CN210830989U - Synthesize pipeline antidetonation gallows - Google Patents

Synthesize pipeline antidetonation gallows Download PDF

Info

Publication number
CN210830989U
CN210830989U CN201921493622.7U CN201921493622U CN210830989U CN 210830989 U CN210830989 U CN 210830989U CN 201921493622 U CN201921493622 U CN 201921493622U CN 210830989 U CN210830989 U CN 210830989U
Authority
CN
China
Prior art keywords
fixing
fixed
rod
supporting
cushioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921493622.7U
Other languages
Chinese (zh)
Inventor
蔡震方
张正强
房建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Liangyouliang Decoration Engineering Co ltd
Original Assignee
Hubei Liangyouliang Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Liangyouliang Decoration Engineering Co ltd filed Critical Hubei Liangyouliang Decoration Engineering Co ltd
Priority to CN201921493622.7U priority Critical patent/CN210830989U/en
Application granted granted Critical
Publication of CN210830989U publication Critical patent/CN210830989U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a synthesize pipeline antidetonation gallows relates to pipeline fixing device field, aims at solving the problem that pipeline welding position damaged easily in the earthquake, and its technical scheme main points are: including fixing a plurality of fixing bases on the floor board, the lower part of fixing base is fixed with the dead lever respectively, the sub-unit connection of dead lever has supporting beam, the fixing base includes the fixed plate and fixes the connecting piece in the fixed plate lower part, be provided with first bradyseism mechanism between fixing base and the dead lever. The utility model discloses have the effect that the condition that reduces the pipeline welding position easy damage takes place in the earthquake.

Description

Synthesize pipeline antidetonation gallows
Technical Field
The utility model relates to a pipeline fixing device field, more specifically say, it relates to a synthesize pipeline antidetonation gallows.
Background
The support and hanger is a building electromechanical engineering facility, and plays a role in supporting a pipeline when the facilities such as drainage, gas transmission pipelines and the like are lapped in a building.
The support and hanger mainly comprises a plurality of fixed seats fixed on a floor plate, wherein a fixed rod vertically extending downwards is fixed at the lower part of each fixed seat, and a support cross beam is connected at the lower part of each fixed rod; the multiple groups of supporting and hanging frames are matched for use, during use, each supporting cross beam is distributed along the width direction of the supporting cross beam, and the pipeline is erected and fixed on the supporting cross beams and extends along the arrangement direction of the supporting cross beams. Under the condition of earthquake, because the fixing base is connected fixedly with the floor board, vibrations can pass to the dead lever through the fixing base, then transmit the pipeline through supporting beam again, and a gallows vibrations can cause the damage to pipeline welding position to a certain extent, consequently need provide a new scheme and solve this problem.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a synthesize pipeline antidetonation gallows, it can reduce the condition emergence that pipeline welding position takes place to damage to a certain extent.
The above technical purpose of the present invention can be achieved by the following technical solutions: the utility model provides a synthesize pipeline antidetonation gallows, is including being fixed in a plurality of fixing bases of floor board, the lower part of fixing base is fixed with the dead lever of vertical downwardly extending, the sub-unit connection of dead lever has supporting beam, the fixing base includes fixed plate and fixes at the connecting piece of fixed plate lower part, the fixed plate is fixed in the floor board, be provided with first bradyseism mechanism between fixing base and the dead lever, first bradyseism mechanism includes first bradyseism spring and first guide rod, first guide rod vertically slides and connects in connecting piece and lower extreme and stretch out the connecting piece, the lower extreme threaded connection of first guide rod is in the dead lever, first bradyseism spring cover is located first guide rod, the upper end butt of first bradyseism spring is in the lower surface of fixing base, the lower extreme butt in the dead lever.
Through adopting above-mentioned technical scheme, vibrations when transmitting the dead lever through the fixing base, first bradyseism mechanism has reduced the vibrations that the fixing base transmitted the dead lever, has reduced the vibrations that the dead lever transmitted on the supporting beam, because the pipeline erects on the supporting beam, has reduced the vibrations of pipeline, has consequently reduced the condition that pipeline welding position takes place to damage.
The utility model discloses further set up to: the second cushioning mechanism is arranged between the fixed rod and the supporting cross beam and comprises a second cushioning spring and a second guide rod, the second guide rod is vertically connected to the supporting cross beam in a sliding mode, the upper end of the second guide rod extends out of the supporting cross beam, the second guide rod is connected to the lower end of the fixed rod in a threaded mode, the second cushioning spring is sleeved on the second guide rod, the upper end of the second cushioning spring abuts against the fixed rod, and the lower end of the second cushioning spring abuts against the supporting cross beam.
Through adopting above-mentioned technical scheme, the second bradyseism mechanism has reduced the vibrations that the dead lever transmitted to supporting beam, because the pipeline erects on supporting beam, has further reduced the vibrations of pipeline.
The utility model discloses further set up to: the fixed rod comprises an upper fixed rod and a lower fixed rod in threaded connection with the lower portion of the upper fixed rod, the upper fixed rod is transversely in threaded connection with a positioning screw, and the screw end of the positioning screw abuts against the lower fixed rod.
Through adopting above-mentioned technical scheme, during the use, pull down the second guide rod of threaded connection in lower dead lever for dead lever and supporting beam separation rotate the height of dead lever in order to adjust the dead lever down, are convenient for install fixedly the pipeline of different occasions, and set screw has improved the stability of being connected of last dead lever and lower dead lever.
The utility model discloses further set up to: the floor plate fixing device comprises a plurality of embedded parts fixed on a floor plate, each embedded part comprises a connecting plate and a fixing column, the upper end of each fixing column is embedded in the floor plate, the lower end of each fixing column is fixed on the connecting plate, and the fixing seats are fixed with the connecting plates.
By adopting the technical scheme, in the house building construction process, the embedded part is fixed on the floor plate in advance, and then the fixed seat and the connecting plate of the embedded part are fixed, so that the installation of the fixed seat is facilitated on one hand, and the connection stability of the fixed seat and the floor plate is improved on the other hand.
The utility model discloses further set up to: the outer wall of the fixed column embedded at one end of the floor plate is provided with a plurality of bulges.
Through adopting above-mentioned technical scheme, the fixed column receives its protruding effect, is difficult relatively more pulled out from the floor board, because the fixing base is connected fixedly with the connecting plate to the installation stability of fixing base has been improved.
The utility model discloses further set up to: the fixed rod is hinged with a supporting rod, one end of the supporting rod is hinged with the fixed rod, the other end of the supporting rod is hinged with the floor plate, the rotating plane of the supporting rod is parallel to the supporting cross beam, the supporting rod comprises two sub-supporting rods and an air spring, and the two sub-supporting rods are connected and fixed through the air spring.
Through adopting above-mentioned technical scheme, the one end and the dead lever of bracing piece are articulated, and the other end is articulated with the floor board, and the bracing piece has reduced the vibrations of dead lever, has improved the utility model discloses a stability.
The utility model discloses further set up to: a plurality of recesses have been seted up to the supporting beam, the inner chamber of recess slides respectively and is connected with the slider, the last fixed surface of slider has the clamp that is used for fixed pipeline, the both ends of slider are fixed with the telescopic link respectively, the telescopic link extends along the glide direction of slider, the other end of telescopic link is fixed at the recess, the cover is equipped with the third bradyseism spring on the telescopic link, the one end butt of third bradyseism spring in the slider, other end butt in the inner wall of recess.
Through adopting above-mentioned technical scheme, because the pipeline is fixed on the clamp, the clamp is fixed on the slider, and under the condition of taking place vibrations, the slider vibrations are less relatively under the effect of telescopic link and third bradyseism spring to the vibrations of pipeline have been reduced.
The utility model discloses further set up to: and a rubber sheet is fixed on the inner wall of the hoop.
Through adopting above-mentioned technical scheme, when the pipeline was fixed in the clamp, the sheet rubber was laminated in the pipeline outer wall this moment, because sheet rubber has elasticity to the vibrations of pipeline have been reduced.
To sum up, the utility model discloses following beneficial effect has:
1. the first cushioning mechanism is arranged between the fixed seat and the fixed rod, so that when vibration is transmitted to the fixed rod through the fixed seat, the first cushioning mechanism reduces the vibration transmitted to the fixed rod by the fixed seat and reduces the vibration transmitted to the supporting cross beam by the fixed rod;
2. through set up second bradyseism mechanism between dead lever and supporting beam, when taking place vibrations, reduced the vibrations that the dead lever transmitted on the supporting beam, because the pipeline erects on the supporting beam, reduced the vibrations of pipeline, the condition that the welding position that has reduced the pipeline takes place to damage has improved the utility model discloses a stability.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the local explosion of the present invention;
FIG. 3 is an enlarged view of part A of FIG. 2, which is mainly used to show the first cushioning mechanism;
FIG. 4 is an enlarged view of the portion B of FIG. 2, which is mainly used to show the second cushioning mechanism;
FIG. 5 is an enlarged view of the portion C of FIG. 2, which is mainly used for showing embedded parts;
fig. 6 is an enlarged schematic view of the portion D of fig. 2, which is mainly used to show the sliding block, the third cushioning spring, the telescopic rod, the groove and the clamp fixed on the sliding block.
In the figure: 1. a fixed seat; 10. a set screw; 11. a fixing plate; 12. a connecting member; 13. a telescopic rod; 14. a third cushioning spring; 15. a rubber sheet; 2. fixing the rod; 21. an upper fixing rod; 22. a lower fixing rod; 3. a support beam; 31. a groove; 4. embedding parts; 41. a connecting plate; 42. fixing a column; 421. a protrusion; 5. a first cushioning mechanism; 51. a first cushioning spring; 52. a first guide bar; 6. a second cushioning mechanism; 61. a second cushioning spring; 62. a second guide rod; 7. a support bar; 71. a sub-support bar; 72. a gas spring; 8. a slider; 9. and (5) clamping a hoop.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and examples.
Referring to fig. 1, the integrated pipeline anti-seismic support and hanger comprises two fixed seats 1 fixed on a floor plate, fixed rods 2 vertically extending downwards are respectively fixed at the lower parts of the two fixed seats 1, a supporting beam 3 is connected at the lower part of each fixed rod 2, and two ends of each supporting beam 3 are fixed at the lower ends of the two fixed rods 2; the pipes are erected on the supporting beams 3.
Referring to fig. 1, the fixing base 1 includes a fixing plate 11 and a connecting member 12 fixed at a lower portion thereof, wherein a longitudinal section of the connecting member 12 is U-shaped, and an upper edge of a U-shaped opening of the connecting member is integrally formed with the fixing plate 11.
Referring to fig. 2 and 3, a first cushioning mechanism 5 is connected between the fixed base 1 and the fixed rod 2, the first cushioning mechanism 5 includes a first cushioning spring 51 and a first guiding rod 52, the first guiding rod 52 is connected to the connecting member 12 in a vertically sliding manner, and the lower end of the first guiding rod 52 extends out of the connecting member 12; a limiting block is fixed at the upper end of the first guide rod 52, and the cross-sectional area of the limiting block is larger than the area of the hole for the first guide rod 52 to pass through the connecting piece 12; the lower end of the first guiding rod 52 is connected to the upper end of the fixing rod 2 through a thread, the first cushioning spring 51 is sleeved on the first guiding rod 52, the upper end of the first cushioning spring 51 abuts against the lower surface of the fixing base 1, and the lower end of the first cushioning spring 51 abuts against the upper surface of the fixing rod 2.
During the use, first bradyseism mechanism 5 has reduced the vibrations that fixing base 1 transmitted on dead lever 2 to reduced the vibrations that dead lever 2 transmitted on the movable supporting beam 3, because the pipeline erects on supporting beam 3, reduced the vibrations of pipeline.
Referring to fig. 2 and 4, a second cushioning mechanism 6 is connected between the fixed rod 2 and the supporting beam 3, the second cushioning mechanism 6 includes a second cushioning spring 61 and a second guide rod 62, the second guide rod 62 is vertically slidably connected to the supporting beam 3, and the upper end of the second guide rod 62 extends out of the supporting beam 3, a limiting block is fixed at the lower part of the second guide rod 62, and the cross-sectional area of the limiting block is larger than that of a hole for the second guide rod 62 to pass through the supporting beam 3; the second guiding rod 62 is connected to the lower end of the fixing rod 2 through a thread, the second cushioning spring 61 is sleeved on the second guiding rod 62, the upper end of the second cushioning spring 61 abuts against the lower end of the fixing rod 2, and the lower end abuts against the supporting beam 3.
When the device is used, the second cushioning mechanism 6 reduces the vibration transmitted to the supporting beam 3 by the fixing rod 2, and the vibration of the pipeline is reduced because the pipeline is erected on the supporting beam 3.
Referring to fig. 2, the fixing rod 2 includes an upper fixing rod 21 and a lower fixing rod 22 threadedly coupled to a lower end of the upper fixing rod 21; a positioning screw 10 is transversely screwed on the upper fixing rod 21, and the screw end of the positioning screw 10 abuts against the lower fixing rod 22.
When the pipeline fixing device is used, the second guide rod 62 in threaded connection with the lower end of the fixing rod 2 is taken down, so that the fixing rod 2 is separated from the supporting cross beam 3, then the lower fixing rod 22 is rotated to adjust the height of the fixing rod 2, and the height of the fixing rod 2 is adjustable, so that pipelines on different occasions can be conveniently installed and fixed.
Referring to fig. 2 and 5, in order to improve the installation stability of the fixing base 1, two embedded parts 4 are fixed on the floor plate, each embedded part 4 comprises a connecting plate 41 and a fixing column 42, each fixing column 42 vertically extends upwards, the upper end of each fixing column 42 is embedded in the floor plate, and the lower end of each fixing column 42 is fixed in the center of the upper surface of the corresponding connecting plate 41 in a welding mode; the connecting plate 41 is separated from the floor plate, and the fixed seat 1 is fixedly connected with the connecting plate 41; in order to improve the installation stability of the embedded part 4, a plurality of bulges 421 are formed on the outer wall of one end of the fixed column 42 embedded in the floor plate; due to the protrusions 421, the embedment 4 is relatively difficult to pull out from the floor slab.
Referring to fig. 1, two fixed rods 2 are respectively hinged with a support rod 7, one end of each support rod 7 is hinged with the fixed rod 2, the other end of each support rod 7 is hinged with a floor plate, and the rotating plane of each support rod 7 is parallel to a support beam 3; the support rod 7 comprises two sub-support rods 71 and a gas spring 72, and the two sub-support rods 71 are connected and fixed through the gas spring 72. In use, the support rods 7 reduce the vibration of the fixing rods 2 and thus the vibration of the pipes erected on the supporting beams 3.
Referring to fig. 2 and 6, two grooves 31 distributed along the length direction of the supporting beam 3 are formed in the supporting beam, sliding blocks 8 are connected to inner cavities of the grooves 31 in a sliding mode respectively, a hoop 9 is fixed to the upper surface of each sliding block 8, the hoop 9 is formed by connecting two components with semicircular longitudinal sections through bolts, and a pipeline is fixed to the hoop 9; in order to reduce the vibration of the pipeline, a rubber sheet 15 is fixed on the inner wall of the hoop 9, and when the pipeline is fixed on the hoop 9, the rubber sheet 15 is circumferentially attached to the outer wall of the pipeline in a surrounding manner; the two ends of the sliding block 8 are respectively fixed with a telescopic rod 13, the telescopic rods 13 extend along the length direction of the supporting beam 3, one end of each telescopic rod 13 is fixed on the sliding block 8, and the other end of each telescopic rod 13 is fixed on the inner wall of the corresponding groove 31; the telescopic rod 13 is sleeved with a third cushioning spring 14, one end of the third cushioning spring 14 abuts against the sliding block 8, and the other end of the third cushioning spring abuts against the inner wall of the groove 31.
When vibration occurs, the interaction of the sliding block 8 between the telescopic rod 13 and the third cushioning spring 14 reduces the vibration, and the vibration of the pipeline is reduced because the pipeline is fixed on the clamp 9.
The implementation principle of the above embodiment is as follows: a first cushioning mechanism 5 is connected between the two fixed seats 1 and the fixed rod 2, the first cushioning mechanism 5 reduces the vibration transmitted from the fixed seats 1 to the fixed rod 2, so that the vibration transmitted from the fixed rod 2 to the supporting beam 3 is reduced, and the pipeline is erected on the supporting beam 3, so that the vibration of the pipeline is reduced; a second shock absorption mechanism 6 is connected between the fixed rod 2 and the supporting beam 3, and the second shock absorption mechanism 6 reduces the shock transmitted from the fixed rod 2 to the supporting beam 3, so that the shock erected on the supporting beam 3 is reduced; the fixed rod 2 comprises an upper fixed rod 21 and a lower fixed rod 22 which is in threaded connection with the lower part of the upper fixed rod 21, so that the height of the fixed rod 2 is adjustable, and pipelines in different occasions can be conveniently installed and fixed; the fixed seat 1 is fixedly connected with the embedded part 4, so that the installation stability of the utility model is further improved; the supporting rod 7 reduces the vibration of the fixing rod 2, and improves the installation stability of the utility model; a plurality of grooves 31 are formed in the supporting beam 3, the grooves 31 are connected with a sliding block 8 in a sliding mode, a hoop 9 for fixing a pipeline is fixed on the sliding block 8, and third cushioning springs 14 are fixed at two ends of the sliding block 8, so that vibration of the hoop 9 for fixing the pipeline is reduced; the rubber sheet 15 is fixed on the inner ring of the clamp 9, and the vibration of the pipeline is further reduced because the rubber sheet 15 has elasticity.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (8)

1. The utility model provides a synthesize a pipeline antidetonation gallows, is including being fixed in a plurality of fixing bases (1) of floor board, the lower part of fixing base (1) is fixed with vertical downwardly extending's dead lever (2), the sub-unit connection of dead lever (2) has supporting beam (3), its characterized in that: the fixing seat (1) comprises a fixing plate (11) and a connecting piece (12) fixed to the lower portion of the fixing plate (11), the fixing plate (11) is fixed to a floor plate, a first cushioning mechanism (5) is arranged between the fixing seat (1) and the fixing rod (2), the first cushioning mechanism (5) comprises a first cushioning spring (51) and a first guide rod (52), the first guide rod (52) is vertically connected to the connecting piece (12) in a sliding mode, the lower end of the first guide rod (52) extends out of the connecting piece (12), the lower end of the first guide rod (52) is connected to the fixing rod (2) in a threaded mode, the first cushioning spring (51) is sleeved on the first guide rod (52), the upper end of the first cushioning spring (51) abuts against the lower surface of the fixing seat (1), and the lower end of the first cushioning spring abuts against the.
2. An integrated pipeline anti-seismic support and hanger as defined in claim 1, wherein: a second cushioning mechanism (6) is arranged between the fixing rod (2) and the supporting cross beam (3), the second cushioning mechanism (6) comprises a second cushioning spring (61) and a second guide rod (62), the second guide rod (62) is vertically connected to the supporting cross beam (3) in a sliding mode, the upper end of the second guide rod (62) extends out of the supporting cross beam (3), the second guide rod (62) is connected to the lower end of the fixing rod (2) in a threaded mode, the second guide rod (62) is sleeved with the second cushioning spring (61), the upper end of the second cushioning spring (61) is abutted to the fixing rod (2), and the lower end of the second cushioning spring (61) is abutted to the supporting cross beam (3).
3. An integrated pipeline anti-seismic support and hanger as defined in claim 1, wherein: the fixing rod (2) comprises an upper fixing rod (21) and a lower fixing rod (22) in threaded connection with the lower portion of the upper fixing rod, a positioning screw (10) is in threaded connection with the upper fixing rod (21) in the transverse direction, and the screw end of the positioning screw (10) abuts against the lower fixing rod (22).
4. An integrated pipeline anti-seismic support and hanger as defined in claim 1, wherein: the floor plate fixing device comprises a plurality of embedded parts (4) fixed on a floor plate, wherein each embedded part (4) comprises a connecting plate (41) and a fixing column (42), the upper end of each fixing column (42) is embedded in the floor plate, the lower end of each fixing column is fixed on the connecting plate (41), and the fixing seat (1) is fixed with the connecting plate (41).
5. An integrated pipeline anti-seismic support and hanger as defined in claim 4, wherein: the outer wall of one end of the fixed column (42) embedded in the floor plate is provided with a plurality of bulges (421).
6. An integrated pipeline anti-seismic support and hanger as defined in claim 1, wherein: the floor plate is characterized in that the fixing rod (2) is hinged to a supporting rod (7), one end of the supporting rod (7) is hinged to the fixing rod (2), the other end of the supporting rod (7) is hinged to the floor plate, the rotating plane of the supporting rod (7) is parallel to the supporting cross beam (3), the supporting rod (7) comprises two sub-supporting rods (71) and an air spring (72), and the two sub-supporting rods (71) are fixedly connected through the air spring (72).
7. An integrated pipeline anti-seismic support and hanger as defined in claim 1, wherein: a plurality of recesses (31) have been seted up in supporting beam (3), the inner chamber of recess (31) slides and is connected with slider (8), the last fixed surface of slider (8) has clamp (9) that are used for fixed pipeline, the both ends of slider (8) are fixed with telescopic link (13) respectively, the slip direction of slider (8) is followed in telescopic link (13) extends, the other end of telescopic link (13) is fixed at recess (31), the cover is equipped with third bradyseism spring (14) on telescopic link (13), the one end butt of third bradyseism spring (14) is in slider (8), other end butt in the inner wall of recess (31).
8. An integrated pipeline anti-seismic support and hanger as defined in claim 7, wherein: and a rubber sheet (15) is fixed on the inner wall of the hoop (9).
CN201921493622.7U 2019-09-06 2019-09-06 Synthesize pipeline antidetonation gallows Expired - Fee Related CN210830989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921493622.7U CN210830989U (en) 2019-09-06 2019-09-06 Synthesize pipeline antidetonation gallows

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921493622.7U CN210830989U (en) 2019-09-06 2019-09-06 Synthesize pipeline antidetonation gallows

Publications (1)

Publication Number Publication Date
CN210830989U true CN210830989U (en) 2020-06-23

Family

ID=71280381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921493622.7U Expired - Fee Related CN210830989U (en) 2019-09-06 2019-09-06 Synthesize pipeline antidetonation gallows

Country Status (1)

Country Link
CN (1) CN210830989U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116146791A (en) * 2023-04-19 2023-05-23 法耳茨建筑科技(常州)有限公司 Building water supply and drainage pipeline anti-seismic bracket and application method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116146791A (en) * 2023-04-19 2023-05-23 法耳茨建筑科技(常州)有限公司 Building water supply and drainage pipeline anti-seismic bracket and application method thereof
CN116146791B (en) * 2023-04-19 2023-06-23 法耳茨建筑科技(常州)有限公司 Building water supply and drainage pipeline anti-seismic bracket and application method thereof

Similar Documents

Publication Publication Date Title
JP7193179B2 (en) bracket
CN210661663U (en) Shock-resistant finely-adjustable pipeline support
CN111577985B (en) Assembling method of anti-seismic support for civil engineering
CN210830989U (en) Synthesize pipeline antidetonation gallows
CN211344248U (en) Fixing structure for building engineering pipeline
CN210920344U (en) Municipal administration is fixed bolster for heat supply pipeline
CN112944044B (en) Concrete pump pipe fixing structure for super high-rise building construction
CN214662563U (en) Comprehensive pipeline anti-seismic support and hanger
JP2007270476A (en) Structure for mounting vibrational energy absorber of wooden building
CN211113153U (en) Bridge damping support convenient to installation and maintenance
CN210600650U (en) Spring support hanger for subway
CN112178279B (en) Anti-seismic support and hanger and installation method thereof
CN216973745U (en) Steel construction antidetonation buffering base for building engineering
CN212509821U (en) Lateral support air pipe anti-seismic hanging bracket
CN204401904U (en) Siphon rainwater suspension pipe fixing device
CN114151614A (en) Supporting structure
KR102016734B1 (en) Prefabricated co-exhaust piping system for architecture
CN218719345U (en) Comprehensive support and hanger
JPH1144382A (en) Hanging device for displacement absorbing joint in piping facility
CN218441033U (en) Shock-resistant hanging bracket for electromechanical pipeline
CN112113034A (en) Building activity board house is laid positioner fast with water and electricity open pipe
CN220396754U (en) Embedded part for water supply and drainage pipe
CN219472945U (en) Round air duct mounting support and hanger
CN212929015U (en) Anti-seismic frame pipeline fixing device
CN218294720U (en) Municipal administration utility tunnel is with converging drainage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200623