CN210659205U - U-shaped water intercepting tank for climbing frame and intercepting water of outer wall of high-rise main body - Google Patents
U-shaped water intercepting tank for climbing frame and intercepting water of outer wall of high-rise main body Download PDFInfo
- Publication number
- CN210659205U CN210659205U CN201920805743.4U CN201920805743U CN210659205U CN 210659205 U CN210659205 U CN 210659205U CN 201920805743 U CN201920805743 U CN 201920805743U CN 210659205 U CN210659205 U CN 210659205U
- Authority
- CN
- China
- Prior art keywords
- water intercepting
- intercepting tank
- tank
- climbing frame
- shaped water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Special Wing (AREA)
Abstract
A U-shaped water intercepting tank for intercepting water of a high-rise main body climbing frame and an outer wall is characterized in that the U-shaped water intercepting tank is connected to a bottom plate of the outer wall climbing frame along the horizontal direction for use, the width of the U-shaped water intercepting tank is slightly wider than that of the climbing frame, two ends of the U-shaped water intercepting tank are closed surfaces, a horizontal drain pipe is arranged at the bottom of the U-shaped water intercepting tank every 25M, one end of the horizontal drain pipe is communicated with the bottom of the U-shaped water intercepting tank through an elbow and a loose joint, and the other end of the horizontal drain pipe is communicated with a drain vertical pipe close to the climbing frame and further; the U-shaped water intercepting tank positioned at the bottom of the special part climbing frame is a folding U-shaped water intercepting tank and comprises a left water intercepting tank and a right water intercepting tank, the left water intercepting tank and the right water intercepting tank are laid flat before the climbing frame is lifted or when the special part is not on the layer, and the left water intercepting tank and the right water intercepting tank are lifted when the climbing frame is lifted or the special part is on the layer, and the steel wire rope I is lifted left and right. The U-shaped water intercepting tank is simple in structure, can effectively collect waste water of an outer wall and a climbing frame, and does not hinder lifting of the climbing frame.
Description
Technical Field
The utility model relates to a water-stop device that construction used especially relates to a U-shaped cut-off basin that is used for high-rise main part to climb frame and outer wall to cut off water.
Background
The construction water consumption of China is about 1T/square meter, in recent years, because of the adoption of new processes and new material construction, the construction water consumption is reduced to a certain extent compared with the prior art, but the reuse problem of the construction water is rarely concerned in common construction sites, particularly large construction sites with large areas and long construction period, and large construction sites with climbing frames used for outer facades, in addition, the annual rainfall in south China is about 1300mm, the annual rainfall in north is about 630mm, and the problem of how to reasonably collect and recycle the rainwater in the construction of open-air work does not cause enough attention. In summary, the water used in the current building construction still has the following problems:
construction water, maintenance water of an operation surface and rainwater are not reasonably collected and recycled, and particularly, drainage of a climbing frame and an outer wall is difficult to recover and has no precedent of collection and recycling until now; so that the construction water and the maintenance water for the working surface are directly irrigated from high altitude, and the construction of the pedestrian and the lower working surface below the building is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a U-shaped cut-off basin that is used for high-rise main part to climb frame and outer wall to intercept water to overcome prior art and exist the above-mentioned not enough.
The utility model adopts the technical proposal that: a U-shaped water intercepting tank for intercepting water of a high-rise main body climbing frame and an outer wall is arranged at the bottom of the climbing frame and used for intercepting and draining water in order to change waste water discharged by the high-rise main body climbing frame and the outer wall in construction into ordered discharge;
the U-shaped water cut-off groove is a water guide groove with a U-shaped cross section and is connected to a bottom plate of an outer wall climbing frame along the horizontal direction for use, the width of the U-shaped water cut-off groove is slightly wider than that of the climbing frame, two ends of the U-shaped water cut-off groove are closed surfaces, a horizontal drain pipe is arranged at the bottom of the U-shaped water cut-off groove every 25M, one end of the horizontal drain pipe is communicated with the bottom of the U-shaped water cut-off groove through an elbow and a loose joint, and the other end of the horizontal drain pipe is communicated with a drain vertical pipe close to the climbing frame;
the U-shaped water intercepting tank positioned at the bottom of the special part climbing frame is a folding U-shaped water intercepting tank and comprises a left water intercepting tank and a right water intercepting tank, the left water intercepting tank is positioned on the left side of the special part wall-attached rod, the right water intercepting tank is positioned on the right side of the special part wall-attached rod, the right end of the left water intercepting tank is a closed surface, the left end of the left water intercepting tank is communicated with the U-shaped water intercepting tank positioned at the bottom of the climbing frame on the left side of the special part through the telescopic U-shaped water intercepting tank, the left end of the right water intercepting tank is a closed surface, and the right end of the right water intercepting tank is communicated with the U-shaped water intercepting tank positioned;
the left water intercepting tank is connected to the bottom of the left connecting plate, the left end of the left connecting plate is hinged to a climbing frame bottom plate on the left of the special part through a hinge, and the right end of the left connecting plate is connected with a climbing frame through a steel wire rope I;
the right water intercepting tank is connected to the bottom of the right connecting plate, the right end of the right connecting plate is hinged to a climbing frame bottom plate on the right side of the special part through a hinge, and the left end of the right connecting plate is connected with a climbing frame through a steel wire rope I; climb before the frame promotes or attach the wall pole when not this layer, wire rope I will left and right cut water tank and set level, climb the frame and promote or attach the wall pole when this layer, wire rope I will control the cut water tank and rise in order to avoid producing with the wall pole of attaching of special parts and interfere.
The further technical scheme is as follows:
the inner side of the U-shaped water intercepting tank is provided with a lifting type galvanized steel plate, the lower end of the lifting type galvanized steel plate is hinged with the edge of a notch in the inner side of the U-shaped water intercepting tank through a hinge, and the upper end of the lifting type galvanized steel plate is connected with the climbing frame through a steel wire rope II; the climbing frame is lifted and the pull type galvanized steel plate is opened to be close to the outer wall, so that water can be collected conveniently, and when the climbing frame is lifted, the steel wire rope II is folded with the pull type galvanized steel plate to avoid interference with the climbing frame.
Further:
the U-shaped water intercepting tank, the left water intercepting tank and the right water intercepting tank are made of galvanized steel plates with the thickness of 1mm, the telescopic U-shaped water intercepting tank is made of waterproof color stripe cloth, and the joint parts of the telescopic U-shaped water intercepting tank, the left water intercepting tank and the U-shaped water intercepting tank are fixedly connected and sealed through rivets and epoxy resin glue.
Since the technical scheme is used, the utility model relates to a U-shaped cut-off basin that is used for high-rise main part to climb frame and outer wall to cut off water has following beneficial effect:
1. the U-shaped water intercepting groove for intercepting water of a high-rise main body climbing frame and an outer wall is slightly wider than the climbing frame, two ends of the U-shaped water intercepting groove are closed surfaces, a lifting type galvanized steel plate is installed on the inner side of the U-shaped water intercepting groove, the lower end of the lifting type galvanized steel plate is hinged to the edge of a notch on the inner side of the U-shaped water intercepting groove through a hinge, the upper end of the lifting type galvanized steel plate is connected with the climbing frame through a steel wire rope II, the lifting type galvanized steel plate is opened to be close to the outer wall to facilitate water collection during normal use, and the lifting type galvanized steel plate is folded by the steel wire rope II to avoid interference with the climbing frame when the;
2. the U-shaped water intercepting tank for the climbing frame of the high-rise main body and the water interception of the outer wall adopts the folding U-shaped water intercepting tank at a special part,
before the climbing frame is lifted or when the wall attaching rod is not on the layer, the left and right water intercepting tanks are placed horizontally by the steel wire rope I, and when the climbing frame is lifted or the wall attaching rod is on the layer, the left and right water intercepting tanks are lifted by the steel wire rope I to avoid interference with the wall attaching rod on a special part;
3, arranging a horizontal drain pipe at the bottom of the U-shaped water intercepting tank every 25M, wherein one end of the horizontal drain pipe is communicated with the bottom of the U-shaped water intercepting tank through an elbow and a loose joint, and the wastewater collected by the U-shaped water intercepting tank is communicated with a ground drainage ditch 10 through the horizontal drain pipe and a vertical drain pipe close to the climbing frame;
adopt above structure both can introduce the ground escape canal with the waste water of climbing frame and outer wall effectively, do not hinder climbing of climbing frame again, solved for a long time climb the frame and the waste water of outer wall be difficult to retrieve the recycling difficult problem.
The technical features of a U-shaped water intercepting tank for intercepting water in a high-rise main body scaffold and an outer wall of the present invention will be further described with reference to the accompanying drawings and embodiments.
Drawings
Fig. 1 to 3 are schematic structural views (installation states) of a U-shaped water intercepting tank for intercepting water of a high-rise main body climbing frame and an outer wall:
FIG. 1 is a front view, FIG. 2 is a side view, and FIG. 3 is an enlarged view of a portion D1 of FIG. 2;
fig. 4-7 are schematic structural views of U-shaped water intercepting tanks located at special positions:
fig. 4 shows a state before the climbing frame is lifted or the wall-attaching rod is not in the current floor (the left water intercepting tank and the right water intercepting tank are laid flat), fig. 5 shows a state before the climbing frame is lifted or the wall-attaching rod is in the current floor (the left water intercepting tank and the right water intercepting tank are lifted), fig. 6 shows an enlarged view of a portion D2 in fig. 4, and fig. 7 shows an enlarged view of a portion D3 in fig. 5.
In the figure:
1-climbing frame, 11-bottom plate, 111-left connecting plate, 112-right connecting plate, 2-U-shaped water intercepting tank, 21-left water intercepting tank, 22-right water intercepting tank, 23-telescopic U-shaped water intercepting tank, 3-horizontal drainage pipe, 4-lifting galvanized steel plate, 5-steel wire rope II, 6-outer wall, 7-steel wire rope I, 8-hinged hinge, 9-wall attaching rod and A-special part.
Detailed Description
A U-shaped water intercepting tank for intercepting water of a high-rise main body climbing frame and an outer wall is arranged at the bottom of the climbing frame and used for intercepting and draining water in order to change waste water discharged by the high-rise main body climbing frame and the outer wall in construction into ordered discharge;
the U-shaped water intercepting tank 2 is a water guiding tank with a U-shaped cross section and is connected to a bottom plate of an outer wall climbing frame along the horizontal direction for use, the width of the U-shaped water intercepting tank is slightly wider than that of the climbing frame, two ends of the U-shaped water intercepting tank are closed surfaces, a horizontal drain pipe is arranged at the bottom of the U-shaped water intercepting tank every 25M, one end of the horizontal drain pipe is communicated with the bottom of the U-shaped water intercepting tank through an elbow and a loose joint, and the other end of the horizontal drain pipe is communicated with a drain vertical pipe close to the climbing frame so as to be communicated with a ground drain ditch;
the U-shaped water intercepting tank positioned at the bottom of the special part climbing frame is a folding U-shaped water intercepting tank and comprises a left water intercepting tank and a right water intercepting tank, the left water intercepting tank is positioned on the left side of the special part wall-attached rod, the right water intercepting tank is positioned on the right side of the special part wall-attached rod, the right end of the left water intercepting tank is a closed surface, the left end of the left water intercepting tank is communicated with the U-shaped water intercepting tank positioned at the bottom of the climbing frame on the left side of the special part through the telescopic U-shaped water intercepting tank, the left end of the right water intercepting tank is a closed surface, and the right end of the right water intercepting tank is communicated with the U-shaped water intercepting tank positioned;
the left water intercepting tank is connected to the bottom of the left connecting plate, the left end of the left connecting plate is hinged to a climbing frame bottom plate on the left of the special part through a hinge, and the right end of the left connecting plate is connected with a climbing frame through a steel wire rope I;
the right water intercepting tank is connected to the bottom of the right connecting plate, the right end of the right connecting plate is hinged to a climbing frame bottom plate on the right side of the special part through a hinge, and the left end of the right connecting plate is connected with a climbing frame through a steel wire rope I; climb before the frame promotes or attach the wall pole when not this layer, wire rope I will left and right cut water tank and set level, climb the frame and promote or attach the wall pole when this layer, wire rope I will control the cut water tank and rise in order to avoid producing with the wall pole of attaching of special parts and interfere.
The inner side of the U-shaped water intercepting tank is provided with a lifting type galvanized steel plate, the lower end of the lifting type galvanized steel plate is hinged with the edge of a notch in the inner side of the U-shaped water intercepting tank through a hinge, and the upper end of the lifting type galvanized steel plate is connected with the climbing frame through a steel wire rope II; the climbing frame is lifted and the pull type galvanized steel plate is opened to be close to the outer wall, so that water can be collected conveniently, and when the climbing frame is lifted, the steel wire rope II is folded with the pull type galvanized steel plate to avoid interference with the climbing frame.
The U-shaped water intercepting tank, the left water intercepting tank and the right water intercepting tank are made of galvanized steel plates with the thickness of 1mm, the telescopic U-shaped water intercepting tank is made of waterproof color stripe cloth, and the joint parts of the telescopic U-shaped water intercepting tank, the left water intercepting tank and the U-shaped water intercepting tank are fixedly connected and sealed through rivets and epoxy resin glue.
Note:
(1) the special parts are: all reserved holes of the outer wall comprise wall attaching rods of the tower crane, wall attaching devices of the construction elevator and wall attaching rod parts of the unloading platform.
(2) The width of the U-shaped water intercepting groove is the width of the cross section of the U-shaped water intercepting groove, and the width of the climbing frame is the width between the outer layer and the inner layer of the climbing frame.
(3) The inner side of the U-shaped water intercepting groove refers to one side of the U-shaped water intercepting groove close to the building outer wall.
Claims (3)
1. The utility model provides a U-shaped cut-off basin that is used for high-rise main part to climb frame and outer wall to cut off water which characterized in that: the U-shaped water intercepting tank is used for changing the wastewater discharged by the high-rise main body climbing frame and the outer wall in construction into ordered discharge, and is arranged at the bottom of the climbing frame for intercepting and draining water;
the U-shaped water intercepting tank (2) is a water guiding tank with a U-shaped cross section, and is connected to a bottom plate (11) of an outer wall climbing frame (1) along the horizontal direction, the width of the U-shaped water intercepting tank is slightly wider than that of the climbing frame, two ends of the U-shaped water intercepting tank are closed surfaces, a horizontal drain pipe (3) is arranged at the bottom of the U-shaped water intercepting tank at intervals of 25M, one end of the horizontal drain pipe is communicated with the bottom of the U-shaped water intercepting tank through an elbow and a loose joint, and the other end of the horizontal drain pipe is communicated with a drain vertical pipe close to the climbing frame so as to be communicated with a;
the U-shaped water intercepting tank positioned at the bottom of the special part climbing frame is a folding U-shaped water intercepting tank and comprises a left water intercepting tank (21) and a right water intercepting tank (22), the left water intercepting tank is positioned on the left side of the special part wall-attached rod (9), the right water intercepting tank is positioned on the right side of the special part wall-attached rod, the right end of the left water intercepting tank is a closed surface, the left end of the left water intercepting tank is communicated with the U-shaped water intercepting tank positioned at the bottom of the climbing frame on the left side of the special part through a telescopic U-shaped water intercepting tank (23), the left end of the right water intercepting tank is a closed surface, and the right end of the right water intercepting tank is communicated with the U-shaped water intercepting tank positioned at the;
the left water intercepting tank is connected to the bottom of the left connecting plate (111), the left end of the left connecting plate is hinged to a climbing frame bottom plate on the left of the special part through a hinge (8), and the right end of the left connecting plate is connected with a climbing frame (1) through a steel wire rope I (7);
the right water intercepting tank is connected to the bottom of a right connecting plate (112), the right end of the right connecting plate is hinged to a climbing frame bottom plate on the right of the special part through a hinge (8), and the left end of the right connecting plate is connected with a climbing frame (1) through a steel wire rope I (7);
climb before the frame promotes or attach the wall pole when not this layer, wire rope I will left and right cut water tank and set level, climb the frame and promote or attach the wall pole when this layer, wire rope I will control the cut water tank and rise in order to avoid producing with the wall pole of attaching of special parts and interfere.
2. The U-shaped water intercepting tank for the climbing of high-rise main bodies and the intercepting of water of the outer wall as claimed in claim 1, wherein:
the inner side of the U-shaped water intercepting tank is provided with a lifting type galvanized steel plate (4), the lower end of the lifting type galvanized steel plate is hinged with the edge of a notch on the inner side of the U-shaped water intercepting tank through a hinge, and the upper end of the lifting type galvanized steel plate is connected with a climbing frame through a steel wire rope II (5);
the steel wire rope II (5) is used for folding the lifting type galvanized steel sheet to avoid interference with the climbing frame when the climbing frame is lifted.
3. The U-shaped water intercepting tank for the climbing of high-rise main bodies and the intercepting of water of the outer wall as claimed in claim 2, wherein:
the U-shaped water intercepting tank, the left water intercepting tank and the right water intercepting tank are made of galvanized steel plates with the thickness of 1mm, the telescopic U-shaped water intercepting tank is made of waterproof color stripe cloth, and the joint parts of the telescopic U-shaped water intercepting tank, the left water intercepting tank and the U-shaped water intercepting tank are fixedly connected and sealed through rivets and epoxy resin glue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920805743.4U CN210659205U (en) | 2019-05-30 | 2019-05-30 | U-shaped water intercepting tank for climbing frame and intercepting water of outer wall of high-rise main body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920805743.4U CN210659205U (en) | 2019-05-30 | 2019-05-30 | U-shaped water intercepting tank for climbing frame and intercepting water of outer wall of high-rise main body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210659205U true CN210659205U (en) | 2020-06-02 |
Family
ID=70839735
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920805743.4U Expired - Fee Related CN210659205U (en) | 2019-05-30 | 2019-05-30 | U-shaped water intercepting tank for climbing frame and intercepting water of outer wall of high-rise main body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210659205U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115110747A (en) * | 2022-08-12 | 2022-09-27 | 中建四局第一建设有限公司 | Building construction elevator climbs frame |
-
2019
- 2019-05-30 CN CN201920805743.4U patent/CN210659205U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115110747A (en) * | 2022-08-12 | 2022-09-27 | 中建四局第一建设有限公司 | Building construction elevator climbs frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202265897U (en) | Water-saving type ecological water collecting well | |
CN210659205U (en) | U-shaped water intercepting tank for climbing frame and intercepting water of outer wall of high-rise main body | |
CN205382501U (en) | Tower crane basis automatic drainage system | |
CN207427039U (en) | The stent and photovoltaic system of photovoltaic module | |
CN206554318U (en) | Wall is built in a kind of room | |
CN209397632U (en) | A kind of anti-white-out construction of basement | |
CN207775983U (en) | A kind of high-rise building top polymorphic structure area Rainwater collection system | |
CN204040331U (en) | The waterproof construction of deformation joint of roof | |
CN217336602U (en) | Green vegetation outer wall | |
CN205935144U (en) | Prefabricated infiltration well | |
CN209907548U (en) | Assembled vertical concrete inlet for stom water | |
CN205935442U (en) | Building roof drainage structures | |
CN214994038U (en) | Retaining wall structure for sloping field building | |
CN214353192U (en) | Prefabricated T roof beam intelligence sprays maintenance system | |
CN213204424U (en) | Integrated intercepting well | |
CN212045261U (en) | Prefabricated case roof beam water conservation maintenance system | |
CN210597770U (en) | Outer curtain wall profiled steel sheet metal roof gutter system | |
CN210459806U (en) | Building integrated building wall structure of photovoltaic | |
CN208039301U (en) | A kind of civil construction retaining wall structure | |
CN104612341A (en) | Canopy | |
CN104481088A (en) | Glass rainshed for building | |
CN109881852A (en) | A kind of collection rainwater green awning | |
CN214364503U (en) | Novel parapet structure | |
CN205894330U (en) | Plug into waterproof board device of position department of curtain first floor and structure | |
CN209975904U (en) | Green rain shed for collecting rainwater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200602 Termination date: 20210530 |