CN210032696U - A outer wall drainage device that intercepts water for during high-rise construction - Google Patents

A outer wall drainage device that intercepts water for during high-rise construction Download PDF

Info

Publication number
CN210032696U
CN210032696U CN201920536464.2U CN201920536464U CN210032696U CN 210032696 U CN210032696 U CN 210032696U CN 201920536464 U CN201920536464 U CN 201920536464U CN 210032696 U CN210032696 U CN 210032696U
Authority
CN
China
Prior art keywords
wall
water
intercepting
rise construction
iron sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920536464.2U
Other languages
Chinese (zh)
Inventor
郑庆标
林国潮
张培强
张勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201920536464.2U priority Critical patent/CN210032696U/en
Application granted granted Critical
Publication of CN210032696U publication Critical patent/CN210032696U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides an outer wall drainage device that intercepts water for during high-rise construction, including intercepting basin, the solid fixed ring of intercepting basin is established in the outer wall outside, and intercepting basin upper portion is equipped with the breakwater, is equipped with buffer in the intercepting basin, and intercepting basin lower part is equipped with the water conservancy diversion mouth, and the water conservancy diversion mouth cooperatees with guiding device. The utility model makes galvanized iron sheet into groove shape, the upper part outside the water interception groove is 45-degree inclined opening, the periphery of the outer wall is encircled and fixed on the outer wall by expansion screws, and the gap between the galvanized iron sheet groove and the outer wall is tightly sealed and compacted by glass cement, so that the construction sewage of the upper construction layer is blocked into the iron sheet groove, and the water interception effect is achieved; when the iron sheet groove is fixed, the slope gradient is selected according to the actual condition length of the outer wall, the slope gradient is preferably 0.5% -1%, the lowest point is controlled in a balcony or a windowsill according to the actual condition, the drainage effect is achieved, and the iron sheet groove is simple to operate and can be repeatedly used.

Description

A outer wall drainage device that intercepts water for during high-rise construction
Technical Field
The utility model relates to a technical field of building drainage especially relates to an outer wall drainage device that intercepts water during high-rise construction.
Background
The full-penetration construction is more and more widely applied in the field of constructional engineering, wherein the anti-pollution protection of the outer wall is the key of the full-penetration construction. In the construction process, the pollution of the sewage of the construction layer to the outer wall is difficult to avoid, and the construction to the outer wall is often after the major structure is capped, and the part with serious pollution still needs to be cleaned, wastes time and energy.
SUMMERY OF THE UTILITY MODEL
The sewage to traditional construction layer is pollution-free serious to the outer wall, still needs the clearance, technical problem that wastes time and energy, the utility model provides an outer wall drainage device that cuts water for during high-rise construction.
In order to solve the above problem, the technical scheme of the utility model is so realized:
the outer wall water intercepting and draining device for high-rise construction comprises a water intercepting groove, wherein the water intercepting groove is fixed on an outer wall, a water baffle is arranged at the upper part of the water intercepting groove, a buffering device is arranged in the water intercepting groove, a flow guide opening is formed in the lower part of the water intercepting groove, and the flow guide opening is matched with the flow guide device.
Preferably, the water intercepting groove and the water baffle form an included angle of 45 degrees, and a gap between the water intercepting groove and the outer wall is filled with glass cement.
Preferably, the buffer device is a sponge strip.
Preferably, the tail end of the water intercepting tank is provided with a preformed hole, the flow guide device comprises a flow guide cavity, and the flow guide cavity is matched with the flow guide port.
Preferably, a baffle plate extends out of the upper portion of the diversion cavity, a connecting hole is formed in the baffle plate, and the connecting hole is connected with the reserved hole through a bolt.
Preferably, a filter screen is arranged in the diversion cavity, and a drainage head is arranged at the lower part of the diversion cavity.
Preferably, the diversion cavity and the drainage head form an included angle of 30 degrees.
Preferably, the water intercepting tank is a galvanized iron sheet tank.
The utility model has the advantages that: the utility model discloses overall structure designs compactly, convenient operation, and the construction is convenient, and the directional emission of the sewage of being convenient for simultaneously avoids sewage pollution outer wall to but reuse has fine popularization application prospect.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic cross-sectional view of the present invention.
Fig. 2 is a schematic structural diagram of the present invention.
Fig. 3 is a schematic view of the connection between the intercepting basin and the outer wall of the present invention.
Fig. 4 is a schematic structural view of the middle diversion cavity of the present invention.
In the figure, 1 is fixed glass cement, 2 is an expansion screw, 3 is a water intercepting groove, 4 is a sponge strip, 5 is a fixing sheet, 6 is a filter screen, 7 is a flow guide cavity, 8 is a baffle, and 9 is a drainage head.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in fig. 1-3, an outer wall water interception and drainage device used in high-rise construction comprises a water interception tank 3, wherein the water interception tank 3 is a galvanized iron sheet tank, the upper part of the outer side of the water interception tank is a 45-degree inclined opening, the periphery of the outer wall is surrounded by an expansion screw and is fixed on the outer wall, and a gap between the galvanized iron sheet tank and the outer wall is tightly sealed by glass cement, so that construction sewage of an upper construction layer is blocked into the galvanized iron sheet tank, and the water interception effect is achieved; when the iron sheet groove is fixed, the slope gradient is selected according to the actual condition length of the outer wall, the slope gradient is preferably 0.5% -1%, the lowest point is controlled in a balcony or a windowsill according to the actual condition, the drainage effect is achieved, and the iron sheet groove is simple to operate and can be repeatedly used. The water intercepting tank 3 is fixed on an outer wall through a plurality of expansion screws, the expansion screws are used for fixing galvanized iron sheet tanks at equal intervals, the adjacent water intercepting tanks are in lap joint, the water intercepting tank can be provided with a highest point at the corner of the outer wall, the water drainage point is the lowest point, subsequent water drainage is facilitated, the joint is welded by a fixing sheet 5 or bonded by glass cement, a water baffle is arranged on the upper portion of the water intercepting tank 3, the water intercepting tank 3 and the water baffle are at an included angle of 45 degrees, gap filling between the water intercepting tank 3 and the outer wall is provided with fixed glass cement 1, a buffer device is arranged in the water intercepting tank 3 and is a sponge strip 4 for buffering and preventing small-sized objects on a construction layer from falling into the water intercepting tank and then popping out of the water intercepting tank, a flow guide port.
The tail end of the water intercepting groove 3 is provided with a preformed hole, as shown in fig. 4, the flow guide device comprises a flow guide cavity 7, the flow guide cavity 7 is matched with a flow guide port, the upper part of the flow guide cavity 7 extends out of a baffle 8, the baffle 8 is provided with a connecting hole, the connecting hole is connected with the preformed hole through a bolt, when the water intercepting groove is actually installed, the flow guide cavity is connected to the lower part of the water intercepting groove 3 in a low position, water drainage is facilitated, a filter screen is arranged in the flow guide cavity 7, sundries are filtered by the filter screen, a water drainage head 9 is arranged on the lower part of the flow guide cavity 7, the flow guide cavity 7 and the water drainage head 9 form an included angle of 30 degrees, after the. After the outer wall intercepting and draining device is fixed, construction sewage of the outer wall of the construction layer flows into the intercepting groove 3 from the outer wall of the construction layer, and then is drained to a balcony through the diversion cavity from the intercepting groove 3, so that the purpose of intercepting and draining water is achieved, after the construction layer finishes structural construction, the outer wall intercepting groove is detached, and the steps are repeated for the last time and are recycled.
Processing a galvanized iron sheet with the thickness of 1mm into a groove shape 3, wherein the bottom is 100mm wide, the short side is 100mm high, the long side is 2500mm long for convenient transportation and construction operation, the total length is determined according to the actual requirement, and the length is determined according to the actual size at the special inflection point; firstly, determining a gable corner point of an east outer wall as a highest point on a drawing, taking a balcony as a lowest point, calculating the length of the outer wall by a slope of 1%, and calculating the height difference between the highest point and the lowest point. And (4) making a height marking point at a layer below the construction layer according to the calculated height difference, and popping up a water intercepting groove position line. The cut-off trough is transferred to the position of the lower layer of the construction layer, the galvanized cut-off trough 3 is fixed on the outer wall at the interval of 800mm by using an expansion screw 2 according to the position line of the cut-off trough, the cut-off trough extends into the balcony position by 1000mm, the lap joint between the galvanized cut-off troughs is 50mm, the lap joint position is sealed by using glass cement 4, the leakage of construction sewage from the lap joint position is avoided, and after the fixation is finished, the gap between the cut-off trough 3 and the outer wall is sealed by using glass cement 1.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides an outer wall drainage device that intercepts water for during high-rise construction, its characterized in that includes cut-off basin (3), the solid fixed ring of cut-off basin (3) is established in the outer wall outside, and cut-off basin (3) upper portion is equipped with the breakwater, is equipped with buffer in cut-off basin (3), and cut-off basin (3) lower part is equipped with the water conservancy diversion mouth, and the water conservancy diversion mouth cooperatees with the water conservancy diversion device.
2. The outer wall water intercepting and draining device for high-rise construction according to claim 1, wherein the water intercepting groove (3) forms an included angle of 45 degrees with the water baffle plate, and a gap between the water intercepting groove (3) and the outer wall is filled with the fixed glass cement (1).
3. The outer wall water interception and drainage device for high-rise construction according to claim 1, wherein said buffer device is a sponge strip (4).
4. The outer wall water intercepting and draining device for high-rise construction according to claim 1, wherein a preformed hole is formed in the tail end of the water intercepting tank (3), the flow guiding device comprises a flow guiding cavity (7), and the flow guiding cavity (7) is matched with the flow guiding opening.
5. The outer wall water intercepting and draining device for high-rise construction according to claim 4, wherein a baffle (8) extends out of the upper part of the diversion cavity (7), and a connecting hole is formed in the baffle (8) and connected with the reserved hole through a bolt.
6. The outer wall water intercepting and draining device for high-rise construction according to claim 4, wherein a filter screen is arranged in the diversion cavity (7), and a drainage head (9) is arranged at the lower part of the diversion cavity (7).
7. The outer wall water interception and drainage device for high-rise construction according to claim 6, wherein said diversion cavity (7) forms an angle of 30 ° with the drainage head (9).
8. The outer wall intercepting and draining device for high-rise construction according to claim 1, 2 or 4, wherein the intercepting tank (3) is a galvanized iron sheet tank.
CN201920536464.2U 2019-04-19 2019-04-19 A outer wall drainage device that intercepts water for during high-rise construction Active CN210032696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920536464.2U CN210032696U (en) 2019-04-19 2019-04-19 A outer wall drainage device that intercepts water for during high-rise construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920536464.2U CN210032696U (en) 2019-04-19 2019-04-19 A outer wall drainage device that intercepts water for during high-rise construction

Publications (1)

Publication Number Publication Date
CN210032696U true CN210032696U (en) 2020-02-07

Family

ID=69360278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920536464.2U Active CN210032696U (en) 2019-04-19 2019-04-19 A outer wall drainage device that intercepts water for during high-rise construction

Country Status (1)

Country Link
CN (1) CN210032696U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030534A (en) * 2022-06-08 2022-09-09 源龙建设集团有限公司 Building outer wall water-blocking structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030534A (en) * 2022-06-08 2022-09-09 源龙建设集团有限公司 Building outer wall water-blocking structure and construction method thereof
CN115030534B (en) * 2022-06-08 2024-01-09 源龙建设集团有限公司 Building exterior wall water-blocking structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN210032696U (en) A outer wall drainage device that intercepts water for during high-rise construction
CN113944240A (en) Fixed prefabricated structure for sealing basement outer wall post-cast strip in advance and construction method thereof
CN206554318U (en) Wall is built in a kind of room
CN209855152U (en) Water and slurry intercepting device for high-rise building outer wall
CN211815294U (en) Terrace permeates water
CN211200477U (en) Basement post-cast strip antiseep system
CN203452101U (en) Sealing device for post-pouring belt of external wall of multi-storey basement
CN211173065U (en) Basement outer wall construction joint anti-seepage template structure
CN108547282A (en) A kind of the composite structure diaphram wall and its construction method of steel and concrete
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN211816055U (en) Pre-positioning device for sluice construction
CN207194462U (en) A kind of water burst concrete storehouse surface pouring structure
CN207419781U (en) A kind of T shaped steels pipe bundle combinations welding structure device
CN211849956U (en) Environment-friendly waterproof device for building outer wall
CN218267675U (en) Simple plugging device for temporary discharge port
CN221461286U (en) Basement roof pre-closed post-pouring belt structure
CN209686545U (en) A kind of concrete prefabricated drainpipe of cinder from refuse incineration
CN216787234U (en) Advanced plugging structure for post-cast strip
CN216640448U (en) Template corner reinforcing apparatus is pour in water conservancy flood control
CN216405500U (en) Anti-leakage device for deformation joint of basement of high-rise building
CN220203292U (en) Engineering flue with waterproof anti-blocking function
CN216276972U (en) Framework column grouting device
CN208201938U (en) A kind of prefabricated post-cast strip cover board of bottom plate
CN220451220U (en) Prefabricated building block and frame eye plugging system
CN213449493U (en) Recyclable rapid hole plugging template