CN211081061U - A assembled platform of unloading for high-rise building construction - Google Patents

A assembled platform of unloading for high-rise building construction Download PDF

Info

Publication number
CN211081061U
CN211081061U CN201921538376.2U CN201921538376U CN211081061U CN 211081061 U CN211081061 U CN 211081061U CN 201921538376 U CN201921538376 U CN 201921538376U CN 211081061 U CN211081061 U CN 211081061U
Authority
CN
China
Prior art keywords
longitudinal beams
side wall
building construction
rise building
discharging platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921538376.2U
Other languages
Chinese (zh)
Inventor
曹大永
潘东
刘丽莉
肖连德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921538376.2U priority Critical patent/CN211081061U/en
Application granted granted Critical
Publication of CN211081061U publication Critical patent/CN211081061U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an assembled platform of unloading for high-rise building construction, including setting up two longerons between two walls bodies, and two longerons parallel arrangement each other, two U type mounting has all been cup jointed on the longeron, and the screw thread runs through there is the bolt on the U type mounting, is located the below the upper surface of wall body is equipped with the bolt hole that matches with the bolt, two equal fixedly connected with baffle on the longeron is close to a lateral wall of wall body. The utility model discloses let user very simple and convenient assemble and dismantle discharge apparatus's main part, improved discharge apparatus's installation effectiveness to the discharge apparatus of part state can be more convenient transport and save, reduced the cost of transporting and saving, in addition, fix the longeron with the help of bolt and U type mounting, improved discharge apparatus's stability and security.

Description

A assembled platform of unloading for high-rise building construction
Technical Field
The utility model relates to a building technical field especially relates to an assembled platform of unloading for high-rise building construction.
Background
The unloading platform is a temporary operation platform and an operation frame which are usually erected on a construction site and are generally used for material turnover. The discharging platform is divided into a movable discharging platform, a floor type discharging platform and an overhanging type discharging platform.
Present platform of unloading needs the professional to weld the equipment to the part of the platform of unloading before using, very extravagant manpower, when transporting the platform of unloading after the completion of welding assigned position, because of the volume of unloading is huge, so transport very inconvenient, and the platform of unloading uses the completion back, because of it can not dismantle, so store also very inconvenient, the platform of unloading is when installing, fixed longeron in-process need use the wooden wedge to fix the longeron, the hardness and the stability of wooden wedge are lower, it is fixed insecure easily to cause the longeron.
Disclosure of Invention
The purpose of the utility model is to solve the shortcoming that exists among the prior art, if: present platform of unloading needs the professional to weld the equipment to the part of the platform of unloading before using, very extravagant manpower, when transporting the platform of unloading after the completion of welding assigned position, because of the volume of unloading is huge, so transport very inconvenient, and the platform of unloading uses the completion back, because of it can not dismantle, so store also very inconvenient, the platform of unloading is when installing, fixed longeron in-process need use the wooden wedge to fix the longeron, the hardness and the stability of wooden wedge are lower, it is fixed insecure easily to cause the longeron.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an assembled discharging platform for high-rise building construction comprises two longitudinal beams arranged between two walls, wherein the two longitudinal beams are arranged in parallel, U-shaped fixing parts are sleeved on the two longitudinal beams, bolts penetrate through the threads of the U-shaped fixing parts, bolt holes matched with the bolts are formed in the upper surfaces of the walls below the U-shaped fixing parts, baffle plates are fixedly connected to one side wall, close to the walls, of the two longitudinal beams, mounting grooves are formed in the side wall, opposite to the two longitudinal beams, of each longitudinal beam, grooves are uniformly formed in the bottom of each mounting groove, supporting rods are connected between every two corresponding grooves, a bottom plate is laid between the two mounting grooves and positioned above the supporting rods, slots are formed in the bottom of each groove, first inserting holes communicated with the slots are formed in the supporting rods, a plurality of first inserting rods matched with the first inserting holes and the slots are arranged on the lower side wall of the bottom plate, be equipped with the side guardrail on the longeron, and be equipped with preceding guardrail between two longerons, the bottom of side guardrail is equipped with a plurality of second inserted bars, and the last lateral wall of longeron is equipped with a plurality of second jacks that match with the second inserted bar, all be equipped with the commentaries on classics hole on side guardrail and the preceding guardrail, and rotate in the commentaries on classics hole and be connected with the bull stick, the lateral wall of bull stick is equipped with the fixture block, and the lateral wall in commentaries on classics hole is equipped with the slippery fellow that matches with the fixture block, be equipped with the draw-in groove that matches with the fixture block in the longeron, the last lateral wall of longeron is equipped with the through-hole with the draw-in groove intercommunication.
Preferably, two equal fixedly connected with rings on the lateral wall that the longeron was kept away from each other, the hawser has all been passed in the rings, is located the top the fixed solid fixed ring that is equipped with of lateral wall of wall body, and the one end that rings were kept away from to the hawser passes through the checkpost and is connected with solid fixed ring.
Preferably, the end of the rotating rod, which is far away from the clamping groove, is rotatably connected with a limiting block through a rotating shaft, and the limiting block is far away from the clamping block.
Preferably, the U-shaped notch of the U-shaped fixing piece is matched with the longitudinal beam in shape and size.
Preferably, both ends of the mooring rope are sleeved with the anti-stab sleeves.
Preferably, the longitudinal beam and the baffle are integrally formed.
The utility model has the advantages that:
1. this device can be simple and convenient assemble and dismantle, no longer need the professional to weld the installation to the device, has saved the manpower and has improved the installation effectiveness, and the part of dismantling the back and before the installation is very convenient for transport and storage, has reduced and has transported and save the cost.
2. When carrying out fixed mounting to two longerons, insert the longeron earlier in the U type mounting, move the suitable position on the wall body with the longeron according to the position of baffle again, twist reverse the bolt after that, make the U type mounting press from both sides the longeron tightly, so alright fix the longeron very firmly, improved the stability and the security of device operation.
Drawings
Fig. 1 is a front structural sectional view of an assembled discharging platform for high-rise building construction, which is provided by the utility model;
FIG. 2 is an enlarged view of the structure A of FIG. 1;
fig. 3 is a cross-sectional view of a top view structure of the assembly type discharging platform for high-rise building construction provided by the utility model;
FIG. 4 is a front sectional view of a rotary rod part of an assembled discharging platform for high-rise building construction;
fig. 5 the utility model provides a partial side structure section view of U type mounting that is used for assembled platform of unloading of high-rise building construction.
In the figure: the device comprises a wall body 1, longitudinal beams 2, a 3U-shaped fixing piece, bolts 4, baffles 5, mounting grooves 6, grooves 7, supporting rods 8, slots 9, a bottom plate 10, a first inserted bar 11, a side guardrail 12, a clamp 13, a fixing ring 14, a lifting ring 15, a second inserted bar 16, a rotating rod 17, a rotating hole 18, a clamping groove 19, a clamping block 20, a limiting block 21, a mooring rope 22 and a sliding opening 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-5, an assembled discharging platform for high-rise building construction comprises two longitudinal beams 2 arranged between two walls 1, wherein the two longitudinal beams 2 are arranged in parallel, U-shaped fixing members 3 are sleeved on the two longitudinal beams 2, the U-shaped gaps of the U-shaped fixing members 3 are matched with the longitudinal beams 2 in shape and size, the U-shaped gaps matched with the longitudinal beams 2 in shape and size can limit and fix the longitudinal beams 2, so that the longitudinal beams 2 can be prevented from sliding, the driving device can shake, in addition, the U-shaped gaps can also have auxiliary positioning effect on the longitudinal beams 2, the longitudinal beams can be more simply and conveniently installed, bolts 4 penetrate through the U-shaped fixing members 3, bolt holes matched with the bolts 4 are formed in the upper surface of the wall 1 below, the longitudinal beams 2 are fixed by means of the bolts 4, the stability is good, the safety is high, baffle plates 5 are fixedly connected on one side wall of the two longitudinal beams 2 close to the wall, the baffle 5 can facilitate a user to directly install the longitudinal beam 2 at a proper position without measuring the distance again on site, the installation process is simplified, the installation efficiency is improved, in addition, the baffle 5 has a supporting effect on the device, the pressure of the bolt 4 for fixing the longitudinal beam 2 can be reduced, the stability and the safety of the device are further improved, the longitudinal beam 2 and the baffle 5 are integrally formed, the integrally formed longitudinal beam 2 and the baffle 5 are connected more firmly, and the stability of the baffle 5 for supporting the device can be improved;
the side walls of one side of each longitudinal beam 2 opposite to each other are provided with a mounting groove 6, the bottoms of the mounting grooves 6 are uniformly provided with grooves 7, a support rod 8 is connected between each two corresponding grooves 7, the support rod 8 is limited and fixed in the groove 7 under the action of gravity, a bottom plate 10 is laid between the two mounting grooves 6, the bottom plate 10 is limited and fixed in the mounting groove 6 under the action of gravity, the bottom plate 10 is positioned above the support rods 8, the bottom of each groove 7 is provided with a slot 9, the support rod 8 is provided with a first jack communicated with the slot 9, the lower side wall of the bottom plate 10 is provided with a plurality of first insert rods 11 matched with the first jack and the slot 9, the bottom plate 10 further limits and fixes the support rods 8 through the first insert rods 11, the first jack and the slot 9, the longitudinal beams 2 are provided with side guardrails 12, a front guardrail is arranged between the two longitudinal beams 2, the bottoms of the side guardrails 12 are provided with a plurality of second insert, the upper side wall of the longitudinal beam 2 is provided with a plurality of second insertion holes matched with the second insertion rods 16, and the second insertion rods 16 and the second insertion holes are matched under the action of gravity to limit and fix the side guard rail 12;
the side guard rails 12 and the front guard rail are both provided with rotating holes 18, the rotating holes 18 are rotatably connected with rotating rods 17, the side walls of the rotating rods 17 are provided with clamping blocks 20, the side walls of the rotating holes 18 are provided with sliding openings 23 matched with the clamping blocks 20, clamping grooves 19 matched with the clamping blocks 20 are arranged in the longitudinal beams 2, the upper side walls of the longitudinal beams 2 are provided with through holes communicated with the clamping grooves 19, the through holes are matched with the rotating rods 17, the side walls of the through holes are provided with notches matched with the clamping blocks 20, the sliding openings 23 and the notches ensure that the clamping blocks 20 can move along the rotating holes 18 along with the rotating rods 17 and can only move at fixed positions, when the clamping blocks 20 leave the corresponding positions of the notches in the clamping grooves 19, the clamping blocks 20 can be matched with the clamping grooves 19 to further limit and fix the side guard rails 12 and the front guard rails, so that the front guard rails can be fixedly connected to the longitudinal beams 2 without being influenced by gravity, and the front guard rails which are further limited, the bottom plate 10 and the support rod 8 can be fixedly connected to the longitudinal beam 2 under the condition of not being influenced by gravity, one end of the rotating rod 17, which is far away from the clamping groove 19, is rotatably connected with the limiting block 21 through the rotating shaft, the limiting block 21 is far away from the fixture block 20, the limiting block 21 and the fixture block 20 are not arranged on the same vertical plane any more, so that when the limiting block 21 rotates to the position corresponding to the sliding opening 23, the fixture block 20 is not in the position corresponding to the notch, the rotating rod 17 can not rotate when the limiting block 21 is inserted into the sliding opening 23, the fixture block 20 can not rotate to the notch due to vibration in the process of the loading work, the side guardrail 12 and the front guardrail can not be fixed any more stably, the stability and the safety of the device are further influenced, the main body part of the unloading device can be simply assembled, the professional is not needed to be welded and fixed, the side guardrail and, the transportation and storage cost is greatly reduced;
equal fixedly connected with rings 15 on the lateral wall of two longerons 2 keeping away from each other, hawser 22 has all been passed in the rings, hawser 22's both ends all overlap and are equipped with prevents stinging the cover, this place often uses the steel cable in order to guarantee safety, the end of steel cable is very sharp, prevent stinging the end fish tail that the cover can protect the user not by hawser 22, stabbing, the fixed solid fixed ring 14 that is equipped with of lateral wall 1 that is located the top, and the one end that rings 15 were kept away from to hawser 22 is passed through checkpost 13 and is connected with solid fixed ring 14, hawser 22 alright further fix the device like this, the stability and the security of.
In the utility model, when the user uses the device, firstly, the parts to be assembled are conveyed to the designated position, the support rod 8 is clamped in the corresponding groove 7, then the position of the floor 10 is adjusted, after the first inserted bar 11 is aligned with the slot 9, the floor 13 is clamped in the floor slot 7, the first inserted bar 11 passes through the bottom plate 10 and then is inserted into the slot 9, then the two side guardrails 12 are adjusted to the direction, namely the turning hole 18 is arranged close to the baffle, the second inserted bar 16 is aligned with the second jack, then the second inserted bar 16 is inserted into the second jack, then the turning bar 17 is taken up, the position of the clamping block 20 is aligned with the sliding opening 23, then the turning bar 17 is inserted into the turning hole 18 and passes through the through hole on the longitudinal beam 2, the clamping block 20 reaches the clamping groove 19, then the turning bar 17 is rotated, the limiting block 21 reaches right above the sliding opening 23, the limiting block 21 is pressed, the limiting block 21 rotates around the rotating shaft and is inserted into the sliding opening, then the front guardrail is taken up, the direction of the front guardrail is adjusted, the rotating hole 18 and the sliding opening 23 on the front guardrail are matched with the through hole and the gap on the longitudinal beam 2, the front guardrail is placed between the two longitudinal beams 2, the rotating rod 17 is taken up, after the positions of the limiting block 21 and the sliding opening 23 are adjusted, the rotating rod 17 is inserted into the rotating hole 18 and passes through the through hole on the longitudinal beam 2, so that the clamping block 20 reaches the clamping groove 19, then the rotating rod 17 is rotated to enable the limiting block 21 to reach the position right above the sliding opening 23, the limiting block 21 is pressed, the limiting block 21 rotates around the rotating shaft and is inserted into the sliding opening 23, the main body of the discharging device can be easily assembled, and can be conveniently disassembled into various assembled parts after use, and the parts can be classified and stored, so that the storage space is saved, the part is more convenient and labor-saving to transport than the main body part of the whole discharging device.
And then, installing the main body part of the discharging device at a designated position according to the process requirements, inserting the longitudinal beam 2 into the U-shaped fixing piece when fixing the two longitudinal beams 2, moving the longitudinal beam 2 to a proper position on the wall body 1 by means of the position of the baffle 5, screwing the bolt 4, descending the U-shaped fixing piece 3 to clamp the longitudinal beam 2, and then installing the cable 22 according to the process requirements. Therefore, the longitudinal beam 2 can be fixed by the U-shaped fixing piece 3, the bolt 4 and the bolt hole on the wall body 1, and the stability and the safety of the whole device can be greatly improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The assembled discharging platform for the high-rise building construction comprises two longitudinal beams (2) arranged between two walls (1), wherein the two longitudinal beams (2) are arranged in parallel, the assembled discharging platform is characterized in that U-shaped fixing pieces (3) are sleeved on the two longitudinal beams (2), bolts (4) penetrate through the U-shaped fixing pieces (3) in a threaded manner, bolt holes matched with the bolts (4) are formed in the upper surfaces of the walls (1) below, baffles (5) are fixedly connected to one side wall, close to the walls (1), of the two longitudinal beams (2), mounting grooves (6) are formed in the side wall, opposite to the two longitudinal beams (2), the bottoms of the mounting grooves (6) are uniformly provided with grooves (7), supporting rods (8) are connected between every two corresponding grooves (7), and a bottom plate (10) is further laid between the two mounting grooves (6), the bottom plate (10) is positioned above the support rods (8), the bottom of each groove (7) is provided with a slot (9), the support rods (8) are provided with first jacks communicated with the slots (9), the lower side wall of the bottom plate (10) is provided with a plurality of first insertion rods (11) matched with the first jacks and the slots (9), the longitudinal beams (2) are provided with side guardrails (12), a front guardrail is arranged between the two longitudinal beams (2), the bottom of each side guardrail (12) is provided with a plurality of second insertion rods (16), the upper side wall of each longitudinal beam (2) is provided with a plurality of second jacks matched with the second insertion rods (16), the side guardrails (12) and the front guardrail are respectively provided with a rotary hole (18), the rotary rod (17) is rotatably connected in the rotary hole (18), the side wall of each rotary rod (17) is provided with a fixture block (20), and the side wall of each rotary hole (18) is provided with a sliding opening (23) matched with the fixture block (20), be equipped with draw-in groove (19) that match with fixture block (20) in longeron (2), the last lateral wall of longeron (2) is equipped with the through-hole with draw-in groove (19) intercommunication, and through-hole and bull stick (17) match the setting, the lateral wall of through-hole is equipped with the breach that matches with fixture block (20).
2. The assembly type discharging platform for high-rise building construction is characterized in that a hanging ring (15) is fixedly connected to one side wall, away from each other, of each of the two longitudinal beams (2), a cable (22) penetrates through each hanging ring, a fixing ring (14) is fixedly arranged on the side wall, located above the side wall, of the wall body (1), and one end, away from the hanging ring (15), of each cable (22) is connected with the fixing ring (14) through a clamp (13).
3. The assembly type discharging platform for high-rise building construction according to claim 1, wherein one end of the rotating rod (17) far away from the clamping groove (19) is rotatably connected with a limiting block (21) through a rotating shaft, and the limiting block (21) is far away from the clamping block (20).
4. The fabricated discharging platform for high-rise building construction according to claim 1, wherein the U-shaped notch of the U-shaped fixing member (3) is matched with the longitudinal beam (2) in shape and size.
5. The fabricated discharging platform for high-rise building construction according to claim 2, wherein both ends of the cable (22) are sleeved with stab-resistant sleeves.
6. The fabricated discharging platform for high-rise building construction according to claim 1, wherein the longitudinal beams (2) are integrally formed with the baffle plate (5).
CN201921538376.2U 2019-09-14 2019-09-14 A assembled platform of unloading for high-rise building construction Expired - Fee Related CN211081061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921538376.2U CN211081061U (en) 2019-09-14 2019-09-14 A assembled platform of unloading for high-rise building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921538376.2U CN211081061U (en) 2019-09-14 2019-09-14 A assembled platform of unloading for high-rise building construction

Publications (1)

Publication Number Publication Date
CN211081061U true CN211081061U (en) 2020-07-24

Family

ID=71628637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921538376.2U Expired - Fee Related CN211081061U (en) 2019-09-14 2019-09-14 A assembled platform of unloading for high-rise building construction

Country Status (1)

Country Link
CN (1) CN211081061U (en)

Similar Documents

Publication Publication Date Title
EP3309091B1 (en) Lateral pull rod mechanism configured to lock steel tube support assembly
CN211081061U (en) A assembled platform of unloading for high-rise building construction
CN210067415U (en) Scaffold connecting device
CN110748233A (en) Building site enclosure with accomodate bearing structure function
CN212373609U (en) Steel pile limiting device
KR101376764B1 (en) Temporary resources for constructing tank of LNG carrier
CN214834735U (en) A fast-assembling support die carrier for face is early torn open
CN103322298A (en) Pulley bracket for cable laying in tunnel
KR20110080196A (en) Railling system for safety
KR200466760Y1 (en) Temporary installation fixing clamp
CN213893292U (en) Platform is deposited to portable reinforcing bar
CN205000659U (en) Discharging platform
CN212001057U (en) Cast-in-place pile for building for karst cave geology
CN201092729Y (en) Foot hand cross bar
KR100297929B1 (en) Slip form for excavation molding in vertical tunnel
US4364539A (en) Diamond drill skid pad
US3804199A (en) Apparatus for constructing scaffolds
CN220395602U (en) Cement bin concatenation cat ladder
CN215979227U (en) Coal mine underground outburst prevention drilling machine support
US1662859A (en) Clamp
CN210762131U (en) Packaging frame for steel structural member
CN216406136U (en) Building scaffold consolidates stabilising arrangement
CN211870331U (en) Storage device places frame
CN220414931U (en) Combined type edge protection device
CN216766731U (en) Be applied to panel turnover mechanism of scaffold frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200724

Termination date: 20210914