CN210169327U - Construction project information management device - Google Patents

Construction project information management device Download PDF

Info

Publication number
CN210169327U
CN210169327U CN201920756780.0U CN201920756780U CN210169327U CN 210169327 U CN210169327 U CN 210169327U CN 201920756780 U CN201920756780 U CN 201920756780U CN 210169327 U CN210169327 U CN 210169327U
Authority
CN
China
Prior art keywords
containing box
management device
workbench
sets
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920756780.0U
Other languages
Chinese (zh)
Inventor
Yixian Wang
王一显
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920756780.0U priority Critical patent/CN210169327U/en
Application granted granted Critical
Publication of CN210169327U publication Critical patent/CN210169327U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sheet Holders (AREA)

Abstract

The utility model discloses a construction project information-based management device, comprises a workbench, the workstation top is with the all fixed mounting riser in both sides of bottom, the outside of workstation bottom riser sets up dustbin and containing box respectively, the inside of containing box sets up the multiunit drawer, the top of containing box sets up the file rack, four openings are all seted up on the surface of the riser of workstation top both sides, four open-ended insides all set up a pasting board, one side of pasting board sets up the connecting piece, one side of connecting piece sets up the joint pipe, the inside intermediate position of joint sets up the branch spacer block, the top and the below of dividing the spacer block all set up reset spring, the both ends of joint pipe all run through and set up the bayonet lock. The utility model discloses have and to carry out orderly arrangement with the file data of waiting to type and place, will wait that the data of type is puted up from nearly to far and help the staff to watch next data text at any time on the flitch simultaneously, saved operating time, improved work efficiency.

Description

Construction project information management device
Technical Field
The utility model relates to a construction project information-based management device technical field especially relates to a construction project information-based management device.
Background
Construction project management informatization refers to development and utilization of construction project management information resources, as well as development and application of information technology in construction project management. When a new project is invested in and constructed, attention should be paid to developing and fully utilizing relevant information resources of domestic and foreign similar or similar construction projects. As the regional span of a plurality of construction projects is larger and larger, project participation units are distributed more and more, project information is exponentially increased, and the problem of information exchange becomes a main problem influencing the implementation of the construction projects. Therefore, the related information resources need to be integrated and recorded, so that the manager can compare and view the information better, and research the information accordingly.
However, when the existing construction project informatization management device is used, paper data which needs to be recorded by recording personnel are generally stacked on a working table top and appear to be piled, when other data are searched for to be recorded, the working table top is jumped in a mess, and time is consumed.
Therefore, we propose a construction project information management device to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcomings existing in the prior art and providing a construction project informatization management device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a construction project information-based management device, includes the workstation, the both sides of workstation top and bottom are fixed mounting all has the riser, the outside of workstation bottom riser is provided with dustbin and containing box respectively, and the inside of containing box is provided with the multiunit drawer, the top of containing box is provided with the file rack, four openings have all been seted up on the surface of the riser of workstation top both sides, and four open-ended inside all is provided with a pasting board, one side of pasting board is provided with the connecting piece, and one side of connecting piece is provided with the joint pipe, the inside intermediate position of joint pipe is provided with the branch spacer block, and the top of dividing the spacer block all is provided with reset spring with the below, the both ends of joint pipe all run through and are provided with the bayonet lock.
Preferably, the recyclable mark is pasted on the surface of one side of the garbage can, a U-shaped clamping block is fixedly welded on the surface of the other side of the garbage can, a reversed V-shaped clamping piece is fixedly welded on the surface of a vertical plate on one side of the bottom of the workbench, and the garbage can is detachably mounted with the vertical plate on one side of the bottom of the workbench through the mutual matching of the U-shaped clamping block and the reversed V-shaped clamping piece.
Preferably, the surfaces of the inner walls of the two sides of the containing box are provided with a plurality of groups of notches, a plurality of groups of rolling rollers are movably arranged in the containing box, two ends of each rolling roller are respectively positioned in the notches, and the drawer is movably arranged in the containing box through the rolling rollers.
Preferably, one side of the pasting plate is fixedly provided with a connecting rod, a bearing is arranged inside one side of the connecting piece, one end of the connecting rod is fixedly arranged inside the bearing, and the connecting rod is rotatably connected with the connecting piece through the bearing.
Preferably, the bottom of the clamping pin is fixedly welded with a stop block, the stop blocks are located at two ends of the clamping pin, and the reset spring is located between the stop block and the separation block.
Preferably, the first groove of puting up has been seted up on the surface of drawer, and the first groove of puting up pastes data category name, two seconds have all been seted up on the tow sides of posting up the board and have been puted up the groove, and the groove pastes the data file is puted up to the second.
Compared with the prior art, the utility model discloses the beneficial effect who has is: the file data that will wait to type in can carry out orderly arrangement and place, and can post the data text that is typing or will about to type on a poster board and be convenient for type personnel watch, paste the data that will wait to type in from nearly to far away and help the staff to watch next data text at any time on the poster board simultaneously, saved and gone to look for the time of putting next data text again after the staff's data type finishes, it seems that the thing is piled up comparatively more messy to have solved the paper data that type personnel need type in and stack on the mesa of work, when looking for next data text and typing in addition, can be with the seven in a wretched state that the mesa tumbles, consume operating time's problem.
Drawings
Fig. 1 is a front view structural diagram of a construction project informatization management device provided by the utility model;
FIG. 2 is a schematic diagram of the right side view of the structure of FIG. 1;
fig. 3 is an enlarged view of a portion of the connector and the bayonet tube of fig. 1.
In the figure: 1. a work table; 2. a vertical plate; 3. a dustbin; 4. a recyclable flag; 5. a U-shaped fixture block; 6. a 7-shaped clamping piece; 7. a storage box; 8. a recess; 9. rolling a roller; 10. a drawer; 11. a first pasting groove; 12. a document holder; 13. an opening; 14. pasting a board; 15. a second posting slot; 16. a connecting member; 17. a connecting rod; 18. a bearing; 19. clamping the connecting pipe; 20. a separation block; 21. a return spring; 22. a stopper; 23. a bayonet lock.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a construction project information management device comprises a workbench 1, vertical plates 2 are fixedly installed on both sides of the top and bottom of the workbench 1, a garbage can 3 and a storage box 7 are respectively installed on the outer sides of the vertical plates 2 on the bottom of the workbench 1, a plurality of groups of drawers 10 are installed in the storage box 7, a file rack 12 is installed on the top of the storage box 7, the file rack 12 is used for temporarily storing data files, four openings 13 are respectively installed on the surfaces of the vertical plates 2 on both sides of the top of the workbench 1, a pasting plate 14 is installed in each of the four openings 13, a connecting piece 16 is installed on one side of the pasting plate 14, a clamping pipe 19 is installed on one side of the connecting piece 16, a separation block 20 is installed in the middle position of the inside of the clamping pipe 19, return springs 21 are installed above and below the separation block 20, clamping pins 23 are installed at both ends of the clamping pipe 19, this joint pipe 19 is located the inside of riser 2, and bayonet lock 23 when using the staff utilizes reset spring 21 earlier to press two bayonet locks 23 to the inside of joint pipe 19, then puts into 2 inside and the joint pipe 19 cooperation of riser blocks into, and when the staff released two bayonet locks 23 this moment, bayonet lock 23 pop out the upper and lower both ends of butt in the inside of the draw-in groove of using with the joint pipe 19 cooperation from the inside of joint pipe 19 in the twinkling of an eye when the staff.
The recyclable mark 4 is adhered to the surface of one side of the dustbin 3, the recyclable mark 4 plays a role of reminding a user that the dustbin 3 is a recyclable garbage placing barrel, the surface of the other side of the dustbin 3 is fixedly welded with a U-shaped clamping block 5, the U-shaped clamping block 5 is used when inverted, a 7-shaped clamping piece 6 is fixedly welded on the surface of the vertical plate 2 on one side of the bottom of the workbench 1, the 7-shaped clamping piece 6 is used when inverted, and the dustbin 3 is detachably mounted between the vertical plate 2 on one side of the bottom of the workbench 1 through the mutual matching of the U-shaped clamping block 5 and the 7-shaped clamping piece 6; a plurality of groups of notches 8 are formed in the surfaces of the inner walls of the two sides of the containing box 7, a plurality of groups of rolling rollers 9 are movably arranged in the containing box 7, two ends of each rolling roller 9 are respectively fixed in the notches 8, and the drawer 10 is movably installed in the containing box 7 through the rolling rollers 9; one side of the pasting plate 14 is fixedly provided with a connecting rod 17, the inside of one side of the connecting piece 16 is provided with a bearing 18, one end of the connecting rod 17 is fixedly arranged inside the bearing 18, and the connecting rod 17 is rotatably connected with the connecting piece 16 through the bearing 18; the bottom of the bayonet 23 is fixedly welded with a stop 22, the stop 22 is positioned at two ends of the interior of the bayonet tube 19, and the return spring 21 is positioned between the stop 22 and the separating block 20; the drawer 10 has a first pasting groove 11 formed on the surface thereof, the first pasting groove 11 pasting the data type name, and two second pasting grooves 15 formed on both sides of the pasting board 14, and the second pasting grooves 15 pasting the data file.
The working principle of the utility model is that when in use, the data entry personnel sits at the position of the workbench 1, simultaneously opens the computer and pulls out the keyboard tray from the inside of the workbench 1, then the entry personnel find the corresponding data placement drawer 10 from the category of the data installed in the containing box 7 and draws out the drawer 10 from the inside of the containing box 7, at the moment, the rolling roller 9 rolls at the bottom of the drawer 10, then the entry personnel stick the data texts in the sequence from near to far in the second sticking groove 15 on the front and back sides of the poster board 14, at the moment, the preparation work can be started by the worker after the preparation work is done, when the entry personnel finish the data text on the front side of the poster board 14, the worker grasps the edge at one end of the poster board 14 by hands and rotates the poster board 14 by three hundred sixty degrees, at the moment, the poster board 14 drives the connecting rod 17 to rotate in the inside of the bearing 18 inside the connecting piece 16, make the flitch 14 reverse side towards the personnel of typing, data typing personnel can carry out the work of typing again this moment, after the data text that personnel of typing pasted 14 reverse side once again input, the staff can push back flitch 14 in the opening 13 that riser 2 surface was seted up from the top of workstation 1, bayonet lock 23 rotates in the inner wall of opening 13 one side this moment, so that flitch 14 can regard as rotatory base point with one side inside opening 13, after first flitch 14 pushed back in opening 13, the personnel of typing can have the data text order of oneself pasting and watch second flitch 14 again, so until the personnel of typing accomplish this data typing work of typing can.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The information management device for the construction projects comprises a workbench (1) and is characterized in that vertical plates (2) are fixedly mounted on the top and the bottom of the workbench (1), a garbage can (3) and a containing box (7) are respectively arranged on the outer sides of the vertical plates (2) on the bottom of the workbench (1), a plurality of groups of drawers (10) are arranged in the containing box (7), a file rack (12) is arranged on the top of the containing box (7), four openings (13) are formed in the surfaces of the vertical plates (2) on the two sides of the top of the workbench (1), a pasting plate (14) is arranged in each opening (13), a connecting piece (16) is arranged on one side of the pasting plate (14), a clamping pipe (19) is arranged on one side of the connecting piece (16), and a separation block (20) is arranged in the middle of the clamping pipe (19), and return springs (21) are arranged above and below the separating block (20), and clamping pins (23) penetrate through two ends of the clamping pipe (19).
2. The construction project informatization management device according to claim 1, characterized in that a recoverable mark (4) is pasted on the surface of one side of the dustbin (3), a U-shaped clamping block (5) is fixedly welded on the surface of the other side of the dustbin (3), a 7-shaped clamping piece (6) is fixedly welded on the surface of the vertical plate (2) on one side of the bottom of the workbench (1), and the dustbin (3) is detachably mounted between the vertical plate (2) on one side of the bottom of the workbench (1) through the mutual matching of the U-shaped clamping block (5) and the 7-shaped clamping piece (6).
3. The construction project informatization management device according to claim 1, characterized in that a plurality of groups of notches (8) are formed on the surfaces of the inner walls of the two sides of the containing box (7), a plurality of groups of rolling rollers (9) are movably arranged in the containing box (7), two ends of each rolling roller (9) are respectively positioned in the notches (8), and the drawer (10) is movably installed in the containing box (7) through the rolling rollers (9).
4. The information management device for the construction projects according to claim 1, wherein a connecting rod (17) is fixedly mounted on one side of the poster board (14), a bearing (18) is arranged inside one side of the connecting piece (16), one end of the connecting rod (17) is fixedly mounted inside the bearing (18), and the connecting rod (17) is rotatably connected with the connecting piece (16) through the bearing (18).
5. The information management device for construction projects according to claim 1, wherein the bottom of the bayonet (23) is fixedly welded with a stop (22), the stop (22) is positioned at two ends inside the bayonet tube (19), and the return spring (21) is positioned between the stop (22) and the separation block (20).
6. The construction project informatization management device according to claim 1, characterized in that a first posting slot (11) is opened on the surface of the drawer (10), and the first posting slot (11) posts the data category name, two second posting slots (15) are opened on both the front and back sides of the posting board (14), and the second posting slot (15) posts the data file.
CN201920756780.0U 2019-05-23 2019-05-23 Construction project information management device Expired - Fee Related CN210169327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920756780.0U CN210169327U (en) 2019-05-23 2019-05-23 Construction project information management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920756780.0U CN210169327U (en) 2019-05-23 2019-05-23 Construction project information management device

Publications (1)

Publication Number Publication Date
CN210169327U true CN210169327U (en) 2020-03-24

Family

ID=69834509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920756780.0U Expired - Fee Related CN210169327U (en) 2019-05-23 2019-05-23 Construction project information management device

Country Status (1)

Country Link
CN (1) CN210169327U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113345347A (en) * 2021-06-25 2021-09-03 上海建科工程咨询有限公司 Management device suitable for design management process is formulated to hospital's construction project

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113345347A (en) * 2021-06-25 2021-09-03 上海建科工程咨询有限公司 Management device suitable for design management process is formulated to hospital's construction project

Similar Documents

Publication Publication Date Title
CN210169327U (en) Construction project information management device
CN214928440U (en) Finishing device for educational management information storage
CN204861833U (en) Desk for accounting
CN202698333U (en) Novel financial document box for hospitals
CN211065356U (en) Portable account book storage device for financial management teaching
CN209777028U (en) Tool rack for accountants
CN210383179U (en) Space-saving book storage device for library
CN208277683U (en) A kind of human resources hold-down bar
CN206062419U (en) A kind of bank's articles for use receiver
CN218173113U (en) Printed matter storage device
CN213007218U (en) Financial document finishing device
CN215347693U (en) Accounting document management device
CN216435308U (en) Meeting signboard
CN211252005U (en) Office stationery integration storage device
CN213820443U (en) Big data auxiliary data arrangement machine case
CN2778573Y (en) Table top single sheet file data storage box
CN217753296U (en) Document arranging device
CN216256010U (en) Multifunctional teacher's desk for public management major
CN217375504U (en) Physical examination report storage rack convenient to search for physical examination center
CN213154770U (en) Manpower resources data classification statistics device
CN216001969U (en) Structure is accomodate to financial accounting file
CN213768010U (en) Accounting document storage device
CN211323803U (en) Convenient teacher's data classification management device of looking over
CN214904937U (en) Manpower resource file management box
CN210211786U (en) Multifunctional teaching file folder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200324

Termination date: 20210523