CN210439534U CN201920929181.4U CN201920929181U CN210439534U CN 210439534 U CN210439534 U CN 210439534U CN 201920929181 U CN201920929181 U CN 201920929181U CN 210439534 U CN210439534 U CN 210439534U
Authority
CN
China
Prior art keywords
keel
environmental protection
green building
ceiling structure
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920929181.4U
Other languages
Chinese (zh)
Inventor
胡长斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhongyuejian Geotechnical Engineering Co Ltd
Original Assignee
Shenzhen Zhongyuejian Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhongyuejian Geotechnical Engineering Co Ltd filed Critical Shenzhen Zhongyuejian Geotechnical Engineering Co Ltd
Priority to CN201920929181.4U priority Critical patent/CN210439534U/en
Application granted granted Critical
Publication of CN210439534U publication Critical patent/CN210439534U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a green building environmental protection ceiling structure, including main joist, false keel, ceiling and hanging muscle, the main joist with false keel mutually perpendicular fixed connection, the ceiling is installed in the nip of main joist with the false keel, the hanging muscle is installed on the top of main joist, still include the multiunit location installation piece of installing in the main joist, every group location installation piece homogeneous phase is installed two relatively, its inboard is for supplying the installing port that the end of false keel imbeds, install the elastic mounting subassembly on the location installation piece respectively; the suspended ceiling structure of the utility model is convenient and stable to install, has long service life and is not easy to loosen; the installation process is simple and convenient, labor force is saved, and the safety of the installation process is ensured.

Description

Green building environmental protection furred ceiling structure
Technical Field
The utility model belongs to the technical field of the building, concretely relates to green building environmental protection furred ceiling structure.
Background
The suspended ceiling is a decoration of the top decoration of the residential environment of a house, in short, the ceiling decoration, and is one of important parts of indoor decoration.
The suspended ceiling has the functions of heat preservation, heat insulation, sound insulation and sound absorption, and is also a hidden layer for projects such as electric, ventilation air-conditioning, communication and fire prevention, alarm pipeline equipment and the like.
The house ornamentation furred ceiling is common link in the house ornamentation, and the furred ceiling is different according to the material of decorative board, and categorised also inequality, and furred ceiling finishing material is the main foundation of distinguishing the furred ceiling name, mainly has: light steel keel gypsum board suspended ceiling, mineral wool board suspended ceiling, splint suspended ceiling, special-shaped long aluminum pinch plate suspended ceiling, square paint-coated aluminum pinch plate suspended ceiling, painted glass suspended ceiling, aluminum honeycomb perforated acoustic panel suspended ceiling, full-house duplex suspended ceiling and the like.
When the installation of current green building environmental protection furred ceiling, need many people to assist the installation to accomplish the installation of whole ceiling usually to, along with live time's extension, the furred ceiling structure still can become flexible, and life is short, causes a series of incident's problem easily, for this reason we provide a green building environmental protection furred ceiling structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green building environmental protection furred ceiling structure to when solving the current green building environmental protection furred ceiling that proposes in the above-mentioned background art, need many people to assist the installation to accomplish the installation of whole ceiling usually, and, along with the extension of live time, the furred ceiling structure still can become flexible, and life is short, causes the problem of a series of incident easily.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a green building environmental protection furred ceiling structure, includes main joist, false keel, ceiling and hangs the muscle, the main joist with false keel mutually perpendicular fixed connection, the ceiling is installed the main joist with in the nip of false keel, it installs to hang the muscle the top of main joist is still including installing multiunit location installation piece in the main joist, every group location installation piece homogeneous phase is to installing two, and its inboard is for supplying the installing port of false keel tip embedding install the elastic mounting subassembly on the location installation piece respectively.
Preferably, the elastic mounting assembly comprises a pull rod and a telescopic spring, first through holes for the pull rod to penetrate through are respectively formed in the positioning mounting blocks, a mounting groove is formed in the outer side surface of the auxiliary keel, one end of the pull rod penetrates through the first through hole and is embedded into the mounting groove, and the other end of the pull rod is exposed out of the first through hole; a first limiting ring and a third limiting ring are respectively fixed at two ends of the side wall of the first through hole, a second limiting ring is fixed on the pull rod, and the telescopic spring is sleeved on the pull rod and is positioned between the first limiting ring and the second limiting ring.
Preferably, the connection part of the hanging rib and the main keel is provided with a hanging block, and the hanging block is of a horseshoe-shaped structure.
Preferably, the hanging block is provided with a second through hole for the bottom end of the hanging rib to penetrate through, the bottom end of the hanging rib is fixedly provided with a tray located on the inner side of the hanging block, and the main keel is respectively provided with a third through hole for the two supporting feet of the hanging block to penetrate through.
Preferably, the fixing device further comprises a fastener, the fastener is an L-shaped block, fixing holes are respectively formed in the fastener, and the fastener is fixed in a clamping opening between the auxiliary keel and the positioning and mounting block.
Preferably, the auxiliary keel and the main keel are I-shaped keels, and bosses capable of being embedded into grooves of the auxiliary keel are respectively arranged on opposite surfaces of the two positioning and mounting blocks.
Preferably, the auxiliary keel and the main keel are respectively fixed with a positioning sheet corresponding to the ceiling.
Compared with the prior art, the beneficial effects of the utility model are that: the suspended ceiling structure of the utility model is convenient and stable to install, has long service life and is not easy to loosen; the installation process is simple and convenient, labor force is saved, and the safety of the installation process is ensured.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a partial front structure of the present invention;
FIG. 3 is a schematic view of the fastener side structure of the present invention;
FIG. 4 is a schematic view of a fastener mounting structure of the present invention;
FIG. 5 is a schematic view of the front cross-sectional structure of the present invention;
FIG. 6 is a schematic view of the front structure of the hanging bar of the present invention;
in the figure: 1. a main keel; 2. a false keel; 3. a ceiling; 4. positioning plates; 5. hanging the ribs; 6. a hanging block; 7. positioning the mounting block; 8. a boss; 9. an elastic mounting assembly; 10. a fastener; 11. a fixing hole; 12. a first perforation; 13. a pull rod; 14. a first limit ring; 15. a tension spring; 16. a second stop collar; 17. a third limit ring; 18. mounting grooves; 19. a second perforation; 20. a tray; 21. and a third perforation.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2, fig. 3, fig. 4, fig. 5 and fig. 6, the present invention provides a technical solution: a green building environment-friendly ceiling structure comprises a main keel 1, a cross keel 2, a ceiling 3 and a hanging rib 5, wherein the main keel 1 and the cross keel 2 are mutually perpendicular and fixedly connected, the ceiling 3 is arranged in a clamping opening of the main keel 1 and the cross keel 2, positioning pieces 4 corresponding to the ceiling 3 are respectively fixed on the cross keel 2 and the main keel 1, the hanging rib 5 is arranged at the top end of the main keel 1, the mounting quantity of the cross keel 2 and the main keel 1 is selected according to the mounting area when the ceiling 3 is mounted, meanwhile, the cross keel 2 is respectively fixed between two adjacent main keels 1, the inner side spaces of the two cross keels 2 and the two main keels 1 are the mounting positions of the ceiling 3, the positioning pieces 4 enable the ceiling 3 to be conveniently and stably mounted, in the mounting process, the main keel 1 is firstly suspended through the hanging rib 5, then the cross keels 2 are sequentially mounted, and each time of mounting one cross keel 2, the ceiling 3 is installed at positions on both sides thereof, respectively.
Further, still including installing multiunit location installation piece 7 in main joist 1, the group number of location installation piece 7, size and installation quantity to ceiling 3 are decided, simultaneously every group location installation piece 7 homogeneous phase is relatively installed two, the installing port of its inboard for supplying the embedding of false keel 2 tip, false keel 2 and main joist 1 are "worker" style of calligraphy fossil fragments, but have the boss 8 of embedding false keel 2 inslot on two location installation piece 7's the opposite face respectively, boss 8 can make the installation of false keel 2 more stable, false keel 2 is crooked has been avoided simultaneously, guarantee the accuracy of installation ceiling 3, install elastic mounting subassembly 9 on location installation piece 7 respectively.
Specifically, the elastic mounting assembly 9 includes a pull rod 13 and a telescopic spring 15, the positioning and mounting block 7 is respectively provided with a first through hole 12 for the pull rod 13 to pass through, the outer side surface of the false keel 2 is provided with a mounting groove 18, one end of the pull rod 13 passes through the first through hole 12 and is embedded in the mounting groove 18, and the other end is exposed out of the first through hole 12; a first limiting ring 14 and a third limiting ring 17 are respectively fixed at two ends of the side wall of the first through hole 12, a second limiting ring 16 is fixed on the pull rod 13, an expansion spring 15 is sleeved on the pull rod 13 and is positioned between the first limiting ring 14 and the second limiting ring 16, when the assembly of the false keel 2 is carried out, the positions of the positioning and mounting blocks 7 are selected and adjusted according to different widths of the false keel 2, the false keel 2 is vertically inserted into the inner sides of the two positioning and mounting blocks 7, meanwhile, the pull rod 13 is pulled outwards, the expansion spring 15 is compressed and contracted, after the false keel 2 is mounted in place, the pull rod 13 is loosened, under the reset action of the expansion spring 15, the pull rod 13 returns to the initial position, the end part is embedded into the mounting groove 18, the false keel 2 is pre-fixed, and the first-stage stability of the false keel 2 is realized.
Further, for making things convenient for going on smoothly of above-mentioned operation, reduce the labour, can reform transform the embedded end and the mounting groove 18 of pull rod 13, make the embedded end and the mounting groove 18 processing of pull rod 13 for the hemisphere structure can, it is more convenient to install false keel 2 like this, directly push can.
After the auxiliary keel 2 is installed, the auxiliary keel 2 is connected with the main keel 1 through bolts, and the second-level stability of the auxiliary keel 2 is achieved.
Further, the auxiliary keel structure further comprises a fastener 10, the fastener 10 is an L-shaped block, fixing holes 11 are respectively formed in the fastener 10, and the fastener 10 is fixed in a clamping opening between the auxiliary keel 2 and the positioning and mounting block 7 through a bolt, as shown in fig. 4, third-stage stabilization of the auxiliary keel 2 is achieved.
In addition, to the furred ceiling structure of different occasions to and different customers' user demand, under the prerequisite that elasticity installation component 9 and bolt can guarantee that the stable installation of false keel 2, the fastener 10 of this embodiment also can not be used.
Furthermore, the joint of the hanging rib 5 and the main keel 1 is provided with a hanging block 6, the hanging block 6 is of a horseshoe structure, the hanging block 6 is provided with a second through hole 19 for the bottom end of the hanging rib 5 to penetrate through, the bottom end of the hanging rib 5 is fixedly welded with a tray 20 positioned on the inner side of the hanging block 6, the tray 20 can support the hanging block 6, the main keel 1 is provided with a third through hole 21 for two support legs of the hanging block 6 to penetrate through, and after the two support legs of the hanging block 6 penetrate through the third through hole 21, the hanging rib 5 is ensured to reliably hang the main keel 1 through bolt fastening.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a green building environmental protection furred ceiling structure, includes main joist (1), false keel (2), ceiling (3) and hangs muscle (5), main joist (1) with false keel (2) mutually perpendicular fixed connection, install ceiling (3) main joist (1) with in the double-layered mouth of false keel (2), it installs to hang muscle (5) the top of main joist (1), its characterized in that: still including installing multiunit location installation piece (7) in main joist (1), every group location installation piece (7) homogeneous phase is to installing two, and its inboard is for supplying the installing port of false keel (2) tip embedding install elastic mounting subassembly (9) on location installation piece (7) respectively.
2. The green building environmental protection ceiling structure of claim 1, wherein: the elastic mounting assembly (9) comprises a pull rod (13) and a telescopic spring (15), first through holes (12) for the pull rod (13) to penetrate through are respectively formed in the positioning mounting block (7), a mounting groove (18) is formed in the outer side face of the auxiliary keel (2), one end of the pull rod (13) penetrates through the first through holes (12) and is embedded into the mounting groove (18), and the other end of the pull rod is exposed out of the first through holes (12); first perforation (12) lateral wall both ends are fixed with first spacing ring (14) and third spacing ring (17) respectively, be fixed with second spacing ring (16) on pull rod (13), expanding spring (15) cover is established on pull rod (13) and be in first spacing ring (14) with between second spacing ring (16).
3. The green building environmental protection ceiling structure of claim 1, wherein: the joint of the hanging rib (5) and the main keel (1) is provided with a hanging block (6), and the hanging block (6) is of a horseshoe-shaped structure.
4. The green building environmental protection ceiling structure of claim 3, wherein: the hanging block (6) is provided with a second through hole (19) for the bottom end of the hanging rib (5) to penetrate through, the bottom end of the hanging rib (5) is fixed with a tray (20) located on the inner side of the hanging block (6), and the main keel (1) is provided with a third through hole (21) for two support legs of the hanging block (6) to penetrate through.
5. The green building environmental protection ceiling structure of claim 1, wherein: the fixing device is characterized by further comprising a fastener (10), wherein the fastener (10) is an L-shaped block, fixing holes (11) are formed in the fastener (10) respectively, and the fastener (10) is fixed in clamping openings of the auxiliary keel (2) and the positioning and mounting block (7).
6. The green building environmental protection ceiling structure of claim 1, wherein: the auxiliary keel (2) and the main keel (1) are I-shaped keels, and the opposite surfaces of the positioning installation blocks (7) are respectively provided with bosses (8) which can be embedded into grooves of the auxiliary keel (2).
7. The green building environmental protection ceiling structure of claim 1, wherein: and positioning sheets (4) corresponding to the ceiling (3) are respectively fixed on the auxiliary keel (2) and the main keel (1).
CN201920929181.4U 2019-06-20 2019-06-20 Green building environmental protection furred ceiling structure Expired - Fee Related CN210439534U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920929181.4U CN210439534U (en) 2019-06-20 2019-06-20 Green building environmental protection furred ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920929181.4U CN210439534U (en) 2019-06-20 2019-06-20 Green building environmental protection furred ceiling structure

Publications (1)

Publication Number Publication Date
CN210439534U true CN210439534U (en) 2020-05-01

Family

ID=70403601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920929181.4U Expired - Fee Related CN210439534U (en) 2019-06-20 2019-06-20 Green building environmental protection furred ceiling structure

Country Status (1)

Country Link
CN (1) CN210439534U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108931A (en) * 2021-12-15 2022-03-01 深圳市晶宫建筑装饰集团有限公司 Suspended ceiling device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108931A (en) * 2021-12-15 2022-03-01 深圳市晶宫建筑装饰集团有限公司 Suspended ceiling device
CN114108931B (en) * 2021-12-15 2022-07-15 深圳市晶宫建筑装饰集团有限公司 Suspended ceiling device

Similar Documents

Publication Publication Date Title
CN105220810A (en) A kind of lightgage steel joist folding light trough structure
CN210439534U (en) Green building environmental protection furred ceiling structure
CN206987154U (en) A kind of aluminium side being easily installed leads to grille ceiling furred ceiling
CN212561919U (en) High strength environmental protection furred ceiling decorative board structure
CN204983333U (en) Light gauge steel rolls over light trough structure
CN201972342U (en) Detachable sound-absorption and heat-insulation decorative inner wall
CN207727826U (en) A kind of aluminium seine furred ceiling structure
CN205822554U (en) A kind of rock cotton board garage furred ceiling
CN211172640U (en) Suspended ceiling hanging structure
CN210013374U (en) Assembled plane suspended ceiling module
CN210562943U (en) Suspended ceiling structure
CN212224375U (en) Novel galvanized steel sheet folding groove furred ceiling mechanism
CN112282180A (en) Integrated ceiling convenient for installing central air conditioner
CN218060952U (en) Furred ceiling board convenient to install fast
CN212224386U (en) Soundproof household soundproof ceiling for roof
CN219808566U (en) Suspended ceiling framework mounting mechanism
CN211774988U (en) Indoor suspended ceiling structure
CN212866550U (en) Ceiling structure for interior decoration for preventing furred ceiling falls
CN113338522B (en) Splice member and installation method
CN217268281U (en) Assembled fireproof suspended ceiling structure
CN214144350U (en) Mineral wool board ceiling construction system
CN212358812U (en) GRG modeling suspended ceiling for kitchen and bathroom
CN213216297U (en) Screen cuts off decorative board
CN212295274U (en) Mineral wool abatvoix furred ceiling
CN215948639U (en) Be applied to architectural decoration's furred ceiling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200501