CN210460692U - Platform is pour in tunnel - Google Patents

Platform is pour in tunnel Download PDF

Info

Publication number
CN210460692U
CN210460692U CN201921071157.8U CN201921071157U CN210460692U CN 210460692 U CN210460692 U CN 210460692U CN 201921071157 U CN201921071157 U CN 201921071157U CN 210460692 U CN210460692 U CN 210460692U
Authority
CN
China
Prior art keywords
platform
template
main
fixed
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921071157.8U
Other languages
Chinese (zh)
Inventor
吴文彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Hongpeng Machinery Technology Co ltd
Original Assignee
Wuhan Hongpeng Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Hongpeng Machinery Technology Co ltd filed Critical Wuhan Hongpeng Machinery Technology Co ltd
Priority to CN201921071157.8U priority Critical patent/CN210460692U/en
Application granted granted Critical
Publication of CN210460692U publication Critical patent/CN210460692U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a platform is pour in tunnel, include: left mould platform, master mode platform, right template platform, fixed pull rod and locking piece, fixed pull rod one end with the master mode platform is fixed, and the other end wears to locate left mould platform or right template platform, locking piece one end is fixed left mould platform or on the right template platform, the locking piece other end with master mode platform joint realizes left side mould platform right template platform with the master mode platform is fixed, left side mould platform includes left socle, left master template, left processing platform, right side mould platform includes right socle, right master template, right processing platform, the master mode platform includes main support, main processing platform, left side assistant template and right assistant template. Platform is pour in tunnel, processing platform and the integrative setting of pouring mould just can process the junction when pouring for the processing speed has improved work efficiency.

Description

Platform is pour in tunnel
Technical Field
The utility model relates to a pier construction technical field specifically is a platform is pour in tunnel.
Background
In the process of modern infrastructure, sometimes a tunnel needs to be excavated, a stand column is poured in the tunnel to support the interior of the tunnel, a common conventional method is to pour concrete, a mould adopted by pouring is generally formed by splicing a plurality of templates, when pouring is carried out, the moulds are spliced together one by one, after pouring is finished, the other blocks are detached and then transported to the next pouring position, and the process is repeated; assembling and disassembling the template repeatedly; and a processing platform is arranged beside the stand column to process the joint of the stand column and the top of the tunnel, so that the processing speed is low, a large amount of manpower is consumed, and the working efficiency is very low.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the above-mentioned current situation, a platform is pour in tunnel is provided.
The utility model adopts the technical proposal that: a tunnel casting platform, comprising: the left formwork platform comprises a left bracket, a left main formwork and a left processing platform, the right main formwork is arranged on one face, close to the main formwork platform, of the right bracket, the main formwork platform comprises a main bracket, a right main formwork and a right processing platform, the main formwork platform comprises a main bracket, a main formwork, a fixed pull rod and a locking piece, one end of the fixed pull rod is fixed with the main formwork platform, the other end of the fixed pull rod penetrates through the left formwork platform or the right formwork platform, one end of the locking piece is fixed on the left formwork platform or the right formwork platform, the other end of the locking piece is connected with the main formwork platform in a clamped mode to achieve fixing of the left formwork platform and the right formwork platform with the main formwork platform, the left formwork platform comprises a left bracket, a left main formwork and a left processing platform, the left formwork platform comprises a right bracket, a right main formwork and a right processing platform, the right main formwork is arranged on one face, close to, The left auxiliary template is connected with the main processing table and arranged opposite to the left main template, and the right auxiliary template is connected with the main processing table and arranged opposite to the right main template.
The utility model has the effects that: platform is pour in tunnel, processing platform and the integrative setting of pouring mould just can process the junction when pouring for the processing speed has improved work efficiency.
Drawings
Fig. 1 is a schematic structural view of a tunnel casting platform according to the present invention in use;
FIG. 2 is an enlarged schematic view of FIG. 1 at A;
fig. 3 is an enlarged schematic view of the point B in fig. 1.
Detailed Description
The embodiments of the present invention are described below with reference to specific embodiments, and other advantages and effects of the present invention will be easily understood by those skilled in the art from the disclosure of the present specification. The invention is capable of other and different embodiments and of being practiced or of being carried out in various ways, and its several details are capable of modification in various respects, all without departing from the spirit and scope of the present invention.
The utility model discloses a platform is pour in tunnel with following combination drawing introduction:
referring to fig. 1-3, for the present invention provides a tunnel casting platform, which includes: left side mould platform 1, master mode platform 2, right side template platform 3, fixed pull rod 4 and locking piece 5, fixed pull rod 4 one end with master mode platform 2 is fixed, and the other end wears to locate left side mould platform 1 or right side template platform 3, 5 one end of locking piece is fixed left side mould platform 1 or on the right side template platform 3, the 5 other end of locking piece with master mode platform 2 joint realizes left side mould platform 1 right side template platform 3 with master mode platform 2's is fixed.
The left die platform 1 comprises a left support 11, a left main die plate 12, a left processing table 13, a left travelling wheel 14 and a left hydraulic jacking device 15, the left main die plate 12 is arranged on one face, close to the main die platform 2, of the left support 11, the left processing table 13 is arranged at the top of the left support 11, and the left travelling wheel 14 and the left hydraulic jacking device 15 are arranged at the bottom of the left support 11.
The left main template 12 comprises a left template surface 121 and a left fixing head 122, the left fixing head 122 is fixed on one surface of the left template surface 121 close to the left support 11, and a left locking block 123 for locking is arranged on the left fixing head 122.
The stiff end of left side hydraulic pressure jacking ware 15 with the bottom of left socle 11 is fixed, the expansion end of left side hydraulic pressure jacking ware 15 moves in vertical direction, works as when the expansion end of left side hydraulic pressure jacking ware 15 extends to the longest state, left side travelling wheel 14 breaks away from the contact with ground.
The right die platform 3 comprises a right support 31, a right main template 32, a right processing table 33, a right travelling wheel 34 and a right hydraulic jacking device 35, the right main template 32 is arranged on one surface of the right support 31 close to the main die platform 2, the right processing table 33 is arranged at the top of the right support 31, and the right travelling wheel 34 and the right hydraulic jacking device 35 are arranged at the bottom of the right support 31.
The right main template 32 comprises a right template surface 321 and a right fixing head 322, the right fixing head 322 is fixed on one surface of the right template surface 321 close to the right bracket 31, and a right locking block 323 for locking is arranged on the right fixing head 322.
The stiff end of right side hydraulic pressure jacking ware 35 with the bottom of right branch frame 31 is fixed, the expansion end of right side hydraulic pressure jacking ware 35 moves in vertical direction, works as when the expansion end of right side hydraulic pressure jacking ware 35 extends to the longest state, the contact breaks away from with ground walking wheel 34 on the right side.
The main mold platform 2 includes a main support 21, a main processing table 22, a left sub-mold plate 23 and a right sub-mold plate 24, the main processing table 22 is disposed on top of the main support 21, the left sub-mold plate 23 is connected to the main processing table 22 and disposed opposite to the left main mold plate 12, and the right sub-mold plate 24 is connected to the main processing table 22 and disposed opposite to the right main mold plate 32.
The main processing table 22 is horizontally arranged on the top of the main support 21, a left sliding wheel 221 is arranged on the edge of the main processing table 22 close to the left die platform 1, and a right sliding wheel 222 is arranged on the edge of the main processing table 22 close to the right die platform 3.
The left auxiliary template 23 is provided with a left pull wire, one end of the left pull wire, which is far away from the left auxiliary template 23, is wound on the left sliding wheel 221, the right auxiliary template 24 is provided with a right pull wire, and one end of the right pull wire, which is far away from the right auxiliary template 24, is wound on the right sliding wheel 222.
The left and right sliding wheels 221 and 222 are provided to adjust the heights of the left and right sub-forms 23 and 24 in the vertical direction, and to prevent the left and right sub-forms 23 and 24 from falling on the ground after opening the molds.
A left auxiliary fixing end 231 is arranged on the left auxiliary template 23, and a right auxiliary fixing end 241 is arranged on the right auxiliary template 24.
The fixed pull rod 4 is divided into a left fixed pull rod 41 and a right fixed pull rod 42, one end of the left fixed pull rod 41 is fixed to the left auxiliary fixed end 231, the other end of the left fixed pull rod is fixed to the left fixed head 122, one end of the right fixed pull rod 42 is fixed to the right auxiliary fixed end 241, and the other end of the right fixed pull rod is fixed to the right fixed head 322.
One end of the locking piece 5 is bent to form a locking end matched with the left locking block 123 or the right locking block 323.
Two bulges are arranged on the left locking block 123, and the locking end of the locking piece 5 rotates between the two bulges to realize the locking of the locking piece along the direction of the pull rod 4.
The right locking block 323 is provided with two protrusions, and the locking end of the locking piece 5 rotates between the two protrusions to realize locking along the direction of the pull rod 4.
Platform is pour in tunnel, processing platform and the integrative setting of pouring mould just can process the junction when pouring for the processing speed has improved work efficiency.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (7)

1. A platform is pour in tunnel, its characterized in that includes: the left mould platform comprises a left support, a left main template and a right processing platform, the right main template is arranged on one side of the right support close to the main mould platform, the main mould platform comprises a main support, a main mould, a fixing pull rod and a locking piece, one end of the fixing pull rod is fixed with the main mould platform, the other end of the fixing pull rod penetrates through the left mould platform or the right mould platform, one end of the locking piece is fixed on the left mould platform or the right mould platform, the other end of the locking piece is clamped with the main mould platform to realize the fixation of the left mould platform and the right mould platform with the main mould platform, the left mould platform comprises a left support, a left main template and a left processing table, the left main template is arranged on one side of the left support close to the main mould platform, the left processing table is arranged at the top of the left support, the right mould platform comprises a right support, a right main template and a right processing table, the, The left auxiliary template is connected with the main processing table and arranged opposite to the left main template, and the right auxiliary template is connected with the main processing table and arranged opposite to the right main template.
2. The tunnel casting platform of claim 1, wherein the left main template comprises a left template surface and a left fixing head, the left fixing head is fixed on a surface of the left template surface close to the left bracket, a left locking block for locking is arranged on the left fixing head, the right main template comprises a right template surface and a right fixing head, the right fixing head is fixed on a surface of the right template surface close to the right bracket, and a right locking block for locking is arranged on the right fixing head.
3. The tunnel casting platform of claim 2, wherein a left auxiliary fixing end is disposed on the left auxiliary template, a right auxiliary fixing end is disposed on the right auxiliary template, the fixing pull rod is divided into a left fixing pull rod and a right fixing pull rod, one end of the left fixing pull rod is fixed to the left auxiliary fixing end, the other end of the left fixing pull rod is fixed to the left fixing head, one end of the right fixing pull rod is fixed to the right auxiliary fixing end, and the other end of the right fixing pull rod is fixed to the right fixing head.
4. The tunnel casting platform of claim 3, wherein one end of the locking member is bent to form a locking end matched with the left locking block or the right locking block, the left locking block is provided with two protrusions, the locking end of the locking member is rotated between the two protrusions to lock the locking member in the direction of the fixed pull rod, the right locking block is provided with two protrusions, and the locking end of the locking member is rotated between the two protrusions to lock the locking member in the direction of the fixed pull rod.
5. The tunnel casting platform of claim 4, wherein the left mold platform further comprises a left traveling wheel and a left hydraulic jack, the left traveling wheel and the left hydraulic jack are disposed at the bottom of the left support, a fixed end of the left hydraulic jack is fixed to the bottom of the left support, a movable end of the left hydraulic jack moves in a vertical direction, and when the movable end of the left hydraulic jack extends to a longest position, the left traveling wheel is separated from the ground.
6. The tunnel casting platform of claim 5, wherein the right mold platform further comprises a right traveling wheel and a right hydraulic jack, the right traveling wheel and the right hydraulic jack are disposed at the bottom of the right bracket, a fixed end of the right hydraulic jack is fixed to the bottom of the right bracket, a movable end of the right hydraulic jack moves in a vertical direction, and when the movable end of the right hydraulic jack is extended to a longest state, the right traveling wheel is separated from the ground.
7. The tunnel casting platform of claim 6, wherein a left sliding wheel is disposed on an edge of the main processing platform close to the left mold platform, a right sliding wheel is disposed on an edge of the main processing platform close to the right mold platform, a left pulling wire is disposed on the left auxiliary mold plate, an end of the left pulling wire far away from the left auxiliary mold plate is wound on the left sliding wheel, a right pulling wire is disposed on the right auxiliary mold plate, and an end of the right pulling wire far away from the right auxiliary mold plate is wound on the right sliding wheel.
CN201921071157.8U 2019-07-09 2019-07-09 Platform is pour in tunnel Active CN210460692U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921071157.8U CN210460692U (en) 2019-07-09 2019-07-09 Platform is pour in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921071157.8U CN210460692U (en) 2019-07-09 2019-07-09 Platform is pour in tunnel

Publications (1)

Publication Number Publication Date
CN210460692U true CN210460692U (en) 2020-05-05

Family

ID=70444762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921071157.8U Active CN210460692U (en) 2019-07-09 2019-07-09 Platform is pour in tunnel

Country Status (1)

Country Link
CN (1) CN210460692U (en)

Similar Documents

Publication Publication Date Title
CN103726511B (en) A kind of template system for large-area tunnel immersed tube monobloc cast
CN106426525A (en) Prefabricated pipe rack mold
CN110777674A (en) Hydraulic self-propelled anti-collision wall formwork trolley
CN102528896B (en) Block making machine
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN210460692U (en) Platform is pour in tunnel
CN202946193U (en) Tunnel center gutterway formwork
CN209703708U (en) It is a kind of for the pre-buried positioning device for hanging nail of prefabricated components
CN207564681U (en) A kind of prefabricated three-dimensional mobile formwork of cantilever beam section long line method
CN204934530U (en) A kind of Stripping pattern machine
CN107060044B (en) One-step forming die for pouring groove and using method thereof
CN212716661U (en) External contraction type tunnel center ditch post forming template of slide rail
CN212803252U (en) Full-automatic hydraulic invert center ditch template
CN209838436U (en) Modular tunnel cable trench template running gear
CN210500730U (en) Hydraulic horizontal die for urban comprehensive pipe gallery
CN210458961U (en) Pouring mold equipment
CN207348880U (en) A kind of tunnel center gutter formed molding board
CN208849425U (en) Integral movable type cable channel forming template
CN112746857A (en) Full-hydraulic highway tunnel cable trench lining construction device and construction method
CN205712138U (en) A kind of tunnel inside groove channel forming machinery
CN111673883A (en) Production line system of prefabricated concrete member
CN112832203A (en) Angle-adjustable lining trolley suitable for multiple sections of water conservancy ditches
CN217053667U (en) Groove template
CN219862651U (en) Center ditch template shedder
CN209832021U (en) Hydraulic T-beam template device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A tunnel pouring platform

Effective date of registration: 20220808

Granted publication date: 20200505

Pledgee: Bank of China Limited Wuhan Municipal sub branch

Pledgor: WUHAN HONGPENG MACHINERY TECHNOLOGY Co.,Ltd.

Registration number: Y2022420000251

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230727

Granted publication date: 20200505

Pledgee: Bank of China Limited Wuhan Municipal sub branch

Pledgor: WUHAN HONGPENG MACHINERY TECHNOLOGY Co.,Ltd.

Registration number: Y2022420000251

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A tunnel pouring platform

Effective date of registration: 20230728

Granted publication date: 20200505

Pledgee: Bank of China Limited Wuhan Municipal sub branch

Pledgor: WUHAN HONGPENG MACHINERY TECHNOLOGY Co.,Ltd.

Registration number: Y2023420000317

PE01 Entry into force of the registration of the contract for pledge of patent right