CN210737776U - Steel pipe bundle installation adjusting and positioning device - Google Patents

Steel pipe bundle installation adjusting and positioning device Download PDF

Info

Publication number
CN210737776U
CN210737776U CN201921367878.3U CN201921367878U CN210737776U CN 210737776 U CN210737776 U CN 210737776U CN 201921367878 U CN201921367878 U CN 201921367878U CN 210737776 U CN210737776 U CN 210737776U
Authority
CN
China
Prior art keywords
clamping plate
steel
pipe bundle
mounting body
movable clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921367878.3U
Other languages
Chinese (zh)
Inventor
王艳英
龙胜
褚剑跃
张吉银
俞佳宏
陈笠
金仕杰
陈豪
易书云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dadong Wuhangxiao Green Construction Technology Co Ltd
Original Assignee
Zhejiang Dadong Wuhangxiao Green Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dadong Wuhangxiao Green Construction Technology Co Ltd filed Critical Zhejiang Dadong Wuhangxiao Green Construction Technology Co Ltd
Priority to CN201921367878.3U priority Critical patent/CN210737776U/en
Application granted granted Critical
Publication of CN210737776U publication Critical patent/CN210737776U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a steel-pipe bundle, specific steel-pipe bundle installation adjustment positioner that says so belongs to steel-pipe bundle erection equipment technical field. The clamping device comprises a mounting body, a lower clamping plate, an upper clamping plate, a middle lower clamping plate, an upper clamping plate and a movable clamping plate assembly, wherein the left side and the right side of the upper part of the mounting body are connected with upper adjusting bolts, and the left side and the right side of the middle upper part of the mounting body are connected with upper adjusting bolts; the left side and the right side of the lower part of the mounting body are connected with lower locking bolts, and the left side and the right side of the middle lower part of the mounting body are connected with middle and lower locking bolts; the movable clamping plate assembly is arranged between the middle lower clamping plate and the middle upper clamping plate, the left side and the right side of the middle upper clamping plate are connected with vertical adjusting bolts, and the lower ends of the vertical adjusting bolts tightly support the movable clamping plate assembly. The utility model discloses simple structure, compactness, reasonable, the operation of assembling of completion steel-pipe bundle unit that can be accurate quick has improved positioning accuracy and the work efficiency that the unit was assembled to the steel-pipe bundle.

Description

Steel pipe bundle installation adjusting and positioning device
Technical Field
The utility model relates to a steel-pipe bundle, specific steel-pipe bundle installation adjustment positioner that says so belongs to steel-pipe bundle erection equipment technical field.
Background
At present, steel structures are used more and more in the technical field of building structures, various novel steel structure forms are continuously emerged, the steel structures are applied to the engineering field, the number of the steel structures is continuously increased, and the steel structures have wide prospects. The main advantages of the novel steel structure are as follows: compared with a concrete building structure, the concrete building structure has better applicability and feasibility. Such as reducing the volume of the component and increasing the use space; the self weight of the structure is reduced, and templates and supports required by construction are reduced or completely not required; embedded parts are reduced, and the anti-seismic performance of the structure is improved; the construction is convenient, and the construction period is shortened. Compared with the traditional steel structure, the steel can be saved more, the stability and the torsion resistance of the component are improved, the rigidity is increased, the anti-rust and fire-resistant limit performance is enhanced, and the economy and the attractiveness are achieved.
The steel pipe bundle structure is one of steel structures, and when the traditional steel pipe bundle structure is connected up and down in pairs, the lining support plate of the previous steel pipe bundle unit and the flange of the next steel pipe bundle unit are welded into a whole, and then grouting forming is carried out in the steel pipe bundle unit. Because the steel tube bundle structure is large in size and difficult to position and assemble, a large amount of manpower and time are consumed for positioning and assembling, and the production efficiency of the steel tube bundle structure is affected.
Disclosure of Invention
An object of the utility model is to overcome above-mentioned weak point to a steel-pipe bundle installation adjustment positioner is provided, the operation of assembling of completion steel-pipe bundle unit that can be accurate quick has improved positioning accuracy and the work efficiency that the unit was assembled to the steel-pipe bundle.
According to the technical scheme provided by the utility model, steel-pipe bundle installation adjustment positioner is including installing the body, down the cardboard, go up the cardboard, well middle and upper cardboard and activity cardboard subassembly down, characterized by: an upper clamping plate is welded on the outer surface of the upper part of the mounting body, a lower clamping plate is welded on the outer surface of the lower part of the mounting body, an upper middle clamping plate is welded on the upper middle part of the mounting body, and a middle lower clamping plate is welded on the lower middle part of the mounting body;
the left side and the right side of the upper part of the mounting body are connected with upper adjusting bolts, and the left side and the right side of the middle upper part of the mounting body are connected with middle and upper adjusting bolts; the left side and the right side of the lower part of the mounting body are connected with lower locking bolts, and the left side and the right side of the middle lower part of the mounting body are connected with middle and lower locking bolts;
the movable clamping plate assembly is arranged between the middle lower clamping plate and the middle upper clamping plate, the left side and the right side of the middle upper clamping plate are connected with vertical adjusting bolts, and the lower ends of the vertical adjusting bolts tightly support the movable clamping plate assembly.
Further, the installation body, lower cardboard, go up the cardboard, well cardboard under, well middle and upper cardboard are the U-shaped structure.
Further, the movable clamping plate assembly comprises two bilaterally symmetrical movable clamping plates, the middle parts of the two movable clamping plates are connected into a whole through a connecting plate, one rear part of the two movable clamping plates is connected with a puller bolt, and the puller end of the puller bolt is in contact with the other rear part of the two movable clamping plates.
Compared with the prior art, the utility model has the advantages that:
the utility model discloses simple structure, compactness, reasonable, the operation of assembling of completion steel-pipe bundle unit that can be accurate quick has improved positioning accuracy and the work efficiency that the unit was assembled to the steel-pipe bundle.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a side view of the present invention.
Fig. 3 is a cross-sectional structure view of the present invention.
Fig. 4 is the structure diagram of the movable card assembly of the present invention.
Description of reference numerals: 1-mounting body, 2-lower clamping plate, 3-lower locking bolt, 4-upper clamping plate, 5-upper adjusting bolt, 6-middle lower clamping plate, 7-middle lower locking bolt, 8-middle upper clamping plate, 9-middle upper adjusting bolt, 10-vertical adjusting bolt, 11-movable clamping plate, 12-connecting plate and 13-jacking bolt.
Detailed Description
The invention will be further described with reference to the embodiments shown in the drawings to which:
as shown in figures 1 to 3, the utility model mainly comprises a mounting body 1, a lower clamping plate 2, an upper clamping plate 4, a middle lower clamping plate 6 and a middle upper clamping plate 8,
the installation body 1 is a U-shaped structure, an upper clamping plate 4 of the U-shaped structure is welded on the outer surface of the upper part of the installation body 1, a lower clamping plate 2 of the U-shaped structure is welded on the outer surface of the lower part of the installation body 1, an upper middle clamping plate 8 of the U-shaped structure is welded on the upper middle part of the installation body 1, and a lower middle clamping plate 6 of the U-shaped structure is welded on the lower middle part of the installation body 1. The lower clamping plate 2, the upper clamping plate 4, the middle lower clamping plate 6 and the middle upper clamping plate 8 are used for positioning the steel pipe bundle body.
The left side and the right side of the upper part of the mounting body 1 are connected with upper adjusting bolts 5, and the upper adjusting bolts 5 can lock the front end face and the rear end face of the upper steel tube bundle unit. The left side and the right side of the upper middle part of the mounting body 1 are connected with middle and upper adjusting bolts 9, and the middle and upper adjusting bolts 9 can lock the front end face and the rear end face of the upper steel tube bundle unit.
The left side and the right side of the lower part of the installation body 1 are connected with lower locking bolts 3, and the lower locking bolts 3 can lock the front end face and the rear end face of the lower steel pipe bundle unit. The left side and the right side of the middle lower part of the installation body 1 are connected with middle and lower locking bolts 7, and the middle and lower locking bolts 7 can lock the front end face and the rear end face of the lower steel pipe bundle unit.
The utility model discloses still including activity cardboard subassembly, activity cardboard subassembly sets up in between cardboard 6 and the well cardboard 8 of going up down, and activity cardboard subassembly chucking is connected on last steel tube bundle unit, and terminal surface contacts the location terminal surface of steel tube bundle unit down under the activity cardboard subassembly.
As shown in fig. 4, the movable clamping plate assembly comprises two movable clamping plates 11 which are bilaterally symmetrical, the middle parts of the two movable clamping plates 11 are connected into a whole through a connecting plate 12, one rear part of each of the two movable clamping plates 11 is connected with a puller bolt 13, and the puller end of the puller bolt 13 contacts the other rear part of each of the two movable clamping plates 11.
Vertical adjusting bolt 10 is connected to the middle and upper cardboard 8 left and right sides, and the activity cardboard subassembly is tightly pushed up in the lower extreme top of vertical adjusting bolt 10, and vertical adjusting bolt 10 can adjust the horizontal angle position of activity cardboard subassembly.
The utility model discloses a theory of operation is: when assembling two steel-pipe bundles unit from top to bottom, with two the utility model discloses a lower cardboard respectively the chucking connect both ends around the steel-pipe bundles unit down, lower lock bolt and middle and lower lock bolt will be down the steel-pipe bundles unit locking around the unit jointly. And then the upper steel tube bundle unit is lifted to a butt joint position, the butt joint assembly of the upper steel tube bundle unit and the lower steel tube bundle unit is realized at the butt joint position by coarse positioning, then the upper clamping plate and the middle upper clamping plate are tightly clamped and connected at the front end and the rear end of the upper steel tube bundle unit, and the front position and the rear position of the upper steel tube bundle unit are adjusted by the upper adjusting bolt and the middle upper adjusting bolt, so that the accurate positioning of the upper steel tube bundle unit in the front. After the front and back direction positioning is completed, the left side and the right side of the upper steel pipe bundle unit are connected with the movable clamping plate assemblies, and after the movable clamping plate assemblies are clamped and connected, the left position and the right position of the upper steel pipe bundle unit are adjusted through the vertical adjusting bolts, so that the upper steel pipe bundle unit can be accurately positioned in the left and right directions. After the positioning is completed, the utility model is dismantled.

Claims (3)

1. The utility model provides a steel-pipe bundle installation adjustment positioner, includes installation body (1), down cardboard (2), goes up cardboard (4), well cardboard (6) down, well cardboard (8) and activity cardboard subassembly, characterized by: an upper clamping plate (4) is welded on the outer surface of the upper part of the installation body (1), a lower clamping plate (2) is welded on the outer surface of the lower part of the installation body (1), a middle and upper clamping plate (8) is welded on the middle and upper part of the installation body (1), and a middle and lower clamping plate (6) is welded on the middle and lower part of the installation body (1);
the left side and the right side of the upper part of the mounting body (1) are connected with upper adjusting bolts (5), and the left side and the right side of the middle upper part of the mounting body (1) are connected with middle and upper adjusting bolts (9); the left side and the right side of the lower part of the mounting body (1) are connected with lower locking bolts (3), and the left side and the right side of the middle lower part of the mounting body (1) are connected with middle and lower locking bolts (7);
the movable clamping plate assembly is arranged between a middle lower clamping plate (6) and a middle upper clamping plate (8), the left side and the right side of the middle upper clamping plate (8) are connected with vertical adjusting bolts (10), and the lower ends of the vertical adjusting bolts (10) tightly support the movable clamping plate assembly.
2. The steel pipe bundle mounting, adjusting and positioning device according to claim 1, wherein: the mounting body (1), the lower clamping plate (2), the upper clamping plate (4), the middle lower clamping plate (6) and the middle upper clamping plate (8) are all of U-shaped structures.
3. The steel pipe bundle mounting, adjusting and positioning device according to claim 1, wherein: the movable clamping plate assembly comprises two movable clamping plates (11) which are bilaterally symmetrical, the middle parts of the two movable clamping plates (11) are connected into a whole through a connecting plate (12), one rear part of each of the two movable clamping plates (11) is connected with a puller bolt (13), and the puller end of the puller bolt (13) is in contact with the other rear part of each of the two movable clamping plates (11).
CN201921367878.3U 2019-08-21 2019-08-21 Steel pipe bundle installation adjusting and positioning device Active CN210737776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921367878.3U CN210737776U (en) 2019-08-21 2019-08-21 Steel pipe bundle installation adjusting and positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921367878.3U CN210737776U (en) 2019-08-21 2019-08-21 Steel pipe bundle installation adjusting and positioning device

Publications (1)

Publication Number Publication Date
CN210737776U true CN210737776U (en) 2020-06-12

Family

ID=71004625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921367878.3U Active CN210737776U (en) 2019-08-21 2019-08-21 Steel pipe bundle installation adjusting and positioning device

Country Status (1)

Country Link
CN (1) CN210737776U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424537A (en) * 2019-08-21 2019-11-08 浙江大东吴杭萧绿建科技有限公司 Steel pipe bundle mounting and adjusting positioning device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424537A (en) * 2019-08-21 2019-11-08 浙江大东吴杭萧绿建科技有限公司 Steel pipe bundle mounting and adjusting positioning device

Similar Documents

Publication Publication Date Title
CN210737776U (en) Steel pipe bundle installation adjusting and positioning device
CN217480405U (en) Assembled steel construction building
CN111535196B (en) Bridge building templates link for civil engineering
CN212671267U (en) Be used for reinforced (rfd) energy stand of single-pipe tower
CN212176530U (en) Assembled building construction template
CN103758342A (en) Tool-type top form for buildings
CN216740781U (en) Small-size steel stand positioner
CN215717359U (en) Steel column installation correction fixture and correction system
CN214329270U (en) Box steel column butt joint auxiliary structure
CN211037548U (en) Truss structure for roof
CN216460939U (en) Device for correcting deformation of flange plate of small-section thin-flange H-shaped steel
CN219094118U (en) Steel arch connecting plate assembly fixture
CN206873629U (en) A kind of steel construction being used in building frame
CN213868899U (en) Template panel can be dismantled and combination formula steel bar truss building carrier plate of thickness adjustable
CN219196827U (en) Reinforcing mechanism for frame beam
CN219364929U (en) H-shaped steel column and H-shaped steel beam end assembly type node
CN211949196U (en) Steel structure building component
CN212927011U (en) Reinforcement type template based on house building engineering
CN217044064U (en) Steel construction bridge slab unit spare flame correction device
CN216740821U (en) Reinforcing and pressing device for steel plate for opening masonry wall
CN220451361U (en) Scaffold capable of being installed and constructed stably rapidly for house building
CN203640271U (en) Tool-type top die for buildings
CN220151040U (en) Novel anchor ear for fixing tower body of tetragonal tower
CN214116998U (en) Movable steel house room outrigger and frame column's connection structure
CN219711036U (en) Self-holding device for steel structure pre-assembled joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant