CN210597398U - Dog-ear type two-phase underground continuous wall cold joint waterproof construction - Google Patents

Dog-ear type two-phase underground continuous wall cold joint waterproof construction Download PDF

Info

Publication number
CN210597398U
CN210597398U CN201920659081.4U CN201920659081U CN210597398U CN 210597398 U CN210597398 U CN 210597398U CN 201920659081 U CN201920659081 U CN 201920659081U CN 210597398 U CN210597398 U CN 210597398U
Authority
CN
China
Prior art keywords
drilling
continuous wall
underground continuous
piles
dog
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920659081.4U
Other languages
Chinese (zh)
Inventor
薛光桥
肖明清
彭佳湄
鲁志鹏
邓朝晖
梁艳
罗驰恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201920659081.4U priority Critical patent/CN210597398U/en
Application granted granted Critical
Publication of CN210597398U publication Critical patent/CN210597398U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a dog-ear type underground continuous wall cold joint waterproof construction in two stages, including dog-ear type underground continuous wall in two stages and the stake of drilling that is executed with the underground continuous wall homogeneous phase in two stages of dog-ear type underground continuous wall dog-ear department, dog-ear type underground continuous wall in two stages includes the preceding underground continuous wall and the later stage underground continuous wall that are 90 degrees dog-ears each other, the periphery of stake of drilling is tangent with preceding underground continuous wall and later stage ground wire continuous wall simultaneously, executes at the stake of drilling and accomplishes the back, clears away soil body and the mud skin between stake of drilling and the underground continuous wall in two stages, again to refill self-setting material in the stake of drilling, through self-setting material fills space between stake of drilling and stake and the underground continuous wall in two stages to form stagnant water reinforcing body.

Description

Dog-ear type two-phase underground continuous wall cold joint waterproof construction
Technical Field
The method relates to the field of constructional engineering, in particular to a cold joint waterproof structure of a bevel type two-stage underground diaphragm wall.
Background
With the gradual expansion of the development scale and depth of the underground space in China, the underground diaphragm wall is widely applied to the construction of the enclosure structure of underground engineering due to the advantages of strong foundation applicability, small construction influence, large wall rigidity and the like. Due to project planning or construction organization planning, the foundation pit excavation is implemented in stages. In the staged construction of the underground continuous wall, when the time interval of each stage of engineering is longer, cold joints are easy to form at joints. Joints such as I-steel or joint boxes pre-embedded in the underground diaphragm wall at the early stage have the problems of weak strength, large verticality deviation and the like, so that water leakage and even water burst at a cold joint are caused, and foundation pit safety accidents are caused.
Method content
In order to solve the technical problem, the utility model provides a dog-ear type two-phase underground continuous wall cold joint waterproof construction strengthens two-phase underground continuous wall cold joint department stagnant water effect under the prerequisite that reduces the influence to earlier stage structure. The technical scheme of the utility model as follows:
a cold joint waterproof structure of a folded angle type two-stage underground continuous wall comprises the folded angle type two-stage underground continuous wall and drilled piles which are arranged at the folded angle of the two-stage underground continuous wall and are tangent with the two-stage underground continuous wall, wherein self-setting materials are poured back into the drilled piles.
Furthermore, the structure also comprises a row of drilling secant piles tangent to the drilling piles at the periphery of the drilling piles, the drilling secant piles are meshed with each other, the first drilling secant pile is also tangent to the early underground continuous wall, the last drilling secant pile is also tangent to the later underground continuous wall, and the drilling secant piles are refilled with self-setting materials.
Further, the self-setting material is plain concrete or cement paste.
Further, the bored pile is implemented by a full-casing full-circle drilling machine.
Further, self-setting materials are filled between the drilled piles and the two-stage underground continuous wall.
Further, self-setting materials are filled between the drilling occlusive piles and the drilling piles and between the drilling occlusive piles, the drilling piles and the underground continuous wall.
The utility model has the advantages that:
due to the fact that the bored pile is large in rigidity and small in verticality deviation, cold joint water leakage and even water burst caused by failure or poor verticality of the embedded joint of the underground diaphragm wall in the early period can be effectively prevented, the waterproof quality of the cold joint is improved, and engineering risks are reduced.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor;
FIG. 1 is a schematic view of a cold joint waterproof structure of a dog-ear type two-stage underground diaphragm wall provided by an embodiment of the present invention;
fig. 2 is another angle-folding type two-stage underground continuous wall cold joint waterproof structure schematic diagram provided by the embodiment of the utility model.
Description of reference numerals: 1. the method comprises the steps of firstly, preparing an underground continuous wall, 2, later, preparing an underground continuous wall, 3, drilling piles, 4, cold joints, 5 and drilling secant piles.
Detailed Description
The technical solution in the embodiment of the present method will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present method, and it is obvious that the described embodiment is only a part of the present method, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the method without making any creative effort, fall within the protection scope of the method.
As shown in fig. 1, as a first embodiment of the present invention, there is provided a cold joint waterproof structure for a dog-ear type two-stage underground diaphragm wall, comprising a dog-ear type two-stage underground diaphragm wall and bored piles 3 formed at dog-ear portions of the two-stage underground diaphragm wall and cut along the two-stage underground diaphragm wall, the angle-folding type two-stage underground continuous wall comprises a first-stage underground continuous wall 1 and a later-stage underground continuous wall 2 which mutually form an angle of 90 degrees, the periphery of the bored pile 3 is tangent to the early underground diaphragm wall 1 and the late ground wire diaphragm wall at the same time, after the drilling pile is constructed, soil and mud skin between the drilling pile 3 and the two-stage underground continuous wall are removed, self-setting materials are poured back into the drilling pile 3, the bored pile and the space between bored pile 3 and the two-stage underground diaphragm wall are filled with the self-setting material, thereby forming a water-stop reinforcing body, and the shaded part shown in figure 1 is the bored pile after the self-setting material is back-poured.
Preferably, as shown in fig. 2, the structure further comprises a row of drilling occlusive piles 5 tangent to the drilling piles 3 at the periphery of the drilling piles 3, the drilling occlusive piles 5 are mutually occluded, the first drilling occlusive pile 5 is also tangent to the prior underground continuous wall 1, the last drilling occlusive pile 5 is also tangent to the later underground continuous wall 2, after the drilling occlusive piles 5 are completely constructed, soil or mud skin between the drilling occlusive piles and the drilling piles and between the drilling occlusive piles, the drilling piles and the underground continuous wall is removed, then self-setting materials are poured back into the drilling occlusive piles 5, and gaps among the drilling occlusive piles 5, the drilling occlusive piles and the drilling piles and between the drilling occlusive piles, the drilling piles and the underground continuous wall are filled with the self-setting materials, such as shaded parts shown in fig. 2.
Wherein the self-setting material is plain concrete or cement paste; and the drilled pile 3 and the drilled secant pile 5 are both implemented by a full-casing full-circle drilling machine.
The utility model discloses: the cold joint 4 of the folded angle type two-stage underground diaphragm wall is reinforced by the drilled pile 3, so that the water stopping effect of the cold joint 4 is ensured, and the influence on the early underground diaphragm wall can be reduced.
The utility model discloses a construction steps as follows:
step 1, drilling piles 3 tangent to the two-stage underground continuous wall are applied to the break corners of the break-angle type two-stage underground continuous wall;
step 2, removing soil and mud skin between the drilled pile 3 and the two-stage underground continuous wall;
and 3, recharging a self-setting material into the drilled pile 3, and filling the drilled pile and a gap between the drilled pile 3 and the two-stage underground continuous wall with the self-setting material to form a water-stopping reinforcing body.
And 4, constructing a row of drilling secant piles 5 tangent to the drilling piles 3 on the periphery of the drilling piles 3, mutually meshing the drilling secant piles 5, enabling the first drilling secant pile 5 to be tangent to the early underground continuous wall 1, enabling the last drilling secant pile 5 to be tangent to the later underground continuous wall 2, removing soil or mud between the drilling secant piles and the drilling piles and between the drilling secant piles, the drilling piles and the underground continuous wall after constructing the drilling secant piles 5, recharging self-setting materials into the drilling secant piles 5, and filling gaps among the drilling secant piles 5, the drilling secant piles and the drilling piles and between the drilling secant piles, the drilling piles and the underground continuous wall with the self-setting materials.
And a full-casing full-rotary drilling machine is used for constructing the drilled piles 3 and the drilled secant piles 5, and high-pressure gas nozzles are adopted for removing soil or mud skins between the drilled piles 3 and the two underground continuous walls, between the drilled secant piles and the drilled piles and between the drilled secant piles, the drilled piles and the underground continuous walls.
The method for recharging the self-setting material into the drilled pile 3 or the drilled interlocking pile 5 comprises the following steps: and (3) pulling out the sleeve of the drilled pile 3 or the drilled occlusive pile 5 while recharging the self-setting material.
Wherein the self-setting material is plain concrete or cement paste.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (6)

1. The cold joint waterproof structure of the angle-folded two-stage underground continuous wall is characterized by comprising the angle-folded two-stage underground continuous wall and drilled piles which are formed at the angle of the angle-folded two-stage underground continuous wall and are tangent with the two-stage underground continuous wall, wherein self-setting materials are poured back into the drilled piles.
2. The dog-ear type two-stage underground diaphragm wall cold joint waterproof construction according to claim 1, characterized in that the construction further comprises a row of drilling secant piles tangent to the drilling piles at the periphery of the drilling piles, the drilling secant piles are meshed with each other, the first drilling secant pile is also tangent to the former underground diaphragm wall, the last drilling secant pile is also tangent to the latter underground diaphragm wall, and the drilling secant piles are reinjected with self-setting materials.
3. The angle type two-stage underground diaphragm wall cold joint waterproof structure according to claim 1 or 2, wherein the self-setting material is plain concrete or cement paste.
4. The break-angle type two-stage underground diaphragm wall cold joint waterproof structure according to claim 1, wherein the bored pile is implemented by a full-casing full-circle drilling machine.
5. The cold joint waterproof structure for the dog-ear type two-stage underground diaphragm wall according to claim 1, wherein a self-setting material is filled between the bored pile and the two-stage underground diaphragm wall.
6. The angle type two-stage underground diaphragm wall cold joint waterproof structure according to claim 2, wherein self-setting materials are filled between the drilling secant pile and the drilling pile and between the drilling secant pile, the drilling pile and the underground diaphragm wall.
CN201920659081.4U 2019-05-09 2019-05-09 Dog-ear type two-phase underground continuous wall cold joint waterproof construction Active CN210597398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920659081.4U CN210597398U (en) 2019-05-09 2019-05-09 Dog-ear type two-phase underground continuous wall cold joint waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920659081.4U CN210597398U (en) 2019-05-09 2019-05-09 Dog-ear type two-phase underground continuous wall cold joint waterproof construction

Publications (1)

Publication Number Publication Date
CN210597398U true CN210597398U (en) 2020-05-22

Family

ID=70721041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920659081.4U Active CN210597398U (en) 2019-05-09 2019-05-09 Dog-ear type two-phase underground continuous wall cold joint waterproof construction

Country Status (1)

Country Link
CN (1) CN210597398U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158663A (en) * 2019-05-09 2019-08-23 中铁第四勘察设计院集团有限公司 A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158663A (en) * 2019-05-09 2019-08-23 中铁第四勘察设计院集团有限公司 A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure

Similar Documents

Publication Publication Date Title
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN105464686B (en) Multi-layer underground space curtain posture excavating construction method and supporting construction under existing facility
CN101769154A (en) Excavation supporting method for tunnel construction
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN104329095B (en) A kind of existing tunnel Widening Construction method
CN109404005A (en) Bored tunnel duck eye is into big hole pre-add solid system and construction method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN106761918A (en) A kind of tunnel solution cavity and Groundwater Comprehensive administer construction and construction method
CN109026020B (en) Water-rich tunnel karst cave treatment and excavation method
CN204080789U (en) The preparing structure of underground continuous wall width breach
CN102061710A (en) Diaphragm wall joint and manufacturing method of diaphragm wall
CN113153308A (en) Construction method for double arch tunnel collapse section
CN101270579A (en) Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit
CN102410031B (en) Underground space structure constructed by pile wall construction method
CN112901207A (en) Treatment method for collapse in tunnel during arch change of secondary lining in sulfate corrosion section of operation tunnel
CN115324591A (en) Saturated soft loess tunnel subsection precipitation-support comprehensive construction method
CN210597398U (en) Dog-ear type two-phase underground continuous wall cold joint waterproof construction
CN112682048B (en) Replacement reinforcement construction method for small clear distance up-span existing tunnel of newly-built tunnel
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN209228377U (en) A kind of multistage set arch structure and pipe canopy set arch structure for tunnel portal supporting
CN107143149A (en) A kind of existing masonry structure building sets up the construction method of basement
CN104153347A (en) Repair structure of underground diaphragm wall panel notch and construction method of repair structure
CN109577998B (en) Construction method for backfilling and station-crossing of piston air duct in shield interval
CN202830969U (en) Rectifying and reinforcing structure of cantilever retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant