CN210134434U - Foundation ditch support reinforcing apparatus for building - Google Patents

Foundation ditch support reinforcing apparatus for building Download PDF

Info

Publication number
CN210134434U
CN210134434U CN201920935155.2U CN201920935155U CN210134434U CN 210134434 U CN210134434 U CN 210134434U CN 201920935155 U CN201920935155 U CN 201920935155U CN 210134434 U CN210134434 U CN 210134434U
Authority
CN
China
Prior art keywords
rod
groove
connecting block
seted
support reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920935155.2U
Other languages
Chinese (zh)
Inventor
李彦
樊涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Rongjian Foundation Engineering Co ltd
Original Assignee
Zhuhai Rongjian Foundation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Rongjian Foundation Engineering Co ltd filed Critical Zhuhai Rongjian Foundation Engineering Co ltd
Priority to CN201920935155.2U priority Critical patent/CN210134434U/en
Application granted granted Critical
Publication of CN210134434U publication Critical patent/CN210134434U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a retaining and protecting reinforcing apparatus for excavation supporting for building, collude type pole and sill bar in the device, collude type pole and sill bar tip and all be fixed with the connecting block, collude and be provided with the connecting rod between type pole and the sill bar, the spread groove has all been seted up on connecting rod both ends surface, the connecting block can be inserted inside the spread groove and be connected, the through-hole has all been seted up on connecting block and spread groove surface, the inside dead lever that runs through of through-hole, the dismantlement groove has been seted up on dead lever one end surface, the dismantlement inslot wall is provided with the internal thread, and through the dismantlement groove of design, when the dismantlement groove can be dismantled in the later stage, the user can directly extract the pin rod through the threaded connection of threaded rod and dismantlement groove to change the connecting rod of different length.

Description

Foundation ditch support reinforcing apparatus for building
Technical Field
The utility model belongs to the technical field of the fastener that the building trade was used, concretely relates to excavation supporting reinforcing apparatus for building.
Background
In the current construction site, the traditional construction fixing method generally uses iron wires, wood support rods, steel bar bent collars, fixed clamps or adjustable clamps welded by angle steels and steel pipes and the like, when the traditional construction fixing method is used, a large number of nails are used for some of the objects, the cost is high, wood is easy to damage, and the waste is high; some need lease a large amount of steel pipes, fasteners to must possess auxiliary members such as wedge, bolt or reinforcing bar, the turnover number of times is few, and is consuming time hard. The foundation pit supporting and reinforcing device for the building is narrow in use face, poor in fastening effect, limited to concrete formwork supporting in two forms, incapable of being exchanged, inconvenient to store, slow in construction speed and capable of increasing construction cost, is a novel building tool in a step-by-step mode, quick in use method, capable of saving working time, improving working efficiency and saving a large amount of wood, replaces a traditional iron wire binding method, a rod screw method and a ring and plug method, is fixed in length in the processing and production process, is inconvenient for constructors to carry out construction operation due to the fact that the existing building is changeable in shape, is limited in length in specific places, accordingly influences working efficiency of the constructors, causes the phenomena of insecure later-stage installation and the like, and the foundation pit supporting and reinforcing device for the building is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a to provide current the device in solving above-mentioned background art in the processing production process, length all is fixed unchangeable, because current building shape is changeable, in some specific places, because the device's length restriction, the constructor of being not convenient for carries out the construction operation, thereby influences its work efficiency, leads to the problem that phenomenon such as later stage installation is insecure appears.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a foundation ditch support reinforcing apparatus for building, colludes type pole and sill bar among the device, collude type pole and sill bar tip and all be fixed with the connecting block, collude and be provided with the connecting rod between type pole and the sill bar, the spread groove has all been seted up on connecting rod both ends surface, the connecting block can be inserted inside the spread groove and be connected, the through-hole has all been seted up on connecting block and spread groove surface, the inside dead lever that runs through of through-hole.
Preferably, the fixed slot has all been seted up to dead lever both ends outer wall, the standing groove has all been seted up to connecting block outer wall both sides, the standing groove is inside to be fixed with the solid fixed ring of rubber, the solid fixed ring outside of rubber laminates with the fixed slot inner wall each other.
Preferably, the surface of one end of the fixing rod is provided with a dismounting groove, and the inner wall of the dismounting groove is provided with an internal thread.
Preferably, a movable chuck is mounted outside the hook-shaped rod, and a convex tooth is fixed on the surface of the movable chuck.
Preferably, the surface of the hook-shaped rod is provided with a graduated scale.
Preferably, a protecting sleeve is arranged at the bottom of the bottom rod and is a rubber component.
Preferably, the connecting block is connected with the bottom rod and the hook-shaped rod through welding.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) through the dismantlement groove of design, dismantle the groove can be when the later stage is dismantled, the user can directly extract the pin rod through threaded rod and the threaded connection who dismantles the groove to change the connecting rod of different length.
(2) Through the scale ruler of design, the help user that the scale ruler can be more convenient is adjusting to the object of variation in size using the device to guarantee the precision of during operation.
(3) Through the connecting rod of design, the connecting rod can help the user to adjust the length of device according to the work occasion to the convenience is used under different occasions.
(4) Through the designed protective sleeve, the protective sleeve can be convenient for a user to use without sliding of the hand, thereby being beneficial to protecting the safety of the user.
Drawings
FIG. 1 is a schematic view of the overall cross-sectional structure of the present invention;
FIG. 2 is a schematic view of the present invention showing a part A enlarged;
fig. 3 is a schematic perspective view of the present invention;
fig. 4 is a schematic view of the three-dimensional structure of the connecting block of the present invention;
in the figure: 1. a protective sleeve; 2. a bottom bar; 3. connecting blocks; 4. a placement groove; 5. a rubber fixing ring; 6. connecting grooves; 7. a connecting rod; 8. a movable chuck; 9. a hook-shaped rod; 10. a graduated scale; 11. a convex tooth; 12. fixing the rod; 13. disassembling the groove; 14. and fixing the grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2, fig. 3 and fig. 4, the present invention provides a technical solution: the utility model provides a foundation ditch support reinforcing apparatus for building, colludes type pole 9 and sill bar 2 among the device, colludes type pole 9 and 2 tip of sill bar all are fixed with connecting block 3, colludes and is provided with connecting rod 7 between type pole 9 and the sill bar 2, and spread groove 6 has all been seted up on 7 both ends surfaces of connecting rod, and connecting block 3 can insert spread groove 6 inside and be connected, and connecting block 3 has all seted up the through-hole with spread groove 6 surface, and the inside dead lever 12 that runs through of through-hole has.
In this embodiment, preferably, fixed slot 14 has all been seted up to the both ends outer wall of dead lever 12, and standing groove 4 has all been seted up to 3 outer wall both sides of connecting block, and standing groove 4 is inside to be fixed with solid fixed ring 5 of rubber, and solid fixed ring 5 outside of rubber laminates with fixed slot 14 inner wall each other.
In this embodiment, preferably, the dismounting groove 13 has been seted up on dead lever 12 one end surface, and the dismounting groove 13 inner wall is provided with the internal thread, and through the dismounting groove 13 of design, when dismounting groove 13 can be dismantled in the later stage, the user can directly extract the pin rod through threaded rod and the threaded connection who dismantles groove 13 to change the connecting rod 7 of different length.
In this embodiment, preferably, the hook rod 9 is externally provided with a movable chuck 8, and a convex tooth 11 is fixed on the surface of the movable chuck 8.
In this embodiment, it is preferred, collude type pole 9 surface and be provided with scale 10, through the scale 10 of design, the help user that scale 10 can be more convenient adjusts to the object of variation in size using the device to guarantee the precision of during operation.
In this embodiment, preferably, the bottom device of the bottom rod 2 is provided with the protection sleeve 1, the protection sleeve 1 is made of rubber, and through the designed protection sleeve 1, the protection sleeve 1 can be used for facilitating a user to use without sliding due to hands, thereby being beneficial to protecting the safety of the user.
In this embodiment, preferably, the connecting block 3 is connected with the bottom rod 2 and the hook-shaped rod 9 by welding.
The utility model discloses a theory of operation and use flow: in the installation process, a user can select the connecting rod 7 with the corresponding specification length through a proper occasion so as to install the connecting rod with the specified length, in the installation process, the bottom rod 2 and the connecting block 3 at the end part of the connecting rod 7 are inserted into the connecting groove 6, the pin is introduced between the connecting groove 6 and the connecting block 3 through the through hole so as to be fixed in the connecting groove 6, when the fixed rod 12 is inserted, the fixed groove 14 on the surface of the fixed rod 12 is clamped into the rubber fixing ring 5 so as to fix the fixed rod 12, and after the installation of the device is finished, the length of the device can be limited to a certain degree; when dismantling in the later stage, the user can directly extract the pin rod through threaded rod and the threaded connection who dismantles groove 13 to change the connecting rod 7 of different length.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a foundation ditch support reinforcing apparatus for building, colludes type pole (9) and sill bar (2) among the device, its characterized in that: collude type pole (9) and sill bar (2) tip and all be fixed with connecting block (3), collude and be provided with connecting rod (7) between type pole (9) and sill bar (2), spread groove (6) have all been seted up on connecting rod (7) both ends surface, connecting block (3) can be inserted spread groove (6) inside and be connected, the through-hole has all been seted up on connecting block (3) and spread groove (6) surface, the inside dead lever (12) that has run through of through-hole.
2. The foundation pit support reinforcing device for buildings according to claim 1, wherein: fixed slot (14) have all been seted up to dead lever (12) both ends outer wall, standing groove (4) have all been seted up to connecting block (3) outer wall both sides, standing groove (4) inside is fixed with solid fixed ring of rubber (5), solid fixed ring of rubber (5) outside and fixed slot (14) inner wall laminate each other.
3. The foundation pit support reinforcing device for buildings according to claim 1, wherein: a dismounting groove (13) is formed in the surface of one end of the fixing rod (12), and internal threads are formed in the inner wall of the dismounting groove (13).
4. The foundation pit support reinforcing device for buildings according to claim 1, wherein: the hook-type rod (9) is externally provided with a movable clamping head (8), and the surface of the movable clamping head (8) is fixed with a convex tooth (11).
5. The foundation pit support reinforcing device for buildings according to claim 1, wherein: and a graduated scale (10) is arranged on the surface of the hook-shaped rod (9).
6. The foundation pit support reinforcing device for buildings according to claim 1, wherein: the bottom rod (2) bottom device has lag (1), lag (1) are the rubber material component.
7. The foundation pit support reinforcing device for buildings according to claim 1, wherein: the connecting block (3) is connected with the bottom rod (2) and the hook-shaped rod (9) through welding.
CN201920935155.2U 2019-06-20 2019-06-20 Foundation ditch support reinforcing apparatus for building Expired - Fee Related CN210134434U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920935155.2U CN210134434U (en) 2019-06-20 2019-06-20 Foundation ditch support reinforcing apparatus for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920935155.2U CN210134434U (en) 2019-06-20 2019-06-20 Foundation ditch support reinforcing apparatus for building

Publications (1)

Publication Number Publication Date
CN210134434U true CN210134434U (en) 2020-03-10

Family

ID=69706503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920935155.2U Expired - Fee Related CN210134434U (en) 2019-06-20 2019-06-20 Foundation ditch support reinforcing apparatus for building

Country Status (1)

Country Link
CN (1) CN210134434U (en)

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN113431333A (en) Concrete pouring device for building construction and use method thereof
CN201809963U (en) Fixing type profile steel anchor clamp for suspended external scaffold
CN209025468U (en) The device of accurate control multi-thickness wall mortar joint
CN205654089U (en) Pipeline is worn floor and is reserved hole positioner
CN210134434U (en) Foundation ditch support reinforcing apparatus for building
CN211257737U (en) Scaffold frame for building engineering convenient to build
CN204531419U (en) A kind of concrete-pouring template to wire drawing bar fixed structure
CN211666720U (en) Jacking structure of pipe jacking working well
CN204311746U (en) A kind of concrete frame column template fastener
CN105178986B (en) Variable curve mold for lining positioning of earth-sheltered dwelling and construction technology of variable-curve mold
CN207499443U (en) A kind of supporting construction of concrete-pouring template
CN204455779U (en) Combined type channel-section steel formwork leverage
CN204531421U (en) A kind of concrete support mould and fixing templates
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN203499017U (en) Wall tie bar pre-embedded positioning device
CN204531420U (en) Concreting plate device
CN205134546U (en) But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization
CN103556825A (en) Construction method for reserved pipe sleeve in concrete of structural layers of high-rise building
CN210530315U (en) Pouring template convenient to install
CN210421443U (en) Non-welding flat plate fixing embedded part
CN220620691U (en) Combined wallboard for building design
CN210086793U (en) Recyclable combined wall connecting piece
CN111002432A (en) Prefabricated constructional column template and using method thereof
CN213418453U (en) Building engineering is with linking wall spare structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200310

Termination date: 20210620