CN210313196U - Climbing cable hoisting system - Google Patents

Climbing cable hoisting system Download PDF

Info

Publication number
CN210313196U
CN210313196U CN201920313187.9U CN201920313187U CN210313196U CN 210313196 U CN210313196 U CN 210313196U CN 201920313187 U CN201920313187 U CN 201920313187U CN 210313196 U CN210313196 U CN 210313196U
Authority
CN
China
Prior art keywords
steel wire
wire rope
climbing
support arm
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920313187.9U
Other languages
Chinese (zh)
Inventor
刘爱东
孙忠全
李国祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jangho Curtain Wall Co Ltd
Beijing Jangho Curtain Wall System Engineering Co Ltd
Original Assignee
Beijing Jangho Curtain Wall System Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jangho Curtain Wall System Engineering Co Ltd filed Critical Beijing Jangho Curtain Wall System Engineering Co Ltd
Priority to CN201920313187.9U priority Critical patent/CN210313196U/en
Application granted granted Critical
Publication of CN210313196U publication Critical patent/CN210313196U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

A climbing cable hoisting system comprises a climbing cable device and a hoisting device; the rope climbing device comprises a base arranged on a building bottom plate and a support arm arranged on a building top plate, wherein the base is provided with two fixed pulleys, each fixed pulley is wound with a steel wire rope, the top ends of the two steel wire ropes are fixedly connected with the support arm, and the bottom ends of the two steel wire ropes are connected with an electric hoist, so that when the electric hoist tensions each steel wire rope, the two steel wire ropes are vertical; each steel wire rope is sleeved with a binding band which can slide up and down along each steel wire rope; the lifting device is positioned at the top of the outer side of the support arm. The utility model has simple structure, convenient operation and low cost. In the building curtain application range of main field, play the fixed action when can assisting handling cell cube, solved the influence of wind to handling work, can effectively improve engineering efficiency of construction, reduce cost can recycle, green, the commonality is strong.

Description

Climbing cable hoisting system
Technical Field
The utility model relates to a handling system, especially a climb cable handling system.
Background
Along with the continuous development of the construction industry, super high-rise engineering is more and more. The existing hoisting of the curtain wall unit body of the super high-rise building mainly comprises a tower crane and a winch, and is greatly influenced by wind during hoisting, and the wind blows the curtain wall of the unit body hoisted in the air to rotate, deflect and impact a main body structure, so that danger is caused. Therefore, when the wind reaches above the level 4, the hoisting operation is stopped, the construction progress is influenced, the construction period is limited, and the cost is increased.
SUMMERY OF THE UTILITY MODEL
In view of the above problem, the utility model aims at providing a climb cable handling system, its simple structure, convenient operation, cost are low, can solve wind to the influence of handling work, effectively improve engineering efficiency of construction, and reduce cost can recycle, green, and the commonality is strong.
In order to achieve the purpose, the utility model adopts the following technical proposal:
a climbing cable hoisting system comprises a climbing cable device and a hoisting device;
the rope climbing device comprises a base arranged on a building bottom plate and a support arm arranged on a building top plate, wherein the base is provided with two fixed pulleys, each fixed pulley is wound with a steel wire rope, the top ends of the two steel wire ropes are fixedly connected with the support arm, and the bottom ends of the two steel wire ropes are connected with an electric hoist, so that when the electric hoist tensions each steel wire rope, the two steel wire ropes are vertical; each steel wire rope is sleeved with a binding band which can slide up and down along each steel wire rope; the lifting device is positioned at the top of the outer side of the support arm.
Furthermore, the plane where the two steel wire ropes are located is parallel to the outer side face of the building.
Furthermore, the bottom ends of the two steel wire ropes are fixedly connected together and connected to an electric hoist.
Further, the diameter of the steel wire rope is 12 mm.
Further, the base comprises four vertically connected 120mm × 80mm square steels; the support arm is made of square steel with the thickness of 120mm multiplied by 80 mm.
The utility model has the advantages that: the utility model has simple structure, convenient operation and low cost. In the building curtain application range of main field, play the fixed action when can assisting handling cell cube, solved the influence of wind to handling work, can effectively improve engineering efficiency of construction, reduce cost can recycle, green, the commonality is strong.
Drawings
Fig. 1 is the structure schematic diagram of the climbing cable hoisting system of the utility model.
Detailed Description
The invention is further illustrated by the following figures and examples.
As shown in fig. 1, the utility model provides a climbing cable handling system, including climbing cable device and hoisting accessory.
This climb cable device is including locating base 2 on building bottom plate 1 and locating support arm 4 on building roof 3, and this base 2 is equipped with two fixed pulleys 5, and each fixed pulley 5 is around being equipped with wire rope 6, and 6 tops of two wire ropes all are connected with 4 fixed connection of this support arm, and the bottom all is connected with electric block 7, and when making the taut each wire rope 6 of this electric block 7, two wire ropes 6 all are vertical. Preferably, the plane of the two steel cables 6 is parallel to the outer side of the building. Each steel wire rope 6 is sleeved with a binding band 8 which can slide up and down along each steel wire rope 6. The lifting device is positioned at the top of the outer side of the support arm 4.
The bottom ends of the two steel wire ropes 6 are fixedly connected together and connected to an electric hoist 7.
Specifically, the wire rope 6 has a diameter of 12mm, the base 2 comprises four vertically connected 120mm × 80mm square bars, and the arm 4 is 120mm × 80mm square bars.
Before the unit curtain wall is lifted on the ground, the unit 9 is fixed on the steel wire rope by the binding band 8, the electric hoist 7 is operated to straighten the steel wire rope 6, and then the unit 9 is lifted and hoisted along the steel wire rope 6 by the hoisting device, so that the unit 9 cannot be rotated, deflected and impacted on a main body structure by wind power.
Through the utility model discloses handling system's engineering practical application, respond well, can high-efficient main transportation of solution engineering and handling, easy operation, reliable, time cycle is short in the security is torn open, and the cost is low, has ensured that there is not the tower crane or has replaced the normal construction under the tower crane condition when super high-rise engineering construction, makes the whole cycle of engineering obtain shortening, and the security is good simultaneously, the simple operation, and the commonality is strong, green, repeatedly usable reduces construction cost.
The above embodiments are merely illustrative of the principles and effects of the present invention, and are not to be construed as limiting the invention. The present invention can be modified in many ways without departing from the spirit and scope of the present invention, and those skilled in the art can modify or change the above embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which may be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (4)

1. A climbing cable hoisting system is characterized by comprising a climbing cable device and a hoisting device;
the rope climbing device comprises a base arranged on a building bottom plate and a support arm arranged on a building top plate, wherein the base is provided with two fixed pulleys, each fixed pulley is wound with a steel wire rope, the top ends of the two steel wire ropes are fixedly connected with the support arm, and the bottom ends of the two steel wire ropes are connected with an electric hoist, so that when the electric hoist tensions each steel wire rope, the two steel wire ropes are vertical; each steel wire rope is sleeved with a binding band which can slide up and down along each steel wire rope; the hoisting device is positioned at the top of the outer side of the support arm; and the planes of the two steel wire ropes are parallel to the outer side surface of the building.
2. The climbing rope handling system according to claim 1, characterized in that: the bottom ends of the two steel wire ropes are fixedly connected together and connected to an electric hoist.
3. The climbing rope handling system according to claim 1, characterized in that: the diameter of the steel wire rope is 12 mm.
4. The climbing rope handling system according to claim 1, characterized in that: the base comprises four vertically connected 120mm x 80mm square steels; the support arm is made of square steel with the thickness of 120mm multiplied by 80 mm.
CN201920313187.9U 2019-03-12 2019-03-12 Climbing cable hoisting system Active CN210313196U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920313187.9U CN210313196U (en) 2019-03-12 2019-03-12 Climbing cable hoisting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920313187.9U CN210313196U (en) 2019-03-12 2019-03-12 Climbing cable hoisting system

Publications (1)

Publication Number Publication Date
CN210313196U true CN210313196U (en) 2020-04-14

Family

ID=70122633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920313187.9U Active CN210313196U (en) 2019-03-12 2019-03-12 Climbing cable hoisting system

Country Status (1)

Country Link
CN (1) CN210313196U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112110357A (en) * 2020-09-16 2020-12-22 北京城建亚泰金典建设工程有限公司 Material conveying device
CN112207262A (en) * 2020-09-24 2021-01-12 马钢集团设计研究院有限责任公司 Demoulding system and demoulding method suitable for casting moulds with various shapes

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112110357A (en) * 2020-09-16 2020-12-22 北京城建亚泰金典建设工程有限公司 Material conveying device
CN112110357B (en) * 2020-09-16 2022-05-17 北京城建亚泰金典建设工程有限公司 Material transportation device
CN112207262A (en) * 2020-09-24 2021-01-12 马钢集团设计研究院有限责任公司 Demoulding system and demoulding method suitable for casting moulds with various shapes

Similar Documents

Publication Publication Date Title
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN203531496U (en) Falling type double-holding-rod pole erecting device
CN210313196U (en) Climbing cable hoisting system
CN210048319U (en) Traction type construction elevator with foldable top beam
CN209988942U (en) Assembled building superimposed sheet lifting device
CN107161879B (en) Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN202880719U (en) Olecranon-shaped arm head of hoisting multiplying power winding rope of movable arm tower-type crane
CN209873572U (en) Interim navigation lifting station of adjustable vertical lift height
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN208932801U (en) Tower crane stake bracing means
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN201762053U (en) Simple automatic derrick
CN210655895U (en) Large-pitch-angle boom steel wire rope winding device
CN209835486U (en) High-rise hoisting equipment
CN207738353U (en) Lifting hook pulley component and the crane for including the lifting hook pulley component
CN201686458U (en) Movable operating platform used for quickly processing welding seam at end opening of steel box girder
CN211078293U (en) High-altitude hoisting prefabricated part symmetrical equipment
CN216332596U (en) Delta anchor suspension device of offshore wind power platform
CN218598224U (en) Portable movable underground cavern crown anchor cable lowering device
CN212964063U (en) Test bed of grinding machine
CN221141031U (en) Material lifting device for super high-rise building
CN211419396U (en) Integral hoisting device for amplitude-variable derrick mast of large equipment
CN211733665U (en) Lifting device for transporting goods in high-altitude fan cabin
CN211396549U (en) Telescopic folding elevator shaft construction operation platform
CN206142696U (en) Assembled mast lifting hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant