CN210344905U - On-spot mapping device of building engineering cost - Google Patents

On-spot mapping device of building engineering cost Download PDF

Info

Publication number
CN210344905U
CN210344905U CN201921224990.1U CN201921224990U CN210344905U CN 210344905 U CN210344905 U CN 210344905U CN 201921224990 U CN201921224990 U CN 201921224990U CN 210344905 U CN210344905 U CN 210344905U
Authority
CN
China
Prior art keywords
mapping device
fixed
screwed pipe
connecting plate
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921224990.1U
Other languages
Chinese (zh)
Inventor
徐小凤
徐国荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921224990.1U priority Critical patent/CN210344905U/en
Application granted granted Critical
Publication of CN210344905U publication Critical patent/CN210344905U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses an on-spot mapping device of building engineering cost, including body and mounting panel, the bottom of body is fixed with the connecting plate, through-hole and opening have been seted up at the top of mounting panel, the open-ended inside is equipped with the screwed pipe, the spacing groove has been seted up to the open-ended inner wall, the inside of spacing groove is equipped with the spacing ring, the spacing ring is fixed mutually with the screwed pipe, the outside of screwed pipe is fixed with the antiskid cover, the internal thread of screwed pipe runs through threaded column, threaded column's top is fixed mutually with the connecting plate, the inside of through-hole runs through there is the guide rail pole, the top of guide rail pole is fixed mutually with the connecting plate. The utility model discloses can be convenient for height-adjusting, easy operation, convenient to use, stability is good moreover, can carry out supporting leg length adjustment according to actual conditions in addition, is favorable to adapting to hollow ground, is favorable to having improved this on-the-spot mapping device of building engineering cost's adaptability and flexibility, and is comparatively practical.

Description

On-spot mapping device of building engineering cost
Technical Field
The utility model relates to a survey and drawing technical field specifically is an on-spot mapping device of building engineering cost.
Background
The engineering cost refers to the construction price of a project, measurement, evaluation and budget cost are needed in the pricing process, when the construction cost of the construction project is completed, a professional engineer needs to use a surveying and mapping instrument or device to survey the construction site on the construction site, the whole terrain is measured, so that the construction cost of the construction project can be evaluated more accurately, more surveying and mapping instruments are needed to measure during the construction cost surveying and mapping, the instruments are mostly placed on the ground or supported by a support at a certain height, if the instrument cannot be erected at a certain height, the surveying and mapping data of partial instruments or equipment are inaccurate, and accurate data cannot be obtained according to the actual situation.
However, when the ground of the existing construction cost field mapping device is in a depression, the mapping work cannot be normally carried out, the flexibility is not enough, the adaptability is poor, in addition, the existing construction cost field mapping device is not convenient for adjusting the observation height, and the use is very inconvenient, so the construction cost field mapping device is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering cost is at scene mapping device, the height-adjusting of can being convenient for, easy operation, convenient to use, stability is good moreover, can carry out supporting leg length adjustment according to actual conditions in addition, is favorable to adapting to hole ground, is favorable to having improved this building engineering cost at scene mapping device's adaptability and flexibility, and is comparatively practical, is fit for extensively promoting and using, has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a construction engineering cost on-site surveying and mapping device comprises a body and a mounting plate, wherein a connecting plate is fixed at the bottom of the body, a through hole and an opening are formed in the top of the mounting plate, a threaded pipe is arranged in the opening, a limiting groove is formed in the inner wall of the opening, a limiting ring is arranged in the limiting groove and fixed with the threaded pipe, an anti-slip sleeve is fixed on the outer side of the threaded pipe, a threaded column penetrates through the internal thread of the threaded pipe, the top of the threaded column is fixed with the connecting plate, a guide rail rod penetrates through the through hole, the top of the guide rail rod is fixed with the connecting plate, a supporting leg is arranged on the side face of the mounting plate, the top of the supporting leg is movably connected with the mounting plate through a hinged support, a placing cavity is formed in the bottom end of the supporting leg, a movable rod is arranged in the placing cavity, and a tapered end is fixed at, the inner wall of the placing cavity is provided with a threaded hole, the inner thread of the threaded hole is connected with a threaded bolt, and the end part of the threaded bolt is in contact with the movable rod.
As an optimal implementation manner of the utility model, the antiskid cover is the rubber sleeve, the outside of antiskid cover is equipped with anti-skidding line.
As a preferred embodiment of the present invention, the number of the through holes is four, four the through holes are respectively located at four corners of the mounting plate.
As a preferred embodiment of the present invention, the number of the supporting legs is three, three the supporting legs are uniformly distributed outside the mounting plate.
As a preferred embodiment of the present invention, the threaded hole is close to the opening for placing the cavity.
As an optimal implementation mode of the utility model, be fixed with spacing rope between mounting panel and the supporting leg, and spacing rope is the plasticity rope.
As a preferred embodiment of the present invention, the limiting groove is an annular groove, and the limiting groove is located in the middle of the opening.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a mounting panel, connecting plate, through-hole, opening, screwed pipe, spacing groove, spacing ring, antiskid cover, screw thread post and guide rail pole for this on-the-spot mapping device of building engineering cost can be convenient for height-adjusting, easy operation, convenient to use, and stability is good moreover.
2. The utility model discloses a supporting leg, place chamber, movable rod, toper end, screw hole, screw bolt, spacing rope and free bearing for this on-the-spot mapping device of building engineering cost can carry out supporting leg length adjustment according to actual conditions, is favorable to adapting to hole ground, is favorable to having improved this on-the-spot mapping device of building engineering cost's adaptability and flexibility.
Drawings
Other features of the invention will become apparent upon reading of the following detailed description of non-limiting embodiments with reference to the accompanying drawings; the objects and advantages will become more apparent:
FIG. 1 is a schematic cross-sectional view of the construction cost on-site surveying and mapping apparatus of the present invention;
FIG. 2 is an enlarged view of the point A in FIG. 1 according to the present invention;
fig. 3 is the utility model relates to a building engineering cost is on-spot mapping device's supporting leg sectional structure schematic diagram.
In the figure: 1. a body; 2. mounting a plate; 3. a connecting plate; 4. a through hole; 5. an opening; 6. a threaded pipe; 7. a limiting groove; 8. a limiting ring; 9. an anti-slip sleeve; 10. a threaded post; 11. a guide rail rod; 12. supporting legs; 13. a placement chamber; 14. a movable rod; 15. a tapered end; 16. a threaded hole; 17. a threaded bolt; 18. a limiting rope; 19. and (4) hinging seat.
Detailed Description
Technical means for realizing the utility model; authoring features; the purpose and function are easily understood and appreciated, and the present invention will be further described with reference to the following detailed description.
Referring to fig. 1-3, the present invention provides a technical solution: a construction engineering cost on-site surveying and mapping device comprises a body 1 and a mounting plate 2, wherein a connecting plate 3 is fixed at the bottom of the body 1, a through hole 4 and an opening 5 are formed in the top of the mounting plate 2, a threaded pipe 6 is arranged in the opening 5, a limiting groove 7 is formed in the inner wall of the opening 5, a limiting ring 8 is arranged in the limiting groove 7, the limiting ring 8 is fixed with the threaded pipe 6, an anti-skidding sleeve 9 is fixed on the outer side of the threaded pipe 6, a threaded column 10 penetrates through the internal thread of the threaded pipe 6, the top of the threaded column 10 is fixed with the connecting plate 3, a guide rail rod 11 penetrates through the through hole 4, the top of the guide rail rod 11 is fixed with the connecting plate 3, a supporting leg 12 is arranged on the side surface of the mounting plate 2, the top of the supporting leg 12 is movably connected with the mounting plate 2 through a hinged support 19, a placing cavity 13 is formed in the bottom end, the inside of placing chamber 13 is equipped with movable rod 14, the bottom of movable rod 14 is fixed with toper end 15, the inner wall of placing chamber 13 is seted up threaded hole 16, threaded hole 16's internal thread is connected with screw bolt 17, screw bolt 17's tip and movable rod 14 contact.
The anti-skid sleeve 9 is a rubber sleeve, and anti-skid lines are arranged on the outer side of the anti-skid sleeve 9.
The number of the through holes 4 is four, and the four through holes 4 are respectively located at four corners of the mounting plate 2.
The number of the supporting legs 12 is three, and the three supporting legs 12 are uniformly distributed on the outer side of the mounting plate 2.
Wherein the threaded hole 16 is close to the opening of the placing cavity 13.
Wherein, a limiting rope 18 is fixed between the mounting plate 2 and the supporting leg 12, and the limiting rope 18 is a plastic rope.
The limiting groove 7 is an annular groove, and the limiting groove 7 is located in the middle of the opening 5.
The working principle is as follows: when using, rotate supporting leg 12 around free bearing 19, until spacing rope 18 is in straightening state, when ground unevenness has a pothole, take place not hard up screw bolt 17 in screw hole 16 this moment, then outwards stimulate movable rod 14 along placing chamber 13, until conical end 15 with ground grafting can, then again screw bolt 17 in screw hole 16 again can, when needs height-adjusting, hold antiskid cover 9 this moment and then rotate screwed pipe 6, thereby make screw post 10 promote connecting plate 3 and make the height of body 1 change, simultaneously guide rail rod 11 slides along through-hole 4, ensure the stability of body 1 lift in-process, thereby accomplish the altitude mixture control to body 1.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a construction engineering cost on-spot mapping device, includes body (1) and mounting panel (2), its characterized in that, the bottom of body (1) is fixed with connecting plate (3), through-hole (4) and opening (5) have been seted up at the top of mounting panel (2), the inside of opening (5) is equipped with screwed pipe (6), spacing groove (7) have been seted up to the inner wall of opening (5), the inside of spacing groove (7) is equipped with spacing ring (8), spacing ring (8) are fixed mutually with screwed pipe (6), the outside of screwed pipe (6) is fixed with antiskid cover (9), the internal thread of screwed pipe (6) runs through threaded post (10), the top of threaded post (10) is fixed mutually with connecting plate (3), the inside of through-hole (4) runs through has guide rail pole (11), the top of guide rail pole (11) is fixed mutually with connecting plate (3), the side of mounting panel (2) is equipped with supporting leg (12), the top of supporting leg (12) is through free bearing (19) and mounting panel (2) looks swing joint, the bottom of supporting leg (12) has been seted up and has been placed chamber (13), the inside of placing chamber (13) is equipped with movable rod (14), the bottom of movable rod (14) is fixed with toper end (15), place the inner wall of chamber (13) and set up threaded hole (16), the inside threaded connection of screw hole (16) has screw bolt (17), the tip and the movable rod (14) of screw bolt (17) contact.
2. The construction cost on-site surveying and mapping device of claim 1, wherein: the anti-skidding sleeve (9) is a rubber sleeve, and anti-skidding lines are arranged on the outer side of the anti-skidding sleeve (9).
3. The construction cost on-site surveying and mapping device of claim 1, wherein: the number of the through holes (4) is four, and the four through holes (4) are respectively positioned at four corners of the mounting plate (2).
4. The construction cost on-site surveying and mapping device of claim 1, wherein: the number of the supporting legs (12) is three, and the three supporting legs (12) are uniformly distributed on the outer side of the mounting plate (2).
5. The construction cost on-site surveying and mapping device of claim 1, wherein: the threaded hole (16) is close to the opening of the placing cavity (13).
6. The construction cost on-site surveying and mapping device of claim 1, wherein: a limiting rope (18) is fixed between the mounting plate (2) and the supporting leg (12), and the limiting rope (18) is a plastic rope.
7. The construction cost on-site surveying and mapping device of claim 1, wherein: the limiting groove (7) is an annular groove, and the limiting groove (7) is located in the middle of the opening (5).
CN201921224990.1U 2019-07-31 2019-07-31 On-spot mapping device of building engineering cost Expired - Fee Related CN210344905U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921224990.1U CN210344905U (en) 2019-07-31 2019-07-31 On-spot mapping device of building engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921224990.1U CN210344905U (en) 2019-07-31 2019-07-31 On-spot mapping device of building engineering cost

Publications (1)

Publication Number Publication Date
CN210344905U true CN210344905U (en) 2020-04-17

Family

ID=70216694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921224990.1U Expired - Fee Related CN210344905U (en) 2019-07-31 2019-07-31 On-spot mapping device of building engineering cost

Country Status (1)

Country Link
CN (1) CN210344905U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114190356A (en) * 2021-12-21 2022-03-18 山东长岛国家级自然保护区管理中心 Medicine device is spouted in multi-angle forest pest control
CN114367393A (en) * 2021-12-21 2022-04-19 湖南文辉汽车制造有限公司 Pull type caravan shell paint spraying device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114190356A (en) * 2021-12-21 2022-03-18 山东长岛国家级自然保护区管理中心 Medicine device is spouted in multi-angle forest pest control
CN114367393A (en) * 2021-12-21 2022-04-19 湖南文辉汽车制造有限公司 Pull type caravan shell paint spraying device

Similar Documents

Publication Publication Date Title
CN210344905U (en) On-spot mapping device of building engineering cost
CN210219087U (en) Mapping device for geotechnical engineering
CN203375977U (en) Fixed-height leveling device
CN111121739A (en) Centering rod device for high-precision engineering measurement
CN213455486U (en) Measuring apparatu is used in native survey and drawing with angle modulation function
CN210070947U (en) Measuring instrument for land resource management
CN111982080A (en) Terrain measuring device for territory space planning
CN209910641U (en) Seat is placed to sopwith staff that land resource survey and drawing was used
CN209820451U (en) Building engineering surveying and mapping device
CN212029006U (en) Geographic information survey and drawing scale
CN213515646U (en) Inclination measuring device for geological survey
CN205940478U (en) Simple and easy measuring tool of car contour dimension
CN214793125U (en) Portable level for settlement observation of house building
CN205940431U (en) Wrong platform tester in portable cement road surface
CN211576199U (en) Survey and drawing engineering is with sighting rod convenient to fix
CN210570702U (en) Sighting rod rack for surveying and mapping
CN210050522U (en) Can place total powerstation on various ground
CN210831214U (en) Tripod for mapping engineering
CN206399413U (en) Construction of Civil Engineering measurement apparatus
CN203375120U (en) Fixing device for measuring apparatus
CN208635827U (en) A kind of novel building engineering surveying instrument
CN207163494U (en) Corps canopy temperature measuring apparatus
CN206989951U (en) A kind of total powerstation
CN220084031U (en) Land mapping instrument
CN217585732U (en) Be used for sunshine measuring device of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200417

Termination date: 20210731