CN210860116U - Wall-through air duct - Google Patents

Wall-through air duct Download PDF

Info

Publication number
CN210860116U
CN210860116U CN201921701632.5U CN201921701632U CN210860116U CN 210860116 U CN210860116 U CN 210860116U CN 201921701632 U CN201921701632 U CN 201921701632U CN 210860116 U CN210860116 U CN 210860116U
Authority
CN
China
Prior art keywords
wall
connecting rod
tuber pipe
pipe body
air duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921701632.5U
Other languages
Chinese (zh)
Inventor
张淑萍
许有威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yitong Jianye Medical Engineering Co ltd
Original Assignee
Beijing Yitong Jianye Medical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yitong Jianye Medical Engineering Co ltd filed Critical Beijing Yitong Jianye Medical Engineering Co ltd
Priority to CN201921701632.5U priority Critical patent/CN210860116U/en
Application granted granted Critical
Publication of CN210860116U publication Critical patent/CN210860116U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Duct Arrangements (AREA)

Abstract

The utility model discloses a wall-penetrating air pipe, it includes the tuber pipe body, the tuber pipe body passes the through-hole on the wall body, be equipped with the metal casing between the through-hole of tuber pipe body and wall body, the outer wall of metal casing offsets with the through-hole inner wall of wall body, it has the asbestos rope layer to fill between the outer wall of metal casing's inner wall and tuber pipe body, be equipped with strutting arrangement between tuber pipe body and the wall body. Its purpose is in order to provide a wall tuber pipe, and it is good with the installation cooperation between the wall body, and the wall body can carry out safe and reliable's support to the tuber pipe.

Description

Wall-through air duct
Technical Field
The utility model relates to a warm logical field especially relates to a wear wall tuber pipe for air supply.
Background
In the heating ventilation field, air conditioning system supplies air to whole building through the tuber pipe, and the tuber pipe is arranging the in-process, inevitably can pass building wall, and current tuber pipe is after passing the wall body, and the wall body can not carry out good installation fit with the tuber pipe, can not support the tuber pipe safe and reliable.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a wear wall tuber pipe, the installation cooperation is good between its and the wall body, and the wall body can carry out safe and reliable's support to the tuber pipe.
The utility model discloses wear wall tuber pipe, including the tuber pipe body, the tuber pipe body passes the through-hole on the wall body, be equipped with the metal sleeve between the through-hole of tuber pipe body and wall body, the outer wall of metal sleeve offsets with the through-hole inner wall of wall body, it has the asbestos rope layer to fill between the outer wall of metal sleeve's inner wall and tuber pipe body, be equipped with strutting arrangement between tuber pipe body and the wall body.
The utility model discloses wear the wall tuber pipe, wherein two side end face outsides on asbestos rope layer are equipped with the cement mortar layer respectively.
The utility model discloses wear the wall tuber pipe, wherein strutting arrangement includes backup pad and connecting rod, the backup pad supports the bottom at the tuber pipe body, the shape of backup pad and the appearance phase-match of tuber pipe body, the upper end of connecting rod is fixed to be set up in the bottom of backup pad, the lower extreme of connecting rod is fixed to be set up on the wall body.
The utility model discloses wear the wall tuber pipe, wherein the backup pad includes the bottom plate, respectively fixedly on the last side at bottom plate both ends be equipped with a curb plate, the upper end of connecting rod is fixed to be set up on the downside of bottom plate.
The utility model discloses wear the wall tuber pipe, wherein the connecting rod includes connecting rod, annular handle and lower connecting rod, go up the lower extreme of connecting rod and the upper end difference threaded connection of lower connecting rod in the relative both sides of annular handle, the upper end of going up the connecting rod fixed set up in the bottom of backup pad, the lower extreme of connecting rod is fixed to be set up on the wall body down, works as when annular handle rotates, go up the motion that connecting rod and lower connecting rod do and are close to each other or keep away from.
The utility model discloses wear the wall tuber pipe, wherein the fixed mode that sets up on the wall body of lower extreme of lower connecting rod is: the wall body is fixedly provided with a platform, and the lower end of the lower connecting rod is fixedly arranged on the platform.
The utility model discloses the wall tuber pipe, wherein the metal sleeve is the galvanized steel sheet sleeve pipe of 1.6mm thick.
The utility model discloses be equipped with the metal sleeve between the through-hole of the tuber pipe body of wall tuber pipe and wall body, the outer wall of metal sleeve offsets with the through-hole inner wall of wall body, and it has the asbestos rope layer to fill between the outer wall of metal sleeve's inner wall and tuber pipe body, is equipped with strutting arrangement between tuber pipe body and the wall body. Can make through the asbestos rope layer that the installation cooperation is good between tuber pipe and the wall body, simultaneously under strutting arrangement's effect, the wall body can carry out safe and reliable's support more to the tuber pipe.
The present invention will be further explained with reference to the accompanying drawings.
Drawings
FIG. 1 is a schematic structural view of a first embodiment of a wall-penetrating air duct according to the present invention;
FIG. 2 is a schematic structural view of a second embodiment of the wall-penetrating air duct of the present invention;
fig. 3 is a schematic structural view of the supporting device of the present invention;
fig. 4 is a schematic structural view of the ring handle of the present invention.
Detailed Description
Example one
As shown in fig. 1, the utility model discloses the wall-penetrating tuber pipe includes tuber pipe body 5, tuber pipe body 5 passes the through-hole on the wall body 2, be equipped with the metal sleeve between the through-hole of tuber pipe body 5 and wall body 2, the outer wall of metal sleeve offsets with the through-hole inner wall of wall body 2, it has asbestos rope layer 3 to fill between the inner wall of metal sleeve and the outer wall of tuber pipe body 5, be equipped with strutting arrangement between tuber pipe body 5 and the wall body 2.
The utility model discloses wear the wall tuber pipe, wherein two side end face outsides on asbestos rope layer 3 are equipped with cement mortar layer 4 respectively. Because the asbestos rope layer 3 exists, the air pipe body 5 is in flexible contact with the wall body 2, and severe vibration between the air pipe body and the wall body is avoided.
As shown in fig. 3, the utility model discloses the wall tuber pipe, wherein strutting arrangement includes backup pad 7 and connecting rod 1, backup pad 7 supports in the bottom of tuber pipe body 5, the shape of backup pad 7 and the appearance phase-match of tuber pipe body 5, the fixed bottom that sets up in backup pad 7 in upper end of connecting rod 1, the lower extreme of connecting rod 1 is fixed to be set up on wall body 2.
As shown in fig. 3, the supporting plate 7 includes a bottom plate, a side plate is fixedly disposed on each of the upper sides of the two ends of the bottom plate, and the upper end of the connecting rod 1 is fixedly disposed on the lower side of the bottom plate. The whole supporting plate 7 is U-shaped, and a U-shaped space formed by the bottom plate and the two side plates is used for supporting the air pipe body 5.
As shown in fig. 4, the utility model discloses a wall-through air pipe, wherein connecting rod 1 includes connecting rod 101, annular handle 102 and lower connecting rod 103, go up the lower extreme of connecting rod 101 and the upper end of lower connecting rod 103 respectively threaded connection in the relative both sides of annular handle 102, the upper end of going up connecting rod 101 is fixed set up in the bottom of backup pad 7, the lower extreme of lower connecting rod 103 is fixed to be set up on wall body 2, works as when annular handle 102 rotates, go up connecting rod 101 and lower connecting rod 103 and do the motion that is close to each other or keeps away from.
In the concrete installation of wall-penetrating tuber pipe, the staff can adjust the length of connecting rod 1 according to the concrete construction conditions on scene, because the both ends of going up connecting rod 101 and lower connecting rod 103 threaded connection respectively at the both ends of annular handle 102, when rotating annular handle 102, go up connecting rod 101 and lower connecting rod 103 and do the motion that is close to each other or keeps away from. When the upper connecting rod 101 and the lower connecting rod 103 approach each other, the length of the entire connecting rod 1 becomes smaller; in contrast, when the upper and lower connection bars 101 and 103 are distant from each other, the length of the entire connection bar 1 becomes large. The best fit between the connecting rod 1 and the air duct body 5 is achieved by adjusting the length of the connecting rod so as to better support the whole air duct body 5.
The utility model discloses wear the wall tuber pipe, wherein the fixed mode that sets up on wall body 2 of lower extreme of connecting rod 103 does: a platform 8 is fixedly arranged on the wall body 2, and the lower end of the lower connecting rod 103 is fixedly arranged on the platform 8.
The utility model discloses the wall tuber pipe, wherein the metal sleeve is the galvanized steel sheet sleeve pipe of 1.6mm thick.
Air pipe body 5 is when arranging, is located the place that the top in room is close to ceiling 6 usually, for the security of reinforcing air pipe body 5, sets up connecting rod 1 above air pipe body 5, and the lower extreme fixed connection of connecting rod 1 is on air pipe body 5, and the upper end fixed connection of connecting rod 1 is on ceiling 6. The connecting rod 1 here is of the same construction as the connecting rod 1 in the support device described above.
Example two
As shown in fig. 2, the present embodiment is different from the embodiment in that: the air duct body 5 penetrates through two adjacent wall bodies 2, and a set of metal sleeve, an asbestos rope layer 3 and a cement mortar layer 4 are arranged between each wall body 2 and the air duct body 5.
The utility model discloses be equipped with the metal sleeve between the through-hole of tuber pipe body 5 and wall body 2 of wall-penetrating tuber pipe, metal sleeve's outer wall offsets with the through-hole inner wall of wall body 2, and it has asbestos rope layer 3 to fill between metal sleeve's inner wall and the outer wall of tuber pipe body 5, is equipped with strutting arrangement between tuber pipe body 5 and the wall body 2. Can make through asbestos rope layer 3 that the installation cooperation is good between tuber pipe and the wall body 2, simultaneously under strutting arrangement's effect, wall body 2 can carry out safe and reliable's support more to the tuber pipe.
The above-mentioned embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the design spirit of the present invention should fall into the protection scope defined by the claims of the present invention.

Claims (7)

1. The utility model provides a wall tuber pipe which characterized in that: the novel metal sleeve type wind pipe is characterized by comprising a wind pipe body, wherein the wind pipe body penetrates through a through hole in a wall body, a metal sleeve is arranged between the wind pipe body and the through hole in the wall body, the outer wall of the metal sleeve is abutted to the inner wall of the through hole in the wall body, an asbestos rope layer is filled between the inner wall of the metal sleeve and the outer wall of the wind pipe body, and a supporting device is arranged between the wind pipe body and the wall body.
2. A through-wall air duct according to claim 1, wherein: and cement mortar layers are respectively arranged on the outer sides of two side end faces of the asbestos rope layer.
3. A through-wall air duct according to claim 2, wherein: the supporting device comprises a supporting plate and a connecting rod, the supporting plate is supported at the bottom end of the air pipe body, the shape of the supporting plate is matched with the shape of the air pipe body, the upper end of the connecting rod is fixedly arranged at the bottom end of the supporting plate, and the lower end of the connecting rod is fixedly arranged on a wall body.
4. A through-wall air duct according to claim 3, wherein: the backup pad includes the bottom plate, respectively fixedly on the last side at bottom plate both ends be equipped with a curb plate, the upper end of connecting rod is fixed to be set up on the downside of bottom plate.
5. A through-wall air duct according to claim 4, wherein: the connecting rod includes connecting rod, annular handle and lower connecting rod, go up the lower extreme of connecting rod and the upper end of lower connecting rod respectively threaded connection in the relative both sides of annular handle, the upper end of going up the connecting rod fixed set up in the bottom of backup pad, the lower extreme of connecting rod is fixed to be set up on the wall body down, works as when annular handle rotates, go up the motion that connecting rod and lower connecting rod do and be close to each other or keep away from.
6. A through-wall air duct according to claim 5, wherein the lower ends of the lower connecting rods are fixedly arranged on the wall in a manner that: the wall body is fixedly provided with a platform, and the lower end of the lower connecting rod is fixedly arranged on the platform.
7. A through-wall air duct according to claim 6, wherein: the metal sleeve is a galvanized steel plate sleeve with the thickness of 1.6 mm.
CN201921701632.5U 2019-10-11 2019-10-11 Wall-through air duct Expired - Fee Related CN210860116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921701632.5U CN210860116U (en) 2019-10-11 2019-10-11 Wall-through air duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921701632.5U CN210860116U (en) 2019-10-11 2019-10-11 Wall-through air duct

Publications (1)

Publication Number Publication Date
CN210860116U true CN210860116U (en) 2020-06-26

Family

ID=71288590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921701632.5U Expired - Fee Related CN210860116U (en) 2019-10-11 2019-10-11 Wall-through air duct

Country Status (1)

Country Link
CN (1) CN210860116U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116221962A (en) * 2022-12-30 2023-06-06 陕西建工第三建设集团有限公司 Construction method for through-wall pipeline of air conditioning system in medical anti-radiation area

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116221962A (en) * 2022-12-30 2023-06-06 陕西建工第三建设集团有限公司 Construction method for through-wall pipeline of air conditioning system in medical anti-radiation area
CN116221962B (en) * 2022-12-30 2023-08-08 陕西建工第三建设集团有限公司 Construction method for through-wall pipeline of air conditioning system in medical anti-radiation area

Similar Documents

Publication Publication Date Title
CN204901062U (en) A three -dimensional antidetonation gallows
US7770341B2 (en) Suspended electrical service conduit system and method of use
CN210459693U (en) Dry-hanging ceramic brick curtain wall system
CN210860116U (en) Wall-through air duct
CN212001800U (en) Connecting assembly and connecting structure of external wall panel
JP6842881B2 (en) Duct construction method
CN101782266A (en) Connection joint for air conditioner board
CN110512831B (en) Construction method of public ventilation pipeline of civil building
CN210240808U (en) Fire-resistant ventilation tuber pipe
CN111720626A (en) Adjustable support and hanger
CN212026647U (en) Floor deformation expansion joint structure
CN210459589U (en) External wall box-separating heat preservation system
CN211039945U (en) Building engineering air pipe mounting structure
CN205502233U (en) Steel house room is removed in circulated use of industrialization assembled
CN207331980U (en) A kind of masonry set aside pre-embedded constructing structure
CN208056389U (en) The connection structure of brace steel post and outer enclosure wall in portal-rigid frames light house
CN206723595U (en) A kind of reinforced concrete drainage pipe is rested the head on pipe
CN205348422U (en) Movement joint area with back -fire relief is thermal -insulated waterproof
CN217128809U (en) External wall panel and building
CN219298492U (en) Built-in integrated composite insulation board
CN205421656U (en) Put formula sky shed structure under double -parallel formula radiant tube
CN211873417U (en) Combined structure building
CN217028071U (en) Customized mould-hanging tool capable of being circulated
KR102535615B1 (en) the improved outer pannel installing structure
CN218375264U (en) Expansion water stop screw and water stop device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200626