CN210273341U - Construction operation layer power cable handing equipment - Google Patents

Construction operation layer power cable handing equipment Download PDF

Info

Publication number
CN210273341U
CN210273341U CN201921659065.1U CN201921659065U CN210273341U CN 210273341 U CN210273341 U CN 210273341U CN 201921659065 U CN201921659065 U CN 201921659065U CN 210273341 U CN210273341 U CN 210273341U
Authority
CN
China
Prior art keywords
sheet
rubber
cable
loop bar
power cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921659065.1U
Other languages
Chinese (zh)
Inventor
马景刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Construction Engineering Group (Tianjin) Construction Engineering Co., Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201921659065.1U priority Critical patent/CN210273341U/en
Application granted granted Critical
Publication of CN210273341U publication Critical patent/CN210273341U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a construction operation layer power cable handing equipment, including being used for and scaffold frame stand fixed connection's connecting piece, the one end horizontally connected of connecting piece has the extensible member, the flexible end of extensible member links firmly the ascending sleeve of opening, circumference interval evenly distributed has at least three sectorial sheet rubber that is on the same horizontal plane of sleeve inner wall, the one end that sleeve inner wall was kept away from to every sheet rubber all inwards caves in and forms arc laminating portion, the arc laminating portion of all sheet rubbers surrounds the passageway that forms the power cable and pass, and the sheet rubber level is its arc laminating portion when natural stretching surrounds the diameter ratio cable diameter of the passageway that forms little, still be equipped with rather than the elastic component who is used for supplementary sheet rubber return that corresponds in the below of every sheet rubber. Therefore, by utilizing the insulating property of the rubber sheet, the cable surface is prevented from being electrically conducted to a scaffold in case of damage, the safety of workers is harmed, the potential safety hazard is reduced, the whole device is simple, and the cable erection by the workers is facilitated.

Description

Construction operation layer power cable handing equipment
Technical Field
The utility model belongs to the technical field of the construction equipment, especially, relate to a construction operation layer power cable handing equipment.
Background
In the construction of the conventional construction works, the erection of the external scaffolding is increased along with the increase of the construction work level, and the electric cable needs to be erected to the construction work level for the construction work level. Because the construction operation layer is provided with the top plate template, the cable is laid from the inside of the building to the operation layer and needs to pass through the template, so that the cable is not easy to block, and the operation and the use are extremely inconvenient. The conventional commonly-adopted erection measures are that a batten or a porcelain insulator is used for fixing a cable along an outer scaffold at will, and even the cable is directly laid to a construction operation layer along the outer scaffold.
SUMMERY OF THE UTILITY MODEL
To the not enough of above-mentioned prior art, the utility model aims to solve the technical problem that: how to provide a construction operation layer power cable handing equipment, its edge outer scaffold upright post that can be safe upwards erects the cable, and easy and simple to handle, can reduce the potential safety hazard simultaneously.
In order to solve the technical problem, the utility model discloses a following technical scheme:
the utility model provides a construction operation layer power cable handing equipment, including being used for with scaffold frame stand fixed connection's connecting piece, the one end horizontally connected of connecting piece has the extensible member, and the flexible end of extensible member links firmly the ascending sleeve of opening, circumference interval evenly distributed has at least three sectorial sheet rubber on the same horizontal plane of sleeve inner wall, and the one end that sleeve inner wall was kept away from to every sheet rubber all inwards caves in and forms arc laminating portion, and the arc laminating portion of all sheet rubbers surrounds the passageway that forms the power cable and pass, and its arc laminating portion surrounds the diameter ratio cable diameter who forms the passageway little when the sheet rubber level is unfolded naturally, still is equipped with the elastic component rather than the corresponding elastic component that is used for supplementary sheet rubber return in the below of every sheet rubber.
Thus, the sleeve for passing through the cable is fixed on the upright post of the scaffold through the connecting piece and the telescopic piece, the distance between the cable and the upright post can be adjusted through the telescopic piece to avoid obstacles, meanwhile, a plurality of rubber sheets are arranged in the sleeve, a channel formed by encircling the plurality of rubber sheets is utilized, the cable passes through the channel, when the cable passes through the channel, the rubber sheets are extruded, the cable is clamped by utilizing the characteristic of certain elasticity of the rubber sheets to play a role in fixing, when the cable needs to be lifted in construction, the rubber sheets can be bent upwards for one section along with the cable, the connection between the rubber sheets and the cable is released, after the cable is lifted, only a small distance of the cable needs to be adjusted downwards, the rubber sheets return under the auxiliary action of the elastic piece to clamp the cable again, and meanwhile, the insulating property of the rubber sheets is utilized to prevent the surface of the cable from conducting electricity to the scaffold in case, endanger workman's safety, reduced the potential safety hazard, whole device is simple, also does benefit to the workman to erect along outer scaffold frame cable to construction operation layer.
As an optimization, the elastic component is a spring, one end of the spring is fixedly connected to the bottom surface of the rubber sheet and close to the arc-shaped fitting part, the other end of the spring is fixedly connected with the inner wall of the sleeve below the rubber sheet, and the spring is in a natural state when the rubber sheet is horizontally and naturally stretched.
Thus, the elastic force of the spring can assist the rubber sheet to return to the lower position after being lifted upwards, and the clamping of the cable is restored.
As optimization, the connecting piece includes the staple bolt, the staple bolt includes left hoop board and right hoop board, and left hoop board and right hoop board all are the semicircle ring-type, and its both ends are all outwards buckled, respectively form a pterygoid lamina, have seted up the bolt hole on the pterygoid lamina, and left hoop board and right hoop board pass through connecting bolt and pass the mode that corresponds the bolt hole on the pterygoid lamina with both fixed connection.
Therefore, the hoop is arranged by adopting the structure, the hoop is conveniently installed on the scaffold stand column through the connecting bolts, and when the position is required to be adjusted, the height and the direction can be adjusted by loosening the connecting bolts, so that the hoop is very convenient and fast.
As an optimization, the extensible member includes loop bar and inserted bar, the one end welded fastening of loop bar is in one of them hookup location department of left hoop board and right hoop board, and the inserted bar inserts from the other end of loop bar and establishes in the loop bar and can wherein remove, a plurality of jacks that correspond are all seted up along its length direction to loop bar and inserted bar, and the inserted bar passes through the mode and the loop bar fixed connection of the jack on the bolt inserted loop bar and the inserted bar.
Therefore, the telescopic assembly comprises the sleeve rod and the inserted rod, and the inserted rod can be inserted into the insertion holes in the sleeve rod and the inserted rod by the aid of the inserted pin, so that the length of the inserted rod leaking out of the sleeve rod part can be adjusted to avoid obstacles.
Preferably, the rubber sheets are three, the rubber sheets are arranged at an interval of 40 degrees, and the contact surface of the rubber sheets and the contact surface of the cable are sticky.
Therefore, the contact surface of the rubber sheet and the cable has viscosity, so that the rubber sheet and the cable can be conveniently clamped together from top to bottom.
Drawings
Fig. 1 is a schematic view of an installation state of an embodiment of the present invention;
fig. 2 is a partial top view of an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
In the specific implementation: referring to fig. 1 to 2, a construction operation layer power cable handing equipment, including being used for with scaffold frame stand 10 fixed connection's connecting piece, the one end horizontally connected of connecting piece has the extensible member, and the flexible end of extensible member links firmly with the ascending sleeve 1 of opening, circumference interval evenly distributed has at least three sectorial sheet rubber 2 that is on the same horizontal plane of sleeve 1 inner wall, and the one end that sleeve inner wall was kept away from to every sheet rubber 2 all inwards caves in and forms arc laminating portion, and the arc laminating portion of all sheet rubbers 2 surrounds the passageway that forms power supply cable 3 and pass, and the diameter ratio cable diameter that its arc laminating portion surrounded the passageway that forms is little when the level of sheet rubber 2 is naturally extended, still is equipped with rather than the elastic component that is used for supplementary sheet rubber return that corresponds in the below of every sheet rubber 2.
Thus, the sleeve for passing through the cable is fixed on the upright post of the scaffold through the connecting piece and the telescopic piece, the distance between the cable and the upright post can be adjusted through the telescopic piece to avoid obstacles, meanwhile, a plurality of rubber sheets are arranged in the sleeve, a channel formed by encircling the plurality of rubber sheets is utilized, the cable passes through the channel, when the cable passes through the channel, the rubber sheets are extruded, the cable is clamped by utilizing the characteristic of certain elasticity of the rubber sheets to play a role in fixing, when the cable needs to be lifted in construction, the rubber sheets can be bent upwards for one section along with the cable, the connection between the rubber sheets and the cable is released, after the cable is lifted, only a small distance of the cable needs to be adjusted downwards, the rubber sheets return under the auxiliary action of the elastic piece to clamp the cable again, and meanwhile, the insulating property of the rubber sheets is utilized to prevent the surface of the cable from conducting electricity to the scaffold in case, endanger workman's safety, reduced the potential safety hazard, whole device is simple, also does benefit to the workman and erects the cable.
As the optimization, the elastic component is the spring, the one end fixed connection of spring is close to arc laminating portion department in 2 bottom surfaces of sheet rubber, and the other end is in natural state with 1 inner wall fixed connection of sleeve of sheet rubber below, the sheet rubber level when natural extension spring.
Thus, the elastic force of the spring can assist the rubber sheet to return to the lower position after being lifted upwards, and the clamping of the cable is restored.
As optimization, the connecting piece includes staple bolt 4, staple bolt 4 includes left hoop board and right hoop board, and left hoop board and right hoop board all are the semicircle ring-shaped, and its both ends are all outwards buckled, respectively form a pterygoid lamina 5, have seted up the bolt hole on the pterygoid lamina, and left hoop board and right hoop board pass through connecting bolt 6 the mode that passes the bolt hole on the corresponding pterygoid lamina with both fixed connection.
Therefore, the hoop is arranged by adopting the structure, the hoop is conveniently installed on the scaffold stand column through the connecting bolts, and when the position is required to be adjusted, the height and the direction can be adjusted by loosening the connecting bolts, so that the hoop is very convenient and fast.
As an optimization, the extensible member includes loop bar 7 and inserted bar 8, the one end welded fastening of loop bar 7 is in one of them hookup location department of left hoop board and right hoop board, and inserted bar 8 inserts from the other end of loop bar 7 and establishes in the loop bar and can wherein remove, a plurality of jacks that correspond are all seted up along its length direction to loop bar and inserted bar, and the inserted bar passes through the mode and the loop bar fixed connection of the jack on the bolt 9 insertion loop bar and the inserted bar.
Therefore, the telescopic assembly comprises the sleeve rod and the inserted rod, and the inserted rod can be inserted into the insertion holes in the sleeve rod and the inserted rod by the aid of the inserted pin, so that the length of the inserted rod leaking out of the sleeve rod part can be adjusted to avoid obstacles.
Preferably, the rubber sheets are three, the rubber sheets are arranged at an interval of 40 degrees, and the contact surface of the rubber sheets and the contact surface of the cable are sticky.
Therefore, the contact surface of the rubber sheet and the cable has viscosity, so that the rubber sheet and the cable can be conveniently clamped together from top to bottom.

Claims (5)

1. The utility model provides a construction operation layer power cable handing equipment which characterized in that: including being used for with scaffold frame stand fixed connection's connecting piece, the one end horizontally connected of connecting piece has the extensible member, and the flexible end of extensible member links firmly the ascending sleeve of opening, circumference interval evenly distributed has at least three sectorial sheet rubber that is on the same horizontal plane of sleeve inner wall, and the one end that sleeve inner wall was kept away from to every sheet rubber all inwards caves in and forms arc laminating portion, and the arc laminating portion of all sheet rubbers surrounds the passageway that forms the power cable and pass, and its arc laminating portion surrounds the diameter ratio cable diameter of the passageway that forms little when the sheet rubber level is unfolded naturally, still is equipped with the elastic component that is used for supplementary sheet rubber return rather than corresponding in the below of every sheet rubber.
2. The construction work layer power cable erection device according to claim 1, characterized in that: the elastic component is a spring, one end of the spring is fixedly connected to the bottom surface of the rubber sheet and close to the arc-shaped attaching portion, the other end of the spring is fixedly connected with the inner wall of the sleeve below the rubber sheet, and the spring is in a natural state when the rubber sheet is horizontally and naturally unfolded.
3. The construction work layer power cable erection device according to claim 1, characterized in that: the connecting piece includes the staple bolt, the staple bolt includes left hoop board and right hoop board, and left hoop board and right hoop board all are the semicircle ring-type, and its both ends are all outwards buckled, respectively form a pterygoid lamina, have seted up the bolt hole on the pterygoid lamina, and left hoop board and right hoop board pass through connecting bolt and pass the mode that corresponds the bolt hole on the pterygoid lamina with both fixed connection.
4. The construction work layer power cable erection device according to claim 3, characterized in that: the telescopic piece comprises a loop bar and an inserted bar, wherein one end of the loop bar is welded and fixed at one of the connecting positions of the left hoop plate and the right hoop plate, the inserted bar is inserted into the loop bar from the other end of the loop bar and can move in the loop bar, the loop bar and the inserted bar are both provided with a plurality of corresponding jacks along the length direction of the loop bar and are fixedly connected with the loop bar in a mode that the inserted bar is inserted into the jacks on the loop bar and the inserted bar through a bolt.
5. The construction work layer power cable erection device according to claim 1, characterized in that: the rubber sheet is equipped with three, arranges at interval 40 degrees between every rubber sheet, and has the stickness with the contact surface of cable.
CN201921659065.1U 2019-09-30 2019-09-30 Construction operation layer power cable handing equipment Active CN210273341U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921659065.1U CN210273341U (en) 2019-09-30 2019-09-30 Construction operation layer power cable handing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921659065.1U CN210273341U (en) 2019-09-30 2019-09-30 Construction operation layer power cable handing equipment

Publications (1)

Publication Number Publication Date
CN210273341U true CN210273341U (en) 2020-04-07

Family

ID=70019966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921659065.1U Active CN210273341U (en) 2019-09-30 2019-09-30 Construction operation layer power cable handing equipment

Country Status (1)

Country Link
CN (1) CN210273341U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719589A (en) * 2020-06-10 2020-09-29 江苏万年达杭萧钢构有限公司 Prefabricated assembled square shaft

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719589A (en) * 2020-06-10 2020-09-29 江苏万年达杭萧钢构有限公司 Prefabricated assembled square shaft
CN111719589B (en) * 2020-06-10 2021-03-09 江苏万年达杭萧钢构有限公司 Prefabricated assembled square shaft

Similar Documents

Publication Publication Date Title
CN210273341U (en) Construction operation layer power cable handing equipment
CN104967026B (en) Line connector insulation separator plate
CN201083018Y (en) Mobile multipurpose fast mounting scaffold
KR100843058B1 (en) High Voltage Cable Supporter
CN210195457U (en) Safety protective guard is used in civil engineering
CN209704461U (en) Ladder is used in a kind of maintenance of Novel electric pole
CN213418456U (en) Building scaffold wall connecting piece
CN112814346A (en) Operating platform for complex terrain
CN203445075U (en) Line connector insulating separator
CN205422119U (en) Interim fixer of danger pole
CN209397995U (en) It is a kind of to be easily installed transport sightseeing tower
CN215254372U (en) Operating platform for complex terrain
CN218733087U (en) Floor type cable terminal platform
CN218102420U (en) Telescopic movable quick-release insulated cable support
CN201314190Y (en) Telescopic insulating ladder
CN217950251U (en) Plug-and-play type single-post insulator climbing auxiliary device
CN212027071U (en) Building stair convenient to connect scaffold frame
CN210263388U (en) Board house connection fixing structure built temporarily
CN214479056U (en) Movable combined type telescopic cable support
CN214091676U (en) Electric power construction is with cat ladder of ascending a height
CN215563981U (en) Assembled folding stair for building that can install fast
CN215830073U (en) Instrument formula safety is chosen net
CN216362224U (en) Tower section of thick bamboo cable erection auxiliary fixtures
CN214249050U (en) Special lossless clamp
CN214174453U (en) High-voltage lead insulation supporting rod for cable alternating-current voltage withstand test

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200630

Address after: No.1 Tengfei Road, Junliang City, Dongli District, Tianjin

Patentee after: MCC Construction Engineering Group (Tianjin) Construction Engineering Co., Ltd

Address before: No. 1 West Road 400084 Dadukou District of Chongqing

Patentee before: CHINA METALLURGICAL CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right