CN210414501U - Mounting structure of civil engineering pipeline placing frame - Google Patents

Mounting structure of civil engineering pipeline placing frame Download PDF

Info

Publication number
CN210414501U
CN210414501U CN201921428074.XU CN201921428074U CN210414501U CN 210414501 U CN210414501 U CN 210414501U CN 201921428074 U CN201921428074 U CN 201921428074U CN 210414501 U CN210414501 U CN 210414501U
Authority
CN
China
Prior art keywords
base
supporting column
civil engineering
mounting structure
engineering pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921428074.XU
Other languages
Chinese (zh)
Inventor
杨雪
陈艳敏
刘唤
郑展展
邵仁杰
周凤娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shangqiu Institute of Technology
Original Assignee
Shangqiu Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shangqiu Institute of Technology filed Critical Shangqiu Institute of Technology
Priority to CN201921428074.XU priority Critical patent/CN210414501U/en
Application granted granted Critical
Publication of CN210414501U publication Critical patent/CN210414501U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a civil engineering pipeline puts mounting structure of frame relates to equipment technical field for civil engineering. Including first base, first base is the cavity structure, first base one end upper surface swing joint has first support column, the second base has been cup jointed to the other end, the one end upper surface swing joint that first base was kept away from to the second base has the second support column, both sides top-down all is equipped with a plurality of framves around second support column and the first support column, first support column all is equipped with the bracing with second support column inboard, first base bottom is equipped with first truckle all around, the bottom that first base was kept away from to the second base is equipped with the second truckle. The utility model discloses a size in the first base is inserted to the control second base, adjusts the distance between first support and the second support column, can effectually put the pipeline of different length, and avoids transporting many times at the job site, the efficiency of construction that has improved greatly.

Description

Mounting structure of civil engineering pipeline placing frame
Technical Field
The utility model relates to an equipment technical field for civil engineering, concretely relates to civil engineering pipeline puts mounting structure of frame.
Background
The pipeline for civil engineering mainly comprises a steel pipe for building a scaffold and pipelines for draining, supplying heat, supplying gas and the like, various pipelines required for construction are usually purchased in an early stage in order to finish construction according to a planned progress in the implementation process of civil engineering, and at present, various pipelines are generally and directly placed in a site at a construction site, so that a large amount of land area is occupied, the construction site is reduced, and the convenience of constructors in the construction process is seriously influenced. The present adopts the square timber to stack the pipeline successive layer at the job site usually, perhaps erect the pipeline through the steel shelf, the uneven problem is stacked to the job site pipeline of solution, be convenient for job site volume drainage, and avoid the corrosion of steel pipe, however, the pipeline is stacked through fixed support body, if the pipeline on the support body shifts to the place of construction once more often in the process of construction, can consume extra man-hour unavoidably, greatly reduced's efficiency of construction, and simultaneously, the length of pipeline is different, will select different pipeline support bodies when erectting, will install the pipeline support body of different length according to the length of pipeline, can occupy more construction material preparation places like this, in addition, along with the completion of engineering project, shift current fixed pipeline support body to next engineering place, need dismantle, and install once more again, so both time-consuming and hard.
SUMMERY OF THE UTILITY MODEL
In order to solve the defects of the prior art, the utility model provides a civil engineering pipeline puts mounting structure of frame.
In order to achieve the purpose, the mounting structure of the civil engineering pipeline placing frame comprises a first base, wherein the first base is of a cavity structure, the upper surface of one end of the first base is movably connected with a first supporting column, the other end of the first base is sleeved with a second base, the upper surface of one end, far away from the first base, of the second base is movably connected with a second supporting column, the second supporting column is opposite to the first supporting column, a plurality of placing frames are respectively arranged on the front side and the rear side of the second supporting column and the front side and the rear side of the first supporting column from top to bottom, each placing frame is perpendicular to the second supporting column or the first supporting column, and each placing frame mounted on the first supporting column corresponds to each placing frame mounted on the second supporting column one to one; inclined supports are arranged on the inner sides of the first supporting column and the second supporting column, one ends of the two inclined supports are hinged with the first supporting column and the second supporting column respectively, and the other ends of the two inclined supports are movably connected to the first base and the second base respectively; first base bottom four corners department is equipped with the fixed first truckle of stopping in area, the second base is kept away from the bottom of first base is equipped with the fixed second truckle of stopping in area.
Further, the first supporting column and the second supporting column are hinged to the first base and the second base through hinges respectively, and the hinges are located on the inner sides of the first supporting column and the second supporting column.
Further, two the bracing pass through first bolt connect respectively in first base with on the second base, first support column with all offer on the second support column and be used for accomodating the recess of bracing.
Furthermore, the first base is located and cup joints the top of second base department has seted up the through-hole, second base upper surface is followed second base length direction has seted up a plurality of internal thread holes, the second bolt passes simultaneously the through-hole with one of them internal thread hole will second base one end is fixed in the first base.
Furthermore, the bottom of the second base is provided with a plurality of rollers.
Furthermore, a plurality of spaced limiting columns are transversely arranged on the upper surface of each placing frame.
Furthermore, vertical stop posts are arranged at two ends of each placing frame along the length direction.
Furthermore, the bottom end of each retaining column is fixed to the end of each placing frame through a third bolt.
Compared with the prior art, the beneficial effects of the utility model reside in that:
the utility model discloses cup joint the second base in the first base, and insert the size in the first base through controlling the second base, adjust the distance between first support and the second support column, can effectually put the pipeline of different length, in addition, through being located to cup joint the bottom of the inside part in the first base at the second base and being equipped with a plurality of gyro wheels, be convenient for the second base to be located and slide in the first base, it is practical nimble;
the first supporting post and the second supporting post are respectively hinged on the first base and the second base, so that the first supporting post and the second supporting post are laid down and supported on the first base and the second base, meanwhile, an inclined support is arranged on the inner side of the first supporting post opposite to the second supporting post, the stability of the supporting posts is enhanced, and if the first supporting post and the second supporting post are not used, the inclined support can be accommodated in a groove in the first supporting post and the second supporting post, so that the transfer is convenient;
through being equipped with the truckle of taking the fixed stopper at first base and second base, be convenient for will erect the pipeline and transport to the job site from depositing, avoid from another fixed putting the frame and shift to transporting the support body on, simultaneously, avoid transporting many times at the job site, consume extra man-hour to the efficiency of construction that has improved greatly.
Drawings
FIG. 1 is a front view of a civil engineering pipeline laying frame in the embodiment.
FIG. 2 is a schematic structural diagram of a mounting structure of a civil engineering pipeline laying frame in the embodiment.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
A mounting structure of civil engineering pipeline placing frames is shown in figures 1-2 and comprises a first base 3, wherein the first base 3 is of a cavity structure, the upper surface of one end of the first base 3 is movably connected with a first supporting column 1, the other end of the first base is sleeved with a second base 301, the upper surface of one end, away from the first base 3, of the second base 301 is movably connected with a second supporting column 101, the second supporting column 1 is opposite to the first supporting column 101, a plurality of placing frames 2 are respectively arranged on the front side and the rear side of the second supporting column 1 and the front side and the rear side of the first supporting column 101 from top to bottom, each placing frame 2 is perpendicular to the second supporting column 1 or the first supporting column 101, and each placing frame 2 installed on the first supporting column 1 is in one-to-one correspondence with each placing frame 2 installed on the second supporting column 101; therefore, the second base is sleeved in the first base, the distance between the first support column and the second support column is adjusted by adjusting the size of the second base inserted into the first base, and pipelines with different lengths can be placed.
Through being equipped with the fixed first truckle 4 of stopping in area in first base 3 bottom four corners department, the bottom that first base 3 was kept away from to second base 301 is equipped with the fixed second truckle 401 of stopping in area, is convenient for will erect the pipeline and remove and the job site, avoids transporting many times at the job site, consumes extra man-hour, the efficiency of construction that has improved greatly.
In order to further realize the placement of pipelines with different lengths and increase the stability of sleeving, a through hole is formed in the top of the first base 3 at the position where the second base 301 is sleeved, a plurality of internal thread holes are formed in the upper surface of the second base 301 along the length direction of the second base 301, a second bolt 103 simultaneously penetrates through the through hole and one of the internal thread holes, and one end of the second base 301 is fixed in the first base 3; therefore, the depth of the second base inserted into the first base is adjusted by controlling the second bolt, so that the distance between the first support and the second support column is further realized, pipelines with different lengths can be effectively placed, the second bolt is fastened to fixedly sleeve the second base in the first base, and the overall stability of the whole pipeline placing frame is effectively enhanced;
for the convenience of the second base is located first base and slides, just be equipped with a plurality of gyro wheels 402 in the bottom of second base 301, and use with the cooperation of second truckle 401, for this reason, when taking off the second bolt, through promoting second base 301, second truckle 401 that is located second base 301 and gyro wheel 402 are to first base 3's direction round trip movement simultaneously, and then can effectual regulation first support and the second support distance between the post, the labour has been saved greatly simultaneously, can adjust the distance between the pipe rack support column in a flexible way, erect the pipeline of different length.
In order to facilitate the folding and unfolding of the first support and the second support column, the first support column 1 and the second support column 101 are respectively hinged with the first base 3 and the second base 301 through hinges 302, and the two hinges 302 are respectively positioned at the inner sides of the first support column 1 opposite to the second support column 101, so that the first support and the second support column are laid down and erected on the first base and the second base; meanwhile, the inclined supports 104 are arranged on the inner sides of the first supporting column 1 and the second supporting column 101, one ends of the two inclined supports 104 are respectively hinged with the first supporting column 1 and the second supporting column 101, the other ends of the two inclined supports 104 are respectively movably connected to the first base 3 and the second base 301 through the first bolts 102, the stability of the first supporting column and the second supporting column is effectively enhanced, grooves 105 used for containing the inclined supports 104 are formed in the first supporting column 1 and the second supporting column 101, the inclined supports can be contained in the grooves in the first supporting column and the second supporting column when a placing frame is not used, and the transfer is facilitated;
avoid not hard up in order to put the pipeline to putting the frame, transversely be equipped with a plurality of equidistant spacing posts 201 at every 2 upper surfaces of putting the frame, be favorable to establishing the pipeline card between spacing post, and simultaneously, when shifting the pipeline to the job site in order to promote the base, avoid the pipeline to fall from putting the frame, all be equipped with vertical bumping post 202 at every both ends of putting frame 2 along length direction, and every bumping post 202 bottom all is fixed in every tip of putting frame 2 through the third bolt.
The above description is only exemplary of the present invention and should not be construed as limiting the present invention, and any modifications, equivalents and improvements made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (8)

1. The utility model provides a mounting structure of frame is put to civil engineering pipeline which characterized in that: comprises a first base (3), the first base (3) is of a cavity structure, the upper surface of one end of the first base (3) is movably connected with a first supporting column (1), the other end is sleeved with a second base (301), the upper surface of one end of the second base (301) far away from the first base (3) is movably connected with a second supporting column (101), and the second supporting column (101) is arranged opposite to the first supporting column (1), a plurality of placing frames (2) are respectively arranged on the front side and the rear side of the second supporting column (101) and the first supporting column (1) from top to bottom, each placing frame (2) is perpendicular to the second supporting column (101) or the first supporting column (1), and each placing frame (2) installed on the first supporting column (1) is in one-to-one correspondence with each placing frame (2) installed on the second supporting column (101); inclined supports (104) are arranged on the inner sides of the first supporting column (1) and the second supporting column (101), one ends of the two inclined supports (104) are respectively hinged with the first supporting column (1) and the second supporting column (101), and the other ends of the two inclined supports are respectively movably connected to the first base (3) and the second base (301); first base (3) bottom four corners department is equipped with first truckle (4) of area fixed stopping, second base (301) are kept away from the bottom of first base (3) is equipped with second truckle (401) of area fixed stopping.
2. The civil engineering pipeline housing rack mounting structure of claim 1, wherein: the first supporting column (1) and the second supporting column (101) are hinged to the first base (3) and the second base (301) through hinges (302), and the hinges (302) are located on the inner sides of the first supporting column (1) and the second supporting column (101) respectively.
3. The civil engineering pipeline housing rack mounting structure of claim 1, wherein: two the bracing is connected respectively in first base (3) with on second base (301) through first bolt (102), first support column (1) with all offer on second support column (101) and be used for accomodating recess (105) of bracing (104).
4. The civil engineering pipeline housing rack mounting structure of claim 1, wherein: the first base (3) is located and cup joints the top of second base (301) department and has seted up the through-hole, second base (301) upper surface is followed second base (301) length direction has seted up a plurality of internal thread holes, and second bolt (103) pass simultaneously the through-hole with one of them internal thread hole, will second base (301) one end is fixed in first base (3).
5. The civil engineering pipeline housing rack mounting structure of claim 1, wherein: the bottom of the second base (301) is provided with a plurality of rollers (402).
6. The civil engineering pipeline housing rack mounting structure of claim 1, wherein: a plurality of spaced limiting columns (201) are transversely arranged on the upper surface of each placing frame (2).
7. The civil engineering pipeline housing rack mounting structure of claim 1, wherein: vertical retaining columns (202) are arranged at two ends of each placing frame (2) along the length direction.
8. The civil engineering pipeline housing rack mounting structure of claim 7, wherein: the bottom end of each retaining column (202) is fixed to the end of each placing frame (2) through a third bolt.
CN201921428074.XU 2019-08-29 2019-08-29 Mounting structure of civil engineering pipeline placing frame Expired - Fee Related CN210414501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921428074.XU CN210414501U (en) 2019-08-29 2019-08-29 Mounting structure of civil engineering pipeline placing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921428074.XU CN210414501U (en) 2019-08-29 2019-08-29 Mounting structure of civil engineering pipeline placing frame

Publications (1)

Publication Number Publication Date
CN210414501U true CN210414501U (en) 2020-04-28

Family

ID=70365187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921428074.XU Expired - Fee Related CN210414501U (en) 2019-08-29 2019-08-29 Mounting structure of civil engineering pipeline placing frame

Country Status (1)

Country Link
CN (1) CN210414501U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111746743A (en) * 2020-06-30 2020-10-09 扬州市远望橡胶有限公司 Fender compression performance detection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111746743A (en) * 2020-06-30 2020-10-09 扬州市远望橡胶有限公司 Fender compression performance detection device
CN111746743B (en) * 2020-06-30 2021-07-09 扬州市远望橡胶有限公司 Fender compression performance detection device

Similar Documents

Publication Publication Date Title
CN202731297U (en) Adjustable beam form support jacking bracket apparatus
CN202810209U (en) Support carrier of beam framework
CN112510610B (en) Assembled pipe gallery support and construction process thereof
CN210414501U (en) Mounting structure of civil engineering pipeline placing frame
CN102926554B (en) Steel hanging seat formwork support and construction method thereof
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN212317427U (en) Turnover scaffold yard for slope-setting position at top of foundation pit
CN207130821U (en) A kind of portable water storage device
CN214464175U (en) Assembled shield constructs empty counterforce device that pushes away of TBM complete machine
CN212572035U (en) Be applied to sectional shelf-unit of cable pit turning
CN210152295U (en) Can have enough to meet need reverse construction method steel-pipe column guiding device that hangs down of bolt formula
CN209798821U (en) pipe rack bearing structure based on city utility tunnel
CN203878563U (en) Suspended single-row scaffold
CN207174408U (en) A kind of steel pipe storage device
CN210887976U (en) Auxiliary device for installing heat-preservation and decoration integrated board
CN111017590A (en) Shipping method and support frame of conduit frame assembly
CN206171525U (en) Hanger car
CN202357060U (en) Tooling clamp for flow line production of steel structure house
CN216787821U (en) Support device for ramp side mold
CN205205681U (en) Hollow thin wall rectangle mound top application worker uses bracket
CN217812395U (en) Pump line reinforcing apparatus
CN213197512U (en) Pile foundation construction pipe storage and transfer frame
CN215747319U (en) Middle part groove welding safety support device
CN220565688U (en) Unilateral formwork structure of secondary butt joint
JP5126758B1 (en) Concrete boundary block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200428

Termination date: 20200829

CF01 Termination of patent right due to non-payment of annual fee