CN210642943U - List accommodating and managing device for civil engineering cost - Google Patents

List accommodating and managing device for civil engineering cost Download PDF

Info

Publication number
CN210642943U
CN210642943U CN201921981043.7U CN201921981043U CN210642943U CN 210642943 U CN210642943 U CN 210642943U CN 201921981043 U CN201921981043 U CN 201921981043U CN 210642943 U CN210642943 U CN 210642943U
Authority
CN
China
Prior art keywords
wall
civil engineering
sliding
inventory
box cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921981043.7U
Other languages
Chinese (zh)
Inventor
刘绍艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921981043.7U priority Critical patent/CN210642943U/en
Application granted granted Critical
Publication of CN210642943U publication Critical patent/CN210642943U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a management device is acceptd to inventory for civil engineering cost belongs to inventory management technical field. A list containing and managing device for civil engineering construction cost comprises a box body and a box cover, wherein the box body and the box cover are connected through hinges in a rotating mode, a placing groove is formed in the box body, a groove matched with the placing groove is formed in the inner wall of the box cover in a chiseling mode, a first sliding rod is connected to the inner wall of the groove, a sliding plate is connected to the outer wall of the first sliding rod, a first fixed block is connected to the outer wall of the sliding plate, a first connecting rod is connected to the inner wall of the first fixed block in a rotating mode, one end, away from the sliding plate, of the first connecting rod is connected with a sliding block in a rotating mode, a second sliding rod is connected to; the utility model discloses can effectually smooth and flatten the processing to the inventory that takes place pincher trees, avoid the inventory often to be looked up and lead to its condition that takes place pincher trees damaged, and then guarantee the normal of inventory to look up.

Description

List accommodating and managing device for civil engineering cost
Technical Field
The utility model relates to a list management technical field especially relates to a management device is acceptd to list for civil engineering cost.
Background
The construction cost is defined from the perspective of an owner, and refers to the construction cost of a project, i.e., the total sum of all expenses expected or actually required to complete the construction of a project, and the construction cost refers to the construction cost of a project, i.e., all capital investment expenses expected or actually paid for the construction of a project, and the expenses mainly include equipment and tool purchase expenses, construction project and installation project expenses, other expenses of the construction, preparation expenses, interest in construction period, and fixed asset investment direction adjustment taxes, and thus, corresponding cost lists are generated, and thus, the lists need to be stored by a kind of accommodation management.
The list accommodating and managing device for engineering cost in the prior art can only perform corresponding accommodating function on lists, but the lists are often taken out and called before engineering construction, so that the situation that the lists are creased is inevitable, if the lists cannot be protected, the situation that the lists are damaged is caused, the value of the lists is further influenced, the information of the lists cannot be normally consulted, and therefore the list accommodating and managing device for civil engineering cost is particularly important.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problems in the prior art, and providing a management device is acceptd to inventory for civil engineering cost.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a management device is acceptd with inventory to civil engineering cost, includes box and case lid, box and case lid pass through the hinge and rotate and link to each other, the inside standing groove that is provided with of box, dig on the case lid inner wall have with standing groove assorted recess, be connected with first slide bar on the recess inner wall, be connected with the slide on the first slide bar outer wall, be connected with first fixed block on the slide outer wall, it is connected with first connecting rod to rotate on the first fixed block inner wall, the one end that the slide was kept away from to first connecting rod is rotated and is connected with the slider, be connected with the second slide bar on the slider inner wall, be connected with the second fixed block on the second slide bar end wall, be connected with the clamp plate on the.
Preferably, a first elastic piece is connected between the second fixed block and the sliding block, and the first elastic piece is sleeved on the outer wall of the second sliding rod.
Preferably, the inner wall of the groove is further connected with a second connecting rod, the inner wall of one end, far away from the groove, of the second connecting rod is connected with a pressing roller, and the pressing roller is matched with the placing groove.
Preferably, the second connecting rod and the pressing roller are both provided with two groups, and the two groups of second connecting rod side walls are connected with second elastic pieces.
Preferably, the outer wall of the box body is provided with a buckle, and the outer wall of the box cover is provided with a clamping block matched with the buckle.
Preferably, the side walls of the box body and the box cover are both connected with handles, and anti-skid grains are arranged on the outer walls of the handles.
Compared with the prior art, the utility model provides a management device is acceptd to inventory for civil engineering cost possesses following beneficial effect:
1. the inventory accommodating and managing device for civil engineering cost is characterized in that when the inventory needs to be taken or stored, the buckle and the clamping block are opened, the handle on the box cover is pulled, the box body is further opened, the storage inventory can be taken, after the storage inventory is taken or stored, the box cover is driven to rotate through the handle, when the box cover descends to a certain position, the compression roller can act on the inventory surface in the placing groove, then the box cover is continuously pressed downwards, the second connecting rod can be driven to rotate, the compression roller rolls on the inventory, the inventory can be flattened, the second elastic part is arranged, the second connecting rod is guaranteed to have a retraction force in the rotating process, the second connecting rod can better act on the inventory, the wrinkled inventory can be flattened, and meanwhile, when the box cover is rotated, the compression plate can be driven to rotate, and then drive the clamp plate and act on the manifest, after the clamp plate acts on the manifest, continue to push down, and make buckle and fixture block looks block, and then the clamp plate then can receive the reaction force that the manifest gave, and then the reaction force acts on the second slide bar, drive the slide bar rebound, thereby drive first connecting rod and take place the rotation, and then drive the slider and slide to both sides along the second slide bar, and simultaneously, through being provided with first elastic component, and then can produce a reaction force to the slider, thereby obstruct the slider and slide to second slide bar both ends, thereby make the clamp plate inseparable offset with the manifest, thereby with the inseparable mortgage of manifest inside the standing groove, and then can effectually flatten the manifest that often will look up and take place pincher, thereby the effectual broken condition of avoiding the manifest to take place, and then can effectually play good guard action to the manifest.
The device does not relate to the part and all is the same with prior art or can adopt prior art to realize, the utility model discloses can effectually smooth and flatten the processing to the inventory that takes place pincher trees, avoid the inventory often to be consulted and lead to its condition that takes place the pincher trees damaged, and then guarantee the normal of inventory and consult.
Drawings
Fig. 1 is a first schematic structural view of a list accommodation and management device for civil engineering cost according to the present invention;
fig. 2 is a schematic structural diagram of a list accommodating and managing device for civil engineering cost according to the present invention;
fig. 3 is a front view of the press roller and the press plate of the list accommodation management device for civil engineering cost according to the present invention;
fig. 4 is the utility model provides a management device is acceptd with manifest to civil engineering cost's compression roller and clamp plate's schematic structure view.
In the figure: 1. a box body; 101. a placement groove; 102. buckling; 103. a clamping block; 104. a handle; 2. a box cover; 201. a groove; 3. a first slide bar; 301. a slide plate; 302. a first link; 303. a slider; 304. a second slide bar; 305. a first fixed block; 306. a second fixed block; 307. pressing a plate; 308. a first elastic member; 4. a second link; 401. a compression roller; 402. a second elastic member.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1:
referring to fig. 1-4, a civil engineering cost list accommodating and managing device comprises a box body 1 and a box cover 2, wherein the box body 1 is connected with the box cover 2 through hinges in a rotating mode, a placing groove 101 is formed in the box body 1, a groove 201 matched with the placing groove 101 is formed in the inner wall of the box cover 2, a first sliding rod 3 is connected to the inner wall of the groove 201, a sliding plate 301 is connected to the outer wall of the first sliding rod 3, a first fixing block 305 is connected to the outer wall of the sliding plate 301, a first connecting rod 302 is connected to the inner wall of the first fixing block 305 in a rotating mode, one end, far away from the sliding plate 301, of the first connecting rod 302 is connected with a sliding block 303 in a rotating mode, a second sliding rod 304 is connected to the inner wall of the sliding block 303.
A first elastic element 308 is connected between the second fixed block 306 and the sliding block 303, and the first elastic element 308 is sleeved on the outer wall of the second sliding rod 304.
Still be connected with second connecting rod 4 on the recess 201 inner wall, be connected with compression roller 401 on the one end inner wall that recess 201 was kept away from to second connecting rod 4, compression roller 401 and standing groove 101 phase-match.
The second connecting rod 4 and the pressing roller 401 are both provided with two groups, and the side walls of the two groups of second connecting rods 4 are connected with second elastic pieces 402.
The outer wall of the box body 1 is provided with a buckle 102, and the outer wall of the box cover 2 is provided with a clamping block 103 matched with the buckle 102.
The side walls of the box body 1 and the box cover 2 are both connected with a handle 104, and anti-skid grains are arranged on the outer wall of the handle 104.
When the list needs to be taken or stored, the buckle 102 and the fixture block 103 are opened, then the handle 104 on the box cover 2 is pulled, and the box body 1 is further opened, so that the stored list can be taken, after the stored list is taken or stored, the box cover 2 is driven to rotate through the handle 104, when the box cover 2 descends to a certain position, the compression roller 401 acts on the list cleaning surface inside the placing groove 101, then the box cover 2 is continuously pressed downwards, and then the second connecting rod 4 is driven to rotate, so that the compression roller 401 rolls on the list, and the list can be flattened, through the second elastic part 402, the second connecting rod 4 is ensured to have a retraction force in the rotating process, and further can better act on the list, so that the wrinkled list can be flattened, meanwhile, when the box cover 2 is rotated, the compression plate 307 is driven to rotate, and further the compression plate 307 is driven to act on the list, after the pressing plate 307 acts on the list, the pressing plate continues to press downwards, the buckle 102 is clamped with the clamping block 103, the pressing plate 307 can receive a reaction force given by the list, the reaction force acts on the second sliding rod 304, the second sliding rod 304 is driven to move upwards, the first connecting rod 302 is driven to rotate, the sliding block 303 is driven to slide towards two sides along the second sliding rod 304, meanwhile, the first elastic piece 308 is arranged, the reaction force can be generated on the sliding block 303, the sliding block 303 is prevented from sliding towards two ends of the second sliding rod 304, the pressing plate 307 is enabled to be abutted against the list closely, the list is enabled to be abutted against the inside of the placing groove 101 closely, the list which is always checked to be flattened, the situation that the list is broken is effectively avoided, and a good protection effect can be effectively achieved on the list.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The inventory containing and managing device for civil engineering construction cost comprises a box body (1) and a box cover (2), and is characterized in that the box body (1) and the box cover (2) are rotationally connected through hinges, a placing groove (101) is formed in the box body (1), a groove (201) matched with the placing groove (101) is formed in the inner wall of the box cover (2), a first sliding rod (3) is connected to the inner wall of the groove (201), a sliding plate (301) is connected to the outer wall of the first sliding rod (3), a first fixed block (305) is connected to the outer wall of the sliding plate (301), a first connecting rod (302) is rotationally connected to the inner wall of the first fixed block (305), a sliding block (303) is rotationally connected to one end, far away from the sliding plate (301), of the first connecting rod (302), a second sliding rod (304) is connected to the inner wall of the sliding block (303), and a second fixed block (306) is connected to the end, and the outer wall of the second fixing block (306) is connected with a pressing plate (307).
2. The civil engineering cost inventory housing and managing device as claimed in claim 1, wherein a first elastic member (308) is connected between the second fixed block (306) and the sliding block (303), and the first elastic member (308) is sleeved on the outer wall of the second sliding rod (304).
3. The civil engineering cost list storage and management device according to claim 2, wherein the inner wall of the groove (201) is further connected with a second connecting rod (4), the inner wall of one end, far away from the groove (201), of the second connecting rod (4) is connected with a pressing roller (401), and the pressing roller (401) is matched with the placing groove (101).
4. A list accommodating and managing device for civil engineering construction costs according to claim 3 wherein two sets of the second link (4) and the press roller (401) are provided, and a second elastic member (402) is connected to the side wall of the two sets of the second link (4).
5. The civil engineering cost list accommodation and management device as claimed in claim 1, wherein a buckle (102) is arranged on the outer wall of the box body (1), and a clamping block (103) matched with the buckle (102) is arranged on the outer wall of the box cover (2).
6. The civil engineering cost list storage and management device according to claim 5, wherein the side walls of the box body (1) and the box cover (2) are both connected with a handle (104), and the outer wall of the handle (104) is provided with anti-skid lines.
CN201921981043.7U 2019-11-17 2019-11-17 List accommodating and managing device for civil engineering cost Expired - Fee Related CN210642943U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921981043.7U CN210642943U (en) 2019-11-17 2019-11-17 List accommodating and managing device for civil engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921981043.7U CN210642943U (en) 2019-11-17 2019-11-17 List accommodating and managing device for civil engineering cost

Publications (1)

Publication Number Publication Date
CN210642943U true CN210642943U (en) 2020-06-02

Family

ID=70834169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921981043.7U Expired - Fee Related CN210642943U (en) 2019-11-17 2019-11-17 List accommodating and managing device for civil engineering cost

Country Status (1)

Country Link
CN (1) CN210642943U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113439948A (en) * 2021-06-09 2021-09-28 刘权 List storage device is used in civil engineering cost management
CN117837893A (en) * 2024-03-05 2024-04-09 江苏德添项目管理有限公司 Object storage device for engineering cost management

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113439948A (en) * 2021-06-09 2021-09-28 刘权 List storage device is used in civil engineering cost management
CN117837893A (en) * 2024-03-05 2024-04-09 江苏德添项目管理有限公司 Object storage device for engineering cost management
CN117837893B (en) * 2024-03-05 2024-05-07 江苏德添项目管理有限公司 Object storage device for engineering cost management

Similar Documents

Publication Publication Date Title
CN210642943U (en) List accommodating and managing device for civil engineering cost
CN211313726U (en) Tool box locking bar linkage structure
CN206154264U (en) Portable toolbox
CN210195504U (en) Locking device for tool box with good locking effect
CN215708155U (en) Cascaded model instrument containing box
CN207673149U (en) A kind of lockset of side box of motorbike
CN111276651A (en) Cover body capable of quickly and automatically locking battery jar of electronic product
CN210099977U (en) Placer for industrial design instrument
CN211647728U (en) Casement window hinge with limiting function
CN211092644U (en) Information management device for financial accounting
CN209789119U (en) Cabinet is placed to intelligence convenient to deposit article
CN211303847U (en) Panel processing garbage collection device
CN214213742U (en) Take convenient hardware and tools case
CN207069159U (en) Industrial modular socket
CN217453864U (en) Tool box
CN212280279U (en) Portable folder storage box for data statistics
CN211711411U (en) Frock is collected to construction's instrument
CN213904222U (en) Hardware expansion board applied to artificial intelligence
CN210018173U (en) Portable computer hardware maintenance detection equipment
CN211811066U (en) Hardware component storage box
CN213934051U (en) Online detection device for high-voltage alternating-current intelligent power transmission
CN215755644U (en) Box and box assembly with same
CN214433125U (en) Multifunctional stool
CN213849581U (en) Certificate storage device for public security
CN213703364U (en) Intelligent tool kit is used in computer hardware installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200602