CN210853624U - Steel roll placing support in steel rolling raw material area - Google Patents
Steel roll placing support in steel rolling raw material area Download PDFInfo
- Publication number
- CN210853624U CN210853624U CN201921074077.8U CN201921074077U CN210853624U CN 210853624 U CN210853624 U CN 210853624U CN 201921074077 U CN201921074077 U CN 201921074077U CN 210853624 U CN210853624 U CN 210853624U
- Authority
- CN
- China
- Prior art keywords
- steel
- sleeper
- bearing
- saddle
- saddles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 67
- 239000010959 steel Substances 0.000 title claims abstract description 67
- 239000002994 raw material Substances 0.000 title claims abstract description 14
- 238000005096 rolling process Methods 0.000 title claims abstract description 14
- 241001669679 Eleotris Species 0.000 claims abstract description 38
- 239000004575 stone Substances 0.000 claims abstract description 9
- 230000006378 damage Effects 0.000 abstract description 4
- 238000003860 storage Methods 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 241001391944 Commicarpus scandens Species 0.000 description 1
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a support is put to steel rolling raw materials district coil of strip belongs to metallurgical industry steel rolling system coil of strip storage and puts technical field. The technical scheme is as follows: the sleeper bearing plates (2) are fixed on a plurality of load bearing sleepers (1) which are arranged in parallel through threaded spikes (3), ballast stones (4) are used for filling the space between the load bearing sleepers (1), and two load bearing steel rails (5) which are arranged in parallel are respectively fixed on the sleeper bearing plates (2); the cross section of the end saddle (7) is in a right trapezoid shape, and the two end saddles (7) are symmetrically fixed on the sleeper bearing plates (2) at the two ends of the two bearing steel rails (5) which are arranged in parallel respectively; the cross section of middle part saddle (8) is isosceles trapezoid, and a plurality of even settings of middle part saddle (8) are between two tip saddles (7), middle part saddle (8) are fixed on sleeper backing plate (2). The utility model has the advantages that: the steel coil is placed stably, neatly, beautifully and normatively, and safe and reliable has reduced the damage of steel coil.
Description
Technical Field
The utility model relates to a support is put to steel rolling raw materials district coil of strip belongs to metallurgical industry steel rolling system coil of strip storage and puts technical field.
Background
In the production and processing process using the steel coil as a raw material, the steel coil is generally stored in two ways: one is to directly disperse the steel coils on the construction site, and the other is to place the steel coils on the support by using a method of manufacturing the support by pouring concrete.
Directly scattering the steel coils on the construction site, not only the construction site is disordered and the occupied space is large, but also the steel coils are inconvenient to take and use, great inconvenience is brought to production and processing, and the production and processing efficiency is influenced;
the method for manufacturing the bracket by using the concrete pouring has the advantages that the steel coil is heavy in self weight, the steel coil is extruded under heavy load for a long time, the concrete is very easy to break, the maintenance cost is high, the appearance of the steel coil is damaged, even personnel injury is caused, and potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a support is put to steel rolling raw materials district coil of strip, safe and reliable, the installation of being convenient for is maintained, and the coil of strip is neat pleasing to the eye standard, has reduced the damage of coil of strip, solves the problem that exists among the background art.
The technical scheme of the utility model is that:
a steel coil placement support in a steel rolling raw material area comprises a bearing sleeper, a sleeper base plate, a threaded spike, ballast stones, bearing steel rails, end saddles and middle saddles;
the sleeper bearing plates are fixed on a plurality of load-bearing sleepers which are arranged in parallel through threaded spikes, ballast stones are used for filling the space between the load-bearing sleepers, and two load-bearing steel rails which are arranged in parallel are respectively fixed on the sleeper bearing plates;
the cross section of the end saddle is in a right trapezoid shape, and the two end saddles are symmetrically fixed on sleeper bearing plates at two ends of two bearing steel rails which are arranged in parallel respectively;
the cross section of middle part saddle is isosceles trapezoid, and a plurality of even settings of middle part saddle are between two tip saddles, the middle part saddle is fixed on the sleeper backing plate.
The plurality of load-bearing sleepers arranged in parallel are connected through connecting steel plates.
And two sides of the bottom of the bearing steel rail are respectively fixed on the sleeper base plate through steel rail stop blocks.
The distance between the end saddle and the middle saddle and the distance between two adjacent middle saddles are matched with the diameter of the steel coil.
And the sleeper base plate is provided with bolt holes matched with the threaded spikes.
Adopt the utility model discloses, during the use, place the coil of strip on the bearing rail between tip saddle and middle part saddle or two adjacent middle part saddles, but the coil of strip multilayer is put, and coil of strip both sides saddle atress simultaneously makes the coil of strip place firmly, puts more firmly.
The utility model has the advantages that: when the steel coil is placed, the bearing steel rail and the saddles on the two sides support at the same time, so that the phenomenon that the steel coil binding belt is broken and loosened is avoided, the bearing steel rail and the sleeper base plate have a buffering effect, the damage of the steel coil is reduced, and the steel coil is placed stably, neatly, attractively and normally, and is safe and reliable.
Drawings
FIG. 1 is a front view of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is a front view of the end saddle;
FIG. 4 is a left side view of the end saddle;
FIG. 5 is a front view of the middle saddle;
FIG. 6 is a left side view of the middle saddle;
FIG. 7 is a schematic view of an end saddle assembly;
FIG. 8 is a schematic view of the mid-saddle combination;
FIG. 9 is a schematic view of the usage state of the present invention;
FIG. 10 is a schematic view of the present invention showing the arrangement of multiple sets of brackets;
in the figure: 1. a load bearing sleeper; 2. a sleeper pad; 3. a threaded spike; 4. ballast stones; 5. a load bearing rail; 6. a rail stopper; 7. an end saddle; 8. a middle saddle; 9. connecting steel plates; 10. and (5) coiling the steel.
Detailed Description
The invention will be further explained by way of example with reference to the accompanying drawings.
Referring to the attached drawings 1-10, a steel coil arrangement support in a steel rolling raw material area comprises a bearing sleeper 1, a sleeper base plate 2, a threaded spike 3, ballast stones 4, a bearing steel rail 5, an end saddle 7 and a middle saddle 8;
the sleeper base plate 2 is fixed on a plurality of load-bearing sleepers 1 which are arranged in parallel through threaded spikes 3, ballast stones 4 are used for filling the space between the load-bearing sleepers 1, and two load-bearing steel rails 5 which are arranged in parallel are respectively fixed on the sleeper base plate 2;
the cross section of the end saddle 7 is in a right trapezoid shape, and the two end saddles 7 are symmetrically fixed on the sleeper bearing plates 2 at the two ends of the two bearing steel rails 5 which are arranged in parallel respectively;
the cross section of the middle saddle 8 is isosceles trapezoid, a plurality of middle saddles 8 are uniformly arranged between the two end saddles 7, and the middle saddle 8 is fixed on the sleeper pad 2.
The specific embodiment is as follows:
in this embodiment, referring to fig. 1-8, be equipped with the bolt hole on the sleeper backing plate 2, sleeper backing plate 2 is fixed on a plurality of parallel arrangement's bearing sleeper 1 through screw spike 3, set up steel connecting plate 9 between the bearing sleeper 1, steel connecting plate 9 and sleeper backing plate 2 welded fastening use ballast stone 4 to fill between the bearing sleeper 1, two parallel arrangement's bearing rail 5 are placed on sleeper backing plate 2, the bottom of bearing rail 5 is fixed with rail dog 6, bearing rail 5 both ends installation tip saddle 7, middle part saddle 8 of intermediate installation, tip saddle 7 and middle part saddle 8 all with sleeper backing plate 2 welded fastening.
Referring to fig. 3-6, the cross-section of the end saddle 7 is a right trapezoid, and the cross-section of the middle saddle 8 is an isosceles trapezoid.
Referring to fig. 10, a plurality of placing brackets can be arranged in a raw material area according to the area of a field, and a pedestrian safety passage with more than one meter can be arranged between the placing brackets to command operation and improve the operation efficiency.
Referring to the attached figure 9, the steel coils can be placed in multiple layers, the steel coils are placed on the bearing steel rail 5 between the end saddle 7 and the middle saddle 8 or between two adjacent middle saddles 8, and the saddles on the two sides of the steel coils are stressed simultaneously, so that the steel coils are placed stably and more firmly.
Claims (5)
1. The utility model provides a support is put to steel rolling raw materials district coil of strip which characterized in that: the sleeper bearing device comprises a bearing sleeper (1), a sleeper base plate (2), a threaded spike (3), ballast stones (4), bearing steel rails (5), end saddles (7) and middle saddles (8);
the sleeper bearing plates (2) are fixed on a plurality of load bearing sleepers (1) which are arranged in parallel through threaded spikes (3), ballast stones (4) are used for filling the space between the load bearing sleepers (1), and two load bearing steel rails (5) which are arranged in parallel are respectively fixed on the sleeper bearing plates (2);
the cross section of the end saddle (7) is in a right trapezoid shape, and the two end saddles (7) are symmetrically fixed on the sleeper bearing plates (2) at the two ends of the two bearing steel rails (5) which are arranged in parallel respectively;
the cross section of middle part saddle (8) is isosceles trapezoid, and a plurality of even settings of middle part saddle (8) are between two tip saddles (7), middle part saddle (8) are fixed on sleeper backing plate (2).
2. The steel roll arranging support in the steel rolling raw material area according to claim 1, wherein: a plurality of load-bearing sleepers (1) arranged in parallel are connected by connecting steel plates (9).
3. The steel roll arranging support in the steel rolling raw material area according to claim 1, wherein: and two sides of the bottom of the bearing steel rail (5) are respectively fixed on the sleeper base plate (2) through steel rail stop blocks (6).
4. The steel roll arranging support in the steel rolling raw material area according to claim 1, wherein: the distance between the end saddle (7) and the middle saddle (8) and the distance between two adjacent middle saddles (8) are matched with the diameter of the steel coil.
5. The steel roll arranging support in the steel rolling raw material area according to claim 1, wherein: and the sleeper base plate (2) is provided with bolt holes matched with the threaded spikes (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921074077.8U CN210853624U (en) | 2019-07-10 | 2019-07-10 | Steel roll placing support in steel rolling raw material area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921074077.8U CN210853624U (en) | 2019-07-10 | 2019-07-10 | Steel roll placing support in steel rolling raw material area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210853624U true CN210853624U (en) | 2020-06-26 |
Family
ID=71283800
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921074077.8U Expired - Fee Related CN210853624U (en) | 2019-07-10 | 2019-07-10 | Steel roll placing support in steel rolling raw material area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210853624U (en) |
-
2019
- 2019-07-10 CN CN201921074077.8U patent/CN210853624U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202170478U (en) | Snow fence for railways | |
CN202323578U (en) | Fastening piece for auxiliary rail | |
CN201254679Y (en) | Bolt pressure plate fixed type timber tie rail | |
CN210853624U (en) | Steel roll placing support in steel rolling raw material area | |
CN201330112Y (en) | Hoisting tool for hollow slab beam | |
CN207674943U (en) | A kind of car type furnace track installation fixing device | |
CN101195986B (en) | Cantilever casting continuous beam temporary support concretion system for passenger special line | |
CN205329738U (en) | Novel umbelliform ground bearing capacity detecting device | |
CN202124804U (en) | Novel sleeper | |
CN201151872Y (en) | Passenger transport special railway line suspended casting continuous beam temporary support consolidation system | |
CN203923815U (en) | Broad gage prestressed reinforced concrete tie | |
CN219340790U (en) | Novel reinforcing steel bar finished product auxiliary transportation equipment | |
CN201817752U (en) | Special sleeper used for portal crane rail | |
CN207998763U (en) | Railroad track hydraulic tool for taking up tracks | |
CN206438383U (en) | Cambered surface double layer tunnel inverted arch trestle | |
CN206581617U (en) | A kind of construction site reinforcing bar pallet | |
CN217203394U (en) | Fastener system for monolithic ballast bed and iron tie plate | |
CN110670423A (en) | Connecting device for concrete switch tie for metallurgical enterprise railway | |
CN203066372U (en) | Supporting-passing device enabling forklift truck to enter storehouse | |
CN103374883B (en) | A kind of Hanging Basket walking draw-gear | |
CN104631229A (en) | Small-radius curve concrete sleeper component | |
CN211036567U (en) | Connecting device for concrete switch tie for metallurgical enterprise railway | |
CN204509881U (en) | Sharp radius curve concrete sleeper assembly | |
CN201671019U (en) | Binding structure for railroad ballastless track slab reinforcing bars | |
CN213507829U (en) | Pre-buried iron seat type concrete switch tie for vibration reduction turnout |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210602 Address after: 067002 Chenggang No.1 office building, Shuangluan District, Chengde City, Hebei Province Patentee after: Chengde Chenggang Logistics Co.,Ltd. Address before: 067000 Luanhe Town, Shuangluan District, Chengde, Hebei Patentee before: CHENGDE IRON AND STEEL GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200626 |