CN210529487U - Bridge and box-shaped bridge inspection device with flange plates - Google Patents

Bridge and box-shaped bridge inspection device with flange plates Download PDF

Info

Publication number
CN210529487U
CN210529487U CN201920818812.5U CN201920818812U CN210529487U CN 210529487 U CN210529487 U CN 210529487U CN 201920818812 U CN201920818812 U CN 201920818812U CN 210529487 U CN210529487 U CN 210529487U
Authority
CN
China
Prior art keywords
inspection device
working platform
bridge inspection
flange plate
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920818812.5U
Other languages
Chinese (zh)
Inventor
任冰心
贾文龙
常树才
李涛
李树敬
明茂刚
梁龙
任伟娜
李云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
China Railway 14th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical China Railway 14th Bureau Group Co Ltd
Priority to CN201920818812.5U priority Critical patent/CN210529487U/en
Application granted granted Critical
Publication of CN210529487U publication Critical patent/CN210529487U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a bridge inspection device, including running gear, the last supporting mechanism that has linked firmly of running gear, supporting mechanism's both ends are provided with the uplink and downlink mechanism and suspend the mechanism in midair, it is connected with bottom work platform in midair to suspend the mechanism, bottom work platform and supporting mechanism connect through suspending the mechanism in midair and form a closed loop. The closed loop can make whole device atress balanced to more firm, the security is high, and makes the bottom work platform hold more people's simultaneous working, raises the efficiency. In addition, a box-shaped bridge inspection device with the flange plates is further provided, the flange plate working platform is additionally arranged on the basis of the bridge inspection device, a web plate suspension ladder is arranged between the flange plate working platform and the bottom working platform, the flange plate ladder is arranged between the flange plate working platform and the supporting mechanism, and the flange plates are inspected by workers through the flange plate platform.

Description

Bridge and box-shaped bridge inspection device with flange plates
Technical Field
The utility model relates to a bridge equipment field specifically is a bridge inspection device, and in addition, this application still relates to a box bridge inspection device with flange board.
Background
With the rapid development of the construction industry, bridge construction plays an important role as an important component in the construction industry. In the construction process of the bridge superstructure, particularly in the construction of the box girder, the appearance and quality inspection of the outer surface of the box girder may be performed after the installation is completed. The beam body is generally higher in position, limited by sites and equipment and difficult to inspect, so that a special operation platform or an inspection vehicle needs to be manufactured to complete the inspection.
At present, conventional inspection platforms or inspection vehicles are heavy, the manufacturing cost is high, the transportation is complex, the inspection is very inconvenient, the inspection platform or the inspection vehicle is poor in adaptability, the inspection platform or the inspection vehicle can only be used for bridges with single specifications or similar specifications, and special refitting or special inspection equipment is required to be used when box bridges with flange plates are encountered, so that the cost is increased, the inspection platform or the inspection vehicle is not suitable for recycling, the bearing capacity is poor, the number of people to be accommodated is small, and the efficiency is low during inspection or maintenance.
Therefore, it is a technical problem to be solved at present to develop a bridge inspection device with high safety, low cost, strong applicability and large working space.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to foretell technical problem, provide a bridge inspection device with low costs, strong adaptability, security and operation space is big and an inspection device suitable for box bridge with flange board.
The utility model discloses a solve the technical scheme that above-mentioned technical problem adopted and be: the bridge inspection device comprises a travelling mechanism, wherein a supporting mechanism is fixedly connected to the travelling mechanism, an uplink travelling mechanism and a downlink travelling mechanism are arranged at two ends of the supporting mechanism, a bottom working platform is connected to the suspension travelling mechanism, and the bottom working platform and the supporting mechanism are connected through the suspension travelling mechanism to form a closed loop. Through running gear drive whole device that marchs on the bridge floor and remove along the bridge, through supporting mechanism with hang in midair the cooperation of mechanism realize hanging in midair along with bottom work platform firmly, realize that inspection personnel reachs the bottom workstation from the bridge floor through going down the mechanism and carry out work, the closed loop can make whole device atress balanced to more firm, the security is high, and makes the bottom workstation hold more people and operate simultaneously, raises the efficiency.
Further, the supporting mechanism comprises a main beam, and connecting pieces are symmetrically arranged at two ends of the main beam. The stability is strengthened through setting up of girder, improves and supports intensity, and uses the channel-section steel at girder both ends, has more firm welding effect.
Further, the both ends of girder have linked firmly through the connecting piece and have suspended in midair the mechanism, suspend in midair the mechanism and include davit seat and jib, the upper portion of jib is passed through the davit seat and is installed on the connecting piece of girder, pass through the connecting piece transition in the middle of the jib, and the both sides of connecting piece are fixed through the davit seat, the sub-unit connection of jib has bottom work platform, be provided with high adjustment mechanism between bottom work platform and the jib. Because the jib is longer, the middle part uses the connecting piece to pass through, guarantees the reliability of hanging in midair to the bottom work platform, and high adjustment mechanism's setting plays the effect of adjusting the working height of bottom work platform.
Furthermore, the bottom working platform is formed by connecting a longitudinal beam, a transverse beam and a guardrail, fine rolled steel is fixed at two ends of the longitudinal beam through connecting pieces, and the fine rolled steel is connected with the hanging rod through the hanging rod seat. Through using the higher finish rolling of intensity to be connected with the jib on bottom work platform, be difficult for producing local deformation and rupture, further improve the security.
Further, height adjustment mechanism includes chain block, chain block installs on the connecting piece, chain block is connected with girder connecting piece and bottom work platform respectively. The chain block is used for height adjustment to adapt to the weight of the bottom working platform, and the working personnel can conveniently lift and adjust the working platform by themselves.
Furthermore, the walking mechanism comprises at least two walking units, the two walking units are arranged in parallel, and the running directions of the two walking units are the same. The whole device is driven to move by the two walking units together.
Furthermore, the walking unit is a trolley formed by welding tires and profile steel, and the top of the trolley is fixedly connected with a main beam. Simple and practical, and easy on-site manufacture.
Further, the uplink and downlink mechanism is a suspension ladder arranged between the supporting mechanism and the bottom working platform, and the suspension ladder is formed by welding steel bars and angle steel. Can realize welding according to the height of the bridge to be inspected, and use be the reinforcing bar and the angle steel that use commonly used on the building site, draw materials on the spot and practice thrift the cost.
This scheme still provides a box bridge inspection device with flange board, includes running gear, supporting mechanism, suspends mechanism and bottom work platform in midair as before, still includes flange board work platform, be provided with the web between flange board work platform and the bottom work platform and hang the ladder, be provided with the flange board cat ladder between flange board work platform and the supporting mechanism. Design according to the box bridge structures that has the flange board, realize the inspection of staff to the flange board through the flange board platform, hang the ladder through the web and can make the staff inspect the web and regard as the passageway from bottom to flange board workstation, realize the ascending and descending from the bridge floor to workstation through the flange board cat ladder.
Furthermore, the flange plate working platform is formed by mutually connecting a vertical rod, an inclined rod, a transverse beam, a longitudinal beam and a fence, and the vertical rod is fixed at two ends of the supporting mechanism. Simple structure makes things convenient for the scene to process according to actual conditions, and one end is fixed on supporting mechanism, and is more firm.
The utility model discloses an adopt above-mentioned technical scheme, have following advantage:
1. through running gear march on the bridge floor drive whole device and remove along the bridge, realize hanging in midair along with bottom work platform's firm through supporting mechanism and the cooperation of hanging in midair the mechanism, realize that inspection personnel reachs the bottom workstation from the bridge floor through uplink and downlink mechanism and carry out work, the closed loop can make whole device atress balanced, thereby it is more firm, high safety, and make the bottom workstation hold more people's simultaneous operation, and the efficiency is improved, and simultaneously, some mechanisms can realize the processing of drawing materials on the spot, disassemble simple and convenient, be convenient for transportation and installation, and the cost is saved.
2. The unreliability caused by the longer guide rod is effectively avoided through the arrangement of the middle connecting piece of the suspension rod.
3. The height adjusting mechanism adopts a chain block mode to adapt to the weight of the bottom working platform, and is convenient for workers to adjust the lifting of the working platform by themselves, so that the adaptability is high.
4. The hanging ladder and the walking mechanism can be manufactured by welding on site, and the hanging ladder is simple and practical, can be made of local materials, and saves cost.
5. Can design according to the box bridge structures that has the flange board, realize the inspection of staff to the flange board through flange board platform, hang the ladder through the web and can make the staff inspect the web and as the passageway from bottom to flange board workstation, realize the ascending and descending from bridge floor to workstation through the flange board cat ladder. And the workbench is formed by welding according to field materials, has a simple structure, is convenient to process on the field according to actual conditions, and is more firm because one end of the workbench is fixed on the supporting mechanism.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic structural diagram of embodiment 1 of the present invention.
Fig. 2 is a schematic top view of fig. 1.
Fig. 3 is a schematic bottom view of fig. 1.
Fig. 4 is a schematic structural diagram of embodiment 2 of the present invention.
Fig. 5 is a left side view of fig. 4.
FIG. 6 is a front view of the flange plate work platform of FIG. 4.
Fig. 7 is a top view of fig. 6.
In the figure, 1, a trolley, 2, tires, 3, a transverse beam, 4, a main beam, 5, a lifting rod seat, 6, a connecting piece, 7, a lifting rod, 8, a chain block, 9, a bottom workbench, 10, a suspension ladder, 11, a web suspension ladder, 12, a flange plate ladder stand, 13 and a flange plate working platform.
Detailed Description
In order to make the technical solutions in the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, but not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts shall belong to the protection scope of the present invention.
Example 1
As shown in fig. 1-3, a bridge inspection device for bridge inspection and maintenance comprises a traveling mechanism moving along a bridge floor, wherein the traveling mechanism is fixedly connected with a supporting mechanism, an up-down mechanism and a suspension mechanism are arranged at two ends of the supporting mechanism, the suspension mechanism is connected with a bottom working platform 9, and the bottom working platform 9 and the supporting mechanism are connected through the suspension mechanism to form a closed loop; the closed loop here means a closed polygonal figure formed by the connection of the bottom work platform 9, the supporting means and the suspension means, with a central through hole which can be passed through the bridge to be inspected. Through running gear drive whole device on the bridge floor of marcing and remove along the bridge, through supporting mechanism with hang in midair the cooperation of mechanism realize hanging in midair along with the firm of bottom work platform 9, realize that inspection personnel reachs the bottom workstation from the bridge floor through going down the mechanism and carry out work, the closed loop can make whole device atress balanced to more firm, the security is high, and makes the bottom workstation hold more people and operate simultaneously, raises the efficiency.
The walking mechanism comprises two trolleys 1 which are arranged in parallel, tires 2 are arranged on the lower portion of each trolley 1, the tires 2 are welded together through section steel to serve as a group of independent walking supporting legs, the distance between the two supporting legs on one side is 1.5-2.5m, two groups of supporting legs are adopted on each side, the two supporting legs are connected together through double-spliced I-shaped steel in the longitudinal bridge direction, and the two groups of supporting legs can be detached. The landing leg of both sides is suitable in order to avoid the reinforcing bar that both sides were reserved to the interval at the cross bridge, connects through two sets of connecting pieces, and the body of dolly 1 is formed for shaped steel and channel-section steel welding equally, and the body top of dolly 1 has linked firmly supporting mechanism, and the during operation, staff's accessible promotes the removal that the dolly drove real individual device.
The supporting mechanism comprises two main beams 4, the two main beams 4 are fixedly connected through I-shaped steel welding, connecting pieces 6 are symmetrically arranged at two ends of the two main beams 4, the connecting pieces 6 are channel steel double-spliced together for welding, the formed double-spliced channel steel is formed, the connecting pieces are of the type, and for better implementation, cantilevers on two sides of each connecting piece 6 are 60-80cm far away from the outermost side wall of the bridge. Install jib seat 5 on connecting piece 6, vertically install jib 7 on jib seat 5, and fasten through two nuts, because jib 7 is longer, the centre passes through the mode of connecting piece 6 and passes through, use five jibs 7 in this embodiment, two above the adoption, the mode of following three is connected, and jib seat 5 is installed to the both sides of connecting piece 6, and it is fixed through two nuts, guarantee the reliability of suspending to the bottom work platform, it can follow jib 5 bottom work platform 9 that slides from top to bottom to be connected with on jib 7, realize the altitude mixture control through installation chain block 8 between connecting piece 6 on girder 4 and bottom work platform 9, for more facilitate the use, set up chain block 8 on connecting piece 6 in the middle of jib 7.
The bottom working platform 9 is composed of longitudinal beams, transverse beams and guardrails, the bottom is formed by welding the longitudinal beams and the transverse beams, the longitudinal beams and the transverse beams are made of I-shaped steel, the distance between the longitudinal beams is 1.2-1.5 m, the distance between the transverse beams is 30-50cm, and vertical steel bars are welded on the periphery of the bottom to form the guardrails. Meanwhile, in order to facilitate the up-and-down movement of workers, a hanging ladder 10 is arranged between the bottom working platform 9 and the connecting piece 6 on the main beam 4, the upper portion of the hanging ladder 10 is welded on the connecting piece 6, and the hanging ladder 10 is formed by welding steel bars and angle steel and can be welded according to actual conditions on site.
Example 2
On the basis of embodiment 1, the present embodiment further provides a box bridge inspection device with a flange plate, as shown in fig. 4 to 7, including the bridge inspection device in embodiment 1, further including a flange plate working platform 13, a web suspension ladder 11 is arranged between the flange plate working platform 13 and the bottom working platform 9, the web suspension ladder 11 is close to a web of the bridge, and the web suspension ladder 11 enables a worker to inspect the web and serve as a passage from the bottom to the flange plate working platform 13; a flange plate ladder stand 12 is arranged between the flange plate working platform 13 and the supporting mechanism, and the up-down movement from the bridge deck to the working platform is realized through the flange plate ladder stand 12; web hanging ladder 11 all adopts reinforcing bar and angle steel welding to form with flange board cat ladder 12, makes outside arc guardrail with the reinforcing bar in both sides.
Wherein, flange board work platform 13 is formed by montant, down tube, horizontal roof beam, vertical roof beam and rail interconnect, horizontal roof beam and vertical roof beam welding form bottom platform frame, the montant of welding on two outside angles of platform frame, for the enhancement connection, the welding has the down tube between montant and platform frame, and form the rail through the welding reinforcing bar around the platform frame, the montant is fixed on connecting piece 6 of girder 4, and the part that the cantilever came out is drawed knot on the girder with wire rope.
Although the present invention has been described in detail by referring to the drawings in conjunction with the preferred embodiments, the present invention is not limited thereto. Various equivalent modifications or substitutions can be made on the embodiments of the present invention by those skilled in the art without departing from the spirit and substance of the present invention, and these modifications or substitutions are intended to be within the scope of the present invention/any person skilled in the art can easily conceive of changes or substitutions within the technical scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. The bridge inspection device comprises a travelling mechanism and is characterized in that a supporting mechanism is fixedly connected onto the travelling mechanism, an uplink mechanism and a downlink mechanism are arranged at two ends of the supporting mechanism and are suspended in suspension, a bottom working platform (9) is connected onto the suspended mechanism, and the bottom working platform (9) and the supporting mechanism are connected through the suspended mechanism to form a closed loop.
2. The bridge inspection device according to claim 1, characterized in that the support mechanism comprises a main beam (4), and the main beam (4) is symmetrically provided with connecting pieces (6) at both ends.
3. The bridge inspection device of claim 2, wherein the two ends of the main beam (4) are fixedly connected with suspension mechanisms through connecting pieces (6), each suspension mechanism comprises a hanging rod seat (5) and a hanging rod (7), the upper portion of each hanging rod (7) is installed on the corresponding connecting piece (6) of the main beam (4) through the corresponding hanging rod seat (5), the middle of each hanging rod (7) is transited through the corresponding connecting piece (6), the two sides of each connecting piece (6) are fixed through the corresponding hanging rod seats (5), the lower portion of each hanging rod (7) is connected with a bottom working platform (9), and a height adjusting mechanism is arranged between the bottom working platform (9) and the corresponding connecting piece (6).
4. The bridge inspection device according to claim 3, characterized in that the bottom working platform (9) is formed by connecting a transverse beam, a longitudinal beam and a guardrail, wherein the two ends of the longitudinal beam are fixed with finish rolling steel through connecting pieces (6), and the finish rolling steel is connected with the hanger rods (7) through hanger rod seats (5).
5. The bridge inspection device of claim 3, wherein the height adjustment mechanism comprises a chain block (8), the chain block (8) is mounted on the connecting piece (6), and the chain block (8) is connected with the connecting piece (6) on the main beam (4) and the bottom working platform (9) respectively.
6. The bridge inspection device of claim 1, wherein the traveling mechanism comprises at least two traveling units, the two traveling units are arranged in parallel, and the traveling directions of the two traveling units are the same.
7. The bridge inspection device according to claim 6, characterized in that the walking unit is a trolley (1) formed by welding tires (2) and profile steel, and a main beam (4) is fixedly connected to the top of the trolley (1).
8. The bridge inspection device of claim 1, wherein the up-down mechanism is a hanging ladder (10) arranged between the support mechanism and the bottom working platform, and the hanging ladder (10) is formed by welding steel bars and angle steel.
9. A box bridge inspection device with a flange plate, characterized in that it comprises a bridge inspection device according to any one of claims 1-7, and further comprises a flange plate working platform (13), a web suspension ladder (11) is arranged between the flange plate working platform (13) and the bottom working platform (9), and a flange plate ladder (12) is arranged between the flange plate working platform (13) and the supporting mechanism.
10. The box bridge inspection device with flange plates of claim 9, characterized in that the flange plate working platform (13) is formed by interconnecting vertical rods, diagonal rods, transverse beams, longitudinal beams and fences, the vertical rods being fixed at both ends of the support means.
CN201920818812.5U 2019-05-31 2019-05-31 Bridge and box-shaped bridge inspection device with flange plates Active CN210529487U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920818812.5U CN210529487U (en) 2019-05-31 2019-05-31 Bridge and box-shaped bridge inspection device with flange plates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920818812.5U CN210529487U (en) 2019-05-31 2019-05-31 Bridge and box-shaped bridge inspection device with flange plates

Publications (1)

Publication Number Publication Date
CN210529487U true CN210529487U (en) 2020-05-15

Family

ID=70594438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920818812.5U Active CN210529487U (en) 2019-05-31 2019-05-31 Bridge and box-shaped bridge inspection device with flange plates

Country Status (1)

Country Link
CN (1) CN210529487U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576245A (en) * 2020-06-23 2020-08-25 厦门合诚工程技术有限公司 Construction hanging basket for rail type bridge
CN113389366A (en) * 2021-07-28 2021-09-14 中船黄埔文冲船舶有限公司 Arch bridge folds mouth with chain platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576245A (en) * 2020-06-23 2020-08-25 厦门合诚工程技术有限公司 Construction hanging basket for rail type bridge
CN113389366A (en) * 2021-07-28 2021-09-14 中船黄埔文冲船舶有限公司 Arch bridge folds mouth with chain platform

Similar Documents

Publication Publication Date Title
CN100590277C (en) Overhead bridge type suspension scaffold
WO2014015757A1 (en) Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles
CN208122371U (en) On across the high-speed rail safe guarding shed fast dismounting device of operation line
CN212052327U (en) Movable type dismounting and hoisting tool for temporary supporting system of small box girder type hidden cover beam of road and bridge prefabrication
JP2007120077A (en) Erection method of elevated road bridge, and its facility
CN210529487U (en) Bridge and box-shaped bridge inspection device with flange plates
CN109573851A (en) Arcuated roof internode steel truss hangs, fills integrated apparatus and docking hanging method
CN210288140U (en) Simple and easy prefabricated decking hoist and mount platform truck
CN101413234A (en) Arranging construction method of subway narrow shield well inclined hoisting rail
CN102071649B (en) System special for hoisting and dismounting bailey frames
CN210713752U (en) High-altitude operation construction hanging basket capable of moving in three-dimensional space
CN101440660B (en) Guiding-rail attached lifting scaffold
CN102635066A (en) Hanger articulated bridge inspection vehicle
CN202543799U (en) Hanging bracket hinging type bridge maintenance vehicle
CN111847242A (en) Special trolley for mounting movable adjustable sliding contact line
CN106320190A (en) Platform of bridge maintenance, consolidation and suspension construction
CN207862788U (en) It is a kind of to be connected to the outstanding stretch-draw jack hanging apparatus filled on Hanging Basket
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN201141203Y (en) Guiding-rail attached lifting scaffold
CN212245942U (en) Special trolley for mounting movable adjustable sliding contact line
CN213951981U (en) Basket is hung with safe type to bridge construction
CN212425380U (en) Turning device suitable for prefabricated stand
CN210856930U (en) Maintenance system of cable-stay bridge inverted Y-shaped tower column
CN208310160U (en) Steel moving platform for mounting suspended rail type daylighting roof
CN210477296U (en) Special guardrail of mould and special mould is pour to high security roof beam body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant