CN210002838U - Device for mounting steel structure vestibule color plate - Google Patents

Device for mounting steel structure vestibule color plate Download PDF

Info

Publication number
CN210002838U
CN210002838U CN201920750578.7U CN201920750578U CN210002838U CN 210002838 U CN210002838 U CN 210002838U CN 201920750578 U CN201920750578 U CN 201920750578U CN 210002838 U CN210002838 U CN 210002838U
Authority
CN
China
Prior art keywords
hanging
cross arm
steel
vestibule
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920750578.7U
Other languages
Chinese (zh)
Inventor
杜晓楠
王军勇
朱立雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201920750578.7U priority Critical patent/CN210002838U/en
Application granted granted Critical
Publication of CN210002838U publication Critical patent/CN210002838U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a construction technical field, specifically devices that are used for installing the various board of steel construction vestibule devices that are used for installing the various board of steel construction vestibule, including setting up the hanging flower basket on the steel construction vestibule, the hanging flower basket is including hanging frame cross arm and the hanging frame of arranging steel construction vestibule top and below respectively in, the upper end of hanging frame cross arm is provided with the lift that is used for hoisting the various board of vestibule, the lower extreme of hanging frame cross arm is provided with the landing leg, the lower extreme of landing leg is provided with the gyro wheel, be provided with on the up end of steel construction vestibule with gyro wheel complex track, hang the frame both ends and be connected with the both ends of hanging frame cross arm through the jib respectively, hang the frame cross arm and can drive the parallel translation of hanging frame on the steel construction vestibule through gyro wheel and track cooperation, the utility model discloses simple structure, the cost of manufacture is low, has reduced construction cost.

Description

Device for mounting steel structure vestibule color plate
Technical Field
The utility model relates to a construction technical field specifically is kinds of devices that are used for installing the various board of steel construction vestibule.
Background
In industrial factories such as metallurgy, mining industry, thermoelectricity and the like, because the requirements of material transportation processes all need to construct a steel structure corridor for material transportation, and the enclosure structure of the steel structure corridor is a profiled steel color plate, the traditional corridor color plate method is a method for hoisting by using an electric hoist, the manual transport length on the roof is short, and the electric hoist can flexibly move according to the installation requirements, so that the installation and construction are convenient, the installation cost is reduced, but the method has less lifting quantity each time, and only solves the problem of hoisting the color plate for the corridor, or does not solve the problem of high-altitude color plate installation; a movable scaffold can be only erected on the ground or a full scaffold can be used for installing color plates, but the movable scaffold has high requirement on the ground flatness, and is not suitable for a lot of fields; the construction cost for building a full scaffold is too high, and the construction period is long. The self-made movable hanging basket is arranged on the steel structure corridor and used for hoisting and installing the steel color plates, and the cost and the safety risk of installing the steel structure corridor color plates are greatly reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the above problem to provide kinds of devices that are used for installing steel construction vestibule color plates that can reduce construction cost, improve the efficiency of construction, guarantee construction safety.
The utility model provides a problem, the technical scheme who adopts is:
A device for installing various board of steel construction vestibule, including setting up the hanging flower basket on the steel construction vestibule, the hanging flower basket is including hanging frame cross arm and the hanging frame of arranging steel construction vestibule top and below respectively in, the upper end of hanging frame cross arm is provided with the lift that is used for hoist and mount the various board of vestibule, the lower extreme of hanging frame cross arm is provided with the landing leg, the lower extreme of landing leg is provided with the gyro wheel, be provided with on the up end of steel construction vestibule with gyro wheel complex track, the hanging frame both ends are connected with the both ends of hanging frame cross arm through the jib respectively, the hanging frame cross arm can drive the hanging frame parallel translation around on the steel construction vestibule through gyro wheel and track cooperation.
Adopt above-mentioned technical scheme the utility model discloses, compare with prior art, its outstanding characteristics are:
the structure is simple, the manufacturing cost is low, the construction cost is reduced, the construction efficiency is improved, and the construction safety is ensured.
Preferably, the utility model discloses a technical scheme who further step is:
and steel ladders are respectively arranged on two sides of the hanging basket, and two ends of each steel ladder are fixedly connected with the hanging rods through bolts.
The both sides of lift are provided with the chain block respectively, and the end and the last string main girder steel fixed connection of steel construction vestibule of chain block, the end and the hanger frame cross arm fixed connection in addition of chain block.
Be located between two chain blocks and hang frame cross arm intermediate position and be provided with the safety belt, the both ends of safety belt respectively with hang frame cross arm and steel construction vestibule's last quarter main girder steel fixed connection.
Drawings
Fig. 1 is a schematic front view structure diagram of an embodiment of the present invention;
FIG. 2 is a schematic side view of the embodiment of the present invention;
fig. 3 is a schematic top view of the embodiment of the present invention;
in the figure: a steel structure corridor 1; a suspender 2; a hanging frame cross arm 3; a hanging frame 4; a roller 5; a lifter 6; a leg 7; a rail 8; a steel step ladder 9; a chain block 10; a safety belt 11.
The specific implementation mode is as follows:
the invention will now be described by reference to the following example , which is intended only to make the invention better understood and therefore does not limit the scope of the invention.
Refer to fig. 1, fig. 2, fig. 3, kinds of devices for installing steel structure vestibule color plates, including setting up the hanging flower basket on steel structure vestibule 1, the hanging flower basket is including arranging steel structure vestibule 1 top and below in respectively and hanging frame cross arm 3 and hanging frame 4, the upper end of hanging frame cross arm 3 is provided with the lift 6 that is used for hoisting the vestibule color plates, the lower extreme that hangs frame cross arm 3 is provided with landing leg 7, the lower extreme of landing leg 7 is provided with gyro wheel 5, be provided with on the up end of steel structure vestibule 1 with gyro wheel 5 complex track 8, hang frame 4 both ends and be connected through jib 2 and the both ends that hang frame cross arm 3 respectively, it can drive to hang frame 4 through gyro wheel 5 and the cooperation of track 8 and hang frame cross arm around parallel translation on steel structure vestibule 1.
The preparation method comprises the following steps:
the hanging frame 4: the hanging frame 4 is made of angle steel and is formed by connecting the angle steel through bolts, the hanging frame 4 plays a role in carrying people and temporarily storing components, operation and installation of constructors are facilitated, and the hanging frame is further used for storing the corridor color plates temporarily hung on the hanging frame.
A suspender 2: the suspender 2 is made of angle steel, the suspender 2 is connected with the suspension frame 4 through bolts, and the length of the suspender 2 is determined according to the height of the steel structure corridor.
Hanging frame cross arm 3: the hanging frame cross arm 3 is made of channel steel, bears the weight of the hanging frame 4, the hanging rod 2, the temporarily installed maintenance plate and an operator, and is fixed with the hanging rod 2 through bolts.
And 6, the lifter 6 is formed by transforming a winch, circles of steel ring plates are welded in the middle of a winding drum of the winch, holes are symmetrically drilled in the steel ring plates, a winch steel wire rope penetrates through holes of the ring plates and is reversely wound again, and the effect of hoisting the maintenance structure plates on two sides of the steel structure corridor 1 can be achieved.
Leg 7: and the steel channel is made and welded with the hanging frame cross arm 3 and the rolling shaft.
And (5) rollers: the method is characterized in that a thick-wall steel pipe is adopted, two sides of the thick-wall steel pipe are sealed and welded by steel plates, and a hole is drilled in the center of a circle.
The track 8: channel steel is used as a track 8 of the hanging basket, and the hanging basket can move in parallel.
All parts of the device can be made of standard parts such as angle steel or channel steel, the manufacturing cost is low, local materials can be obtained on site, and the device is simple and convenient to manufacture and install.
Hanging flower basket both sides are provided with steel ladder bench 9 respectively, and steel ladder bench 9 adopts the angle steel preparation, and bolt and 2 fixed connection of jib are passed through at the both ends of steel ladder bench 9, and operating personnel can climb from top to bottom, the installation of the various board of vestibule of being convenient for.
The two sides of the lifter 6 are respectively provided with a chain block 10, the end of the chain block 10 is fixedly connected with the upper chord main steel beam of the steel structure gallery 1, and the other end of the chain block 10 is fixedly connected with the suspension frame cross arm 3.
The installation process comprises the following steps: the hanging flower basket is installed on steel construction vestibule 1, and the installer utilizes the hoist engine at hanging flower basket top to hang the colored board handling of vestibule to hanging flower basket 4 that is prepared other in 4 operations of the hanging frame of hanging flower basket, and the installer utilizes the steel ladder bench 9 of hanging flower basket both sides to take one's place the colored board installation of vestibule, adopts the 10 forward movement hanging flower baskets of chain block after the colored board installation of vestibule, finishes until the colored board installation of whole vestibule according to above-mentioned step.
In the installation, be located between two chain blocks 10 and hang frame cross arm 3 intermediate position and increase and be provided with safety belt 11, the both ends of safety belt 11 respectively with hang frame cross arm 3 and steel construction vestibule 1 last quarter main steel roof beam fixed connection, when chain block 10 goes wrong, safety belt 11 just can guarantee that the hanging flower basket is the landing at will, guarantees to hang the interior operating personnel's of frame 4 safety.
This device hanging flower basket is installed on steel construction vestibule 1, through hanging flower basket parallel translation around on steel construction vestibule 1, installer is in the operation of the hanging frame of hanging flower basket, utilize the hoist engine at hanging flower basket top to hanging 4 sides ready steel construction color plates handling, installer utilizes the steel ladder of hanging flower basket both sides to take one's place the color plates installation, the hanging flower basket is parallel translation to installation section installation down on steel construction vestibule 1, accomplish until the installation of the color plates of whole vestibule, moreover, the steam generator is simple in structure, the cost of manufacture is low, construction cost is reduced, construction efficiency is improved, construction safety is guaranteed.
The above description is only a preferred and practical embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent variations made by using the contents of the specification and the drawings are included in the scope of the present invention.

Claims (4)

  1. The device for installing the color plates of the steel structure gallery comprises a hanging basket arranged on the steel structure gallery and is characterized in that the hanging basket comprises a hanging frame cross arm and a hanging frame which are arranged above and below the steel structure gallery respectively, a lifter for hanging the color plates of the gallery is arranged at the upper end of the hanging frame cross arm, supporting legs are arranged at the lower end of the hanging frame cross arm, rolling wheels are arranged at the lower ends of the supporting legs, rails matched with the rolling wheels are arranged on the upper end face of the steel structure gallery, two ends of the hanging frame are connected with two ends of the hanging frame cross arm through hanging rods respectively, and the hanging frame cross arm can drive the hanging frame to move front and back on the steel structure gallery in parallel through the matching of the rolling wheels and the rails.
  2. 2. The device for installing steel structure vestibule colored panels of claim 1, wherein: and steel ladders are respectively arranged on two sides of the hanging basket, and two ends of each steel ladder are fixedly connected with the hanging rods through bolts.
  3. 3. The device for installing the color plates of the steel structure vestibule as claimed in claim 1, wherein the two sides of the lifter are respectively provided with a chain block, the end of the chain block is fixedly connected with the upper main steel beam of the steel structure vestibule, and the other end of the chain block is fixedly connected with the cross arm of the suspension frame.
  4. 4. The device for installing steel structure vestibule colored panels of claim 3, wherein: be located between two chain blocks and hang frame cross arm intermediate position and be provided with the safety belt, the both ends of safety belt respectively with hang frame cross arm and steel construction vestibule's last quarter main girder steel fixed connection.
CN201920750578.7U 2019-05-23 2019-05-23 Device for mounting steel structure vestibule color plate Active CN210002838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920750578.7U CN210002838U (en) 2019-05-23 2019-05-23 Device for mounting steel structure vestibule color plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920750578.7U CN210002838U (en) 2019-05-23 2019-05-23 Device for mounting steel structure vestibule color plate

Publications (1)

Publication Number Publication Date
CN210002838U true CN210002838U (en) 2020-01-31

Family

ID=69307877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920750578.7U Active CN210002838U (en) 2019-05-23 2019-05-23 Device for mounting steel structure vestibule color plate

Country Status (1)

Country Link
CN (1) CN210002838U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029807A (en) * 2019-05-23 2019-07-19 中国二十二冶集团有限公司 For installing the device of steel construction traverse colored steel
CN115405108A (en) * 2022-09-21 2022-11-29 舜元建设(集团)有限公司 Daylighting roof steel frame installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029807A (en) * 2019-05-23 2019-07-19 中国二十二冶集团有限公司 For installing the device of steel construction traverse colored steel
CN115405108A (en) * 2022-09-21 2022-11-29 舜元建设(集团)有限公司 Daylighting roof steel frame installation method

Similar Documents

Publication Publication Date Title
CN101514586B (en) Hanger rail type electric hanging boat and construction method thereof
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN210002838U (en) Device for mounting steel structure vestibule color plate
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN106948604A (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method
CN109653481A (en) A kind of hanging rail formula high-altitude operation platform and production method
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN106829781A (en) Mobile loading and transporting crane and operation method thereof
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN203128099U (en) Slipping type pipeline lifting device
CN104973517A (en) Electric gantry platform for installing sintering machine head equipment and application method thereof
CN205114843U (en) Prefabricated post hoist device with unhook function
CN202379620U (en) Lifting and operating platform comprehensive equipment
CN203834369U (en) Device capable of being rotated by 360 degrees and vertically lifted for bridge
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN110029807A (en) For installing the device of steel construction traverse colored steel
CN206346500U (en) Compact simplified arm extending type straddle truck
CN206693641U (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building
CN214269987U (en) Hoisting device applied to high-rise building roof elevator shaft
CN203257106U (en) Multifunctional power-driven walking type walking system
CN110616909B (en) Construction method of suspension track system at bottom of connecting bridge of super high-rise building
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN209618736U (en) Jacking apparatus is climbed in a kind of derrick crane
CN211006334U (en) Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant