipelines need to be installed again after being disassembled, time and labor are wasted, the working efficiency is reduced, and the construction process is slowed down.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline fixing device on construction frame to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline fixing device on construction frame, includes first fixed plate, the first pipeline of first fixed plate upper end middle part fixedly connected with, the surface lower part fixedly connected with U-shaped frame of first pipeline, the front end lower part of U-shaped frame is provided with flexible extrusion device, the surface upper portion fixedly connected with second fixed plate of first pipeline, the left part and the right part of second fixed plate all are provided with a pipeline device, the surface middle part fixedly connected with third fixed plate of first pipeline, the middle part of third fixed plate is connected with chucking fixing device.
Preferably, the main structure of the telescopic extrusion device is provided with a fourth fixing plate, the middle part of the upper end of the fourth fixing plate is fixedly connected with a telescopic power machine, the output end of the telescopic power machine is fixedly connected with a telescopic rod, the upper end of the telescopic rod is fixedly provided with an extrusion inclined plate, and the fourth fixing plate is fixedly connected to the lower part of the front end of the U-shaped frame to fixedly connect the telescopic extrusion device and the U-shaped frame.
Preferably, the pipeline device has a main structure comprising a first connecting plate and a second pipeline, the second pipeline is fixedly connected to the upper end of the first connecting plate, the lower part of the first connecting plate is provided with a clamping groove, and the first connecting plate is inserted and connected to the left part and the right part of the second fixing plate to movably connect the pipeline device and the second fixing plate together.
Preferably, chucking fixing device's primary structure has first bull stick and second connecting plate, the second connecting plate is provided with two sets ofly, and two sets of second connecting plates difference fixed connection is in the surface left part and the right part of first bull stick, the common fixedly connected with set-square in front end middle part of second connecting plate, the rear end upper portion fixedly connected with chucking piece of second connecting plate, and the lower part of chucking piece and pipeline device is in same water flat line, chucking fixing device and third fixed plate swing joint are connected at the middle part of third fixed plate with the interlude of first bull stick.
Preferably, the left part and the right part of the lower end of the first fixing plate are fixedly connected with two groups of supporting plates, and the lower parts of the supporting plates are movably connected with rollers through rotating shafts.
Preferably, a bearing is fixedly mounted in the middle of the lower end of the first fixing plate, and a threaded limiting rod is fixedly connected to the inner surface of the bearing.
Compared with the prior art, the beneficial effects of the utility model are that:
1. move up through the extrusion swash plate and extrude the set-square and move backward to drive the chucking piece and enter into the chucking inslot, make and play chucking fixed action to first connecting plate, and then play the fixed action between first pipeline and the second pipeline, prevent that the production is not hard up during the construction, improved construction safety level, reduced the possibility that the pipeline damaged.
2. Set up the gyro wheel through the below at first fixed plate to make things convenient for the removal of scaffold, reduce the work load that brings when dismantling the pipeline again, improved work efficiency, play screw thread limiting displacement with scaffold and ground through setting up the screw thread gag lever post simultaneously, also can keep firm when making not need remove the scaffold.
Drawings
Fig. 1 is a schematic view of the overall structure of a pipeline fixing device on a construction frame of the present invention;
fig. 2 is a schematic structural view of a pipeline device of the pipeline fixing device on a construction frame of the present invention;
fig. 3 is a schematic structural view of a clamping and fixing device of the pipeline fixing device on a construction frame of the present invention;
fig. 4 is the utility model relates to a pipeline fixing device's on construction frame flexible extrusion device schematic structure.
In the figure: 1. a first fixing plate; 2. a first pipeline; 3. a U-shaped frame; 4. a telescopic extrusion device; 5. a second fixing plate; 6. a pipeline device; 7. a third fixing plate; 8. a clamping and fixing device; 9. a support plate; 10. a roller; 11. a bearing; 12. a threaded stop bar; 41. a fourth fixing plate; 42. a telescopic power machine; 43. a telescopic rod; 44. extruding the sloping plate; 61. a first connecting plate; 62. a second pipeline; 63. a clamping groove; 81. a first rotating lever; 82. a second connecting plate; 83. a set square; 84. and a clamping block.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a pipeline fixing device on construction frame, including first fixed plate 1, the first pipeline 2 of 1 upper end middle part fixedly connected with of first fixed plate, the surface lower part fixedly connected with U-shaped frame 3 of first pipeline 2, the front end lower part of U-shaped frame 3 is provided with flexible extrusion device 4, the surface upper portion fixedly connected with second fixed plate 5 of first pipeline 2, the left part and the right part of second fixed plate 5 all are provided with a pipeline device 6, the surface middle part fixedly connected with third fixed plate 7 of first pipeline 2, the middle part of third fixed plate 7 is connected with chucking fixing device 8.
The main structure of the telescopic extrusion device 4 is a fourth fixed plate 41, the middle part of the upper end of the fourth fixed plate 41 is fixedly connected with a telescopic power machine 42, the output end of the telescopic power machine 42 is fixedly connected with a telescopic rod 43, the telescopic rod 43 is driven to stretch by the telescopic power machine 42, the upper end of the telescopic rod 43 is fixedly provided with an extrusion inclined plate 44, the triangular plate 83 is extruded by the extrusion inclined plate 44, and the fourth fixed plate 41 is fixedly connected to the lower part of the front end of the U-shaped frame 3 to fixedly connect the telescopic extrusion device 4 with the U-shaped frame 3; the pipeline device 6 mainly comprises a first connecting plate 61 and a second pipeline 62, wherein the second pipeline 62 is fixedly connected to the upper end of the first connecting plate 61, the lower part of the first connecting plate 61 is provided with a clamping groove 63, and the first connecting plate 61 is connected to the left part and the right part of the second fixing plate 5 in an inserting manner to movably connect the pipeline device 6 and the second fixing plate 5 together; the main structure of the clamping and fixing device 8 is provided with a first rotating rod 81 and a second connecting plate 82, two groups of second connecting plates 82 are arranged, the two groups of second connecting plates 82 are fixedly connected to the left part and the right part of the outer surface of the first rotating rod 81 respectively, the middle part of the front end of the second connecting plate 82 is fixedly connected with a triangular plate 83 together, the upper part of the rear end of the second connecting plate 82 is fixedly connected with a clamping block 84, the clamping block 84 enters a clamping groove 63 through the clamping block 84 to clamp and fix the second pipeline 62, the clamping block 84 and the lower part of the pipeline device 6 are positioned on the same horizontal line, and the first rotating rod 81 is connected to the middle part of the third fixing plate 7 in an inserting manner to movably connect the clamping and fixing device 8 and the third fixing plate 7; the left part and the right part of the lower end of the first fixing plate 1 are fixedly connected with two groups of supporting plates 9, and the lower parts of the supporting plates 9 are movably connected with rollers 10 through rotating shafts; the bearing 11 is fixedly installed in the middle of the lower end of the first fixing plate 1, the threaded limiting rod 12 is fixedly connected to the inner surface of the bearing 11, and the first fixing plate 1 is fixed through the threaded limiting rod 12.
It should be noted that the utility model relates to a pipeline fixing device on a construction frame, which drives an extension rod 43 to extend by a telescopic power machine 42, thereby driving an extrusion inclined plate 44 to move upwards, further contacting a triangle 83 and extruding the triangle 83 to move backwards, then driving a first rotating rod 81 to rotate, so as to rotate a second connecting plate 82, thereby driving a clamping block 84 to enter a clamping groove 63, so as to clamp and fix a first connecting plate 61, further fixing a first pipeline 2 and a second pipeline 62, preventing looseness during construction, improving the construction safety level, reducing the possibility of pipeline damage, by arranging a roller 10 below the first fixing plate 1, thereby facilitating the movement of the construction frame, reducing the workload brought when the pipeline is disassembled again, improving the working efficiency, simultaneously, playing a thread limiting role for the construction frame and the ground by arranging a thread limiting rod 12, so that it can be kept stable without moving the scaffold.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. A pipeline fixing device on a construction scaffold, comprising a first fixing plate (1), characterized in that: the utility model discloses a pipeline device, including first fixed plate (1), first pipeline (2) of upper end middle part fixedly connected with of first fixed plate (1), the surface lower part fixedly connected with U-shaped frame (3) of first pipeline (2), the front end lower part of U-shaped frame (3) is provided with flexible extrusion device (4), the surface upper portion fixedly connected with second fixed plate (5) of first pipeline (2), the left part and the right part of second fixed plate (5) all are provided with one pipeline device (6), the surface middle part fixedly connected with third fixed plate (7) of first pipeline (2), the middle part of third fixed plate (7) is connected with chucking fixing device (8).
2. A pipeline fixing device on a construction frame as claimed in claim 1, wherein: the main structure of the telescopic extrusion device (4) is provided with a fourth fixing plate (41), the middle part of the upper end of the fourth fixing plate (41) is fixedly connected with a telescopic power machine (42), the output end of the telescopic power machine (42) is fixedly connected with a telescopic rod (43), the upper end of the telescopic rod (43) is fixedly provided with an extrusion inclined plate (44), and the fourth fixing plate (41) is fixedly connected to the lower part of the front end of the U-shaped frame (3) to fixedly connect the telescopic extrusion device (4) and the U-shaped frame (3).
3. A pipeline fixing device on a construction frame as claimed in claim 1, wherein: the pipeline device (6) mainly comprises a first connecting plate (61) and a second pipeline (62), wherein the second pipeline (62) is fixedly connected to the upper end of the first connecting plate (61), a clamping groove (63) is formed in the lower portion of the first connecting plate (61), and the first connecting plate (61) is connected to the left portion and the right portion of the second fixing plate (5) in a penetrating mode to movably connect the pipeline device (6) and the second fixing plate (5) together.
4. A pipeline fixing device on a construction frame as claimed in claim 1, wherein: the main structure of chucking fixing device (8) has first bull stick (81) and second connecting plate (82), second connecting plate (82) are provided with two sets ofly, and two sets of second connecting plate (82) are fixed connection respectively at the surface left part and the right part of first bull stick (81), the common fixedly connected with set-square (83) in front end middle part of second connecting plate (82), the rear end upper portion fixedly connected with chucking piece (84) of second connecting plate (82), and the lower part of chucking piece (84) and pipeline device (6) is in on same water flat line, first bull stick (81) alternate connection is with chucking fixing device (8) and third fixed plate (7) swing joint at the middle part of third fixed plate (7).
5. A pipeline fixing device on a construction frame as claimed in claim 1, wherein: the lower end left part and the right part of the first fixing plate (1) are fixedly connected with two groups of supporting plates (9), and the lower parts of the supporting plates (9) are movably connected with rollers (10) through rotating shafts.
6. A pipeline fixing device on a construction frame as claimed in claim 1, wherein: the lower end middle part of the first fixing plate (1) is fixedly provided with a bearing (11), and the inner surface of the bearing (11) is fixedly connected with a threaded limiting rod (12).
CN201921728400.9U 2019-10-16 2019-10-16 Pipeline fixing device on construction frame Expired - Fee Related CN211288991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921728400.9U CN211288991U (en) 2019-10-16 2019-10-16 Pipeline fixing device on construction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921728400.9U CN211288991U (en) 2019-10-16 2019-10-16 Pipeline fixing device on construction frame

Publications (1)

Publication Number Publication Date
CN211288991U true CN211288991U (en) 2020-08-18

Family

ID=72014720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921728400.9U Expired - Fee Related CN211288991U (en) 2019-10-16 2019-10-16 Pipeline fixing device on construction frame

Country Status (1)

Country Link
CN (1) CN211288991U (en)

Similar Documents

Publication Publication Date Title
CN206758038U (en) A kind of liquid crystal-spliced screen
CN211288991U (en) Pipeline fixing device on construction frame
CN201318025Y (en) Automatic cleaning machine for U support
CN212957617U (en) Ratchet type template sliding device
CN212916904U (en) Stainless steel water tank cleaning device
CN215164433U (en) Integral road surface basic unit resin template support frame
CN214531878U (en) Repeatedly usable's energy-concerving and environment-protective building templates
CN211229433U (en) Construction platform convenient to remove
CN210045902U (en) Reinforcing bar bending device for building
CN214169876U (en) Scaffold reinforcing apparatus for construction
CN212984614U (en) Template for building engineering
CN211777138U (en) Cat ladder for construction
CN219012174U (en) Novel stainless steel net frame structure
CN212897195U (en) Pre-buried threaded sleeve
CN219471496U (en) Novel wall scaffold connection structure
CN219973873U (en) Assembled bamboo-wood frame template
CN220621215U (en) Supporting structure convenient to detach
CN220058801U (en) Horizontal stay bar matched with disc buckle type support
CN216949391U (en) Scaffold frame that construction was used
CN111519608B (en) Uplift pile capable of quickly connecting pile
CN220224855U (en) Concrete side form improvement template
CN219158385U (en) Multifunctional scaffold convenient to disassemble and assemble
CN220814900U (en) V-shaped and A-shaped plate seam integrated reinforcement for oblique column and oblique splicing template
CN213508380U (en) Continuous fishing device for river floaters
CN214423712U (en) Auxiliary frame of energy-saving waterproof exposed frame curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220610

Address after: 2-2403, yaqinyuan, No. 1288, hongmiaopo Road, Lianhu District, Xi'an, Shaanxi 710000

Patentee after: Shaanxi jieruijia Construction Engineering Co.,Ltd.

Address before: 324014 No.010 Zhiwu, Zhili village, Gouxi Township, Kecheng District, Quzhou City, Zhejiang Province

Patentee before: Shi Xiufang

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200818