CN210086955U - Iron tower climbing device for communication engineering - Google Patents

Iron tower climbing device for communication engineering Download PDF

Info

Publication number
CN210086955U
CN210086955U CN201920687204.5U CN201920687204U CN210086955U CN 210086955 U CN210086955 U CN 210086955U CN 201920687204 U CN201920687204 U CN 201920687204U CN 210086955 U CN210086955 U CN 210086955U
Authority
CN
China
Prior art keywords
fixing
climbing
rod
fixed frame
supporting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920687204.5U
Other languages
Chinese (zh)
Inventor
王生翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Mochi Technology Co Ltd
Original Assignee
Nanjing Mochi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Mochi Technology Co Ltd filed Critical Nanjing Mochi Technology Co Ltd
Priority to CN201920687204.5U priority Critical patent/CN210086955U/en
Application granted granted Critical
Publication of CN210086955U publication Critical patent/CN210086955U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model discloses an iron tower climbing device for communication engineering relates to the iron tower climbing relevant field, and is inconvenient for solving the operation, and dangerous high maintains and changes inconvenient problem. The top of shaft is provided with first fixed plate, the below second fixed plate of shaft, first fixed plate and second fixed plate pass through fixed screw with the shaft and are connected, be provided with first bracing piece and auxiliary stay pole on the preceding terminal surface of first fixed plate, and the auxiliary stay pole is in the below of first bracing piece, one side of first bracing piece is provided with first fixed frame, one side of first fixed frame is provided with the climbing pole fixed block, and first fixed frame and climbing pole fixed block pass through fixing bolt and connect, the lower extreme of climbing pole fixed block is provided with the climbing pole, one side of auxiliary stay pole is provided with supplementary fixed frame, and supplementary fixed frame is located first fixed frame under.

Description

Iron tower climbing device for communication engineering
Technical Field
The utility model relates to an iron tower climbing related field specifically is an iron tower climbing device for communication engineering.
Background
In modern communications, in order to ensure the normal operation of a wireless communications system, a communications antenna is generally installed in a higher building to increase the signal coverage radius of the communications antenna, thereby achieving an ideal communications effect. For the convenience of staff to climb to the communication pole top and maintain work, be equipped with cat ladder or climbing pole on the communication pole and supply the climbing usually.
At present, the climbing device is inconvenient to use and operate, the protection device is not complete, the danger is high, meanwhile, after wind, rain and abrasion in use, the maintenance and the replacement are inconvenient, and the consumption of manpower and material resources is increased; therefore, the market urgently needs to develop an iron tower climbing device for communication engineering to help people solve the existing problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a device is scrambleed to iron tower for communication engineering to the climbing device that proposes in solving above-mentioned background uses the operation inconvenient, and protector is not multiple, and is dangerous high, maintains and changes inconvenient problem.
In order to achieve the above object, the utility model provides a following technical scheme: an iron tower climbing device for communication engineering comprises a column body, wherein a first fixing plate is arranged above the column body, a second fixing plate is arranged below the column body, the first fixing plate and the second fixing plate are connected with the column body through fixing screws, a first supporting rod and an auxiliary supporting rod are arranged on the front end face of the first fixing plate and are arranged below the first supporting rod, a first fixing frame is arranged on one side of the first supporting rod, a climbing rod fixing block is arranged on one side of the first fixing frame and is connected with the climbing rod fixing block through fixing bolts, a climbing rod is arranged at the lower end of the climbing rod fixing block, an auxiliary fixing frame is arranged on one side of the auxiliary supporting rod and is positioned under the first fixing frame, a supporting rod is arranged between the first fixing frame and the auxiliary fixing frame, the safety rope fixing device is characterized in that a second supporting rod is arranged on the front end face of the second fixing plate, a second fixing frame is arranged on one side of the second supporting rod, a safety rope fixing rod is arranged on one side of the second fixing frame, and the second fixing frame and the safety rope fixing rod are connected through a fixing bolt.
Preferably, the climbing rod is provided with anti-slip lines.
Preferably, the climbing rod is fixedly connected with the climbing rod fixing block through a mortise and tenon joint structure.
Preferably, the second fixing plate is integrated with the second support rod, and the first fixing plate is integrated with the first support rod and the auxiliary support rod.
Preferably, the supporting rod is connected with the first fixing frame and the auxiliary fixing frame through bayonets.
Preferably, the column body is provided with a plurality of fixed ports which are arranged in an array.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model has the advantages that through the arrangement of the fixed frame, the connection between the supporting rods is firmer, and meanwhile, the maintenance, the replacement and the installation of each component are more convenient and faster;
2. the utility model can punch holes at each position of the rod body and install the holes at different areas through the detachable setting of the fixing plate, and can install climbing devices with different quantities in different areas, so that the climbing is more convenient;
3. by arranging the safety rope fixing rod, a worker can fix a fixing buckle at one end of the safety rope on the safety rope fixing rod, accidental slipping in the climbing process is avoided, and casualties are reduced;
4. the utility model discloses a setting up auxiliary stay pole can give a holding power of first bracing piece, makes its atress dispersion, can not produce the fracture because the atress is too big.
Drawings
Fig. 1 is a partial schematic view of an iron tower climbing device for communication engineering according to the present invention;
fig. 2 is an enlarged view of an area a of the iron tower climbing device for communication engineering of the present invention;
fig. 3 is the utility model discloses a look-down section of iron tower climbing device for communication engineering.
In the figure: 1. a column body; 2. climbing a pole; 3. a safety rope fixing rod; 4. a first fixing plate; 5. a second fixing plate; 6. fixing screws; 7. a first support bar; 8. fixing the bolt; 9. a climbing rod fixing block; 10. an auxiliary support bar; 11. a strut; 12. a first fixed frame; 13. an auxiliary fixing frame; 14. a second support bar; 15. a second fixed frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: an iron tower climbing device for communication engineering comprises a column body 1, a first fixing plate 4 is arranged above the column body 1, a second fixing plate 5 is arranged below the column body 1, the first fixing plate 4 and the second fixing plate 5 are connected with the column body 1 through fixing screws 6, the fixing plates can be disassembled, a first supporting rod 7 and an auxiliary supporting rod 10 are arranged on the front end face of the first fixing plate 4, the auxiliary supporting rod 10 is arranged below the first supporting rod 7, a first fixing frame 12 is arranged on one side of the first supporting rod 7, a climbing rod fixing block 9 is arranged on one side of the first fixing frame 12, the first fixing frame 12 is connected with the climbing rod fixing block 9 through fixing bolts 8, a climbing rod 2 is arranged at the lower end of the climbing rod fixing block 9, the climbing rod 2 is used for holding and pedaling, an auxiliary fixing frame 13 is arranged on one side of the auxiliary supporting rod 10, and the auxiliary fixing frame 13 is arranged under the first fixing frame 12, be provided with branch 11 between first fixed frame 12 and the supplementary fixed frame 13, be provided with second bracing piece 14 on the preceding terminal surface of second fixed plate 5, one side of second bracing piece 14 is provided with second fixed frame 15, and one side of second fixed frame 15 is provided with safety rope dead lever 3, and second fixed frame 15 and safety rope dead lever 3 pass through fixing bolt 8 to be connected, and the fixed knot of safety rope can block on safety rope dead lever 3.
Further, the climbing rod 2 is provided with anti-slip lines, so that friction force is increased, and workers cannot accidentally slip off.
Further, climbing rod 2 passes through tenon fourth of the twelve earthly branches structure fixed connection with climbing rod fixed block 9, easily installs and dismantles, and stability is also higher.
Further, the second fixing plate 5 and the second supporting rod 14 are integrally formed, and the first fixing plate 4 and the first supporting rod 7 and the auxiliary supporting rod 10 are integrally formed, so that the stability of the structure is improved, and the casualties caused by damage of the connecting structure are avoided.
Furthermore, the supporting rod 11 is connected with the first fixing frame 12 and the auxiliary fixing frame 13 through the bayonet, so that the fixing, the mounting and the dismounting are easy, other parts can be mounted on the ground and then replaced on the tower, the high-altitude working time is reduced, and the risk is reduced.
Further, be provided with fixed mouthful on the shaft 1, and fixed mouthful is provided with a plurality ofly, and fixed mouthful is the array arrangement, can be according to the position at present, the climbing device of suitable quantity of regional installation in the difference for climbing convenience more.
The working principle is as follows: the method comprises the steps of installing components which do not need to be installed in the air on the ground, integrally assembling a climbing unit and a fixing unit if the components are installed integrally, clamping a climbing rod 2 by a climbing rod fixing block 9, fixing the climbing rod fixing block 9 on a first fixing frame 12 by a fixing bolt 8, connecting a support rod 11, the first fixing frame 12 and an auxiliary fixing frame 13 through a bayonet, fixing a safety rope fixing rod 3 on a second fixing frame 15 by the fixing bolt 8, carrying required components if the components need to be replaced, wearing protective equipment after assembling the climbing unit and the fixing unit, arranging two safety ropes on the protective equipment, checking whether a protective device is firm, starting climbing, wherein two safety rope fixing buckles can not be fixed on the safety rope fixing rod 3 at the same height in the climbing process, preventing the two safety ropes from being stressed and broken simultaneously when sliding down, fix and to have a buffering at the co-altitude, fix the safety rope after arriving the assigned position, can fix self when guaranteeing the operation, later take out the part and carry out the operation, fix first fixed plate 4 and second fixed plate 5 on shaft 1 with set screw 6, if change the part according to normal operation order operation can.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a device is scrambleed to iron tower for communication engineering, includes shaft (1), its characterized in that: the two sides of the column body (1) are provided with a first fixing plate (4) and a second fixing plate (5), the first fixing plate (4) is arranged on one side of the second fixing plate (5), the first fixing plate (4) and the second fixing plate (5) are connected with the column body (1) through a fixing screw (6), a first supporting rod (7) and an auxiliary supporting rod (10) are arranged on the first fixing plate (4), the auxiliary supporting rod (10) is arranged below the first supporting rod (7), one end of the first supporting rod (7) is provided with a first fixing frame (12), one side of the first fixing frame (12) is provided with a climbing rod fixing block (9), the first fixing frame (12) and the climbing rod fixing block (9) are connected through a fixing bolt (8), a climbing rod (2) is arranged on the climbing rod fixing block (9), one end of the auxiliary supporting rod (10) is provided with an auxiliary fixing frame (13), and supplementary fixed frame (13) are located first fixed frame (12) under, the centre of first fixed frame (12) and supplementary fixed frame (13) is provided with branch (11), be provided with second bracing piece (14) on second fixed plate (5), the one end of second bracing piece (14) is provided with second fixed frame (15), be provided with safety rope dead lever (3) on second fixed frame (15), and second fixed frame (15) and safety rope dead lever (3) are connected through fixing bolt (8).
2. The iron tower climbing device for communication engineering according to claim 1, characterized in that: the climbing rod (2) is provided with anti-skid lines.
3. The iron tower climbing device for communication engineering according to claim 1, characterized in that: the climbing rod (2) is fixedly connected with the climbing rod fixing block (9) through a mortise and tenon joint structure.
4. The iron tower climbing device for communication engineering according to claim 1, characterized in that: the second fixing plate (5) and the second supporting rod (14) are integrally formed, and the first fixing plate (4) and the first supporting rod (7) and the auxiliary supporting rod (10) are integrally formed.
5. The iron tower climbing device for communication engineering according to claim 1, characterized in that: the support rod (11) is connected with the first fixing frame (12) and the auxiliary fixing frame (13) through bayonets.
6. The iron tower climbing device for communication engineering according to claim 1, characterized in that: the column body (1) is provided with a plurality of fixed ports which are arranged in an array.
CN201920687204.5U 2019-05-14 2019-05-14 Iron tower climbing device for communication engineering Active CN210086955U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920687204.5U CN210086955U (en) 2019-05-14 2019-05-14 Iron tower climbing device for communication engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920687204.5U CN210086955U (en) 2019-05-14 2019-05-14 Iron tower climbing device for communication engineering

Publications (1)

Publication Number Publication Date
CN210086955U true CN210086955U (en) 2020-02-18

Family

ID=69478252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920687204.5U Active CN210086955U (en) 2019-05-14 2019-05-14 Iron tower climbing device for communication engineering

Country Status (1)

Country Link
CN (1) CN210086955U (en)

Similar Documents

Publication Publication Date Title
CN104288935A (en) Wire rope anti-falling system and installation method thereof
CN103001146A (en) Steel pipe pole operation platform and usage method thereof
CN210086955U (en) Iron tower climbing device for communication engineering
CN210003199U (en) general type steelframe cat ladder climbing equipment
CN215528565U (en) Steel construction pylon
CN209011743U (en) A kind of electric power overhaul wire pole climbing device
KR101229098B1 (en) Multipurpose safety foot step ironware
CN208280706U (en) A kind of electric pole facilitating climbing
CN201152141Y (en) Dedicated rope ladder for replacing synthetic electrical insulator
CN204092878U (en) A kind of safety belt suspension device being convenient to set up fast
CN204558970U (en) 10kV, 35kV switch gear room crane span structure lifting device
CN204038917U (en) Detachable external hanging type operating platform
CN208749208U (en) Communicate shaft tower
CN210170698U (en) Quick assembling and disassembling type high hanging safety belt fixing pole setting device
CN210396617U (en) External hanging type working platform for cable maintenance of wind generating set
CN106290955B (en) Wind measuring tower instrument conveying, loading and unloading device and using method
CN206279749U (en) A kind of operating platform for overhauling power transmission tower rod fork beam
CN203564663U (en) Simple falling prevention device of electric transmission line
CN201274392Y (en) Operating platform on portable adjustable bar
CN220058760U (en) Climbing frame protection device and climbing frame
CN110364963A (en) A kind of protection rope for conductor cross-arm fastening means
CN204073183U (en) A kind of cable wire drop preventer
CN211863616U (en) Roof safety belt suspension device
CN214697638U (en) Many functional safety nature cat ladder for electric power engineering
CN116173439B (en) Anti-falling device for power transmission tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A tower climbing device for communication engineering

Effective date of registration: 20211222

Granted publication date: 20200218

Pledgee: Bank of China Limited by Share Ltd. Nanjing Xuanwu sub branch

Pledgor: Nanjing Mochi Technology Co.,Ltd.

Registration number: Y2021980015841

PE01 Entry into force of the registration of the contract for pledge of patent right