CN211283408U - Combined hoisting stress piece - Google Patents

Combined hoisting stress piece Download PDF

Info

Publication number
CN211283408U
CN211283408U CN201922125326.8U CN201922125326U CN211283408U CN 211283408 U CN211283408 U CN 211283408U CN 201922125326 U CN201922125326 U CN 201922125326U CN 211283408 U CN211283408 U CN 211283408U
Authority
CN
China
Prior art keywords
lifting lug
external lifting
stress
external
stress base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922125326.8U
Other languages
Chinese (zh)
Inventor
陈文�
王本友
代明亮
吴军
吴家彬
何昌鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Bureau Fifth Construction Engineering Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201922125326.8U priority Critical patent/CN211283408U/en
Application granted granted Critical
Publication of CN211283408U publication Critical patent/CN211283408U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a combined hoisting stress piece, which comprises a pre-buried stress bottom plate and an external lifting lug; four high-strength bolts are arranged on the embedded stress base plate, and the embedded stress base plate is connected with the high-strength bolts in a welding mode; the external lifting lug is provided with an external lifting lug stress base, and the external lifting lug stress base is welded with the external lifting lug; and four bolt holes are arranged on the external lifting lug stress base and are in fastening connection with four high-strength bolts on the embedded stress base plate through nuts and gaskets. The utility model discloses a hoist and mount atress piece mainly forms by pre-buried atress bottom plate and external lug composite mounting, and this component easy operation only needs in civil engineering work process at the pre-buried atress bottom plate of relevant position, the external lug of installation during equipment fixing, and fixed hand block or electric block transport relevant position with equipment and pipeline and can accomplish the installation operation.

Description

Combined hoisting stress piece
Technical Field
The utility model relates to a combination hoist and mount atress piece belongs to the construction especially indoor pipeline hoist and mount construction technical field.
Background
In factory type and public facility type building construction, large-scale pipelines, equipment and the like need to be installed after civil engineering construction is completed, but indoor mechanical equipment cannot convey the equipment and the pipelines to a specified installation position at one time, and auxiliary hoisting equipment needs to be installed on a civil structure so as to achieve the purpose of equipment installation.
In the installation process of factory and public facility building pipelines and equipment, due to weight limitation or limitations of transportation equipment, installation positions and the like, partial equipment and pipelines cannot be transported and transported to installation heights or positions when needing to be hoisted. Need finely tune in addition when equipment and piping erection, this operation can't be accomplished to transportation equipment, and when equipment hoisted simultaneously, special machinery leased expense was high, and the specialty is strong to cause the cost to increase. Auxiliary assembly is installed on the civil engineering structure temporarily under the general condition, and the safety performance of the auxiliary assembly is reduced while irreversible damage is caused to the civil engineering structure, so that potential safety hazards are large in the installation process.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the not enough of prior art existence, provide a combination hoist and mount atress piece.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a combined hoisting stress piece comprises an embedded stress bottom plate and an external lifting lug; four high-strength bolts are arranged on the embedded stress base plate, and the embedded stress base plate is connected with the high-strength bolts in a welding mode; the external lifting lug is provided with an external lifting lug stress base, and the external lifting lug stress base is welded with the external lifting lug; and four bolt holes are arranged on the external lifting lug stress base and are in fastening connection with four high-strength bolts on the embedded stress base plate through nuts and gaskets.
The utility model discloses a hoist and mount atress mainly is formed by pre-buried base and external lug composite mounting, and this component easy operation only needs set up pre-buried base at the relevant position in the civil engineering work progress, and the external lug of installation during equipment fixing, fixed hand block or electric block transport the relevant position with equipment and pipeline and can accomplish the installation operation.
This pre-buried lug of combination formula easy operation, construction convenience, the easy, the field operation flexibility of drawing materials are big, and reuse rate reaches more than 50%, has guaranteed construction safety when guaranteeing structure safety, does not need professional operating personnel to accomplish equipment and pipeline hoist and mount operation. The hoisting period is carried out along with the use and the processing, thereby reducing the related management cost and the equipment purchase cost.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of the installation;
FIG. 3 is a pre-buried stressed bottom plate;
FIG. 4 is a bottom view of an outboard mounting lug;
figure 5 is a side view of an outboard mounting lug.
Description of reference numerals: 1-pre-buried stress bottom plate, 2-high-strength screw, 3-external lifting lug stress base, 4-external lifting lug, 5-nut and gasket.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1, the utility model is divided into two parts, a pre-buried base and an external lifting lug 4, wherein the pre-buried base is manufactured by welding installation or punching installation of a pre-buried stressed bottom plate 1 and a high-strength screw rod 2; the external lifting lug 4 is formed by vertically welding an external lifting lug stress base 3 and the external lifting lug 4, and a semicircular hole with the radius of 5-7.5 is reserved on the external lifting lug 4 according to requirements; the embedded stress base plate 1 and the external lifting lugs 4 are fixedly connected through high-strength screws 2, nuts and gaskets 5, and therefore the purpose of hanging hoisting equipment and pipelines through manual and electric hoists is achieved. The embedded stress base plate 1 is embedded by combining a 15-25mm thick steel plate and a high-strength screw rod 2, the thickness of an external lifting lug stress base 3 and the thickness of lifting lug materials of an external lifting lug 4 are the same as the thickness of the embedded material, and the diameter of the high-strength screw rod 2 is not less than 16mm and is matched with a nut and a gasket 5 for use.
When the invention is implemented, a single pre-buried stressed bottom plate 1 in a figure 3 is pre-buried in advance according to a figure 2, when later equipment is installed, an external lifting lug 4 in a figure 4 is connected through a nut and a gasket 5, and indoor pipeline and equipment hoisting and installation operations are completed by matching with equipment such as a hoist crane and the like. As shown in fig. 1 and 2, it can be seen that after the external lifting lug 4 is installed, the hoist crane is fixed on the external lifting lug 4, the hoist crane moves up and down by being contracted, and the whole hoisting and installing work is completed by matching with manual fine adjustment.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (1)

1. The utility model provides a combination hoist and mount atress spare which characterized in that: comprises an embedded stressed bottom plate (1) and an external lifting lug (4); four high-strength bolts (2) are arranged on the embedded stress base plate (1), and the embedded stress base plate (1) is connected with the high-strength bolts (2) in a welding mode; the external lifting lug stress base (3) is arranged on the external lifting lug (4), and the external lifting lug stress base (3) is welded with the external lifting lug (4); four bolt holes are arranged on the external lifting lug stress base (3) and are tightly connected with four high-strength bolts (2) on the embedded stress base plate (1) through nuts and gaskets (5).
CN201922125326.8U 2019-12-02 2019-12-02 Combined hoisting stress piece Active CN211283408U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922125326.8U CN211283408U (en) 2019-12-02 2019-12-02 Combined hoisting stress piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922125326.8U CN211283408U (en) 2019-12-02 2019-12-02 Combined hoisting stress piece

Publications (1)

Publication Number Publication Date
CN211283408U true CN211283408U (en) 2020-08-18

Family

ID=72032128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922125326.8U Active CN211283408U (en) 2019-12-02 2019-12-02 Combined hoisting stress piece

Country Status (1)

Country Link
CN (1) CN211283408U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112408189A (en) * 2020-11-24 2021-02-26 陈秀民 Hoisting ring capable of being partially recycled
CN114104942A (en) * 2021-12-09 2022-03-01 中交二公局铁路建设有限公司 Lifting lug in steel spring floating plate hole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112408189A (en) * 2020-11-24 2021-02-26 陈秀民 Hoisting ring capable of being partially recycled
CN114104942A (en) * 2021-12-09 2022-03-01 中交二公局铁路建设有限公司 Lifting lug in steel spring floating plate hole
CN114104942B (en) * 2021-12-09 2024-01-16 中交二公局铁路建设有限公司 Lifting lug in steel spring floating slab hole

Similar Documents

Publication Publication Date Title
CN211283408U (en) Combined hoisting stress piece
CN201176364Y (en) Hoisting tools of steel structure for H-shaped section steel component
CN201695661U (en) Component for arranging external suspending bracket of window
CN204569127U (en) Steel upright post hoisting jig
CN211226032U (en) Hoisting clamp
CN107882339B (en) Construction method of large all-steel structure type indirect cooling tower
CN104097182A (en) Companion flange tightener
CN202689652U (en) Connecting member of single-tube communication tower platform
CN110548619A (en) Device for preventing metal surface from being polluted by spraying and using method thereof
CN110745692A (en) Hoisting clamp and adjusting method thereof
CN111874825A (en) Construction method for hoisting component by using unconventional hoisting equipment
CN219585645U (en) Arc rod type lifting appliance for lifting prefabricated pipe pieces
CN215755981U (en) Lifting appliance matched with flange plate equipment
CN203875846U (en) Companion flange tightener
CN216741509U (en) Installation device suitable for shaft pipeline
CN204675645U (en) The accessory appliances of vertical steel tube lifting in vertical shaft
CN215716563U (en) Multilayer and high-rise steel column convenient to installation
CN220007645U (en) Overhauling and dismounting device for sleeve telescopic joint
CN109399454B (en) Hoisting device and method for pipe fitting below industrial travelling crane beam
CN220870245U (en) Pipeline installation regulator
CN216613753U (en) Roof beam hoist and mount that convenient scene was installed and removed uses hoist
CN212532011U (en) Municipal administration water supply and drainage pipeline lays and uses auxiliary device
CN211283461U (en) Detachable prefabricated assembled box culvert rotary lifting ring with variable lifting points
CN217022546U (en) Portable steel constructs handling device
CN215666580U (en) Transfer device is used in construction of compound incubation exterior sheathing

Legal Events