CN210656601U - Do benefit to ecological remediation's gardens sewage treatment structure - Google Patents

Do benefit to ecological remediation's gardens sewage treatment structure Download PDF

Info

Publication number
CN210656601U
CN210656601U CN201921662412.6U CN201921662412U CN210656601U CN 210656601 U CN210656601 U CN 210656601U CN 201921662412 U CN201921662412 U CN 201921662412U CN 210656601 U CN210656601 U CN 210656601U
Authority
CN
China
Prior art keywords
cavity
fixed
sewage treatment
baffle
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921662412.6U
Other languages
Chinese (zh)
Inventor
李成
李燕玲
余湛铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Yilicheng Construction Engineering Co Ltd
Original Assignee
Shenzhen Yilicheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Yilicheng Construction Engineering Co Ltd filed Critical Shenzhen Yilicheng Construction Engineering Co Ltd
Priority to CN201921662412.6U priority Critical patent/CN210656601U/en
Application granted granted Critical
Publication of CN210656601U publication Critical patent/CN210656601U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

The utility model relates to a do benefit to ecological remediation's gardens sewage treatment structure, including float in the park lake the hull with set up in on the hull and carry out the purification structure of handling to lake water, purification structure includes the purifying tank, the interval has set up first baffle and second baffle in proper order in the purifying tank, first baffle with the second baffle will the purifying tank divide into first cavity, second cavity and third cavity, it has solid phosphorus agent to throw in the first cavity, the second cavity is thrown and is had flotation type pasture and water, photosynthetic bacteria, biological agent etc. the third cavity drops into fish, shrimp, spiral shell etc. first cavity is connected with the pipeline of carrying lake water, the third cavity is connected with drainage pipe, first baffle with the limbers has all been seted up to second baffle lateral wall. The staff can adjust the position of the sewage treatment structure according to the pollution degree of a certain position of the lake water to purify the lake water.

Description

Do benefit to ecological remediation's gardens sewage treatment structure
Technical Field
The utility model relates to a technical field of sewage treatment structure especially relates to a do benefit to ecological remediation's gardens sewage treatment structure.
Background
The water is mostly static or poor-fluidity closed slow-flow water, the water environment capacity is small, the self-purification capacity of the water is low, pipeline sediments in rainy seasons flush and overflow into rivers, the river bottom is settled, peculiar smell gases such as hydrogen sulfide and ammonia gas are generated under anaerobic conditions, lake bodies with rain and sewage discharge openings are black and odorous, the lake bodies are heavily eutrophicated, blue-green algae explode in large area, and the urban water environment quality and the water ecological landscape are seriously affected.
In the prior art, a corresponding sewage treatment structure is generally arranged at a certain position of a pond, so that only the certain position of the pond is purified, and after the purification of lake water at the position is finished, the sewage treatment structure cannot be moved to other positions with serious pollution for purification.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a do benefit to ecological remediation's gardens sewage treatment structure, its advantage lies in, and the staff can be according to the pollution degree of lake water a certain position, adjusts the position of sewage treatment structure, carries out the purification of lake water.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a do benefit to ecological remediation's gardens sewage treatment structure, including float in the park lake the hull with set up in on the hull and carry out the purification structure who handles lake water, purification structure includes the purifying tank, the interval is provided with first baffle and second baffle in proper order in the purifying tank, first baffle with the second baffle will the purifying tank divide into first cavity, second cavity and third cavity, it has solid phosphorus agent to throw in the first cavity, the second cavity is thrown and is had showy type pasture and water grass, photosynthetic bacteria, biological agent etc. the third cavity drops into fish, shrimp, spiral shell etc. into, first cavity is connected with the pipeline of carrying lake water, the third cavity is connected with drainage pipe, first baffle with the limbers has all been seted up to second baffle lateral wall.
By adopting the scheme, the lake water is conveyed into the first cavity through the conveying pipeline, the phosphorus fixing agent in the first cavity is used, and the phosphorus fixing agent treatment causes the problem of phosphorus which is a main influence factor of water eutrophication. Lake water in the first cavity is discharged into the second cavity through the partition plate, floating aquatic plants, light and bacteria, biological agents and the like are thrown in the second cavity, and water quality is purified through the floating aquatic plants, the light and bacteria, the biological agents and the like. The lake water in the second cavity is discharged into the third cavity, so that self-purification is achieved, and the water discharge pipeline is connected into the third cavity, ecological balance is established, and self-purification is completed.
The staff can adjust the position of the ship body according to the needs of the lake water, thereby purifying the position with serious pollution.
Preferably, the purification structure further comprises a sedimentation tank, the conveying pipeline is connected to the sedimentation tank, a submersible pump located in a lake is fixed on the ship body, and the submersible pump is connected with a water inlet pipeline communicated with the sedimentation tank.
Through adopting above-mentioned scheme, the immersible pump is taken out lake water to the sedimentation tank in through the inlet channel to deposit through the sedimentation tank, the lake water after the sediment is carried to first cavity through pipeline, and the sedimentation tank is through the method of sediment, tentatively purifies, clears up lake water.
Preferably, a baffle is fixed in the sedimentation tank, the baffle divides the sedimentation tank into a first sedimentation cavity and a second sedimentation cavity, the first sedimentation cavity is communicated with the water inlet pipeline, the second sedimentation cavity is communicated with the conveying pipeline, and a flocculating agent is put into the second sedimentation cavity.
By adopting the scheme, the lake water is precipitated through the first precipitation cavity and then is discharged into the second precipitation cavity through the baffle plate, and the flocculating agent adsorbs the lake water colloid in the second precipitation cavity, so that the purification of the lake water is further carried out.
Preferably, the middle part of the baffle is provided with a through hole.
Through adopting above-mentioned scheme, more rubbish is floated on the surface of lake water in the first sediment cavity, and the through-hole sets up in the middle part of baffle, and the lake water in the first sediment cavity is discharged into the second through the through-hole and is depositd in the cavity, makes the lake water of second sediment cavity cleaner.
Preferably, the second sedimentation cavity is vertically and movably provided with a box body, the flocculating agent is movably arranged in the box body, two sides of the box body are provided with water drainage holes only for lake water to pass through, and the lake water in the second sedimentation cavity passes through the box body and flows to the conveying pipeline.
Through adopting above-mentioned scheme, through the setting of box body, through taking out of box body, carry out the change of flocculating agent, avoided the unable lake water of flocculating agent secondary.
Preferably, a cover plate is fixed to the top of the purification tank, a solar cell panel is installed on the cover plate, and the solar cell panel is obliquely arranged and is electrically communicated with the submersible pump through a storage battery.
Through adopting above-mentioned scheme, through solar cell panel's setting, the immersible pump utilizes the electricity that solar cell panel produced, makes the sewage treatment structure more environmental protection. Through the setting of apron, solar cell panel installs on the apron, makes better shining of sunshine to solar cell panel on.
Preferably, the cover plate is provided with an installation frame for installing a solar panel, and the installation frame comprises a bottom plate fixed on the cover plate, a support rod vertically fixed on the bottom plate, a rotating rod rotating and vertically penetrating through the support rod, and a fixed sleeve in threaded connection with the rotating rod and the support rod; the section of the rotating rod, which is positioned on the upper side of the supporting rod, is a fixed section provided with threads, and the upper part of the fixed sleeve is in threaded connection with the fixed section; when the support rod and the rotating rod rotate relatively, the fixing sleeve is separated from the fixing section.
By adopting the scheme, the orientation of the solar cell panel is adjusted by the relative rotation of the support rod and the rotating rod; meanwhile, the rotating sleeve is in threaded connection with the supporting rod and the rotating rod at the same time, so that the supporting rod and the rotating rod are relatively stable; simultaneously, when solar cell panel was adjusted to needs, fixed cover broke away from the fixed section to make things convenient for the rotation of dwang.
Preferably, a fixing ring is fixed on the top of the fixing section of the side wall of the rotating rod, and the top of the fixing ring is abutted against the fixing ring.
Through adopting above-mentioned scheme, solid fixed ring has the spacing effect to fixed cover, and fixed cover has tightly stabilized fixed cover in one step simultaneously, makes bracing piece and dwang more firm.
Preferably, the top of the rotating rod is horizontally fixed with a mounting rod, two sides of the solar cell panel are respectively fixed with a mounting block, and the mounting blocks are sleeved and fixed on the mounting rod.
By adopting the scheme, the installation of the solar cell panel is facilitated through the arrangement of the installation rod and the installation block; meanwhile, the solar cell panel is obliquely arranged, so that sunlight can be better irradiated onto the solar cell panel.
To sum up, the utility model discloses a beneficial technological effect does: the lake water is conveyed into the first cavity through a conveying pipeline, the phosphorus fixing agent in the first cavity is used, and the phosphorus fixing agent is used for treating the phosphorus which is the main influence factor of water eutrophication. Lake water in the first cavity is discharged into the second cavity through the partition plate, floating aquatic plants, light and bacteria, biological agents and the like are thrown in the second cavity, and water quality is purified through the floating aquatic plants, the light and bacteria, the biological agents and the like. The lake water in the second cavity is discharged into the third cavity, so that self-purification is achieved, and the water discharge pipeline is connected into the third cavity, ecological balance is established, and self-purification is completed.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the case;
fig. 3 is a schematic view of an exploded structure of the mounting bracket.
In the figure: 1. a hull; 2. a purification tank; 21. a first separator; 22. a second separator; 23. a first cavity; 24. a second cavity; 25. a third cavity; 26. a water through hole; 27. a cover plate; 3. a sedimentation tank; 31. a baffle plate; 311. a through hole; 32. a first precipitation cavity; 33. a second precipitation cavity; 4. a box body; 41. a drain hole; 51. a submersible pump; 52. a water inlet pipe; 53. a delivery conduit; 54. a water discharge pipeline; 6. a mounting frame; 61. a base plate; 62. a support bar; 621. rotating the hole; 63. rotating the rod; 64. Fixing a sleeve; 65. a fixed section; 66. a fixing ring; 67. a support ring; 68. mounting a rod; 7. a solar panel; 71. mounting blocks; 72 storage battery.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a do benefit to ecological remediation's gardens sewage treatment structure, including the hull 1 that can move on water, be provided with the purification structure who is used for purifying lake water on the hull 1. The purification structure comprises a sedimentation tank 3 and a purification tank 2 which are sequentially arranged on the ship body 1, and the sedimentation tank 3 is communicated with the purification tank 2 through a conveying pipeline 53; meanwhile, a submersible pump 51 positioned in a lake is installed at the bottom of the hull 1, a water inlet pipeline 52 for transporting lake water is connected to the submersible pump 51, the water inlet pipeline 52 is communicated with the sedimentation tank 3, and the purification tank 2 is connected with a drainage pipeline 54. When the pollution in the lake is serious, workers move the ship body 1 to a corresponding position, the lake water is pumped into the sedimentation tank 3 for sedimentation through the submersible pump 51, the lake water is conveyed to the purification tank 2 for purification through the conveying pipeline 53 after being precipitated in the sedimentation tank 3, and the lake water is discharged through the drainage pipeline 54 after being purified in the purification tank 2, so that the purification of the lake water is completed.
The sedimentation tank 3 is vertically fixed on the hull 1 and is close to the through head, the vertical fixed baffle 31 in the sedimentation tank 3, baffle 31 divide into about the sedimentation tank 3 two cavitys, and be first sediment cavity 32 and second sediment cavity 33 respectively, the one end that immersible pump 51 was kept away from to inlet channel 52 communicates on first sediment cavity 32 lateral wall, lake water is discharged into through inlet channel 52 in the first sediment cavity 32 and is carried out and deposit the material of great granule in the lake water. Meanwhile, the middle part of the baffle 31 in the vertical direction is provided with a plurality of through holes 311, and the precipitated lake water flows into the second precipitation air conditioner 33 through the through holes 311.
Referring to fig. 1 and 2, a box body 4 similar to a plate-shaped body is vertically fixed in the second settling cavity 33, an opening communicated with the inner side of the box body 4 is formed in the top of the box body 4, and a flocculating agent is placed in the box body 4 through the opening. Meanwhile, the vertical two sides of the box body 4 are provided with drain holes 41, and the drain holes 41 are small in size and only allow lake water to pass through and the flocculating agent cannot pass through. The end of the delivery duct 53 communicates with the second settling cavity 33 and the delivery duct 53 is located on the side of the box 4 remote from the baffle 31. Therefore, the lake water in the first precipitation cavity 32 flows to the box body 4, and the flocculating agent in the box body 4 adsorbs the lake water colloid, so that the effect of clearing the lake water is achieved. The cleaned lake water flows through the transport pipe 53 and is transported into the purification pond 2 through the transport pipe 53.
The purification tank 2 is vertically placed on the ship body 1 and is located one side of the sedimentation tank 3 far away from the ship head, a first partition plate 21 and a second partition plate 22 are fixed in the purification tank 2 at intervals in sequence, the first partition plate 21 and the second partition plate 22 divide the purification tank 2 into a first cavity 23, a second cavity 24 and a third cavity 25, a plurality of water through holes 26 are formed in the upper portions of the side walls of the first partition plate 21 and the second partition plate 22, and the water through holes 26 in the two partition plates 21 enable the first cavity 23 and the second cavity 24 to be communicated with the third cavity 25.
The end part of the conveying pipeline 53 is communicated with the upper part of the inner wall of the first cavity 23, the phosphorus fixing agent is thrown in the first cavity 23, the lake water in the sedimentation tank 3 is conveyed into the first cavity 23 by the conveying pipeline 53, and the problem of phosphorus which is a main influence factor of water eutrophication is solved through the phosphorus fixing agent treatment. Meanwhile, the treated lake water in the first cavity 23 is transported to the second cavity 24 through the water passage hole 26.
Floating waterweeds, light and bacteria, biological agents and the like are thrown in the second cavity 24, water quality is purified through the floating waterweeds, the light and bacteria, the biological agents and the like, and the lake water purified through the second cavity 24 is discharged into the third cavity 25 through the water through hole 26; meanwhile, the third cavity 25 is fed with fish, shrimp, snails, shellfish, etc., and ecological balance is newly achieved in this way, thereby achieving self-purification, and the drain pipe 54 is connected to the third cavity 25. Therefore, the lake water purified through the third cavity 25 is discharged into the lake through the water discharge pipe 54.
Referring to fig. 1 and 3, a cover plate 27 is horizontally fixed on the upper side of the purification tank 2, a mounting frame 6 is fixed on the cover plate 27, and an adjustable solar cell panel 7 is mounted on the mounting frame 6. The solar cell panel 7 is electrically connected with a storage battery 72, and the storage battery 72 is electrically connected with the submersible pump 51. Therefore, the electric power is generated by the solar cell panel 7 and stored in the storage battery 72, and the storage battery 72 generates sufficient electric power to operate the submersible pump 51.
The mounting frame 6 includes a base plate 61, and the base plate 61 is vertically fixed to the upper surface of the cover plate 27 by bolts. A cylindrical support rod 62 is vertically welded at the center of the upper surface of the bottom plate 61, and a circular rotating hole 621 is vertically formed downwards at the top of the support rod 62; meanwhile, the rotating rod 63 is rotatably arranged in the rotating hole 621 in a penetrating manner, the bottom of the rotating rod 63 abuts against the bottom of the rotating hole 621, and the side wall of the rotating rod 63 is attached to the side wall of the rotating hole 621. The solar cell panel 7 is obliquely arranged, and the solar cell panel 7 is fixedly arranged at the top of the rotating rod 63. The worker can adjust the direction of the orientation of the solar cell panel 7 by rotating the rotating rod 63 relative to the support rod 62.
After the solar cell panel 7 is adjusted in the direction, the position of the solar cell panel 7 needs to be fixed. The top threaded connection of bracing piece 62 has fixed cover 64, and the outside of dwang 63 is located to the upper portion cover of fixed cover 64, and dwang 63 is located one section of bracing piece 62 upside and keeps the certain distance for establishing threaded fixed section 65, the bottom of fixed section 65 and the top of bracing piece 62. Rotatory fixed cover 64 about the staff, the upper portion threaded connection of fixed cover is on canned paragraph 65, and the lower part of fixed cover 64 is in the upper portion threaded connection of bracing piece 62, and fixed cover 64 has the better steadiness that makes to have between bracing piece 62 and the dwang 63 this moment, and is difficult for taking place relative rotation, and then stabilizes solar cell panel 7's position.
The lateral wall of dwang 63 establishes with fixed pipeline top cover and is fixed with solid fixed ring 66, and fixed cover 64 just with fixed cover 64 looks butt when the rebound to further the connection of bracing piece 62 in dwang 63 has been stabilized.
A support ring 67 is vertically welded at the top of the rotating rod 63, and a mounting rod 68 is horizontally and fixedly arranged on the support ring 67 in a penetrating manner. The two sides of the solar cell panel 7 are fixed with mounting blocks 71 which are vertically fixed, and the two mounting blocks 71 are sleeved and fixed on the mounting rod 68.
The implementation principle of the embodiment is as follows: the staff charges for battery 72 through solar cell panel 7, starts immersible pump 51 through the electric quantity in the battery 72, and immersible pump 51 carries the lake water to first sediment cavity 32 through inlet channel 52 and deposits, and the lake water through-hole 311 of first sediment cavity 32 carries to second sediment cavity 33, and second sediment cavity 33 carries out the purification of lake water colloid through the flocculating agent in the box body 4. The interior of the second sedimentation cavity 33 is conveyed into the first cavity 23 through a conveying pipe and is purified through a phosphorus fixing agent, one side of the lake water in the first cavity 23 is purified through the second cavity 24 and the third cavity 25, and the purified lake water is discharged through a drainage pipe, so that the purification of the lake water is completed.
When a certain position in the lake needs to be purified, workers move the ship body 1 to the corresponding position to purify the lake water.
Due to the adjustment of the position, the worker needs to adjust the position of the solar cell panel 7, so that the solar cell panel 7 can better receive sunlight. Therefore, the worker rotates the rotation lever 63 relative to the fixing lever, thereby orienting the solar cell panel 7 too early.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (9)

1. The utility model provides a do benefit to ecological remediation's gardens sewage treatment structure which characterized in that: comprises a ship body (1) floating on a park lake and a purification structure which is arranged on the ship body (1) and is used for treating lake water, the purification structure comprises a purification tank (2), a first partition plate (21) and a second partition plate (22) are sequentially arranged in the purification tank (2) at intervals, the first clapboard (21) and the second clapboard (22) divide the purifying tank (2) into a first cavity (23), a second cavity (24) and a third cavity (25), the first cavity (23) is thrown with a phosphorus fixing agent, the second cavity (24) is thrown with floating aquatic plants, photosynthetic bacteria, biological agents and the like, fish, shrimp, snail and the like are put into the third cavity (25), the first cavity (23) is connected with a conveying pipeline (53) for conveying lake water, the third cavity (25) is connected with a drainage pipeline (54), and the side walls of the first partition plate (21) and the second partition plate (22) are both provided with a water through hole (26).
2. The garden sewage treatment structure beneficial to ecological restoration according to claim 1, characterized in that: the purification structure still includes sedimentation tank (3), pipeline (53) connect in sedimentation tank (3), be fixed with immersible pump (51) that are located the lake on hull (1), immersible pump (51) be connected with inlet channel (52) that sedimentation tank (3) are linked together.
3. The garden sewage treatment structure beneficial to ecological restoration according to claim 2, characterized in that: a baffle (31) is fixed in the sedimentation tank (3), the sedimentation tank (3) is divided into a first sedimentation cavity (32) and a second sedimentation cavity (33) by the baffle (31), the first sedimentation cavity (32) is communicated with the water inlet pipeline (52), the second sedimentation cavity (33) is communicated with the conveying pipeline (53), and a flocculating agent is put into the second sedimentation cavity (33).
4. The garden sewage treatment structure beneficial to ecological restoration according to claim 3, wherein: the middle part of the baffle (31) is provided with a through hole (311).
5. The garden sewage treatment structure beneficial to ecological restoration according to claim 3, wherein: the box body (4) is vertically and movably placed in the second sedimentation cavity (33), the flocculating agent is movably placed in the box body (4), water drain holes (41) only allowing lake water to pass through are formed in two sides of the box body (4), and the lake water in the second sedimentation cavity (33) flows to the conveying pipeline (53) through the box body (4).
6. The garden sewage treatment structure beneficial to ecological restoration according to claim 2, characterized in that: the top of purifying pond (2) is fixed with apron (27), install solar cell panel (7) that the slope set up on apron (27), solar cell panel (7) pass through battery (72) with immersible pump (51) electricity intercommunication.
7. The garden sewage treatment structure beneficial to ecological restoration according to claim 6, wherein: the solar cell panel fixing device is characterized in that the cover plate (27) is provided with an installation frame (6) used for installing a solar cell panel (7), and the installation frame (6) comprises a bottom plate (61) fixed on the cover plate (27), a support rod (62) vertically fixed on the bottom plate (61), a rotating rod (63) rotating and vertically penetrating through the support rod (62), and a fixed sleeve (64) in threaded connection with the support rod (62); a section of the rotating rod (63) positioned on the upper side of the supporting rod (62) is a fixed section (65) provided with threads, and the upper part of the fixed sleeve (64) is in threaded connection with the fixed section (65); when the support rod (62) and the rotating rod (63) rotate relatively, the fixing sleeve (64) is separated from the fixing section (65).
8. The garden sewage treatment structure beneficial to ecological restoration according to claim 7, wherein: the lateral wall of dwang (63) in fixed section (65) top is fixed with solid fixed ring (66), the top of fixed cover (64) with gu fixed ring (66) looks butt.
9. The garden sewage treatment structure beneficial to ecological restoration according to claim 7, wherein: the top level of dwang (63) is fixed with installation pole (68), the both sides of solar cell panel (7) are fixed with installation piece (71) respectively, two installation piece (71) cover is established and is fixed in on installation pole (68), just solar cell panel (7) slope sets up.
CN201921662412.6U 2019-09-30 2019-09-30 Do benefit to ecological remediation's gardens sewage treatment structure Expired - Fee Related CN210656601U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921662412.6U CN210656601U (en) 2019-09-30 2019-09-30 Do benefit to ecological remediation's gardens sewage treatment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921662412.6U CN210656601U (en) 2019-09-30 2019-09-30 Do benefit to ecological remediation's gardens sewage treatment structure

Publications (1)

Publication Number Publication Date
CN210656601U true CN210656601U (en) 2020-06-02

Family

ID=70839716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921662412.6U Expired - Fee Related CN210656601U (en) 2019-09-30 2019-09-30 Do benefit to ecological remediation's gardens sewage treatment structure

Country Status (1)

Country Link
CN (1) CN210656601U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116282659A (en) * 2023-02-16 2023-06-23 南通联源机电科技股份有限公司 Self-filtering type wastewater purification treatment equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116282659A (en) * 2023-02-16 2023-06-23 南通联源机电科技股份有限公司 Self-filtering type wastewater purification treatment equipment

Similar Documents

Publication Publication Date Title
CN109467283A (en) Sewage disposal device suitable for more family sanitary sewage disposals
CN112960762B (en) Biological rotating cage water purification system driven by gravity flow water power
CN110182955B (en) Floating bed device for restoring seawater ecological culture water body
CN117164167B (en) Fishery photovoltaic complementary ecological filtration dam system for aquaculture tail water
KR20190009467A (en) Green algae prevention apparatus using sunlight generation and methode thereof
KR101064738B1 (en) Screen module for purifying water and air using effective microoganims, method for purifying and apparatus for purifying water of fish-raising farm
CN210656601U (en) Do benefit to ecological remediation's gardens sewage treatment structure
CN111362406A (en) Suspended solar integrated water purification equipment and water purification method
CN110790451A (en) Black odorous water treatment system and method for treating black odorous water by using same
CN107840458B (en) Mixed oxygenation-microorganism immobilization biological strengthening type artificial floating island
CN111925034B (en) Municipal drainage grading treatment system
KR101547856B1 (en) System for purifying water which uses floating type
CN109836016B (en) River drain sewage treatment plant
CN107129116B (en) Floating type comprehensive water treatment equipment and water treatment method using same
CN106277592B (en) Double-membrane self-circulation sewage treatment system
CN109987796B (en) Efficient water purification modularized constructed wetland system
CN114409199A (en) Constructed wetland sewage purification device and sewage treatment method thereof
CN2818472Y (en) In situ composite reaction treater for domestic and fecal sewage
CN107010726B (en) One kind is drifted along formula water purification system
CN106698845B (en) Water body restoration system and restoration method
CN216687816U (en) Bury formula sewage treatment device
CN217746034U (en) Drainage current stabilizer in rural sewage treatment pond
CN2892234Y (en) Drges scraping device of mud scraper with two sediment tank
CN216337165U (en) Ecological irrigation district ditch pond pollutant clean system
CN113121064B (en) Efficient composite wetland system for reducing rainfall runoff pollutants

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200602

Termination date: 20210930

CF01 Termination of patent right due to non-payment of annual fee