CN210598088U - Climbing frame lifting structure - Google Patents

Climbing frame lifting structure Download PDF

Info

Publication number
CN210598088U
CN210598088U CN201920864927.8U CN201920864927U CN210598088U CN 210598088 U CN210598088 U CN 210598088U CN 201920864927 U CN201920864927 U CN 201920864927U CN 210598088 U CN210598088 U CN 210598088U
Authority
CN
China
Prior art keywords
pulley
frame
climbing frame
hoist
suspension rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920864927.8U
Other languages
Chinese (zh)
Inventor
徐成瑶
赵丽萍
白元
刘琼华
徐辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN201920864927.8U priority Critical patent/CN210598088U/en
Application granted granted Critical
Publication of CN210598088U publication Critical patent/CN210598088U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a climbing frame lifting structure, which comprises a hoist derrick frame, a pulley derrick frame and a climbing frame upright post, wherein the hoist derrick frame is arranged at the upper end of the climbing frame upright post, the pulley derrick frame is arranged at the lower end of the climbing frame upright post, the hoist derrick frame consists of a suspension rod and a support channel steel connected with the two ends of the suspension rod, a hoist fixing shaft is arranged in the suspension rod in a penetrating way, and an electric hoist is fixed on the hoist fixing shaft; the pulley derrick is composed of a groove-shaped mounting cross beam, a mounting support fixedly connected with one end of the mounting cross beam and auxiliary supports respectively connected with two side walls of the other end of the mounting cross beam, a pulley shaft is arranged on the mounting cross beam, a pulley assembly is arranged in the pulley shaft, a steel wire rope is wound in the pulley assembly, one end of the steel wire rope is fixed on a building lifting beam, and the other end of the steel wire rope is fixedly connected with a lifting hook of an electric hoist. The utility model discloses need not frequently to shift installation electric block after improving, it is more convenient, safe to climb a use, and it is higher to climb a availability factor during construction, can improve construction work efficiency.

Description

Climbing frame lifting structure
Technical Field
The utility model relates to a construction technical field especially relates to a climb a hoisting structure.
Background
The climbing frame is also called a lifting frame, and is a novel construction tool which is popularized and used in recent years and can climb up or down along a building.
In the construction process, the climbing frame needs frequent lifting operation. The lifting operation of the climbing frame is usually realized by an electric hoist and a lifting steel wire rope. The electric block that will climb in the frame among the prior art is usually hung and is put and install on the building basis, if set up on the lifting beam of certain one deck of building usually, after the frame that climbs promoted to the position higher than the lifting beam of hanging installation electric block, because electric block still fixes at the building lifting beam, the personnel on the frame that climbs can't operate control electric block again, in order to make the frame that climbs can continue to climb, must retransfer the electric block by construction operation personnel and install on the lifting beam of higher floor position, because electric block is heavier, need several people to operate together when shifting electric block and just can accomplish, electric block shifts the installation frequently promptly, waste time and energy, influence the frame availability factor of climbing. Therefore, the problem that the electric hoist of the climbing frame in the prior art is inconvenient to transfer and install needs to be solved, and the use efficiency of the climbing frame during construction is further improved.
Disclosure of Invention
In order to solve the problem, an object of the utility model is to provide a climb a hoisting structure, can climb a hoisting process and need not frequently to shift installation electric block, it is more convenient, safe to operate and use, climbs during the construction and puts up the availability factor higher.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a climbing frame lifting structure comprises a hoist headframe, a pulley headframe and a climbing frame upright post, wherein the hoist headframe is installed at the upper end of the climbing frame upright post, the pulley headframe is installed at the lower end of the climbing frame upright post, the hoist headframe consists of a suspension rod and a support channel steel connected with two ends of the suspension rod, a hoist fixing shaft penetrates through the suspension rod, and an electric hoist is fixed on the hoist fixing shaft; the pulley derrick is composed of a groove-shaped mounting cross beam, a mounting support fixedly connected with one end of the mounting cross beam and auxiliary supports respectively connected with two side walls of the other end of the mounting cross beam, a pulley shaft is arranged on the mounting cross beam, a pulley assembly is arranged in the pulley shaft, a steel wire rope is wound in the pulley assembly, one end of the steel wire rope is fixed on a building lifting beam, and the other end of the steel wire rope is fixedly connected with a lifting hook of an electric hoist.
Furthermore, the supporting channel steel is provided with a mounting hole, and the supporting channel steel is fixedly connected with the upper end of the climbing frame stand column through the mounting hole.
Furthermore, a reinforcing plate is arranged on the suspension rod, and the hoist fixing shaft penetrates through the suspension rod provided with the reinforcing plate.
Furthermore, the welding of the one end of installation crossbeam has the board of sealing, the installing support with the auxiliary stand with climb the lower extreme fixed linking to each other of frame stand.
Furthermore, the pulley shaft in the installation crossbeam includes two, and fixing nuts are arranged at two ends of the pulley shaft.
The utility model discloses following beneficial effect has:
1. the utility model discloses a set up calabash well cabinet frame in climbing the frame, install electric block on calabash well cabinet frame, rethread pulley and wire rope cooperation, realize the automatic lifting of climbing the frame through operating electric block, electric block follows and climbs the frame and goes up and down together, and operation control is convenient, all no longer need frequently shift installation electric block at the reciprocal lift in-process of a lot of climbing the frame, and it is more convenient, safe to climb the frame use, and it is higher to climb a availability factor during the construction.
2. The utility model discloses calabash groined type frame, pulley groined type frame stable in structure are reliable, calabash groined type frame, pulley groined type frame with climb a stand fixed connection back safe and reliable, overall stability is good, can improve and climb a bulk strength.
3. The utility model discloses set up two sets of pulleys in the pulley well cabinet frame, make around not hard up the pulley that can not jump out of wire rope of putting in loose pulley assembly, the operation is more smooth and easy.
In a word, the utility model discloses need not frequently to shift installation electric block after the improvement, it is more convenient, safe to climb a use, and it is higher to climb a availability factor during the construction, can improve construction work efficiency.
Drawings
Fig. 1 is a schematic structural view of the climbing frame lifting structure of the present invention;
FIG. 2 is a schematic structural view of the gourd derrick of the present invention;
fig. 3 is a schematic structural view of the pulley derrick of the present invention.
Description of reference numerals:
1. a calabash-shaped frame; 11. a suspension rod; 12. a gourd fixing shaft; 13. supporting channel steel; 14. a reinforcing plate; 2. a pulley derrick; 21. mounting a cross beam; 22. a pulley shaft; 23. a sheave assembly; 24. a sealing plate; 25. mounting a bracket; 26. an auxiliary support; 27. fixing a nut; 3. a climbing frame upright post; 4. an electric hoist; 5. a wire rope; 6. a building lifting beam.
Detailed Description
The invention will be described in further detail with reference to the following drawings and specific embodiments:
referring to fig. 1-3, a climbing frame lifting structure comprises a hoist-shaped frame 1, a pulley-shaped frame 2 and a climbing frame upright post 3, wherein the hoist-shaped frame 1 is installed at the upper end of the climbing frame upright post 3, the pulley-shaped frame 2 is installed at the lower end of the climbing frame upright post 3, the hoist-shaped frame 1 is composed of a suspension rod 11 and a support channel steel 13 connected with two ends of the suspension rod 11, a hoist fixing shaft 12 penetrates through the suspension rod 11, and an electric hoist 4 is fixed on the hoist fixing shaft 12; the pulley derrick 2 is composed of a groove-shaped mounting cross beam 21, a mounting support 25 fixedly connected with one end of the mounting cross beam 21 and auxiliary supports 26 respectively connected with two side walls of the other end of the mounting cross beam 21, a pulley shaft 22 is arranged on the mounting cross beam 21, a pulley assembly 23 is arranged in the pulley shaft 22, a steel wire rope 5 is wound in the pulley assembly 23, one end of the steel wire rope 5 is fixed on a building lifting beam 6, and the other end of the steel wire rope 5 is fixedly connected with a lifting hook of an electric hoist 4. The electric block 4 can also be changed into a chain block.
The supporting channel steel 13 is provided with a mounting hole, the supporting channel steel 13 is fixedly connected with the upper end of a climbing frame upright post (3) through the mounting hole, the hoist headframe 1 is formed by welding a suspension rod 11, a supporting channel steel 13 and the like, the supporting channel steel 13 can be selected from 10# channel steel, a reinforcing plate 14 is arranged on the suspension rod 11, and a hoist fixing shaft 12 is arranged in the suspension rod 11 in a penetrating mode and provided with the reinforcing plate 14.
A sealing plate 24 is welded at one end of the mounting cross beam 21, and the mounting bracket 25 and the auxiliary bracket 26 are fixedly connected with the lower end of the climbing frame upright 3. The pulley derrick 2 is formed by welding a mounting cross beam 21, a mounting bracket 25, an auxiliary bracket 26 and the like, the mounting bracket 25 and the auxiliary bracket 26 can be formed by nesting and welding 10# channel steel or 8# channel steel, and the overall strength is guaranteed.
The number of the pulley shafts 22 in the mounting cross beam 21 is two, fixing nuts 27 are arranged at two ends of the pulley shafts 22, and the pulley shafts 22 can be bolts above M10.
The utility model discloses use: through controlling electric block 4, electric block 4 passes through 5 whole climbing frame automatic lifting of wire rope pulling or descends, and electric block 4 follows and climbs the frame and goes up and down together, and wire rope 5's length is selected according to climbing frame construction lifting movement distance, all no longer need frequently shift installation electric block 4 in the reciprocal lift in-process many times of climbing the frame.
The above only is the detailed implementation manner of the present invention, not limiting the patent scope of the present invention, all the equivalent structure changes made in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (5)

1. The utility model provides a climb a hoisting structure which characterized in that: the lifting device comprises a calabash # -shaped frame (1), a pulley # -shaped frame (2) and a climbing frame upright post (3), wherein the calabash # -shaped frame (1) is installed at the upper end of the climbing frame upright post (3), the pulley # -shaped frame (2) is installed at the lower end of the climbing frame upright post (3), the calabash # -shaped frame (1) consists of a suspension rod (11) and a support channel steel (13) connected with the two ends of the suspension rod (11), a calabash fixing shaft (12) penetrates through the suspension rod (11), and an electric calabash (4) is fixed on the calabash fixing shaft (12); pulley derrick (2) comprise installation crossbeam (21) of flute profile, with installation crossbeam (21) one end fixed connection's installing support (25) and auxiliary stand (26) of being connected with installation crossbeam (21) other end both sides wall respectively, be equipped with pulley shaft (22) on installation crossbeam (21), be equipped with loose pulley assembly (23) in loose pulley shaft (22), around putting in loose pulley assembly (23) wire rope (5), the one end of wire rope (5) is fixed on building hoisting beam (6), the other end of wire rope (5) with the lifting hook of electric block (4) is fixed continuous.
2. The climbing frame elevating structure according to claim 1, wherein: the supporting channel steel (13) is provided with a mounting hole, and the supporting channel steel (13) is fixedly connected with the upper end of the climbing frame stand column (3) through the mounting hole.
3. The climbing frame elevating structure according to claim 1, wherein: the suspension rod (11) is provided with a reinforcing plate (14), and the hoist fixing shaft (12) penetrates through the suspension rod (11) provided with the reinforcing plate (14).
4. The climbing frame elevating structure according to claim 1, wherein: the welding of the one end of installation crossbeam (21) has sealing plate (24), installing support (25) with auxiliary stand (26) with climb the lower extreme fixed connection of frame stand (3).
5. The climbing frame elevating structure according to claim 1, wherein: the pulley shafts (22) in the mounting cross beam (21) comprise two pulley shafts, and fixing nuts (27) are arranged at two ends of each pulley shaft (22).
CN201920864927.8U 2019-06-10 2019-06-10 Climbing frame lifting structure Active CN210598088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920864927.8U CN210598088U (en) 2019-06-10 2019-06-10 Climbing frame lifting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920864927.8U CN210598088U (en) 2019-06-10 2019-06-10 Climbing frame lifting structure

Publications (1)

Publication Number Publication Date
CN210598088U true CN210598088U (en) 2020-05-22

Family

ID=70713574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920864927.8U Active CN210598088U (en) 2019-06-10 2019-06-10 Climbing frame lifting structure

Country Status (1)

Country Link
CN (1) CN210598088U (en)

Similar Documents

Publication Publication Date Title
CN209957260U (en) Hoisting frame for mechanical equipment
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN216341336U (en) Adjustable inverted frame structure of 750 x 750mm cross-section holding rod system
CN214989776U (en) Bridge crane with anti-swing function
CN201634333U (en) Super-altitude gantry crane
CN207110428U (en) A kind of positive sheet chain block mounting structure of climbing frame
CN210598088U (en) Climbing frame lifting structure
CN210480530U (en) Elevator shaft traction overhead two-to-one suspension ratio construction elevator
CN110844821A (en) Multifunctional construction operation platform for comprehensive pipe rack
CN215755931U (en) Large transformer hoisting equipment in factory building
CN213085125U (en) Elevator shaft traction rotary telescopic construction elevator
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN201347719Y (en) Telescopic safety ladder
CN210563320U (en) Hanging basket suspension structure without support and counterweight
CN201105957Y (en) Tower crane engineering special-purpose gin pole hoist
CN113323368A (en) Lifting construction method for external protection hanging frame of assembled building
CN2244546Y (en) Self-lifting guide support adding device for construction elevator cage
CN210217102U (en) Hoist is just hanging and is adapted hoisting wire rope type climb a hoisting mechanism
CN214359724U (en) Lifting appliance special for elevator shaft
CN216190195U (en) Rope end combination fixing device
CN213011671U (en) Lightweight simple vertical transportation equipment
CN212356327U (en) Traction device for dismounting and mounting large tower crane
CN218145288U (en) Transformer hoisting tool
CN201538660U (en) Simple hoisting device for mounting steel chimney tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant