CN211147715U CN202020003492.0U CN202020003492U CN211147715U CN 211147715 U CN211147715 U CN 211147715U CN 202020003492 U CN202020003492 U CN 202020003492U CN 211147715 U CN211147715 U CN 211147715U
Authority
CN
China
Prior art keywords
plate
sleeve
foot rest
connecting plate
bracing piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020003492.0U
Other languages
Chinese (zh)
Inventor
谷大鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020003492.0U priority Critical patent/CN211147715U/en
Application granted granted Critical
Publication of CN211147715U publication Critical patent/CN211147715U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a geological survey is with interim foot rest, including backup pad and bracing piece, the lower surface of backup pad articulates through the hinge has the fly leaf, the lifter plate has been cup jointed to the bottom of fly leaf, the bottom joint of lifter plate has the pivot, the lower fixed surface of pivot is connected with the inserted bar, the lower surface of backup pad is pegged graft and is had the bracing piece, the bottom fixedly connected with bottom plate of bracing piece, the sleeve has been cup jointed to the bottom of bracing piece, the bottom of sleeve side is articulated through the hinge has the connecting plate. This geological survey uses interim foot rest, through the setting of bracing piece, sleeve and connecting plate, survey crew can strut this foot rest through sleeve and connecting plate when meetting extreme topography circumstances, makes connecting plate and ground contact, has increased the lifting surface area that the device supported, has guaranteed that this foot rest even if there is a stabilizer blade not have the strong point can not lead to the fact the influence to the holistic stand of foot rest yet, has strengthened the stability of high support.

Description

Temporary foot stool for geological survey
Technical Field
The utility model relates to a geological survey auxiliary device technical field specifically is a geological survey uses interim foot rest.
Background
Various measuring instruments are widely used in the field of precision engineering measurement or deformation monitoring such as ground large-scale buildings, underground tunnel construction and the like, and some measuring instruments usually take a foot rest as a supporting structure, and can stably stand on the ground or other platforms by means of the support of the foot rest.
The existing measuring instrument foot rest is usually provided with three support legs, the length of the existing measuring instrument foot rest can be respectively adjusted, the three support legs are opened and adjusted in length when the measuring instrument foot rest is used, a supporting area is formed through three-point supporting, however, the measuring instrument often meets some more extreme conditions in actual measurement work, such as a riverside, a roadbed and the like, the position drop of a cliff type often exists, the foot standing space of an instrument measuring station is extremely small, only two support legs can be erected, a support point cannot be found even if the third support leg is adjusted to be the longest, one foot is suspended, and the foot rest cannot stand up.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a geological survey is with interim foot rest has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a geological survey uses interim foot rest, includes backup pad and bracing piece, the lower surface of backup pad articulates through the hinge has the fly leaf, the lifter plate has been cup jointed to the bottom of fly leaf, the bottom joint of lifter plate has the pivot, the lower fixed surface of pivot is connected with the inserted bar, the lower surface of backup pad is pegged graft and is had the bracing piece, the bottom fixedly connected with bottom plate of bracing piece, the sleeve has been cup jointed to the bottom of bracing piece, the bottom of sleeve side is articulated through the hinge has the connecting plate, telescopic side fixedly connected with drum, the inside of drum is pegged graft and is had the card post, the spring has been cup jointed to the outside of card post, the bracing piece runs through the board is placed to the top fixedly connected with of backup pad.
Optionally, the support tube is fixedly connected to the upper surface of the support plate, threaded holes are formed in the side surfaces of the support rod and the movable plate, positioning bolts are connected to the side surfaces of the lifting plate and the support tube in a threaded manner, and the positioning bolts are connected with the threaded holes in a threaded manner.
Optionally, one end of the connecting plate is hinged to the sleeve, and the other end of the connecting plate is hinged to the lifting plate through a hinge.
Optionally, the spring is arranged inside the cylinder, one end of the spring is fixedly connected with the sleeve, the other end of the spring is fixedly connected with the clamping column, and the clamping column penetrates through one end of the sleeve and is clamped with the clamping hole.
Optionally, the number of the movable plates is three, and the three movable plates are hinged on the lower surface of the supporting plate in a circular array.
(III) advantageous effects
The utility model provides a geological survey uses interim foot rest possesses following beneficial effect:
1. this geological survey uses interim foot rest, through the setting of bracing piece, sleeve and connecting plate, survey crew can strut this foot rest through sleeve and connecting plate when meetting extreme topography circumstances, makes connecting plate and ground contact, has increased the lifting surface area that the device supported, has guaranteed that this foot rest even if there is a stabilizer blade not have the strong point can not lead to the fact the influence to the holistic stand of foot rest yet, has strengthened the stability of high support.
2. This geological survey uses interim foot rest, through the setting in fly leaf, lifter plate, card post, spring and card hole, behind survey crew adjusted the sleeve to the regulation position, the card post under the effect of spring with block hole joint, guaranteed the stability of this foot rest, and the fly leaf has been convenient for survey crew adjustment measuring equipment's height, provides convenience for survey crew.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
In the figure: 1. a support plate; 2. a support bar; 3. a movable plate; 4. a lifting plate; 5. a rotating shaft; 6. inserting a rod; 7. a base plate; 8. a sleeve; 9. a connecting plate; 10. a cylinder; 11. clamping the column; 12. a spring; 13. placing the plate; 14. a clamping hole; 15. supporting a tube; 16. a threaded hole; 17. and (6) positioning the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a temporary foot rest for geological measurement comprises a supporting plate 1 and a supporting rod 2, wherein the lower surface of the supporting plate 1 is hinged to a movable plate 3 through a hinge, the bottom end of the movable plate 3 is sleeved with a lifting plate 4, the bottom end of the lifting plate 4 is clamped with a rotating shaft 5, the lower surface of the rotating shaft 5 is fixedly connected with an inserting rod 6, a measurer can insert the inserting rod 6 into the ground, the stability of the foot rest is improved, the supporting rod 2 is inserted into the lower surface of the supporting plate 1, the bottom end of the supporting rod 2 is fixedly connected with a bottom plate 7, the bottom end of the supporting rod 2 is sleeved with a sleeve 8, and the bottom end;
through the arrangement of the supporting rod 2, the sleeve 8 and the connecting plate 9, when a measurer encounters extreme terrain conditions, the foot stand can be unfolded through the sleeve 8 and the connecting plate 9, so that the connecting plate 9 is in contact with the ground, the stress area supported by the device is increased, the foot stand is ensured not to influence the integral standing of the foot stand even if one supporting leg does not have a supporting point, and the stability of a high support is enhanced;
a cylinder 10 is fixedly connected to the side surface of the sleeve 8, a clamping column 11 is inserted into the cylinder 10, a spring 12 is sleeved outside the clamping column 11, a placing plate 13 is fixedly connected to the top end of the supporting rod 2 penetrating through the supporting plate 1, a measuring instrument can be placed on the upper surface of the placing plate 13, and a clamping hole 14 is formed in the side surface of the supporting rod 2;
through the arrangement of the movable plate 3, the lifting plate 4, the clamping column 11, the spring 12 and the clamping hole 14, after a measurer adjusts the sleeve 8 to a preset position, the clamping column 11 is clamped with the clamping hole 14 under the action of the spring 12, so that the stability of the foot rest is ensured, the movable plate 3 is convenient for the measurer to adjust the height of measuring equipment, and convenience is brought to the measurer;
the last fixed surface of backup pad 1 is connected with stay tube 15, threaded hole 16 has all been seted up to the side of bracing piece 2 and fly leaf 3, the equal threaded connection in side of lifter plate 4 and stay tube 15 has positioning bolt 17, positioning bolt 17 and threaded hole 16 threaded connection, bracing piece 2 can slide from top to bottom in stay tube 15, the user of having convenient for adjusts the height of bracing piece 2 for backup pad 1, positioning bolt 17 plays the fixed action to bracing piece 2, the one end and the sleeve 8 of connecting plate 9 are articulated, the other end of connecting plate 9 passes through the hinge and is articulated with lifter plate 4, spring 12 sets up the inside at drum 10, the one end and the sleeve 8 fixed connection of spring 12, the other end and the card post 11 fixed connection of spring 12, card post 11 runs through sleeve 8's one end and calorie hole 14 joint, the quantity of fly leaf 3 is three, and three fly leaf 3 articulates the lower surface at backup pad 1 with.
The working principle and the operation method are as follows: this geological survey uses interim foot rest, during the use, survey crew is when meetting extreme topography circumstances, can strut this foot rest through sleeve 8 and connecting plate 9, make connecting plate 9 and ground contact, the lifting surface who the device supports has been increased, even if it does not have a stabilizer blade strong point can not lead to the fact the influence to the holistic stand of foot rest yet to have guaranteed this foot rest, the stability of high support has been strengthened, survey crew adjusts the sleeve 8 to the regulation position after, the jack post 11 with card hole 14 joint under spring 12's effect, the stability of this foot rest has been guaranteed, and fly leaf 3 has been convenient for survey crew adjustment measuring equipment's height, it is convenient to provide for survey crew.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a geological survey is with interim foot rest, includes backup pad (1) and bracing piece (2), its characterized in that: the lower surface of the supporting plate (1) is hinged with a movable plate (3) through a hinge, the bottom of the movable plate (3) is sleeved with a lifting plate (4), the bottom of the lifting plate (4) is clamped with a rotating shaft (5), the lower surface of the rotating shaft (5) is fixedly connected with an inserted rod (6), the lower surface of the supporting plate (1) is inserted with the supporting rod (2), the bottom of the supporting rod (2) is fixedly connected with a bottom plate (7), the bottom of the supporting rod (2) is sleeved with a sleeve (8), the bottom of the side surface of the sleeve (8) is hinged with a connecting plate (9) through a hinge, the side surface of the sleeve (8) is fixedly connected with a cylinder (10), the inside of the cylinder (10) is inserted with a clamping column (11), the outside of the clamping column (11) is sleeved with a spring (12), and the supporting rod (2) penetrates through the top end, the side surface of the supporting rod (2) is provided with a clamping hole (14).
2. A temporary stand for geological survey according to claim 1, characterized in that: the upper surface of the supporting plate (1) is fixedly connected with a supporting tube (15), threaded holes (16) are formed in the side faces of the supporting rod (2) and the movable plate (3), positioning bolts (17) are connected to the side faces of the lifting plate (4) and the supporting tube (15) in a threaded mode, and the positioning bolts (17) are connected with the threaded holes (16) in a threaded mode.
3. A temporary stand for geological survey according to claim 1, characterized in that: one end of the connecting plate (9) is hinged to the sleeve (8), and the other end of the connecting plate (9) is hinged to the lifting plate (4) through a hinge.
4. A temporary stand for geological survey according to claim 1, characterized in that: spring (12) set up the inside of drum (10), the one end of spring (12) with sleeve (8) fixed connection, the other end of spring (12) with card post (11) fixed connection, card post (11) run through the one end of sleeve (8) with block hole (14) joint.
5. A temporary stand for geological survey according to claim 1, characterized in that: the number of the movable plates (3) is three, and the three movable plates (3) are hinged on the lower surface of the supporting plate (1) in a circular array mode.
CN202020003492.0U 2020-01-02 2020-01-02 Temporary foot stool for geological survey Active CN211147715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020003492.0U CN211147715U (en) 2020-01-02 2020-01-02 Temporary foot stool for geological survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020003492.0U CN211147715U (en) 2020-01-02 2020-01-02 Temporary foot stool for geological survey

Publications (1)

Publication Number Publication Date
CN211147715U true CN211147715U (en) 2020-07-31

Family

ID=71754740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020003492.0U Active CN211147715U (en) 2020-01-02 2020-01-02 Temporary foot stool for geological survey

Country Status (1)

Country Link
CN (1) CN211147715U (en)

Similar Documents

Publication Publication Date Title
CN114857434A (en) Urban and rural planning engineering measuring equipment convenient to leveling
CN211425458U (en) High accuracy cadastral survey centering rod
CN211147715U (en) Temporary foot stool for geological survey
CN213809850U (en) Total powerstation tripod is with stabilizing stabilizer blade
CN212986558U (en) Firm surveyor's level is used in soil property exploration
CN219045676U (en) Vertical mapping device of geographical survey and drawing convenient to it is fixed
CN212298386U (en) Engineering detection tripod
CN213541919U (en) Tripod for multi-use architecture is measured
CN113431991A (en) A mapping device for open-air survey engineering
CN207349740U (en) Novel tripod
CN210893166U (en) Leveling instrument leveling device for tunnel measurement
CN212432124U (en) Surveyor's level mobile device for architectural exploration
CN212805090U (en) Support frame for civil engineering measuring apparatu
CN208793969U (en) A kind of fixed device of Portable Measurement Instrument
CN206290224U (en) Drilling well steel pipe clamping device
CN219880656U (en) Mechanism for conveniently cleaning attached soil arranged on tripod support leg for lofting
CN220249536U (en) Adjustable survey and drawing surveyor's level convenient to support
CN214855155U (en) Geological survey drawing support frame device
CN215003475U (en) Flatness instrument for supervision
CN210950489U (en) Surveying and mapping support for uneven ground
CN215261760U (en) Sopwith staff is used in survey and drawing
CN214920731U (en) Height-adjustable drilling device for housing construction
CN221300893U (en) Engineering cost mapping instrument
CN221300697U (en) Measuring instrument for bridge construction
CN219673828U (en) Foot rest assembly for mine measurement