CN210563434U - Movable plank sheathing processing and clout collection platform - Google Patents

Movable plank sheathing processing and clout collection platform Download PDF

Info

Publication number
CN210563434U
CN210563434U CN201920832536.8U CN201920832536U CN210563434U CN 210563434 U CN210563434 U CN 210563434U CN 201920832536 U CN201920832536 U CN 201920832536U CN 210563434 U CN210563434 U CN 210563434U
Authority
CN
China
Prior art keywords
equal
side wall
plank sheathing
movable plank
collection platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920832536.8U
Other languages
Chinese (zh)
Inventor
梁威
曾令新
陈勇
刘俞炜
杨寰宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Pan China Engineering Group Co ltd
Original Assignee
Shenzhen Pan China Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Pan China Engineering Group Co ltd filed Critical Shenzhen Pan China Engineering Group Co ltd
Priority to CN201920832536.8U priority Critical patent/CN210563434U/en
Application granted granted Critical
Publication of CN210563434U publication Critical patent/CN210563434U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a movable wood formwork processing and excess material collecting platform, which comprises a bottom surface and a side wall; the side wall is vertical to the bottom surface and surrounds the bottom surface; the bottom surface is provided with a hanging ring. Therefore, the wood formwork processing and excess material collecting platform has a safe and stable structure, the hoisting ring of the platform can be hoisted by a crane to move, the land occupation of a construction site is reduced, wood processing equipment is far away from possible residential areas around the site, meanwhile, the corner wood formwork of construction waste is recycled, the leftover materials or waste templates of newly cut templates are fully utilized, the repeated transportation of template materials is reduced, and the continuous working time of woodworking operation is shortened.

Description

Movable plank sheathing processing and clout collection platform
Technical Field
The utility model relates to a civil engineering instrument especially indicates a plank sheathing processing platform for building construction working face.
Background
With the progress of economy and urbanization, the construction industry has made a rapid progress, and meanwhile, in the process of city construction, "land shortage" becomes a difficult problem across most construction enterprises. In urban construction, most construction sites have no redundant sites available except for building line withdrawal.
At present, in a building construction site, most projects adopt a conventional method that one or more woodworking processing areas are arranged on the construction site according to the quantity of unit projects, and a wood formwork cutting and formwork distributing site for building construction is provided. The construction difficulty that the field is narrow and usable is aggravated.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem that will solve is: a movable wood formwork processing and excess material collecting platform is provided.
In order to solve the technical problem, the utility model discloses a technical scheme be:
a construction site timber excess material collecting and processing moving platform comprises a bottom surface and a side wall; the side wall is vertical to the bottom surface and surrounds the bottom surface; the bottom surface is provided with a hanging ring.
Further, the platform body comprises a bottom surface and a side wall; the side wall is vertical to the bottom surface and surrounds the bottom surface; the bottom surface is provided with a hanging ring.
Further, the bottom surface is sequentially provided with a channel steel, a batten and a bottom plate from bottom to top; the hanging ring is welded on the side edge of the channel steel; the battens and the channel steel are paved in a crossed mode, and the bottom plate covers the battens.
Further, the channel steel specification is 10# or more and 14# or less.
Furthermore, the hanging ring welded to the side edge of the channel steel is a steel bar, the steel bar is a first-level steel bar (HPB300), and the diameter of the hanging ring is greater than or equal to 20mm and smaller than or equal to 22 mm.
Furthermore, any side of the bottom surface is provided with at least one side wall, and the edges of the adjacent side walls are connected end to end.
Furthermore, the side wall is a plate, reinforcing steel bars are arranged on the side of the side wall, the bottom of each reinforcing steel bar is connected with a channel steel, and each reinforcing steel bar is of a second level or a third level (HRB335 or HRB400), has a diameter larger than or equal to 16mm and smaller than or equal to 22 mm.
Furthermore, a partition board stands on the bottom surface in the surrounding space of the side wall and the bottom surface, and the height of the board is more than or equal to 150mm and less than or equal to 300mm and is opposite to the lower side wall.
Furthermore, at the joint of any two adjacent side walls, the side reinforcing steel bars of the adjacent side walls are welded on the outer sides of the side walls.
The side wall is provided with a first side wall and a second side wall, the height of the first side wall is smaller than that of the second side wall, the height of the second side wall is larger than or equal to 950mm and smaller than or equal to 1200mm, and the height of the first side wall is smaller than or equal to 150mm and larger than or equal to 300 mm. Furthermore, an iron wire is tied between the outer steel bar of the space surrounded by the side wall and the side wall plate, and the specification of the iron wire is more than or equal to 10# and less than or equal to 16 #.
The beneficial effects of the utility model reside in that: be different from traditional wood working district, the utility model discloses there is rings in the bottom, and accessible vertical transportation machinery (like the mobile crane, tower crane etc.) removes, can not occupy the job site and use ground, makes wood working machinery keep away from the peripheral possible residential area in place, and with construction waste's corner wooden template resourceization simultaneously, make full use of newly cuts out the leftover bits or old and useless template of template, reduces the transportation many times of template material, shortens carpenter's operation duration.
Drawings
The following detailed description of the specific structure of the present invention with reference to the accompanying drawings
FIG. 1 is a top view of the present plank sheathing processing and excess material collection platform;
FIG. 2 is a perspective view of the present plank sheathing processing and waste collection platform;
FIG. 3 is a right sectional view of the present plank sheathing processing and excess material collection platform;
fig. 4 is a right side view of the present plank sheathing processing and residue collecting platform.
10-a bottom surface; 101-a lifting ring; 102-a channel steel; 103-flitch; 104-a backplane; 20-a side wall; 201-upper side wall; 202-upper sidewalls; 203-side wall edge reinforcing steel bars.
Detailed Description
In order to explain technical contents, structural features, and objects and effects of the present invention in detail, the following description is given in conjunction with the embodiments and the accompanying drawings.
Be different from traditional wood working district, the utility model discloses use the channel-section steel as the bottom to welding rings, rings can be located channel-section steel bottom both sides, also can be located channel-section steel center department, and the accessible crane removes, practices thrift construction site land used space, makes wood working equipment keep away from the peripheral possible residential quarter in place, and with the corner wooden template resourceization in construction waste simultaneously, the leftover bits or the old and useless template of make full use of newly-cut out the template reduce the transportation many times of template material, shorten carpenter's operation duration.
Referring to fig. 1 to 4, a movable timber processing and remainder collecting platform of the present invention includes a bottom surface and a side wall; the side wall 20 stands on the bottom surface 10 and surrounds the bottom surface 10; the bottom surface 10 has a pair of rings 101.
From the above description, the beneficial effects of the present invention are: the lifting ring 101 on the bottom surface enables the platform to be moved by the crane; the side wall 20 surrounds the bottom surface 10, so that the materials can be scattered in the platform during construction, and the whole construction environment cannot be polluted.
Example 1
In the above, the bottom surface is, from bottom to top, channel steel 102, batten 103 and bottom plate 104 in sequence; the hanging ring 101 is welded on the side edge of the channel steel 102; the battens 103 and the channel steel 102 are paved in a crossed mode, and the bottom plate 104 covers the battens 103.
The weight of channel-section steel 101 guarantees the stable in structure of whole platform bottom 10, and workman and equipment are convenient operation on bottom plate 104, and flitch 103 plays the buffering, increases frictional effect, prevents to appear wearing and tearing and sliding between bottom plate 104 and channel-section steel 102.
Example 2
In the above, the channel 102 is 10# or more and less than 14 #.
The largest model specification can still ensure the portability of the platform, and the smallest model specification still ensures the stability during high-rise construction.
Example 3
In the above, the hanging ring 101 welded to the edge of the channel steel 102 is a steel bar, and the steel bar is a first-grade steel bar (model number is HPB300), and the diameter of the steel bar is greater than or equal to 20mm and less than or equal to 22 mm.
Therefore, the lifting ring steel bars are selected to be the minimum type, so that the safety of the platform when the lifting ring is lifted can be guaranteed, and the lifting ring steel bars are selected to be the maximum type, so that the attractiveness of the lifting ring can be guaranteed.
Example 4
In the above, any side of the bottom surface has at least one side wall, and the edges of adjacent side walls are connected end to end.
The side wall plays a role in containment and can effectively prevent building wastes such as wood chips and the like from polluting the construction platform.
Example 5
In the foregoing, the lateral wall is the panel, and there is the reinforcing bar lateral wall limit, and the channel-section steel is connected to the reinforcing bar bottom, and the reinforcing bar is second grade or tertiary (the model is HRB335 or HRB400), and reinforcing bar diameter more than or equal to 16mm, and less than or equal to 22 mm.
In this specification, the stability of platform lateral wall still can be guaranteed to the minimum reinforcing bar, and the biggest reinforcing bar still makes platform weight be in safety range, can not damage its operation place when guaranteeing this platform construction.
Example 6
In the above, in the space surrounded by the side wall and the bottom surface, a dividing plate stands on the bottom surface, and the height of the plate is greater than or equal to 150mm, less than or equal to 300mm, and is opposite to the lower splint plate surface.
The partition plate can separate a residual material processing area, so that the resource waste can be reduced, and the residual material processing is convenient to reuse.
Example 7
In the above, at the joint of any two adjacent side walls, the side reinforcing steel bars of the adjacent side walls are welded at the outer sides of the side walls.
The reinforcing bar makes the platform form wholly, and is more stable, safer when removing.
Example 8
In the above, the side walls include a first side wall and a second side wall, the height of the first side wall is less than that of the second side wall, the height of the second side wall is greater than or equal to 950mm and less than or equal to 1200mm, and the height of the first side wall is less than or equal to 150mm and greater than or equal to 300 mm.
In this embodiment, there are four sidewalls, one of which is lower, the height of the higher sidewall is greater than or equal to 950mm and less than or equal to 1200mm, and the height of the lower sidewall is less than or equal to 150mm and greater than or equal to 300 mm.
The effect that higher lateral wall prevents that the material from splashing is better, and lower lateral wall makes things convenient for workman's portable equipment to pass in and out the platform work.
Example 9
In the above, there is a wire tie between the outside steel bar of the space surrounded by the side wall and the side wall plate, and the specification of the wire is greater than or equal to 10# and less than or equal to 16 #.
The iron wire plays the auxiliary fixing effect, forms the drawknot muscle between messenger's reinforcing bar and the panel, and the stability of drawknot muscle has been ensured to the specification of reinforcing bar, avoids the material extravagant simultaneously.
To sum up, the utility model provides a pair of movable plank sheathing processing and clout collection platform has safety and stable structure, and the accessible crane lifts up the rings of platform and removes, and less occupation job site land used makes wood working equipment keep away from the peripheral possibly residential area in place, and with the corner wooden template resourceization of building rubbish simultaneously, the leftover bits or the old and useless template of make full use of newly-cut out the template reduce the transportation many times of template material, shorten carpenter's operation duration.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (10)

1. The utility model provides a platform is collected to movable plank sheathing processing and clout which characterized in that: comprises a bottom surface and a side wall; the side wall is vertical to the bottom surface and surrounds the bottom surface; the bottom surface is provided with a hanging ring.
2. The movable plank sheathing processing and waste collection platform of claim 1, wherein: the bottom surface is provided with a channel steel, a batten and a bottom plate from bottom to top in sequence; the hanging ring is welded on the side edge of the channel steel; the battens and the channel steel are paved in a crossed mode, and the bottom plate covers the battens.
3. The movable plank sheathing processing and waste collection platform of claim 2, wherein: the channel steel specification is more than or equal to 10# and less than or equal to 14 #.
4. The movable plank sheathing processing and waste collection platform of claim 3, wherein: the hanging ring welded to the side edge of the channel steel is a steel bar, the steel bar is a first-level steel bar of which the model is HPB300, and the diameter of the steel bar is more than or equal to 20mm and less than or equal to 22 mm.
5. The movable plank sheathing processing and waste collection platform of claim 2, wherein: any side of the bottom surface is provided with at least one side wall, and the edges of the adjacent side walls are connected end to end.
6. The movable plank sheathing processing and waste collection platform of claim 2, wherein: the lateral wall is panel, and there is the reinforcing bar lateral wall limit, and the channel-section steel is connected to the reinforcing bar bottom, and the reinforcing bar model is HRB 335's second grade reinforcing bar or the tertiary reinforcing bar that the model is HRB400, and reinforcing bar diameter more than or equal to 16mm, and less than or equal to 22 mm.
7. The movable plank sheathing processing and waste collection platform of claim 5, wherein: in the space surrounded by the side wall and the bottom surface, a dividing plate stands on the bottom surface, and the height of the plate is more than or equal to 150mm and less than or equal to 300mm, and is opposite to the lower side wall.
8. The movable plank sheathing processing and waste collection platform of claim 5, wherein: and at the joint of any two adjacent side walls, the side reinforcing steel bars of the adjacent side walls are welded on the outer sides of the side walls.
9. The movable plank sheathing processing and waste collection platform of claim 5, wherein: the lateral wall includes first lateral wall and second lateral wall, the height of first lateral wall is less than the second lateral wall, second lateral wall height more than or equal to 950mm, and less than or equal to 1200mm, first lateral wall height less than or equal to 150mm, and more than or equal to 300 mm.
10. The movable plank sheathing processing and waste collection platform of claim 6, wherein: and an iron wire is tied between the outer steel bar of the space surrounded by the side wall and the side wall plate, and the specification of the iron wire is more than or equal to 10# and less than or equal to 16 #.
CN201920832536.8U 2019-06-03 2019-06-03 Movable plank sheathing processing and clout collection platform Expired - Fee Related CN210563434U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920832536.8U CN210563434U (en) 2019-06-03 2019-06-03 Movable plank sheathing processing and clout collection platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920832536.8U CN210563434U (en) 2019-06-03 2019-06-03 Movable plank sheathing processing and clout collection platform

Publications (1)

Publication Number Publication Date
CN210563434U true CN210563434U (en) 2020-05-19

Family

ID=70633901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920832536.8U Expired - Fee Related CN210563434U (en) 2019-06-03 2019-06-03 Movable plank sheathing processing and clout collection platform

Country Status (1)

Country Link
CN (1) CN210563434U (en)

Similar Documents

Publication Publication Date Title
CN105569376B (en) The Demolition Construction method of construction wall
CN101509319B (en) Replacement construction method for post-adding reinforced concrete beam unit for wall
CN104196049B (en) A kind of construction method of the fetal membrane of foundation platform and grade beam
CN205954660U (en) Steel tower crane foundation structure
CN104975719A (en) Novel material distribution device and construction method for pouring floor concrete by using same
CN102619152A (en) Split mounting type prefabricated reinforced concrete construction temporary road
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN210659200U (en) High-rise building elevator shaft operation platform
CN210563434U (en) Movable plank sheathing processing and clout collection platform
CN115162594A (en) Construction method based on BIM floor support plate process deepening
CN206233546U (en) A kind of elevator hoistways workbench
CN105317057A (en) Reinforced manhole cover plate of which upper part is provided with stainless steel plates
CN103243912B (en) Multilayer is without plate framework construction method
CN108842933B (en) Tower crane opening blocking method
CN204418229U (en) Poured band of outer wall of basement concrete draw-in groove
CN214269948U (en) Lifting device for dismantling wet joint formwork of bridge
CN210194691U (en) Protective structure for post-cast strip of settlement of basic raft
CN202466352U (en) Spliced prefabricated reinforced concrete construction temporary road
CN211142816U (en) Construction platform
CN106639290A (en) Construction method for reinforcing cantilever scaffold through recyclable embedded bolts
CN208815690U (en) A kind of tower crane sealing hole structure
CN207620429U (en) The constructing structure of rope saw dismantling concrete wall
CN113106980A (en) Method for dismantling old beam plate in foundation pit supporting structure
CN214885270U (en) Core platform is got to drilling bored concrete pile
CN106193578B (en) It is a kind of that modular system and construction technology are matched somebody with somebody based on groove type quarter bend

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200519