Pipe laying and paying-off device for hydraulic engineering Download PDF

Info

Publication number
CN210480462U
CN210480462U CN201920536226.1U CN201920536226U CN210480462U CN 210480462 U CN210480462 U CN 210480462U CN 201920536226 U CN201920536226 U CN 201920536226U CN 210480462 U CN210480462 U CN 210480462U
Authority
CN
China
Prior art keywords
rod
fixedly connected
outer side
bottom plate
pipe laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920536226.1U
Other languages
Chinese (zh)
Inventor
李丹玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Lexin Construction Engineering Co Ltd
Original Assignee
Xinjiang Lexin Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Lexin Construction Engineering Co Ltd filed Critical Xinjiang Lexin Construction Engineering Co Ltd
Priority to CN201920536226.1U priority Critical patent/CN210480462U/en
Application granted granted Critical
Publication of CN210480462U publication Critical patent/CN210480462U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a hydraulic engineering is with pipe laying pay-off, comprising a base plate, two spinal branch vaulting poles of top fixedly connected with of bottom plate, the top of bottom plate is provided with first pivot, the tip of first pivot rotates with two spinal branch vaulting poles respectively to be connected, the fixed cylinder that has cup jointed of lateral wall of first pivot, the top fixedly connected with backup pad of bottom plate, the top fixedly connected with limiting plate of backup pad. In the utility model, one end of the cable is drawn from the winding reel and bypasses two limit rods in sequence, and the excessive cable can not be driven to be separated from the winding reel even if the force is too large, so that the wire outlet speed of the cable can be controlled; the up-down movement of the L-shaped rod is controlled by the up-down movement of the electric push rod, the second rotating shaft is driven to move up and down, the angle between the two adjusting rods can be controlled, and therefore the cables with different thicknesses can be limited, the structure is simple, and the operation is convenient.

Description

Pipe laying and paying-off device for hydraulic engineering
Technical Field
The utility model relates to a hydraulic engineering technical field especially relates to a pipe laying pay-off for hydraulic engineering.
Background
The hydraulic engineering is a general term of various engineering constructions built for controlling, utilizing and protecting surface and underground water resources and environments, the construction scale of the hydraulic engineering in China is getting larger and larger in the years, and more places needing to build the hydraulic engineering are needed, and in the construction process of the hydraulic engineering, a buried pipe is usually needed to be used for laying cables in underground pipelines.
At present, be used for the buried pipe pay-off that hydraulic engineering construction used, at the in-process of unwrapping wire, because the cable is directly taken out from the reel, often because of using too big, thereby drive the speed when the rotation that the reel was not stopped through the cable and can't control the cable and take out, lead to unnecessary cable to break away from the reel easily, when unnecessary cable is at will scattered ground, when staff and construction pass through from the top, cause the damage easily to the epidermis of cable and make the cable unusable, thereby cause the waste of resource, need the staff to collect the arrangement again to the cable this moment, greatly reduced the efficiency of construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem existing in the prior art and providing a pipe laying and paying off device for hydraulic engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a pipe laying pay-off for hydraulic engineering, includes the bottom plate, two spinal branch vaulting poles of top fixedly connected with of bottom plate, the top of bottom plate is provided with first pivot, the tip of first pivot rotates with two spinal branch vaulting poles respectively to be connected, the fixed cover of lateral wall of first pivot has connect the spool, the top fixedly connected with backup pad of bottom plate, the top fixedly connected with limiting plate of backup pad, the lateral wall of limiting plate articulates through two first hinges has two sets of stop gear.
Preferably, stop gear includes first bull stick and the second bull stick of articulated through first hinge and limiting plate lateral wall, the lateral wall of first bull stick rotates and is connected with the gag lever post, the one end that first bull stick was kept away from to the gag lever post rotates with the lateral wall of second bull stick to be connected, the foam-rubber cushion has been cup jointed on the gag lever post.
Preferably, the lateral wall fixedly connected with connecting rod of first bull stick, the one end that first bull stick was kept away from to the connecting rod is connected with the lateral wall fixed connection of second bull stick, the connecting rod passes through adjustment mechanism and is connected with the limiting plate.
Preferably, adjustment mechanism includes the electric putter that passes through bolt fixed connection with the limiting plate lateral wall, electric putter's movable end fixedly connected with L shape pole, electric putter's one end fixedly connected with second pivot is kept away from to L shape pole, the lateral wall of second pivot is rotated and is connected with two regulation poles, two the one end of keeping away from the second pivot of regulation pole is articulated with the lateral wall of two connecting rods respectively through the second hinge.
Preferably, the top of each of the two support rods is provided with a U-shaped groove, and the end of the first rotating shaft is arranged at the bottom of the U-shaped groove in a lapping manner.
Preferably, four universal wheels in 2 x 2 arrangement are connected to the bottom of the bottom plate.
In the utility model, through the mutual cooperation of the first rotating shaft, the supporting plate, the limiting plate, the first rotating rod, the second rotating rod, the connecting rod, the second rotating shaft and the electric push rod, one end of the cable is drawn out from the winding reel and bypasses two limiting rods in sequence, so that the cable bypasses the two limiting rods all the time in the process of drawing out the cable outwards, and the redundant cable cannot be driven to be separated from the winding reel even if the force is too large, thereby controlling the wire outlet speed of the cable; the up-down movement of the L-shaped rod is controlled by the up-down movement of the electric push rod, the second rotating shaft is driven to move up and down, the angle between the two adjusting rods can be controlled, and therefore the cables with different thicknesses can be limited, the structure is simple, and the operation is convenient.
Drawings
Fig. 1 is a schematic structural view of a pipe laying and paying-off device for hydraulic engineering according to the present invention;
FIG. 2 is an enlarged view taken at A in FIG. 1;
fig. 3 is the utility model provides a limiting plate among pipe laying pay-off for hydraulic engineering looks sideways at the schematic structure.
In the figure: the universal wheel comprises a base plate 1, a supporting rod 2, a first rotating shaft 3, a winding reel 4, a supporting plate 5, a limiting plate 6, a first hinge 7, a first rotating rod 8, a second rotating rod 9, a limiting rod 10, a spongy cushion 11, a connecting rod 12, a bolt 13, an electric push rod 14, a rod 15L, a second rotating shaft 16, an adjusting rod 17, a second hinge 18 and a universal wheel 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a pipe laying pay-off for hydraulic engineering, includes bottom plate 1, two spinal branch vaulting poles 2 of bottom plate 1's top fixedly connected with, bottom plate 1's top is provided with first pivot 3, and the tip of first pivot 3 rotates with two spinal branch vaulting poles 2 respectively to be connected, and the U-shaped groove has all been seted up at the top of two spinal branch vaulting poles 2, and the tip of first pivot 3 is taken and is established on the interior bottom of U-shaped groove, and the bobbin 4 has been cup jointed to the lateral wall of first pivot 3 is fixed.
Wherein, the top of the bottom plate 1 is fixedly connected with a supporting plate 5, the top of the supporting plate 5 is fixedly connected with a limiting plate 6, the outer side wall of the limiting plate 6 is articulated with two groups of limiting mechanisms through two first hinges 7, each limiting mechanism comprises a first rotating rod 8 and a second rotating rod 9 which are articulated with the outer side wall of the limiting plate 6 through the first hinges 7, the outer side wall of the first rotating rod 8 is rotationally connected with a limiting rod 10, one end of the limiting rod 10 far away from the first rotating rod 8 is rotationally connected with the outer side wall of the second rotating rod 9, a spongy cushion 11 is sleeved on the limiting rod 10, wherein the spongy cushion 11 can prevent the cable from wearing and reducing the service life of the cable when the cable slides on the limiting rod 10, wherein, when the constructor pulls the cable, because the movable end of the cable winds around the first limiting rod 10 from top to bottom and from left to bottom and from right to left to bypass the second limiting rod 10, the cable between two gag lever posts 10 will be in the state of stretching straight all the time for intertwine's the condition can not appear in the cable, the lateral wall fixedly connected with connecting rod 12 of first bull stick 8, the one end that first bull stick 8 was kept away from to connecting rod 12 and the lateral wall fixed connection of second bull stick 9, connecting rod 12 passes through adjustment mechanism and is connected with limiting plate 6.
It should be noted that, the adjusting mechanism includes the electric putter 14 that passes through bolt 13 fixed connection with the limiting plate 6 lateral wall, wherein electric putter 14 is servo motor formula electric putter among the prior art, do not do detailed vegetations here, the movable end fixed connection of electric putter 14 has L shape pole 15, the one end fixedly connected with second pivot 16 that electric putter 14 was kept away from to L shape pole 15, the lateral wall of second pivot 16 rotates and is connected with two regulation poles 17, the one end that second pivot 16 was kept away from to two regulation poles 17 is articulated with the lateral wall of two connecting rods 12 through second hinge 18 respectively, the bottom of bottom plate 1 is connected with four universal wheels 19 of 2 x 2 range, can the position of mobile device in the use, make things convenient for the constructor to use, wherein universal wheel 19 is prior art, do not do detailed here.
The utility model discloses in, when using, the expansion end of cable breaks away from the back from reel 4, from the top down and turn right from a left side walk around behind one of them gag lever post 10, turn left from the top down and follow the right side and walk around another gag lever post 10 again, because of the existence of gag lever post 10, the cable that is located between two gag lever posts 10 is in the state of stretching straight all the time, and the lateral wall of gag lever post 10 bonds and has foam-rubber cushion 11, can not cause the damage to the epidermis of cable, thereby two gag lever posts 10 are walked around in proper order to the expansion end of cable on the reel 4 to the staff, take out outward again, thereby the cable will not drive 3 rotations of first pivot because of the power is too big and make unnecessary cable drop from reel 4 this moment, make things convenient for the constructor to carry out cable laying work in the pipeline.
In addition, when cables with different thicknesses need to be limited, the electric L-shaped rod 15 can be moved up and down by the electric push rod 14, and the second rotating shaft 16 can be moved up and down simultaneously, so that the adjusting rod 17 can be driven to open and close between the two connecting rods 12, the angle between the first rotating rod 8 and the second rotating rod 9 can be adjusted, the distance between the two limiting rods 10 can be adjusted, and the limiting effect on the cables with different thicknesses can be realized.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a pipe laying pay-off for hydraulic engineering, includes bottom plate (1), its characterized in that, two spinal branch vaulting poles of top fixedly connected with (2) of bottom plate (1), the top of bottom plate (1) is provided with first pivot (3), the tip of first pivot (3) rotates with two spinal branch vaulting poles (2) respectively and is connected, spool (4) have been cup jointed to the lateral wall of first pivot (3) is fixed, the top fixedly connected with backup pad (5) of bottom plate (1), the top fixedly connected with limiting plate (6) of backup pad (5), the lateral wall of limiting plate (6) articulates through two first hinges (7) has two sets of stop gear.
2. The pipe laying and paying off device for the water conservancy project according to claim 1, wherein the limiting mechanism comprises a first rotating rod (8) and a second rotating rod (9) which are hinged with the outer side wall of the limiting plate (6) through a first hinge (7), the outer side wall of the first rotating rod (8) is rotatably connected with a limiting rod (10), one end, far away from the first rotating rod (8), of the limiting rod (10) is rotatably connected with the outer side wall of the second rotating rod (9), and a sponge pad (11) is sleeved on the limiting rod (10).
3. The pipe laying and paying off device for the water conservancy project according to claim 2, characterized in that a connecting rod (12) is fixedly connected to the outer side wall of the first rotating rod (8), one end, far away from the first rotating rod (8), of the connecting rod (12) is fixedly connected to the outer side wall of the second rotating rod (9), and the connecting rod (12) is connected with the limiting plate (6) through an adjusting mechanism.
4. The pipe laying and paying off device for the water conservancy project according to claim 3, wherein the adjusting mechanism comprises an electric push rod (14) fixedly connected with the outer side wall of the limiting plate (6) through a bolt (13), an L-shaped rod (15) is fixedly connected with the movable end of the electric push rod (14), a second rotating shaft (16) is fixedly connected with one end, away from the electric push rod (14), of the L-shaped rod (15), two adjusting rods (17) are rotatably connected with the outer side wall of the second rotating shaft (16), and one ends, away from the second rotating shaft (16), of the two adjusting rods (17) are hinged to the outer side walls of the two connecting rods (12) through second hinges (18).
5. The pipe laying and paying off device for the water conservancy project according to claim 1, wherein a U-shaped groove is formed in the top of each of the two support rods (2), and the end of the first rotating shaft (3) is erected on the inner bottom of the U-shaped groove.
6. A pipe laying line device according to claim 1, characterized in that four universal wheels (19) are connected to the bottom of the bottom plate (1) in a 2 x 2 arrangement.
CN201920536226.1U 2019-04-19 2019-04-19 Pipe laying and paying-off device for hydraulic engineering Expired - Fee Related CN210480462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920536226.1U CN210480462U (en) 2019-04-19 2019-04-19 Pipe laying and paying-off device for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920536226.1U CN210480462U (en) 2019-04-19 2019-04-19 Pipe laying and paying-off device for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN210480462U true CN210480462U (en) 2020-05-08

Family

ID=70485801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920536226.1U Expired - Fee Related CN210480462U (en) 2019-04-19 2019-04-19 Pipe laying and paying-off device for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN210480462U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112278986A (en) * 2020-11-10 2021-01-29 陆伟 Water conservancy construction pipe laying pay-off
CN116695295A (en) * 2023-08-08 2023-09-05 江苏欣战江纤维科技股份有限公司 Wire feeding tension control equipment for false twist texturing machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112278986A (en) * 2020-11-10 2021-01-29 陆伟 Water conservancy construction pipe laying pay-off
CN112278986B (en) * 2020-11-10 2022-04-12 陆伟 Water conservancy construction pipe laying pay-off
CN116695295A (en) * 2023-08-08 2023-09-05 江苏欣战江纤维科技股份有限公司 Wire feeding tension control equipment for false twist texturing machine
CN116695295B (en) * 2023-08-08 2023-10-17 江苏欣战江纤维科技股份有限公司 Wire feeding tension control equipment for false twist texturing machine

Similar Documents

Publication Publication Date Title
CN210480462U (en) Pipe laying and paying-off device for hydraulic engineering
CN108714883A (en) A kind of substation's hotline maintenance AUTONOMOUS TASK robot platform
CN211799635U (en) Tower crane spraying dust-settling system
CN108748073A (en) Substation equipment live-line maintenance operation robot
CN107331476B (en) A kind of online waste and old cable recovering apparatus
CN108714897A (en) Live-line maintenance operation robot of substation insulation arm Pose Control system and method
KR200465974Y1 (en) Orchards reflective-vinyl mulching collect unit
CN216883947U (en) Single-arm man-machine cooperation distribution network live working equipment
CN209767014U (en) Multifunctional power cable construction auxiliary device
CN205166918U (en) Portable pneumatic manipulator
CN209685021U (en) A kind of wiring architecture bobbin winder device
CN115902548B (en) Overhead wire insulator detection robot in transformer substation and obstacle crossing method of overhead wire insulator detection robot
CN115726363A (en) Concrete curing means for electric power capital construction engineering
CN212982039U (en) Portable pay-off of rural power grids fortune dimension
CN112234519B (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN210297075U (en) Safety protection device for erecting power line
CN210082983U (en) Quick-charging high-efficiency alternating-current charging pile device convenient for winding
CN206023073U (en) Communication special electric paying out machine
CN209913376U (en) Threading construction device for building electrical engineering
CN212668876U (en) Automatic cable winding and unwinding device and excavator
CN205753271U (en) Electrical cables support means is faced in construction
CN220165441U (en) Wiring device for building construction
CN211895564U (en) Power transmission line winding and unwinding device for electric power facility
CN205527092U (en) Cable receiving and releasing device
CN219078754U (en) Power cable paying-off device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200508

Termination date: 20210419